Overflow mounting part assembling equipment and valve assembly production line
Through automated overcurrent mounting parts assembly equipment, the high labor intensity and safety risks caused by manual operation in the prior art are solved, and more efficient and safe assembly and production are achieved.
Patent Information
- Application Number
- CN202411295218.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-16
- Publication Date
- 2024-12-06
AI Technical Summary
The assembly process of the overflow mounting parts of existing gas pressure reducing valves requires manual operation, resulting in high labor intensity, high cost and safety risks.
An automated overcurrent mounting assembly equipment is designed, including a frame, a moving mechanism, an upper QCC shell mechanism, an upper spring mechanism, an upper steel ball mechanism, an upper rubber part mechanism and an upper air intake nozzle mechanism, through the coordination of these mechanisms Work, automatically complete the insertion and plugging of springs, steel balls, rubber parts and air intake nozzles, and avoid manual direct use of pressing equipment.
It reduces the labor intensity and labor costs of production personnel, avoids safety risks such as pinching of press-fitting equipment, and improves the efficiency and safety of assembly and production.
Smart Images

Figure CN119077352A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of valve body assembly, and in particular to an assembly device for flow-through mounting parts and a valve assembly production line. Background Art
[0002] In the existing technology, the gas pressure reducing valve has an overflow fitting (or QCC fitting) at the air inlet end. The overflow fitting can cut off the air inlet to the gas pressure reducing valve when the gas enters the gas pressure reducing valve at high speed and high pressure, thereby playing an important safety protection role.
[0003] Reference Fig.14 and Fig.15 The over-current mounting part includes a QCC shell 910, a spring 920, a steel ball 930, a rubber particle part 940 and an air inlet nozzle 950. The QCC shell 910 is provided with a gas channel 911 formed by a plurality of cavity sections connected in sequence. During the assembly and production process of the over-current mounting part, the production personnel need to manually put the spring 920, the steel ball 930 and the rubber particle part 940 into the gas channel 911 through the inlet of the gas channel 911 in sequence, and then use the pressing equipment to insert the plug-in part 951 of the air inlet nozzle 950 at the inlet of the gas channel 911 to complete the assembly and production of the over-current mounting part. However, the above-mentioned assembly and production method of the over-current mounting part has the following problems: 1. The assembly and production steps of the over-current mounting part are all completed manually by the production personnel. Therefore, on the one hand, the labor intensity of the production personnel is high, and on the other hand, the labor cost invested is high, which will make the assembly and production cost of the over-current mounting part also high; 2. The steps of manually using the pressing equipment have safety risks such as pinching. Summary of the invention
[0004] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the present invention provides an assembly device for an overflow mounting member.
[0005] The invention also provides a valve assembly production line having the overflow installation piece assembly equipment.
[0006] According to a first aspect of the present invention, an over-current mounting assembly device includes a frame, a moving mechanism, an upper QCC shell mechanism, an upper spring mechanism, an upper steel ball mechanism, an upper rubber particle mechanism and an upper air inlet nozzle mechanism group, wherein the moving mechanism is arranged on the frame, and the moving mechanism is provided with a first fixture, and the moving mechanism can drive the first fixture to move to a first station, a second station, a third station and a fourth station in sequence, the upper QCC shell mechanism is arranged on the frame, the upper QCC shell mechanism can store QCC shells, and can transfer QCC shells to the first fixture of the first station, the upper spring mechanism is arranged on the frame, and the upper spring mechanism can store springs, And it can transfer the spring to the QCC shell on the first fixture at the second station, the upper steel ball mechanism is arranged on the frame, the upper steel ball mechanism can store steel balls, and can transfer the steel balls to the QCC shell on the first fixture at the third station, the upper glue particle mechanism is arranged on the frame, the upper glue particle mechanism can store glue particles, and can transfer the glue particles to the QCC shell on the first fixture at the fourth station, the upper air inlet nozzle mechanism group is arranged on the frame, the upper air inlet nozzle mechanism group can remove the QCC shell on the first fixture that is equipped with springs, steel balls and glue particles, and can insert the stored air inlet nozzle into the QCC shell.
[0007] An overcurrent installation piece assembly device according to an embodiment of the present invention has at least one of the following beneficial effects:
[0008] Through the above structure, the moving mechanism, upper QCC shell mechanism, upper spring mechanism, upper steel ball mechanism, upper rubber particle mechanism and upper air inlet nozzle mechanism group on the frame cooperate with each other, so that the spring, steel ball and rubber particle can be placed in the gas channel of the QCC shell in turn, and then the plug-in part of the air inlet nozzle is inserted at the inlet of the gas channel to complete the assembly and production of the over-current mounting parts. From the above, it can be seen that, on the one hand, the assembly and production of the over-current mounting parts does not require human participation, so the labor intensity of the production personnel can be greatly reduced, and the labor cost invested can be greatly reduced, so as to reduce the assembly and production cost of the over-current mounting parts; on the other hand, the assembly and production of the over-current mounting parts does not require human participation, that is, there is no need for the production personnel to manually use the pressing equipment to insert the plug-in part of the air inlet nozzle at the inlet of the gas channel, so the safety risk of the pressing equipment pinching personnel can be avoided.
