Water conservancy pipeline welding operation room and welding method
By designing the welding operation room and welding methods of water conservancy pipelines, sealing components and dust removal systems are used to solve the problems of welding slag splash and dust pollution during the welding process, safe and efficient welding operations are achieved, and environmental sanitation and construction progress are ensured.
Patent Information
- Application Number
- CN202411376081.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-30
- Publication Date
- 2024-12-06
AI Technical Summary
Under severe geological and variable climatic conditions, open-pipe welding has affected the welding quality, splashing of welding slag causes damage, dust and waste gas pollute the environment, and wind and rain affect the construction progress.
Design a water conservancy pipeline welding operation room, including sealing components and dust removal system, sealing the water conservancy pipeline in the working space through sealing components, welding equipment is installed in the operating room, and dust removal system is used to collect dust and exhaust gas during welding, limiting components Ensure accurate docking of pipelines.
Effectively prevent welding slag from splashing, reduce environmental pollution, ensure workers' safety, ensure high-quality and high-precision welding work, and avoid affecting the construction progress due to weather conditions.
Smart Images

Figure CN119077232A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of pipeline welding equipment, and in particular to a water conservancy pipeline welding operation room and a welding method. Background Art
[0002] In the construction of water conservancy projects, pipeline welding is usually carried out in the open air. Severe geological conditions and changeable climate have a great impact on the welding quality of pipelines. Welding operations cannot be carried out on rainy days, affecting the construction progress; when the wind is strong, welding sparks may be blown to the vicinity of the work site, and once they touch flammable materials, they may cause fires. Therefore, windy and rainy days are a severe test for welding operations. In addition, the welding slag formed during the welding process will splash everywhere and may splash onto the human body, causing harm. When working in the open air, the glare generated by welding will cause damage to the eyes of nearby personnel. The dust and exhaust gas generated by field welding operations will also cause serious pollution to the environment. Therefore, in order to solve the above problems, it is necessary to avoid open-air welding operations as much as possible. Summary of the invention
[0003] The purpose of the present application is to provide a water conservancy pipeline welding operation room and a welding method to solve the defects of the prior art that welding slag will splash everywhere and dust will pollute the environment during the welding process.
[0004] In order to achieve the above objectives, this application is implemented by adopting the following technical solutions: On the one hand, a water conservancy pipeline welding operation room comprises: An operation room body, wherein a working space is arranged in the operation room body, and a first door body and a second door body are arranged on the operation room body and are relatively installed, and a water conservancy pipeline runs through the first door body and the second door body; A sealing component, the sealing component is arranged at the contact surface between the first door body, the second door body and the water conservancy pipeline, so that the water conservancy pipeline is sealed and placed in the working space; Welding equipment, which is installed in the operating room and is used for welding the water pipe between the first door body and the second door body; A dust removal system is fixed in the operating room and is used to collect exhaust gas during welding in the operating room.
[0005] According to a further solution of the present application, the operating room body comprises an alloy bracket and a profile connector, a flexible light shielding plate is fixed on opposite surfaces of the alloy bracket through the profile connector, and the first door body and the second door body are hinged on the other opposite surface of the operating room body.
[0006] In a further solution, the door body No. 1 includes a first door panel and a second door panel, the door body No. 2 includes a third door panel and a fourth door panel, the sealing assembly is installed on the adjacent edges of the first door panel and the second door panel and on the adjacent edges of the third door panel and the fourth door panel, and the line connecting the center points of the two groups of the sealing assemblies is perpendicular to the door body No. 1 and the door body No. 2.
[0007] According to a further solution, in the No. 1 door body, the first door panel and the second door panel hinges are installed on the operating room body, and the sealing assembly includes a through-sealing bag and a sealing rope. The adjacent edges of the first door panel and the second door panel are provided with mounting openings, one side of the sealing bag is fixed around the mounting opening, and the other side of the sealing bag is opened by adjusting the diameter through the sealing rope to contact the water conservancy pipeline.
