Contaminated soil leaching remediation decision-making method based on carbon emission intensity

Through a decision-making method based on carbon emission intensity, combined with carbon emission assessment and response surface fitting, the problem of insufficient carbon emission regulation in soil pollution restoration is solved, and the synchronous decision-making between pollution control and carbon emission reduction is achieved, providing a variety of applicable methods. Low-carbon leaching and repair scheme for pollutants.

CN119076598AActive Publication Date: 2024-12-06INST OF URBAN ENVIRONMENT CHINESE ACAD OF SCI
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411368847.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-29
Publication Date
2024-12-06
Estimated Expiration
2044-09-29

AI Technical Summary

Technical Problem

The existing soil pollution restoration technology lacks in-depth research on the carbon emission regulation mechanism, which makes it difficult to meet pollutant removal rates and carbon emission reduction requirements simultaneously, and lacks effective low-carbon leaching and restoration decision-making methods.

Method used

Using a method of leaching and restoration of polluted soil based on carbon emission intensity, through carbon emission intensity calculation and fit prediction, combining pollution control and carbon emission reduction decisions, the optimal low-carbon leaching and restoration process plan is selected, including project basic information analysis , construction of carbon emission intensity evaluation model, establishment of basic data sets for leaching and repair, removal rate and carbon emission intensity response surface fitting, and recommendations of ectopic leaching and repair schemes.

Benefits of technology

It has achieved the decision-making needs of taking into account both pollution control and carbon emission reduction, provided a method and tool to quickly screen the optimal low-carbon restoration process solution, improved the fitting accuracy of carbon emission intensity, and is suitable for the control of heavy metals and organic pollutants, with wide applicability. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure SMS_1
    Figure SMS_1
  • Figure SMS_2
    Figure SMS_2
  • Figure SMS_3
    Figure SMS_3
Patent Text Reader

Abstract

The invention discloses a contaminated soil leaching remediation decision-making method based on carbon emission intensity. The method comprises the six steps of project basic information analysis, carbon emission intensity evaluation model construction, leaching remediation basic data set establishment, removal rate response curved surface fitting, carbon emission intensity response curved surface fitting and ex-situ leaching remediation scheme recommendation. The carbon emission intensity is a carbon emission value corresponding to the unit pollutant removal amount; compared with a traditional carbon emission evaluation index based on the restoration volume, the carbon emission intensity index can meet the decontamination and carbon reduction evaluation requirements. According to the method, on the basis of calculation and fitting prediction of the carbon emission intensity value, the optimal low-carbon remediation process parameter combination is screened and determined for the construction side according to the principle that the removal rate reaches the standard and the carbon emission intensity value is the lowest, powerful support is provided for soil pollution remediation carbon emission reduction decision making, and the method has good application and popularization potential.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of soil pollution remediation, and specifically relates to a contaminated soil leaching and remediation decision-making method based on carbon emission intensity. Background Art

[0002] With the accelerated pace of industrialization and modernization, soil pollution incidents are becoming more frequent. Leaching remediation technology, which removes pollutants from soil through water or chemical solutions, reduces the risk of soil pollution to ecosystems and human health, and is a key engineering technology for remediating contaminated land. In recent years, the number of leaching remediation projects for contaminated soil in my country has increased significantly, and the technological level of leaching remediation technology has advanced significantly. However, there is still considerable room for improvement in terms of remediation energy consumption, material consumption, environmental impact, and carbon emissions.

[0003] Industries across the globe are actively promoting greener and lower-carbon production processes. Carbon reduction in soil pollution remediation has become a new focus for regulatory authorities and companies. However, research on soil pollution remediation has long focused on improving pollution control effectiveness, lacking in-depth exploration of the environmental impacts of remediation activities and carbon emission control mechanisms. Pollutant removal rates remain the primary, or even the sole, metric for decision-making in remediation projects, making them unable to meet the requirements for simultaneous pollution and carbon reduction. For example, in leaching remediation projects, contractors generally use pollutant removal rates from pilot tests as a guide for selecting leaching agents and optimizing leaching process parameters. However, there is a lack of data supporting the impact of process adjustments on remediation carbon emissions, potentially increasing environmental burdens after implementation. Furthermore, research on the carbon footprint of soil pollution leaching remediation technologies is limited, and the correlation between leaching carbon emissions and pollutant removal effectiveness is unclear. Consequently, the carbon reduction recommendations proposed by scholars based on carbon emission assessments lack practical guidance. In summary, existing research results and engineering experience cannot provide effective support for the design of efficient and low-carbon contaminated soil leaching and remediation solutions. It is necessary to develop a soil contamination leaching and remediation decision-making method that takes into account both decontamination and carbon emission reduction, to help develop a green and low-carbon remediation model for contaminated soil. Summary of the Invention