[0009] According to some embodiments of the present invention, the upper air inlet nozzle mechanism group includes a detection mechanism and a feeding mechanism, the detection mechanism is arranged on the frame, the detection mechanism can remove the QCC shell that is equipped with a spring, steel balls and granular parts on the first fixture, and can perform flow detection on the QCC shell, the feeding mechanism is arranged on the frame, the feeding mechanism can remove the QCC shell that has been detected by the detection mechanism, and can insert the stored air inlet nozzle into the QCC shell.
[0010] According to some embodiments of the present invention, the moving mechanism can drive the first jig to move to the first station, the second station, the third station, the fourth station and the fifth station in sequence, the detection mechanism includes a first moving component, a first material transfer component and a detection component, the first moving component is arranged on the frame, the first moving component is provided with a second jig, the first moving component can drive the second jig to move to the sixth station, the seventh station and the eighth station in sequence, the first material transfer component is arranged on the frame, the first material transfer component can transfer the QCC shell on the first jig at the fifth station to the second jig at the sixth station, the detection component is arranged on the frame, the detection component can perform flow detection on the QCC shell on the second jig at the seventh station, wherein the loading mechanism can remove the QCC shell on the second jig at the eighth station.
[0011] According to some embodiments of the present invention, the loading mechanism includes a second moving component, a second material transfer component, an upper air inlet nozzle component and a press-fitting device, the second moving component is arranged on the frame, the second moving component is provided with a third jig, the second moving component can drive the third jig to move to the ninth station, the tenth station and the eleventh station in sequence, the second material transfer component is arranged on the frame, the second material transfer component can transfer the QCC shell inspected by the inspection mechanism to the third jig at the ninth station, the upper air inlet nozzle component is arranged on the frame, the upper air inlet nozzle component can store the air inlet nozzle, and can transfer the air inlet nozzle to the third jig at the tenth station, the press-fitting device is arranged on the frame, the press-fitting device can press the air inlet nozzle on the third jig at the eleventh station so that the air inlet nozzle is inserted into the QCC shell.
[0012] According to some embodiments of the present invention, the moving mechanism can drive the first jig to move to the first station, the twelfth station, the second station, the third station and the fourth station in sequence, and the frame is provided with a deburring mechanism, which can remove burrs from the side wall of the gas channel of the QCC shell on the first jig at the twelfth station.
[0013] According to some embodiments of the present invention, the upper QCC shell mechanism includes a first material rack assembly, a shifting plate assembly and a third material moving assembly, the first material rack assembly is arranged on the frame, the first material rack assembly is provided with a material tray capable of storing QCC shells, the shifting plate assembly is arranged on the frame, the shifting plate assembly is provided with a bearing seat, the shifting plate assembly can drive the bearing seat to move to the first material rack assembly to support and receive the material tray transferred by the first material rack assembly, the third material moving assembly is arranged on the frame, the shifting plate assembly can drive the bearing seat to move to the third material moving assembly, so that the third material moving assembly can remove the QCC shell located on the material tray on the bearing seat, and can transfer the QCC shell to the first fixture of the first station.
[0014] According to some embodiments of the present invention, the upper spring mechanism includes a first vibration plate and a fourth material moving assembly, the first vibration plate is arranged on the frame, the first vibration plate is provided with a first tube connected to its inner cavity, the first vibration plate can work to drive the spring stored in its inner cavity to move through the first tube, the fourth material moving assembly is arranged on the frame, and the fourth material moving assembly can transfer the spring moved out of the first tube to the QCC shell on the first fixture of the second station.
[0015] According to some embodiments of the present invention, the upper steel ball mechanism includes a second material rack assembly and a first material dividing assembly, the second material rack assembly is arranged on the frame, the second material rack assembly can store steel balls, the first material dividing assembly is arranged on the frame, the first material dividing assembly is connected to the second material rack assembly, the first material dividing assembly can receive the steel balls delivered through the second material rack assembly, and can transfer the steel balls to the QCC shell on the first fixture of the third station.
[0016] According to some embodiments of the present invention, the glue particle loading mechanism includes a first material storage and conveying component, a second material distribution component and a fifth material moving component, the first material storage and conveying component is arranged on the frame, the first material storage and conveying component is provided with a first channel, the first material storage and conveying component can store the glue particles and can drive the glue particles to move through the first channel, the second material distribution component is arranged on the frame, the second material distribution component can remove the glue particles removed from the first channel and can close the first channel outlet, the fifth material moving component is arranged on the frame, and the fifth material moving component can transfer the glue particles removed by the second material distribution component to the QCC shell on the first fixture of the fourth station.