[0008] According to a further solution of the present application, the dust removal system includes a dust suction port and a dust collector. The dust collector is arranged at an opening on the top of the operating room body. The dust collector is mounted above the opening of the operating room body through a connecting piece. The dust suction port is fixed inside the operating room body. A smoke exhaust pipe is connected between the dust suction port and the dust collector.
[0009] In a further solution, there are multiple dust collectors, and the multiple dust collectors are symmetrically installed on the inner wall of the operating room.
[0010] According to a further solution of the present application, the welding equipment includes a welding gun, a welding trolley and a limit assembly. A track is radially defined on the water conservancy pipeline in the operating room. The welding trolley is mounted on the track via rollers. The welding gun and the welding trolley are fixedly connected. The limit assembly is disposed in the operating room and is used to fix the water conservancy pipeline in the operating room.
[0011] A further solution is that the limit assembly includes two clamping parts, and the clamping parts include a first sliding assembly, a second sliding assembly, a first oil cylinder and a second oil cylinder. The first sliding assembly and the second sliding assembly are cross-movably installed, the first oil cylinder is fixed on one side of the first sliding assembly, the second oil cylinder is fixed on one side of the second sliding assembly, a limit frame is fixed above the second sliding assembly, a coupling base is movably arranged between two side plates of the limit frame, a bearing is rotatably arranged on the coupling base, a V-shaped clamp block is fixed on the bearing, a pair of pull rods are installed on the top of the V-shaped clamp block through the clamping cylinder, and a support bar is movably arranged between the coupling base and the bottom plate of the limit frame.
[0012] On the other hand, a welding method based on the above-mentioned water conservancy pipeline welding operation room comprises: Insert two water conservancy pipes from the No. 1 door body and the No. 2 door body into the operating room body respectively, and butt the adjacent ends of the two water conservancy pipes; The contact surfaces between the No. 1 door body, the No. 2 door body and the corresponding water conservancy pipeline are sealed by using a sealing component; The contact parts of the two water conservancy pipelines are quickly welded by using welding equipment, and at the same time, the dust removal system is started to quickly collect the dust and exhaust gas generated by the welding equipment during operation.
[0013] The beneficial effects of this application are: In the present application, an operating room is designed, and the pipeline is placed in a relatively closed space in the operating room for operation. Two movable doors of the operating room are convenient for the entry and exit of the pipeline. The gap between the door and the pipeline is closed by a sealing component. The dust and exhaust gas generated by the welding equipment during the welding operation are collected by the dust removal system, and the welding slag during welding is confined in the operating room, thereby ensuring the safety of the workers and preventing pollution to the environment caused by the pipeline welding process.
[0014] Secondly, a limit assembly is set in the welding equipment, which enables the sliding assembly and the welding trolley set to move around the water conservancy pipeline to ensure auxiliary correction of the pipeline and the accurate docking of the interfaces of the two pipelines, thereby achieving high-quality and high-precision welding work. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the structure of Embodiment 1 of the present application; Figure 2 This is a schematic diagram of the internal structure of Embodiment 1 of the present application; Figure 3 This is a front view of Embodiment 1 of the present application; Figure 4 It is a side view of the first embodiment of the present application; Figure 5 A top view of the first embodiment of the present application; Figure 6 This is a schematic diagram of the structure of the dust collector in Example 1 of the present application; Figure 7 A top view of the dust collector in Example 1 of the present application; Figure 8 This is a schematic diagram of the structure of door body No. 1 in Example 1 of the present application; Fig. 9 This is a structural diagram of the welding equipment in Example 1 of the present application when in use; Fig.10 This is a front view of the welding device in Example 1 of the present application when in use; Fig.11 This is a front view of the limit assembly in the first embodiment of the present application when in use; Fig.12 This is a side view of the middle component in use in Example 1 of the present application; Fig.13This is a top view of the mid-position component in use according to Example 1 of the present application.