[0004] In response to the above problems, this patent proposes a contaminated soil leaching and remediation decision-making method based on carbon emission intensity. By introducing carbon emission intensity calculation and fitting prediction links into the technical solution, it takes into account the pollution control and carbon emission reduction decision-making needs, and provides a new method tool for screening and determining the optimal low-carbon leaching and remediation process solution.

[0005] The specific technical solutions are:

[0006] A decision-making method for contaminated soil leaching remediation based on carbon emission intensity includes the following steps:

[0007] Step 1: Analyze basic project information. Collect basic data on the target plot, identify target pollutants in the soil, and select the intended eluent and capture agent types; collect information on ex situ elution remediation equipment, analyze the remediation process flow, and determine process parameter indicators;

[0008] Step 2: Construct a carbon emission intensity assessment model. Analyze the carbon emission sources of the leaching remediation process, collect carbon emission factor data, establish a calculation formula for remediation carbon emissions, and construct a carbon emission intensity assessment model.

[0009] Step 3: Establish a basic data set for elution remediation. Design single-factor experiments and response surface experiments to obtain the pollutant elution effects corresponding to different process parameter combinations and construct a basic data set.

[0010] Step 4: Fitting the removal rate response surface. Based on the elution remediation basic data set from step 3, perform removal rate response surface fitting, test the significance of the fitting results, determine the validity of the experimental data, and construct a pollutant removal rate prediction formula;

[0011] Step 5: Fitting the carbon emission intensity response surface. Based on the leaching remediation basic data set in step 3, calculate the corresponding carbon emission intensity value; perform carbon emission intensity response surface fitting prediction and test the significance of the fitting results; under the condition that the carbon emission intensity tends to decrease, randomly fit and generate alternative low-carbon remediation process parameter combinations;

[0012] Step 6: Recommend ex situ leaching remediation solutions. Based on the pollutant removal rate prediction formula from Step 4, calculate the pollutant removal rate data corresponding to each alternative low-carbon remediation process parameter combination. Based on the remediation target value, and based on the principles of achieving the removal rate standard and minimizing the carbon emission intensity value, select the optimal combination from the alternative low-carbon remediation process parameter combinations to form a recommended ex situ low-carbon leaching remediation process solution for contaminated soil.

[0013] The target pollutants in step 1 are heavy metals or organic pollutants, and the number of pollutants is one or more; the target pollutants may also be heavy metal and organic composite pollutants.

[0014] The repair process of step 1 includes but is not limited to pulping and leaching, vibration screening, solid-liquid separation, sewage purification and other process links; the process parameter index is preferably the concentration of the eluent (Conc 淋洗剂 ), elution time (Time 淋洗 ), liquid-to-solid ratio 液固比 ), and can also be increased, decreased or replaced according to actual needs.

[0015] The carbon emission intensity of step 2 is based on the unit pollutant removal, that is, the carbon emission intensity is equal to the carbon emission corresponding to the unit pollutant removal in the repair activity, and its value is the ratio of carbon emissions in the repair activity to the pollutant removal. The carbon emission intensity assessment model is: carbon emission intensity T 碳排放 =TE 总碳排放 / TS 总去除量 =E 碳排放 / S 去除量 , where TE 总碳排放 and TS 总去除量 Represent the total carbon emissions and total pollutant removal of the restoration project, E 碳排放 and S 去除量 Respectively represent the carbon emissions and pollutant removal corresponding to the unit soil remediation amount; T 碳排放 The unit is kg CO2eq / kg pollutant , and the units can also be adjusted according to needs.

[0016] The scope of accounting for total carbon emissions includes all direct and indirect carbon emissions from the consumption of chemicals, electricity, and diesel. Sources of total carbon emissions include, but are not limited to, the production and transportation of eluents and wastewater purification chemicals, electricity input for operating ex-situ eluent remediation equipment, and diesel input for operating mechanical vehicles.