[0017] The valve assembly production line according to the second aspect of the present invention includes an overflow mounting piece assembly device as described above.
[0018] The valve assembly production line according to the present invention has at least the following beneficial effects: through the above structure, the labor cost required for assembling the flow-through mounting parts in the valve assembly process can be reduced, and the safety risks such as pinching caused by manually using press-fitting equipment can be avoided.
[0019] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0021] Figure 1 It is a structural diagram of an embodiment of an overcurrent mounting assembly device of the present invention;
[0022] Figure 2 for Figure 1 The structural diagram of the upper QCC shell mechanism shown in;
[0023] Figure 3 for Figure 1 The structural diagram of the deburring mechanism shown in;
[0024] Figure 4 for Figure 1 The structural diagram of the upper spring mechanism shown in;
[0025] Figure 5 for Figure 1 The structural diagram of the upper steel ball mechanism shown in;
[0026] Figure 6 for Figure 5 A structural diagram of the second rack assembly shown in ;
[0027] Figure 7 for Figure 5 A cross-sectional view of the mounting block and the twenty-second drive member shown in;
[0028] Figure 8 for Figure 1 The structural diagram of the glue particle mechanism shown in ;
[0029] Fig. 9 for Figure 1 The structural diagram of the upper air inlet nozzle mechanism group shown in ;
[0030] Fig.10 for Fig. 9 The structural diagram of the upper air intake nozzle assembly shown in ;
[0031] Fig.11 for Figure 8 The structural diagram of the second material distribution component and the second direct vibration feeder shown in ;
[0032] Fig.12 for Fig.10 The structural diagram of the third material distribution assembly and the first vertical vibration feeder shown in;
[0033] Fig.13 for Figure 1 The structural diagram of the moving mechanism shown in;
[0034] Fig.14 This is the structural diagram of the overcurrent installation parts;
[0035] Fig.15 for Fig.14 A cross-sectional view of the wetted mounting is shown in FIG. DETAILED DESCRIPTION
[0036] This section will describe in detail the specific embodiments of the present invention. The preferred embodiments of the present invention are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the present invention, but it cannot be understood as a limitation on the scope of protection of the present invention.
[0037] In the description of the present invention, if there is a description of first, second, third, fourth, fifth, etc., it is only for the purpose of distinguishing the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the sequence of the indicated technical features.
[0038] In the description of the present invention, it should be understood that descriptions involving orientations, such as up, down, front, back, left, right, etc., and orientations or positional relationships indicated are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0039] In the present invention, unless otherwise clearly defined, the words "set", "install", "connect" and the like should be understood in a broad sense, for example, they can be directly connected or indirectly connected through an intermediate medium; they can be fixedly connected or detachably connected or integrally formed; they can be mechanically connected; they can be the internal connection of two elements or the interaction relationship between two elements. Those skilled in the art can reasonably determine the specific meanings of the above words in the present invention in combination with the specific content of the technical solution.
[0040] Reference Figures 1 to 13 An embodiment of the present invention provides an over-current mounting assembly device, which includes a frame 100, a moving mechanism 200, an upper QCC shell mechanism 300, an upper spring mechanism 400, an upper steel ball mechanism 500, an upper glue particle mechanism 600 and an upper air inlet nozzle mechanism group.
[0041] The moving mechanism 200 is arranged on the frame 100, and the moving mechanism 200 is provided with a first fixture 231. The moving mechanism 200 can drive the first fixture 231 to move to the first station S1, the second station S2, the third station S3 and the fourth station S4 in sequence. The upper QCC shell mechanism 300 is arranged on the frame 100, and the upper QCC shell mechanism 300 can store the QCC shell 910 and can transfer the QCC shell 910 to the first fixture 231 of the first station S1. The upper spring mechanism 400 is arranged on the frame 100, and the upper spring mechanism 400 can store the spring 920 and can transfer the spring 920 to the QCC shell 910 on the first fixture 231 of the second station S2. The upper steel ball mechanism 5 00 is arranged on the frame 100, the upper steel ball mechanism 500 can store the steel balls 930, and can transfer the steel balls 930 to the QCC shell 910 on the first fixture 231 of the third station S3, the upper glue particle mechanism 600 is arranged on the frame 100, the upper glue particle mechanism 600 can store the glue particle 940, and can transfer the glue particle 940 to the QCC shell 910 on the first fixture 231 of the fourth station S4, the upper air inlet nozzle mechanism group is arranged on the frame 100, the upper air inlet nozzle mechanism group can remove the QCC shell 910 on the first fixture 231 that is equipped with the spring 920, the steel balls 930 and the glue particle 940, and can insert the stored air inlet nozzle 950 into the QCC shell 910.
[0042] It can be understood that the first fixture 231 is provided with a first groove 231A for vertically placing the QCC shell 910. When the QCC shell 910 is inserted and placed in the first groove 231A of the first fixture 231, the inlet of the gas channel 911 of the QCC shell 910 is set upward to allow the spring 920, steel ball 930 and rubber particle part 940 to be placed in.