[0016] Among them: 1. Operation room body; 11. Alloy bracket; 12. Profile connector; 2. Dust collector; 3. Door body No. 1; 4. Door body No. 2; 5. Sealing assembly; 6. Dust suction port; 7. Smoke exhaust pipe; 8. Welding trolley; 9. Welding gun; 10. Track; 100. Base; 101. First sliding assembly; 102. Second sliding assembly; 103. First cylinder; 104. Second cylinder; 105. Support bar; 106. Clamping cylinder; 107. Pull rod; 108. V-shaped clamp block; 109. Coupling base; 110. Limit frame. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present application and its application or use. Embodiment 1
[0018] like Figure 1 and Figure 2 As shown, the present embodiment discloses a water conservancy pipeline welding operation room, which includes an operation room body 1, a sealing component 5, welding equipment and a dust removal system, wherein the operation room body 1 is placed on a flat ground, a working space is arranged in the operation room body 1, a No. 1 door body 3 and a No. 2 door body 4 which are relatively movably installed are arranged on the operation room body 1, the water conservancy pipeline runs through the No. 1 door body 3 and the No. 2 door body 4, the No. 1 door body 3 and the No. 2 door body 4 are provided with installation ports, and the sealing component 5 is installed on the installation port, which makes the water conservancy pipeline as sealed as possible in the working space, so that the working space is relatively closed; the welding equipment is installed in the operation room body 1, which is used for welding the water conservancy pipeline between the No. 1 door body 3 and the No. 2 door body 4; the dust removal system is fixed on the inner wall of the operation room body 1, and the exhaust gas during welding in the operation room body 1 is collected in real time.
[0019] When the present application is used, the working space provided in the operating room body 1 can meet the welding space requirements of the water conservancy pipeline, and the welding slag is blocked in the operating room body 1, and the exhaust gas and dust during welding will be absorbed and removed by the dust removal system, thereby ensuring the hygiene of the environment to the greatest extent and reducing environmental pollution.
[0020] Observation attachment Figure 1 , Figure 3 and Figure 5In this embodiment, the No. 1 door body 3 and the No. 2 door body 4 are symmetrically arranged. Usually, the No. 1 door body 3 includes a first door panel 31 and a second door panel 32, and the No. 2 door body 4 includes a third door panel 41 and a fourth door panel 42, wherein the first door panel 31 corresponds to the third door panel 41, and the second door panel 32 corresponds to the fourth door panel 42. The sealing component 5 is installed on the adjacent edges of the first door panel 31 and the second door panel 32 and on the adjacent edges of the third door panel 41 and the fourth door panel 42. When in use, after the water conservancy pipeline enters the operating room body 1, the sealing component 5 is tightened to seal the space between each door panel and the water conservancy pipeline. In production, it is necessary to ensure that the center point connection line of the two sets of sealing components 5 is perpendicular to the No. 1 door body 3 and the No. 2 door body 4, so that the water conservancy pipeline can enter the working space in the operating room body 1 in the correct position to avoid unnecessary adjustments in the later stage.
[0021] Continue to observe the attached Figure 3 , Figure 4 as well as Figure 8 In this embodiment, the installation of the No. 1 door body 3 and the No. 2 door body 4 is the same as that of the No. 1 door body, but the positions are relative. The first door panel 31 and the second door panel 32 in the No. 1 door body 3 are hingedly installed on the operating room body 1. The installation process here can be installed using a hinge plate, which belongs to the prior art and will not be repeated here. The first door panel 31 and the second door panel 32 can be relatively movable and opened. The sealing component 5 in this embodiment includes a through sealing bag 51 and a sealing rope (the sealing rope is hidden in the specification to better show the relative structure), wherein the sealing bag 51 is It is a split type, with one half fixed on the first door panel 31 and the other half fixed on the second door panel 32. After the first door panel 31 and the second door panel 32 are hinged, the two half-piece sealing bags 51 are closed into a cone barrel shape, and the adjacent edges of the first door panel 31 and the second door panel 32 are provided with installation openings, one side of the sealing bag 51 is fixed around the installation opening, and the other side of the opening of the sealing bag 51 is tightened by a sealing rope to adjust the caliber so that the sealing bag 51 contacts the water conservancy pipeline to complete the sealing work. It should be noted here that the sealing rope is attached to and fixed on the sealing bag 51 after the device is manufactured.