[0017] The basic data set of step 3 includes the pollutant elution effect in the single factor experiment and the response surface experiment. The response surface experiment adopts the Box-Behnken Designs method to design the experimental plan; the center point treatment group of the response surface experiment is not less than 5.

[0018] The pollutant elution effect is the removal rate of a target pollutant in the response surface experiment or the average removal rate of multiple target pollutants. The removal rate calculation formula for a single target pollutant is: Removal rate R = TS 总去除量 / TS 初始 × 100% = (TS 初始 -TS 修复后 ) / TS 初始 ×100%=(C 初始 -C 修复后 ) / C 初始 × 100%, where TS 总去除量 is the total amount of soil pollutants removed during the remediation project, TS 初始 and TS 修复后 are the initial total amount of soil pollutants and the total amount after remediation, C 初始 and C 修复后 are the initial concentration and post-remediation concentration of pollutants in the soil, respectively. The calculation formula for the average removal rate of multiple target pollutants is: Removal rate R ave=(ΣR i ) / n,R i is the removal rate of the i-th pollutant, and n is the number of pollutant types examined.

[0019] The pollutant removal rate prediction formula in step 4 is a multivariate quadratic equation based on process parameter indicators.

[0020] The significance test of the removal rate in step 4 includes the significance test of model fit and the significance test of the lack of fit term. 拟合度1 Should be less than 0.05, the significance test result of the lack of fit item P 失拟项1 Should be greater than 0.05. 拟合度1 and P 失拟项1 If the values ​​do not meet the requirements, step three should be repeated to optimize the experimental gradient of key process parameters and collect data again.

[0021] The carbon emission intensity response surface fitting result in step 5 is a multivariate quadratic equation based on process parameter indicators, and the fitting degree R 2 Greater than 0.9.

[0022] The significance test of carbon emission intensity value in step 5 includes the significance test of model fit and the significance test of lack of fit. 拟合度2 Should be less than 0.05, the significance test result of the lack of fit item P 失拟项2 Should be greater than 0.05. 拟合度2 and P 失拟项2 If the numerical value does not meet the requirements, steps three and four should be carried out again, the response surface experiment plan should be optimized, the process parameter test gradient should be adjusted, and the basic data should be collected again.

[0023] The number of combinations of alternative low-carbon repair process parameters in step five is 10 to 100 groups, preferably 30 groups, which can be adjusted according to actual needs.

[0024] The beneficial effects of the present invention are:

[0025] (1) Compared with traditional remediation solution decision-making methods that only consider pollutant removal effects, this invention introduces the concept of carbon emission intensity based on the ratio of carbon emissions to removal rates. The process parameter combination is screened and determined based on the principle of achieving the required removal rate and minimizing the carbon emission intensity. This technical solution can take into account both pollution control and carbon emission reduction decision-making needs, providing a new method and tool for construction units to quickly screen the optimal low-carbon remediation process solution, and has great application potential.

[0026] (2) This method collects basic data on contaminated soil leaching and remediation through single-factor experiments and response surface experiments, and then uses the response surface fitting method to construct a multivariate quadratic equation for removal rate based on process parameters, thereby achieving rapid fitting prediction of pollutant removal rate and reducing the workload of data collection. Furthermore, this technical solution extends the response surface fitting method used for removal rate prediction to the fitting prediction of carbon emission intensity. Compared with the traditional multivariate linear regression method, this fitting method takes into account the interactive effect of process parameters on carbon emission intensity, is more consistent with the nonlinear correlation between carbon emission intensity and process parameters, and has higher fitting accuracy for carbon emission intensity, providing more accurate data support for screening low-carbon process parameter combinations.

[0027] (3) The decision-making method proposed in this invention is applicable to ex situ leaching remediation technology for contaminated soils and can be used for single or combined heavy metal / organic soil pollution control project decision-making activities. It has strong applicability and a wide range of applications. By adjusting process parameter indicators, this method can also be used for decision-making activities for other types of contaminated soil or groundwater remediation technology processes, providing scientific and technological support for the remediation of contaminated sites in my country and helping to build a green, low-carbon, circular economy system. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 Implementing a flowchart for decision-making methodology;

[0029] Figure 2 It is the response surface fitting diagram of lead removal rate in the embodiment;

[0030] Figure 3 It is the response surface fitting diagram of carbon emission intensity in the embodiment. DETAILED DESCRIPTION

[0031] The present invention will be further described in detail below in conjunction with specific implementation methods to better demonstrate the advantages of the present invention.