[0043] The process of assembling and producing the over-current installation parts by the over-current installation parts assembly equipment of the present application is as follows: 1. The upper QCC shell mechanism 300 transfers the QCC shell 910 on it to the first fixture 231 of the first station S1, so that the QCC shell 910 is inserted into the first groove 231A; 2. The moving mechanism 200 drives the first fixture 231 of the first station S1 to move to the second station S2; 3. The upper spring mechanism 400 transfers the spring 920 on it to the QCC shell 910 on the first fixture 231 of the second station S2, so that the spring 920 is placed in the gas channel 911; 4. The moving mechanism 200 drives the first fixture 231 of the second station S2 to move to the third station S3; 5. The upper steel ball mechanism 500 transfers the steel ball 930 on it to the first fixture 231 of the third station S3 910, so that the steel ball 930 is placed in the gas channel 911 and above the spring 920; 6. The moving mechanism 200 drives the first fixture 231 of the third station S3 to move to the fourth station S4; 7. The upper granular component mechanism 600 transfers the granular component 940 thereon to the QCC shell 910 on the first fixture 231 of the fourth station S4, so that the granular component 940 is placed in the gas channel 911 and above the steel ball 930; 8. The upper air inlet nozzle mechanism group removes the QCC shell 910 on the first fixture 231 that is equipped with the spring 920, the steel ball 930 and the granular component 940, and inserts the air inlet nozzle 950 thereon into the QCC shell 910, that is, the plug-in portion 951 of the air inlet nozzle 950 thereon is inserted at the entrance of the gas channel 911.
[0044] Through the above structure, the moving mechanism 200, the upper QCC shell mechanism 300, the upper spring mechanism 400, the upper steel ball mechanism 500, the upper rubber particle mechanism 600 and the upper air inlet nozzle mechanism group on the frame 100 cooperate with each other, so that the spring 920, the steel ball 930 and the rubber particle member 940 can be placed in the gas channel 911 of the QCC shell 910 in sequence, and then the plug-in part 951 of the air inlet nozzle 950 is inserted at the entrance of the gas channel 911 to complete the assembly and production of the flow-through mounting parts. As can be seen from the above, one side On the one hand, the assembly and production of the overflow mounting parts requires no human intervention, thereby greatly reducing the labor intensity of the production personnel and the labor cost, thereby reducing the assembly and production cost of the overflow mounting parts. On the other hand, the assembly and production of the overflow mounting parts requires no human intervention, that is, the production personnel do not need to manually use the pressing equipment 840 to insert the plug-in part 951 of the air inlet nozzle 950 at the inlet of the gas channel 911, thereby avoiding the safety risk of the pressing equipment 840 injuring personnel.
[0045] The moving mechanism 200 includes a first gear, a first driving member 210 and a chain link 230. Fig.13The first gear is rotatably connected to the frame 100, the first driving member 210 is disposed on the frame 100, the output end of the first driving member 210 is provided with a second gear, the chain condition 230 is sleeved on the first gear and the second gear, the chain condition 230 is provided with the above-mentioned first fixture 231, the first driving member 210 can drive the second gear to rotate, so as to drive the chain condition 230 to operate, and drive the first fixture 231 to move to the first station S1, the second station S2, the third station S3 and the fourth station S4 in sequence. Among them, the first driving member 210 is set as a motor.
[0046] In this embodiment, refer to Fig.13 The first fixture 231 is provided with a positioning groove 231B, and the mobile mechanism 200 further includes a positioning assembly 220, which includes a second driving member 221 and a rotating shaft 222, the second driving member 221 is rotatably connected to the frame 100, the rotating shaft 222 is rotatably connected to the frame 100, the rotating shaft 222 is provided with a positioning block, the output end of the second driving member 221 is rotatably connected to the rotating shaft 222, and the second driving member 221 can drive the rotating shaft 222 to rotate, so that the positioning block is inserted into the positioning groove to fix the first fixture 231 at the corresponding station. Among them, the second driving member 221 is set as a cylinder or the like.
[0047] In this embodiment, refer to Figure 1 , Figure 3 , Fig. 9 as well as Fig.13 The moving mechanism 200 can drive the first fixture 231 to move to the first station S1, the twelfth station S12, the second station S2, the third station S3, the fourth station S4 and the fifth station S5 in sequence, wherein the frame 100 is provided with a deburring mechanism 110, and the deburring mechanism 110 can remove the burrs on the side wall of the gas channel 911 of the QCC shell 910 on the first fixture 231 at the twelfth station S12; the upper air inlet nozzle mechanism group can remove the QCC shell 910 equipped with the spring 920, the steel ball 930 and the rubber particle part 940 on the first fixture 231 at the fifth station S5.