[0022] In other embodiments, an integral design is used for the sealing bag 51, and its material is fireproof cotton. One end of the sealing bag 51 installed on the door body is designed to be corrugated, similar to the design of the elastic openings at both ends of the sleeve. In this way, when the No. 1 door body 3 and the No. 2 door body 4 are opened, the opening of the sealing bag 5 at this point will be enlarged under the action of external force, which is convenient for the entry and exit of the water conservancy pipe. The other end of the sealing bag 51 is designed as a drawstring bag. This design is convenient and quick, and can achieve the rapid placement of the water conservancy pipe and the rapid closing of the inlet and outlet gaps of the device.
[0023] Reference Figure 2 , Figure 6 as well as Figure 7The dust removal system in this embodiment includes a dust suction port 6 and a dust collector 2. The dust collector 2 is arranged at the opening on the top of the operating room body 1. The dust collector 2 is mounted above the top opening of the operating room body 1 through a connecting piece. The dust suction port 6 is fixed inside the operating room body 1. A smoke exhaust pipe 7 is connected between the dust suction port 6 and the dust collector 2. Usually, the dust suction port 6 is designed to be two or four to meet the full range of dust collection processing. Figure 7 The two dust collectors 2 are symmetrically fixed on the alloy bracket 11 on the top of the operating room body 1, and the fixing method can be fixed by bolts, welding, or even by connectors.
[0024] Reference Fig. 9 and Fig.10 In order to realize relatively automated production, the welding equipment in this embodiment includes a welding carriage 8, a guide rail of the welding carriage 8 and a limit assembly. The guide rail of the welding carriage 8 is fixed on the pipeline, and the welding carriage 8 is fixed on the track 10 of the welding carriage 8. The curvature of the slider on the welding carriage 8 matches the curvature of the track 10. Rollers are installed on both sides of the bottom of the welding carriage 8 so that the welding carriage 8 can move along the track 10. The welding gun 9 on the welding carriage 8 is facing the pipe butt joint. The limit assembly is slidably arranged at the bottom of the operating room body 1, and is used to fix the water conservancy pipeline in the operating room body 1. The welding carriage 8 and the limit assembly are connected with a control device by wire. The control device collects data through an industrial camera and inputs it to a computer processing module for precision welding. The limit assembly can perfectly carry out accurate docking of two water conservancy pipelines; the structure of the limit assembly is various, such as clamping positioning and blocking positioning; Reference Figures 10 to 11In this embodiment, the limit assembly can also be called a positioning and calibration assembly. The limit assembly includes two sets of clamping parts arranged opposite to each other. The clamping parts include a first sliding assembly 101 and a second sliding assembly 102. The movement directions of the first sliding assembly 101 and the second sliding assembly 102 are arranged crosswise in a horizontal plane. A first oil cylinder 103 is fixed to one side of the first sliding assembly 101, and a second oil cylinder 104 is fixed to the side of the second sliding assembly 102. A support bar 105 is fixed to the second sliding assembly 102. The end of the hydraulic rod of the support bar 105 is hinged with a V-shaped clamp block 108 through a rotating shaft. The top two sides of the V-shaped clamp block 108 are connected with pull rods 107 through clamping oil cylinders 106. The pull rods here are The rod 107 is rotatably connected to the corresponding clamping cylinder 106, and a clamping area of the water conservancy pipeline is formed between the V-shaped clamp block 108 and the two pull rods 107. A limit frame 110 is fixed on the second sliding component 102, and a coupling base 109 is movably installed between the vertical plates on both sides of the limit frame 110. A rotating shaft is rotatably installed between the coupling bases 109, and the rotating shaft is fixedly connected to the V-shaped clamp block 108; the interfaces of the two water conservancy pipelines are accurately docked through the first cylinder 103, the second cylinder 104 and the supporting cylinder. In actual applications, the base 100 can be installed at the bottom of any first sliding component 101 according to needs, and the base 100 is fixed to the bottom plate of the operating room body 1 or outside the operating room body 1.