[0032] Example 1

[0033] A soil lead contamination remediation project at an abandoned site was selected and the technical solution proposed in this invention was used to carry out ex situ leaching remediation process decision making. The specific implementation process is as follows:

[0034] (1) Analysis of basic project information

[0035] The target pollutant in the soil of the site is heavy metal lead (Pb), and the lead content exceeds the national "Soil Environmental Quality Construction Land Soil Pollution Risk Control Standard (Trial)" (GB 36600-2018).

[0036] The site is to be treated by ex situ leaching remediation technology for contaminated soil. The specific remediation process is as follows:

[0037] a. Excavation of contaminated soil and manual removal of large rocks;

[0038] b. Send the contaminated soil into the leaching and remediation equipment, mix it with the leaching agent, and make slurry for leaching;

[0039] c. Vibration screening, solid-liquid separation, solid samples are sent to the inspection area, and after passing the inspection, they are sent out of the operation area, and liquid samples are sent to the sewage treatment equipment;

[0040] d. Add capture agents to the sewage treatment equipment to precipitate heavy metals and purify the water. After passing the inspection, the water will be reused or discharged to the site.

[0041] The key indicators that the construction party intends to determine through the decision-making process in this case include the concentration of the eluent (Conc 淋洗剂 ), elution time (Time 淋洗 ), liquid-to-solid ratio 液固比 ).

[0042] According to the decision-making needs, collect the basic information of the construction party's technical equipment. Among them, the eluent to be used is EDTA, The capture agents are PAC, PAM and Na2S; the proposed ex situ leaching and remediation equipment mainly includes pulping and leaching equipment, vibration screening equipment, solid-liquid separation equipment and sewage treatment equipment. The power and reagent information of each equipment are as follows: The operating power of pulping and leaching equipment is P 造浆淋洗 =31.6kW; operating power P of vibration screening equipment 振动筛分 =71 kW; operating power P of solid-liquid separation equipment 固液分离 =93.5kW; operating power P for wastewater treatment 废水处理 =28.2 kW, single running time Time 废水处理 =0.03h / m 3 , capture agent PAC, PAM, Na2S dosage Conc w1 =1.90 kg / m 3 soil、Conc w2 =0.19kg / m 3 soil、Conc w3 =0.19kg / m 3 soil; purchasing distance of eluent L 淋洗剂 =50km, the purchasing distance of the capture agent is L w1 =L w2 =L w3 =50km; fuel consumption per 100 kilometers of transport vehicles N 运输 =35L / 100km, and the single transport volume is W=60t.

[0043] (2) Construction of carbon emission intensity assessment model

[0044] Because excavation of contaminated soil does not affect the determination of leaching process parameters, this example does not include the excavation stage in the carbon emissions accounting boundary. Therefore, the carbon emissions accounting boundary includes the slurrying and leaching stage, the solid-liquid separation stage, and the wastewater treatment stage. Analysis of the sources of carbon emissions from the contaminated soil leaching remediation process shows that carbon emissions from the contaminated soil leaching remediation process primarily come from indirect carbon emissions from the production of leaching agents, water, and capture agents; direct and indirect carbon emissions from diesel combustion in machinery and vehicles during agent transportation; and indirect carbon emissions from electricity consumption during the operation of the leaching remediation equipment.

[0045] Collect carbon emission factor data and summarize them as follows: The indirect carbon emission factor of the eluent production process is F f =4.3859kg CO2eq / kg, the carbon emission factor of water is F w =0.21kg CO2 eq / m 3 The indirect carbon emission factors of the production process of capture agents PAC, PAM, and Na2S are F b1 =1.6879kg CO2eq / kg、F b2 =3.2546kg CO2eq / kg、F b3 =2.9396kg CO2eq / kg, the indirect carbon emission factor of electricity is F e =0.5703kg CO2 eq / kWh; the total carbon emission factor of diesel is F g =3.7659kg CO2eq / kg, the total carbon emission factor is the sum of the direct carbon emission factor and the indirect carbon emission factor.