[0048] The deburring mechanism 110 includes a third driving member 111 and an ejector pin 112. Figure 3 The third driving member 111 is disposed on the frame 100, and the ejector pin 112 is connected to the third driving member 111. The third driving member 111 can drive the ejector pin 112 to rise and fall. The third driving member 111 is configured as a cylinder or the like.
[0049] When the first jig 231 equipped with the QCC shell 910 moves from the first station S1 to the twelfth station S12, the third driving member 111 drives the ejector pin 112 to move down to the gas channel 911 inserted in the QCC shell 910 to remove the burrs on the side wall of the gas channel 911. Through the above structure, the burrs on the side wall of the gas channel 911 can be removed to avoid their influence on the performance of the flow-through mounting member.
[0050] In some embodiments, the ejector pin 112 is sleeved with an elastic member. When the ejector pin 112 moves down to the gas channel 911 inserted in the QCC shell 910, the elastic member abuts against the QCC shell 910 and is compressed until the ejector pin 112 moves upward away from the gas channel 911. Then the elastic member recovers and pushes the QCC shell 910 to ensure that the QCC shell 910 is not moved up by the ejector pin 112 and leaves the first groove 231A.
[0051] The upper air inlet nozzle mechanism group includes a detection mechanism 700 and a feeding mechanism 800. Figure 1 and Fig. 9 The detection mechanism 700 is arranged on the frame 100. The detection mechanism 700 can remove the QCC shell 910 equipped with the spring 920, the steel ball 930 and the rubber particle part 940 on the first fixture 231 of the fifth station S5, and can perform flow detection on the QCC shell 910. The feeding structure 800 is arranged on the frame 100. The feeding mechanism 800 can remove the QCC shell 910 after being detected by the detection mechanism 700, and can insert the stored air inlet nozzle 950 into the QCC shell 910.
[0052] It can be understood that flow detection is performed on the QCC shell 910 equipped with a spring 920, a steel ball 930 and a rubber particle part 940, that is, high-speed and high-pressure gas is input into the QCC shell 910 to detect whether the steel ball 930 in the QCC shell 910 moves to cut off the gas channel 911 of the QCC shell 910.
[0053] Through the above structure, the detection mechanism 700 is arranged to ensure that a flow-through installation member with a safety protection function is obtained after the air inlet nozzle 950 is installed.
[0054] The detection mechanism 700 includes a first moving assembly 710, a first material moving assembly 720 and a detection assembly 730. Fig. 9The first moving component 710 is arranged on the frame 100, and the first moving component 710 is provided with a second fixture 711, and the second fixture 711 is provided with a second groove for vertically placing the QCC shell. The first moving component 710 can drive the second fixture 711 to move to the sixth station S6, the seventh station S7 and the eighth station S8 in sequence. The first material moving component 720 is arranged on the frame 100, and the first material moving component 720 can transfer the QCC shell 910 on the first fixture 231 of the fifth station S5 to the second groove on the second fixture 711 of the sixth station S6. The detection component 730 is arranged on the frame 100, and the detection component 730 can perform flow detection on the QCC shell 910 on the second fixture 711 of the seventh station S7, wherein the loading mechanism 800 can remove the QCC shell 910 on the second fixture 711 of the eighth station S8; the first moving component 710 is a linear module.
[0055] The first material moving assembly 720 includes a fourth driving member 721, a fifth driving member 722 and a first clamp 723. Fig. 9 The fourth driving member 721 is provided on the frame 100, the fifth driving member 722 is connected to the fourth driving member 721, the first clamp 723 is provided on the fifth driving member 722, the first clamp 723 can clamp the QCC shell 910, the fourth driving member 721 can drive the first clamp 723 to move horizontally, and the fifth driving member 722 can drive the first clamp 723 to move vertically. The fourth driving member 721 is configured as a cylinder, etc.; the fifth driving member 722 is configured as a linear module; the first clamp 723 is configured as a pneumatic clamp, etc.
[0056] The working process of the detection mechanism 700 is: 1. The first clamp 723 clamps the QCC shell 910 on the first fixture 231 of the fifth station S5; 2. The fourth driving member 721 drives the first clamp 723 to move horizontally, and the fifth driving member 722 drives the first clamp 723 to move vertically, so as to transfer the clamped QCC shell 910 to the second groove on the second fixture 711 of the sixth station S6; 3. The first moving component 710 drives the second fixture 711 to move from the sixth station S6 to the seventh station S7; 4. The detection component 730 performs flow detection on the QCC shell 910 on the second fixture 711 of the seventh station S7; 5. The first moving component 710 drives the second fixture 711 to move from the seventh station S7 to the eighth station S8, waiting for the loading mechanism 800 to remove the detected QCC shell 910.