[0025] What needs to be taken into consideration here is that the first sliding component 101 and the second sliding component 102 are both designed with sliders and slide rails, using dovetail guide rails and dovetail sliders. The slide rail of the second sliding component 102 is fixed on the slider of the first sliding component 101 to achieve cross movement. The specific installation will not be repeated here.
[0026] In other embodiments, a limit ring is used, and a plurality of telescopic rods are radially installed on the wall of the limit ring, and the plurality of telescopic rods synchronously abut the water conservancy pipeline in the operating room body 1. The telescopic rods here have multiple options, such as a cylinder controlling the limit column to move and limit, or using a screw to spirally rotate and move to abut and limit, both of which have good limiting effects. A sliding part is installed along the arrangement direction of the two sealing components 5 at the bottom of the operating room body 1, and the limit ring is vertically fixed on the sliding part. The sliding part here usually adopts the design of a slide rail and a slider, which is low in price, easy to install, and has the characteristics of high sliding stability. At this time, the movement of the slider is realized by a rodless cylinder. In this way, the position of the limit ring can be adjusted, and the pipeline can be adaptively docked and adjusted. Embodiment 2
[0027] This embodiment discloses a welding method, which utilizes the water conservancy pipeline welding operation room in the above-mentioned embodiment 1 to perform water conservancy pipeline welding operations in the field, and the method includes the following steps: First, insert two water conservancy pipes from the first door body 3 and the second door body 4 into the operating room body 1, and connect the adjacent ends of the two water conservancy pipes; The contact surfaces of the first door body 3 and the second door body 4 and the corresponding water conservancy pipeline body are sealed by using the sealing assembly 5, and the sealing rope is used to tighten with the sealing bag 51; The contact parts of the two water conservancy pipes are quickly welded by using welding equipment. Before welding, according to the welding process of the two water conservancy pipes, the slider on the slide rail is moved to adjust the position of the limit ring, and the pipe body is positioned at different positions. When positioning, it is only necessary to start the telescopic rod to fix the water conservancy pipe; finally, the dust collector 2 of the dust removal system is started, and the dust and exhaust gas generated during the operation of the welding equipment are sucked in from the dust suction port 6 and collected centrally.
[0028] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", etc. are used only for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present application, unless otherwise specified, "multiple" means two or more.
[0029] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood by specific circumstances.
Claims
1. A water conservancy pipeline welding operation room, characterized in that: include: An operating room body (1), wherein the operating room body (1) has an operating space therein, wherein a first door body (3) and a second door body (4) are relatively movably mounted on the operating room body (1), and a water conservancy pipeline runs through the first door body (3) and the second door body (4); A sealing component (5), the sealing component (5) being arranged at the contact surface between the first door body (3), the second door body (4) and the water conservancy pipeline, so that the water conservancy pipeline is sealed and placed in the working space; Welding equipment, the welding equipment is installed on the water conservancy pipeline in the operating room (1), and is used for welding the water conservancy pipeline between the first door body (3) and the second door body (4); A dust removal system is fixed in the operating room body (1) and is used to collect exhaust gas during welding in the operating room body (1).
2. The water conservancy pipeline welding operation room according to claim 1 is characterized in that: The operating room body (1) comprises an alloy bracket (11) and a profile connecting piece (11), a flexible light shielding plate being fixed on opposite surfaces of the alloy bracket (11) via the profile connecting piece (11), and the first door body (3) and the second door body (4) being hinged on the other opposite surfaces of the operating room body (1).