[0046] Establish a calculation formula for restoration carbon emissions: Carbon emissions E 碳排放 = Carbon emissions from leaching agents E 淋洗剂 + Carbon emissions from water resource input E 水 + Carbon emissions from capture agent input E 捕获剂 + Carbon emissions from pharmaceutical transportation E 药剂运输 + Carbon emissions from the operation of pulping and washing equipment E 造浆淋洗 + Carbon emissions from the operation of vibration screening equipment E 振动筛分 + Carbon emissions from the operation of solid-liquid separation equipment E 固液分离 + Carbon emissions from wastewater treatment equipment operation E 废水处理

[0047] Specifically, the formulas for each sub-item are:

[0048] E 淋洗剂 =Conc 淋洗剂 ×Ratio 液固比 ×K×F f ; Where K is the soil remediation amount, which is assigned a value of 1;

[0049] E 水 =Ratio 液固比 ×K×F w ;

[0050] E 捕获剂 =Ratio 液固比 ×K×(Conc w1 ×F b1 +Conc w2 ×F b2 +Conc w3 ×F b3 );

[0051] E 药剂运输 =N 运输 ×(L 淋洗剂 ×((Conc 淋洗剂 ×(Ratio 液固比 ×K)) / W)+((Ratio 液固比 ×K)×(L w1 ×C w1 + L w2 ×Conc w2 +L w3 ×Conc w3 )) / W))×F g ;

[0052] E 造浆淋洗 =Time 淋洗 ×P 造浆淋洗 ×F e ;

[0053] E 振动筛分 =Time 淋洗 ×P 振动筛分 ×F e ;

[0054] E 固液分离 =Time 淋洗 ×P 固液分离 ×F e ;

[0055] E 废水处理 =Time 废水处理 ×P 废水处理 ×Ratio 液固比 ×K×Fe .

[0056] After aggregation, carbon emissions E 碳排放 =Conc 淋洗剂 ×Ratio 液固比 ×K×F f +Ratio 液固比 ×K×F w +Ratio 液固比 ×K×(Conc w1 ×F b1 +Conc w2 ×F b2 +Conc w3 ×F b3 )+N 运输 ×(L 淋洗剂 ×((Conc 淋洗剂 ×(Ratio 液固比 ×K)) / W)+((Ratio 液固比 ×K)×(L w1 ×C w1 +L w2 ×Conc w2 +L w3 ×Conc w3 )) / W))×F g +Time 淋洗 ×P 造浆淋洗 ×F e +Time 淋洗 ×P 振动筛分 ×F e +Time 淋洗 ×P 固液分离 ×F e +Time 废水处理 ×P 废水处理 ×Ratio 液固比 ×K×F e

[0057] Substituting the above case data, the calculation formula for the restoration carbon emissions of this case is: E 碳排放 =7.84×10 3 ×Conc 淋洗剂 +0.20×Ratio 液固比 +0.003×Time 淋洗 -1.17×10 3 . E 碳排放 The unit is kg eqCO2 / t soil.

[0058] Furthermore, by constructing the carbon emission intensity assessment model for this case, we can obtain:

[0059] Carbon emission intensity T 碳排放 =TE 总碳排放 / TS 总去除量 =E 碳排放 / S 去除量 =E 碳排放 / (C 初始 -C 修复后 )

[0060] Among them, TE 总碳排放 and TS 总去除量 Represent the total carbon emissions and total Pb removal of the restoration project, respectively, in kg CO2eq and g; E 碳排放 and S 去除量 Represent the carbon emission and Pb removal corresponding to the unit soil remediation amount, respectively, in kg CO2eq / t and g / t; C 初始 and C 修复后 Respectively represent the Pb concentration before and after soil remediation, both in g / t; T 碳排放 The unit is kg CO2eq / kg Pb.

[0061] Substituting the above restoration carbon emission calculation formula, we can get the carbon emission intensity T 碳排放 =(7.84×10 3 ×Conc 淋洗剂 +0.20×Ratio 液固比 +0.003×Time 淋洗 -1.17×10 3 ) / (C 初始 -C 修复后 ).