[0057] The feeding mechanism 800 includes a second moving assembly 810, a second material moving assembly 820, an upper air inlet nozzle assembly 830 and a press-fit device 840. Fig. 9 and Fig.10The second moving assembly 810 is provided on the frame 100, and the second moving assembly 810 is provided with a third fixture 811, and the third fixture 811 is provided with a third slot for vertically placing the QCC shell, and the second moving assembly 810 can drive the third fixture 811 to move to the ninth station S9, the tenth station S10 and the eleventh station S11 in sequence, and the second material moving assembly 820 is provided on the frame 100, and the second material moving assembly 820 can move the QCC shell 9 on the second fixture 711 of the eighth station S8 10 is transferred to the third slot on the third fixture 811 of the ninth station S9, the upper air inlet nozzle assembly 830 is arranged on the frame 100, the upper air inlet nozzle assembly 830 can store the air inlet nozzle 950, and can transfer the air inlet nozzle 950 to the third fixture 811 of the tenth station S10, the pressing device 840 is arranged on the frame 100, and the pressing device 840 can press the air inlet nozzle 950 on the third fixture 811 of the eleventh station S11, so that the air inlet nozzle 950 is inserted into the QCC shell 910. Among them, the second moving component 810 is a linear module.
[0058] In this embodiment, refer to Fig.10 The third fixture 811 is provided with a fourth fixture 811A. When the upper air inlet nozzle assembly 830 transfers the air inlet nozzle 950 to be clamped by the fourth fixture 811A, the upper air inlet nozzle assembly 830 can transfer the air inlet nozzle 950 to the third fixture 811 of the tenth station S10.
[0059] The second material moving assembly 820 includes a sixth driving member 821, a seventh driving member 822 and a second clamp 823. Fig. 9 The sixth driving member 821 is provided on the frame 100, the seventh driving member 822 is connected to the sixth driving member 821, the second clamp 823 is connected to the seventh driving member 822, the second clamp 823 can clamp the QCC shell 910, the sixth driving member 821 can drive the second clamp 823 to move horizontally, and the seventh driving member 822 can drive the second clamp 823 to move vertically. The sixth driving member 821 is configured as a cylinder, etc.; the seventh driving member 822 is configured as a cylinder, etc.; the second clamp 823 is configured as a pneumatic clamp.
[0060] In this embodiment, refer to Fig. 9The frame 100 is provided with a fourth fixture 120, and the fourth fixture 120 is provided with a fourth slot for inserting and placing the over-current mounting part. The second fixture 823 is set to two. When the QCC shell of the third fixture 811 completes the installation of the air inlet nozzle 950 at the eleventh station S11 (that is, after being assembled into the over-current mounting part), the second moving component 810 will drive the third fixture 811 to move from the eleventh station S11 to the ninth station S9, the sixth driving member 821 drives the two second fixtures 823 to move horizontally, and the seventh driving member 822 drives the two second fixtures 823 to move vertically, so that one of the second fixtures 823 clamps the over-current mounting part on the third fixture 811 at the ninth station S9 and transfers it to the fourth slot of the fourth fixture 120, and the other second fixture 823 clamps the QCC shell 910 on the second fixture 711 at the eighth station S8 and transfers it to the third fixture 811 at the ninth station S9.
[0061] The upper air inlet nozzle assembly 830 includes a second material storage and conveying assembly, a third material distribution assembly, and a sixth material transfer assembly. The second material storage and conveying assembly includes a second vibration plate 834 and a first vibration feeder 835, Fig.10 The second vibration disk 834 and the first straight vibration feeder 835 are both arranged on the frame 100, the second vibration disk 834 and the first straight vibration feeder 835 are connected, the first straight vibration feeder 835 is provided with a second channel 835A, the second vibration disk 834 can store the air inlet nozzle 950, the second vibration disk 834 and the first straight vibration feeder 835 can work to drive the air inlet nozzle 950 on the second vibration disk 834 to move through the second channel 835A.
[0062] The third material dividing assembly includes an eighth driving member 836 and a first material dividing block 837. Fig.10 and Fig.12 The eighth driving member 836 is arranged on the frame 100, the first dividing block 837 is connected to the eighth driving member 836, the first dividing block 837 is provided with a fifth groove 837A, and the eighth driving member 836 can drive the first dividing block 837 to move to the first position or the second position, wherein, when the first dividing block 837 is located at the first position, the fifth groove 837A can receive the air inlet nozzle 950 moved out from the second channel 835A; when the first dividing block 837 is located at the second position, the first dividing block 837 closes the outlet of the second channel 835A, and the air inlet nozzle 950 on the fifth groove 837A located at the second position can be removed by the sixth material moving assembly.
[0063] The sixth material moving assembly includes a ninth driving member 831, a tenth driving member 832 and a third clamp 833. Fig.10The ninth driving member 831 is provided on the frame 100, the tenth driving member 832 is connected to the ninth driving member 831, the third clamp 833 is connected to the tenth driving member 832, the third clamp 833 can clamp the air inlet nozzle 950, the ninth driving member 831 can drive the third clamp 833 to move horizontally, and the tenth driving member 832 can drive the third clamp 833 to move vertically. The third clamp 833 is a pneumatic clamp, etc.; the tenth driving member 832 is set as a linear module; the ninth driving member 831 is set as a cylinder, etc.