3. The water conservancy pipeline welding operation room according to claim 2 is characterized in that: The first door body (3) comprises a first door panel (31) and a second door panel (32), the second door body (4) comprises a third door panel (41) and a fourth door panel (42), the sealing assembly (5) is installed on the adjacent edges of the first door panel (31) and the second door panel (32) and on the adjacent edges of the third door panel (41) and the fourth door panel (42), and a line connecting the center points of the two groups of the sealing assembly (5) is perpendicular to the first door body (3) and the second door body (4).
4. The water conservancy pipeline welding operation room according to claim 3 is characterized in that: In the first door body (3), a first door panel (31) and a second door panel (32) are hingedly mounted on the operating room body (1); the sealing assembly (5) comprises a through-going sealing bag (51) and a sealing rope; adjacent edges of the first door panel (31) and the second door panel (32) are provided with mounting openings; one side of the sealing bag (51) is fixed around the mounting opening; the other side of the sealing bag (51) is opened to adjust the diameter through the sealing rope so as to contact the water conservancy pipeline.
5. The water conservancy pipeline welding operation room according to claim 1 is characterized in that: The dust removal system comprises a dust suction port (6) and a dust collector (2); the dust collector (2) is arranged at an opening at the top of the operating room body (1); the dust collector (2) is mounted above the opening of the operating room body (1) via a connecting piece; the dust suction port (6) is fixed inside the operating room body (1); and a smoke exhaust pipe (7) is connected between the dust suction port (6) and the dust collector (2).
6. The water conservancy pipeline welding operation room according to claim 5 is characterized in that: There are a plurality of dust collectors (2), and the plurality of dust collectors (2) are symmetrically mounted on the inner wall of the operating room body (1).
7. The water conservancy pipeline welding operation room according to claim 1 is characterized in that: The welding equipment comprises a welding gun (9), a welding trolley (8) and a limit assembly; a track (10) is radially fixed on the water conservancy pipeline in the operating room body (1); the welding trolley (8) is mounted on the track (10) via rollers; the welding gun (9) and the welding trolley (8) are fixedly connected; the limit assembly is arranged in the operating room body (1) and is used to fix the water conservancy pipeline in the operating room body (1).
8. The water conservancy pipeline welding operation room according to claim 7 is characterized in that: The limit assembly comprises two clamping parts, and the clamping parts comprise a first sliding assembly (101), a second sliding assembly (103), a first oil cylinder (103) and a second oil cylinder (104); the first sliding assembly (101) and the second sliding assembly (103) are cross-movably installed; the first oil cylinder (103) is fixed on one side of the first sliding assembly (101); the second oil cylinder (104) is fixed on one side of the second sliding assembly (103); a limit frame (110) is fixed above the second sliding assembly (103); a coupling base (109) is movably arranged between two side plates of the limit frame (110); a bearing is rotatably arranged on the coupling base (109); a V-shaped clamp block (109) is fixed on the bearing; a pair of pull rods (107) are installed on the top of the V-shaped clamp block (109) through a clamping oil cylinder (106); and a support bar (105) is movably arranged between the coupling base (109) and the bottom plate of the limit frame (110).
9. A welding method for a water conservancy pipeline welding operation room based on any one of claims 1 to 8, characterized in that: include: Inserting two water conservancy pipes from the first door body (3) and the second door body (4) into the operating room body (1), respectively, and butting the adjacent ends of the two water conservancy pipes; The contact surfaces between the first door body (3) and the second door body (4) and the corresponding water conservancy pipeline are sealed by using a sealing assembly (5); The contact parts of the two water conservancy pipelines are quickly welded by using welding equipment, and at the same time, the dust removal system is started to quickly collect the dust and exhaust gas generated by the welding equipment during operation.