[0062] (3) Establishment of basic data set for elution repair

[0063] Design single factor experiments and response surface experiments to obtain the pollutant elution effects corresponding to different process parameter combinations and construct a basic data set. The specific implementation process is as follows:

[0064] a Single factor experiment

[0065] Based on the data collection requirements, experiments were designed to investigate elution time, eluent concentration, and liquid-to-solid ratio. In the elution time investigation experiment, the experimental gradient was 30, 60, 120, 180, and 240 min, and the eluent concentration and liquid-to-solid ratio were fixed at 0.01 mol / L and 8 mL / g. In the eluent concentration investigation experiment, the experimental gradient of eluent concentration was 0.01, 0.05, 0.10, 0.15, and 0.20 mol / L, and the elution time and liquid-to-solid ratio were fixed at 4 h and 8 mL / g. In the liquid-to-solid ratio investigation experiment, the experimental gradient of liquid-to-solid ratio was 2, 3, 4, 5, and 8 mL / g, and the eluent concentration and elution time were fixed at 0.01 mol / L and 4 h.

[0066] Furthermore, according to the experimental plan, different doses of contaminated soil and eluent were weighed into a reaction vessel and shaken in the dark at 25°C and 180 rpm to elute Pb from the soil. After the elution time was reached, the sample was removed, solid-liquid separation was performed, and the Pb content in the liquid was tested by AAS to calculate the pollutant removal rate. The removal rate formula is R = (C 初始 -C 修复后 ) / C 初始 × 100%, where C 初始 and C 修复后 are the initial concentration and concentration of Pb in soil after remediation, respectively.

[0067] b Response surface experiment

[0068] Based on the inflection point data of the removal rate change curve in the single-factor experiment, the experimental gradient of the response surface experiment was screened, with elution times of 60, 150, and 240 min, eluent concentrations of 0.10, 0.15, and 0.20 mol / L, and liquid-to-solid ratios of 4, 6, and 8 mL / g. Using Design-Expert 13, a three-factor, three-level experiment was designed using the Box-Behnken Design (BBD) method, including EDTA-2Na concentration, elution time, and liquid-to-solid ratio. The number of center points was set to 5, for a total of 17 small-scale tests. Furthermore, an experimental process similar to the single-factor experiment was used to obtain the changes in pollutant concentration and calculate the removal rate.

[0069] c Basic data set construction

[0070] Summarize the results of single-factor experiments and response surface experiments to form a basic data set.

[0071] Table 1 Single factor and response surface test data sets

[0072] (4) Removal rate response surface fitting

[0073] Based on the basic data set in step 3, the pollutant removal rate equation based on process parameter indicators was obtained by fitting the response surface fitting method of Design Expert software, which is a three-variable quadratic equation:

[0074] R=72.57-204.65×Conc 淋洗剂 +0.19×Time 淋洗剂 -3.68Ratio 液固比 -0.31×Conc 淋洗剂 ×Time 淋洗剂 -16.16×Conc 淋洗剂 ×Ratio 液固比 -0.013×Time 淋洗剂 ×Ratio 液固比 +1460×(Conc 淋洗剂 ) 2 -0.000037× (Time 淋洗剂 ) 2 +0.70×(Ratio 液固比 ) 2

[0075] Model Fitting R 2 It is 0.970.

[0076] The significance test of the removal rate fitting results was carried out, and the significance test result of the model fitting was P 拟合度1 The value is 0.0002, and the significance test result of the lack of fit term is P 失拟项1 is 0.5019, and the fitting results meet the requirements of the response surface method (P 拟合度2 The value should be less than 0.05, and the significance test result of the lack of fit item P 失拟项2 should be greater than 0.05).

[0077] The removal rate response surface fitting results are as follows Figure 2 shown.

[0078] (5) Carbon emission intensity response surface fitting

[0079] a Carbon emission intensity fitting

[0080] Based on the basic data set of (3), the carbon emission intensity assessment model (carbon emission intensity T 碳排放 = (7.84×10 3 ×Conc 淋洗剂 +0.20×Ratio 液固比 +0.003×Time 淋洗 -1.17×10 3 ) / (C初始 -C 修复后 ))Calculate and obtain the carbon emission intensity value corresponding to each process parameter combination.