[0064] The working process of the feeding mechanism 800 is as follows: 1. Another second clamp 823 clamps the QCC shell 910 on the second fixture 711 of the eighth station S8; 2. The sixth driving member 821 drives the second clamp 823 to move horizontally, and the seventh driving member 822 drives the second clamp 823 to move vertically, and transfers the QCC shell 910 clamped by another second clamp 823 to the third groove on the third fixture 811 of the ninth station S9; 3. The second moving assembly 810 drives the third fixture 811 of the ninth station S9 to move to the tenth station S10; 4. The eighth driving member 836 drives the first dividing block 837 to move to the first position, so that the fifth groove 837A receives the air inlet nozzle 950 moved out of the second channel 835A; 5. The eighth driving member 836 drives the first dividing block 837 to move to the second position, and the first dividing block 837 Close the outlet of the second channel 835A; 6. The third clamp 833 clamps the air inlet nozzle 950 on the first dividing block 837 at the second position; 7. The ninth driving member 831 drives the third clamp 833 to move horizontally, and the tenth driving member 832 drives the third clamp 833 to move vertically, so as to transfer the air inlet nozzle 950 clamped by the third clamp 833 to the fourth clamp 811A on the third fixture 811 of the tenth station S10 for clamping; 8. The second moving component 810 drives the third fixture 811 of the tenth station S10 to move to the eleventh station S11; 9. The pressing device 840 presses the air inlet nozzle 950 on the third fixture 811 of the eleventh station S11, so that the air inlet nozzle 950 is inserted into the QCC shell 910, that is, the plug-in portion 951 of the air inlet nozzle 950 is inserted into the inlet of the gas channel 911 of the QCC shell 910.
[0065] The upper QCC shell mechanism 300 includes a first material rack assembly 310, a shifting plate assembly 320 and a third material shifting assembly 330. Figure 2The first material rack assembly 310 is arranged on the frame 100, and the first material rack assembly 310 can store the material tray with the QCC shell 910. The transfer plate assembly 320 is arranged on the frame 100, and the transfer plate assembly 320 is provided with a bearing seat. The transfer plate assembly 320 can drive the bearing seat to move to the first material rack assembly 310 to support and receive the material tray transferred by the first material rack assembly 310. The third material transfer assembly 330 is arranged on the frame 100, and the transfer plate assembly 320 can drive the bearing seat to move to the third material transfer assembly 330, so that the third material transfer assembly 330 can remove the QCC shell 910 located on the material tray on the bearing seat, and can transfer the QCC shell 910 to the first fixture 231 of the first station S1.
[0066] The first material rack assembly 310 includes a first material cavity rack 311, four eleventh driving members 312, a twelfth driving member 313 and a first moving rack 314. Figure 2 The first cavity frame 311 is provided on the frame 100, and the first cavity frame 311 is provided with a first cavity for stacking a plurality of material trays, and the bottom of the first cavity is provided with a first opening, and the eleventh driving member 312 is provided on the first cavity frame 311, and the four eleventh driving members 312 can support the lowest material tray in the first cavity, and the twelfth driving member 313 is provided on the frame 100, and the twelfth driving member 313 is connected to the first moving frame 314, and the twelfth driving member 313 can drive the first moving frame 314 to rise and fall. Among them, the eleventh driving member 312 is provided as a cylinder or the like; and the twelfth driving member 313 is provided as a cylinder or the like.
[0067] In this embodiment, refer to Figure 2 The first material rack assembly 310 is provided with two, wherein one of the first material rack assemblies 310 stores the material trays with the QCC shells 910 , and the other receives and stores the empty material trays transferred by the tray transfer assembly 320 .
[0068] The plate moving assembly 320 includes a thirteenth driving member 321 and a fourteenth driving member 322. Figure 2 The thirteenth driving member 321 is provided on the frame 100, the fourteenth driving member 322 is provided on the thirteenth driving member 321, the fourteenth driving member 322 is provided with the above-mentioned bearing seat, the thirteenth driving member 321 can drive the bearing seat to move horizontally, and the fourteenth driving member 322 can drive the bearing seat to move up and down. Among them, the thirteenth driving member 321 is provided as a linear module, and the fourteenth driving member 322 is provided as a cylinder or the like.
[0069] The third material moving assembly 330 includes a fifteenth driving member 331, a sixteenth driving member 332 and a fifth clamp 333. Figure 2The fifteenth driving member 331 is provided on the frame 100, the sixteenth driving member 332 is provided on the fifteenth driving member 331, the fifth clamp 333 is provided on the sixteenth driving member 332, the fifth clamp 333 can clamp the QCC shell 910, the fifteenth driving member 331 can drive the fifth clamp 333 to move horizontally, and the sixteenth driving member 332 can drive the fifth clamp 333 to move vertically. Among them, the fifteenth driving member 331 is provided as a linear module; the sixteenth driving member 332 is provided as a linear module; the fifth clamp 333 is provided as a pneumatic clamp, etc.