[0081] Furthermore, the carbon emission intensity value equation based on process parameter indicators was obtained by fitting the response surface fitting method of Design Expert software, which is a three-variable quadratic equation:

[0082] T 碳排放 =5.00+75.2×Conc 淋洗剂+ 5.98×Ratio 液固比 -0.025×Time 淋洗 -401×(Conc 淋洗剂 ) 2 -0.40×(Ratio 液固比 ) 2 +129×(Time 淋洗剂 ) 2 +129×Conc 淋洗剂 ×Ratio 液固比 -0.36×Conc 淋洗剂 ×Time 淋洗 -0.006×Time 淋洗 ×Ratio 液固比

[0083] Model Fitting R 2 is 0.990.

[0084] Carry out significance test of carbon emission intensity fitting results, including model fit significance test and lack of fit significance test. 拟合度2 The value is less than 0.001, and the significance test result of the lack of fit term is P 失拟项2 The fitting result is 0.6916, and the fitting result meets the requirements of the response surface method (P 拟合度2 The value should be less than 0.05, and the significance test result of the lack of fit item P 失拟项2 should be greater than 0.05).

[0085] The carbon emission intensity response surface fitting results are as follows Figure 3 shown.

[0086] In order to compare the accuracy of different fitting methods, this embodiment also uses a multivariate linear regression model to fit the carbon emission intensity value to obtain the equation T 碳排放 =792×Conc 淋洗剂+ 15.3×Ratio 液固比 -0.08×Time 淋洗 -70.7, R 2 The R 2Lower than the R of the response surface fitting method 2 This is because the process parameters have an interactive effect on carbon emission intensity, and the multiple linear regression model cannot reflect the interaction between parameters. The response surface fitting method based on the ternary quadratic equation has a better fitting result for the carbon emission intensity value.

[0087] b Alternative carbon repair process parameter combination fitting

[0088] Based on the above equation, the Design Expert software was used to randomly fit and generate the repair process parameter combinations. Under the condition that the carbon emission intensity tends to decrease, the top 30 repair process parameter combinations were screened as alternative low-carbon repair process parameter combinations.

[0089] Table 2 Alternative low-carbon repair process parameter combinations

[0090] (6) Recommended ectopic elution repair solution

[0091] Based on the pollutant removal rate prediction formula of step 4 (R = 72.57-204.65×Conc 淋洗剂 +0.19×Time 淋洗剂 -3.68Ratio 液固比 -0.31×Conc 淋洗剂 ×Time 淋洗剂 -16.16×Conc 淋洗剂 ×Ratio 液固比 -0.013×Time 淋洗剂 ×Ratio 液固比 +1460×(Conc 淋洗剂 ) 2 -0.000037×(Time 淋洗剂 ) 2 +0.70×(Ratio 液固比 ) 2 ), calculate the pollutant removal rate data corresponding to the 30 sets of alternative low-carbon remediation process parameter combinations in step five.

[0092] Taking the removal rate limit of 80% provided by the construction party as the critical point, the alternative low-carbon remediation process parameter combinations that meet the remediation requirements are sorted according to the carbon emission intensity value, and the Test 1 treatment group with the lowest carbon emission intensity value is selected as the optimal remediation process parameter combination. The specific process parameters and their removal rates and carbon emission intensity values ​​are Conc 淋洗剂 =0.10mol / L, Time 淋洗 =239.38min, Ratio 液固比=4.01, R=80.63%, T 碳排放 =52.57kg CO2eq / kg Pb. The results will be submitted to the construction party as a recommended solution for the ex situ low-carbon leaching remediation process for contaminated soil.

[0093] The contents of the above embodiments should be understood as being only used to more clearly illustrate the present invention and not to limit the scope of the present invention. After reading the present invention, modifications of various equivalent forms of the present invention made by those skilled in the art shall fall within the scope defined by the claims attached to this application.

Claims

1. A decision-making method for contaminated soil leaching and remediation based on carbon emission intensity, characterized by: The following steps are involved: Step 1: Analyze basic project information. Collect basic data on the plot, determine the target pollutants, and select the intended eluent and capture agent types; Collect information on ex-situ elution repair equipment, analyze the repair process flow, and determine process parameter indicators; The process parameter index preferably has a concentration of eluent (Conc 淋洗剂 ), elution time 淋洗 ) and liquid-to-solid ratio 液固比 ); Step 2: Construct a carbon emission intensity assessment model. Analyze the carbon emission sources of the leaching remediation process, collect carbon emission factor data, establish a remediation carbon emission accounting formula, and construct a carbon emission intensity assessment model; Step 3: Establishment of the basic data set for elution remediation. Design single factor experiments and response surface experiments to obtain the pollutant elution effects corresponding to different process parameter combinations and construct the basic data set for elution remediation; Step 4: Fitting the removal rate response surface. Based on the elution remediation basic data set, carry out fitting of the removal rate response surface, test the significance of the fitting results, judge the validity of the experimental data, and construct a pollutant removal rate prediction formula; Step 5: Carbon emission intensity response surface fitting. Based on the leaching remediation basic data set, calculate the carbon emission intensity values ​​corresponding to different process parameter combinations; Carry out carbon emission intensity response surface fitting prediction and test the significance of fitting results; Under the condition that the carbon emission intensity tends to decrease, the alternative low-carbon restoration process parameter combination is fitted and generated; Step 6: Recommend ex situ elution remediation scheme. Based on the pollutant removal rate prediction formula in step 4, calculate the pollutant removal rate data corresponding to the alternative low-carbon remediation process parameter combination; Based on the principles of achieving removal rate standards and minimizing carbon emission intensity values, the optimal combination of low-carbon remediation process parameters is screened and determined to form a recommended low-carbon leaching remediation process plan.

2. The contaminated soil leaching and remediation decision-making method based on carbon emission intensity according to claim 1 is characterized by: The carbon emission intensity of step 2 is based on the unit pollutant removal amount, which is the ratio of carbon emissions in the restoration activity to the pollutant removal amount. The carbon emission intensity assessment model is carbon emission intensity T 碳排放 =TE 总碳排放 / TS 总去除量 =E 碳排放 / S 去除量 , where TE 总碳排放 and TS 总去除量 Represent the total carbon emissions and total pollutant removal of the restoration project, E 碳排放 and S 去除量 They represent the carbon emissions and pollutant removal corresponding to unit soil restoration volume, respectively.

3. The contaminated soil leaching and remediation decision-making method based on carbon emission intensity according to claim 1 is characterized by: The pollutant elution effect in step 3 is the removal rate of one target pollutant or the average removal rate of multiple target pollutants in the response surface experiment, and the pollutants are heavy metals or organic pollutants, or they can be heavy metal and organic composite pollutants; The calculation formula for the removal rate of the single target pollutant is: Removal rate R = TS 总去除量 / TS 初始 ×100%=(TS 初始 -TS 修复后 ) / TS 初始 ×100%=(C 初始 -C 修复后 ) / C 初始 × 100%, where TS 总去除量 TS is the total amount of soil pollutants removed during the remediation project. 初始 and TS 修复后 are the initial total amount of soil pollutants and the total amount after remediation, C 初始 and C 修复后 are the initial concentration and post-remediation concentration of pollutants in the soil respectively; the calculation formula for the average removal rate of the multiple target pollutants is: Removal rate R ave =(ΣR i ) / n,R i is the removal rate of the ith pollutant, and n is the number of pollutant types examined.

4. The method for contaminated soil leaching and remediation decision-making based on carbon emission intensity according to claim 1 is characterized by: The pollutant removal rate prediction formula in step 4 is a multivariate quadratic equation based on process parameter indicators; the significance test of the removal rate includes a model fit significance test and a lack of fit term significance test, and the model fit significance test result P 拟合度1 Should be less than 0.05, the significance test result of the lack of fit item P 失拟项1 Should be greater than 0.

05.

5. The method for contaminated soil leaching and remediation decision-making based on carbon emission intensity according to claim 1 is characterized by: The carbon emission intensity response surface fitting result in step 5 is a multivariate quadratic equation based on process parameter indicators, and the fitting degree R 2 Should be greater than 0.9; the significance test of carbon emission intensity value includes the significance test of model fit and the significance test of lack of fit. The significance test result of the model fit is P 拟合度2 Should be less than 0.05, the significance test result of the lack of fit item P 失拟项2 Should be greater than 0.05.

Citation Information

Patent Citations

  • Carbon emission accounting method and system for polluted soil ex-situ remediation technology

    CN115660279A

  • Evaluation method of contaminated site soil remediation technology

    CN116523408A

  • Calculation method for carbon footprint of ex-situ remediation engineering of polluted site and carbon emission reduction method

    CN116822993A

  • Intelligent control method and system for drip washing

    CN117900246A

  • Contaminated site soil multi-path low-carbon synergistic remediation process integration method

    CN118469590A