[0070] The working process of the upper QCC shell mechanism 300 is as follows: 1. The thirteenth driving member 321 drives the bearing seat to move below the first opening; 2. The twelfth driving member 313 drives the first movable frame 314 to rise, so that the first movable frame 314 supports the lowest material tray in the first material cavity through the first opening; 3. The four eleventh driving members 312 release the support for the lowest material tray in the first material cavity; 4. The twelfth driving member 313 drives the first movable frame 314 to move down to the first height, and the four eleventh driving members 312 work to support the material tray adjacent to the lowest material tray; 5. The twelfth driving member 313 drives the first movable frame 314 to move down to the first height, and the four eleventh driving members 312 work to support the material tray adjacent to the lowest material tray; The driving member 313 drives the first movable frame 314 to continue to move down to the second height, so that the material tray supported by the first movable frame 314 is separated and moved to the supporting seat; 6. The thirteenth driving member 321 drives the supporting seat to move to the third material transfer assembly 330; 7. The fifth clamp 333 clamps the QCC shell 910 on the material tray of the supporting seat; 8. The fifteenth driving member 331 drives the fifth clamp 333 to move horizontally, and the sixteenth driving member 332 drives the fifth clamp 333 to move vertically, so that the QCC shell 910 is clamped by the fifth clamp 333 and transferred to the first fixture 231 of the first station S1.
[0071] The upper spring mechanism 400 includes a first vibration plate 410 and a fourth material moving assembly 420. Figure 4 The first vibration plate 410 is provided on the frame 100, and the first vibration plate 410 is provided with a first tube 411 connected to its inner cavity. The first vibration plate 410 can work to drive the spring 920 stored in its inner cavity to move through the first tube 411. The fourth material moving assembly 420 is provided on the frame 100, and the fourth material moving assembly 420 can move the spring 920 moved out of the first tube 411 to the QCC shell 910 on the first fixture 231 of the second station S2. Among them, the spring 920 moving through the first tube 411 is arranged obliquely.
[0072] The fourth material moving assembly 420 includes a seventeenth driving member 421, an eighteenth driving member 422, a nineteenth driving member 423 and a sixth clamp 424. Figure 4, the seventeenth driving member 421 is arranged on the frame 100, the eighteenth driving member 422 is connected to the seventeenth driving member 421, the nineteenth driving member 423 is arranged on the eighteenth driving member 422, the sixth clamp 424 is arranged on the nineteenth driving member 423, the sixth clamp 424 can clamp the spring 920, the nineteenth driving member 423 can drive the sixth clamp 424 to move linearly, the eighteenth driving member 422 can drive the sixth clamp 424 to rotate, and the seventeenth driving member 421 can drive the sixth clamp 424 to rise and fall. Among them, the seventeenth driving member 421 is set as a cylinder, etc.; the eighteenth driving member 422 is set as a rotating cylinder; the nineteenth driving member 423 is set as a cylinder, etc.; the sixth clamp 424 is set as a pneumatic clamp.
[0073] The working process of the upper spring mechanism 400 is: 1. The sixth clamp 424 clamps the spring 920 moved out from the first tube 411; 2. The eighteenth driving member 422 drives the sixth clamp 424 to rotate, the nineteenth driving member 423 drives the sixth clamp 424 to move linearly, and the seventeenth driving member 421 drives the sixth clamp 424 to rise and fall, so as to transfer the spring 920 clamped by the sixth clamp 424 to the QCC shell 910 on the first fixture 231 of the second station S2.
[0074] The upper steel ball mechanism 500 includes a second material rack assembly 510 and a first material distribution assembly 520. Figure 5 The second material rack assembly 510 is arranged on the frame 100, and the second material rack assembly 510 can store steel balls 930. The first material dividing assembly 520 is arranged on the frame 100, and the first material dividing assembly 520 is connected to the second material rack assembly 510. The first material dividing assembly 520 can receive the steel balls 930 delivered by the second material rack assembly 510, and can transfer the steel balls 930 to the QCC shell 910 on the first fixture 231 of the third station S3.
[0075] The second material rack assembly 510 includes a second material cavity rack 511, a material taking head 512 and a twentieth driving member 513. Figure 5 and Figure 6 The second material cavity frame 511 is provided on the frame 100, and is provided with a second tube 511B and a second material cavity 511A for storing the steel ball 930. The cavity wall of the second material cavity 511A is provided with a second opening communicating with the second tube 511B. The material taking head 512 is slidably provided on the cavity bottom of the second material cavity 511A. The material taking head 512 is provided with a material guide groove 512A located in the second material cavity 511A. The twentieth driving member 513 is provided on the second material cavity frame 511, and is connected to the material taking head 512. The twentieth driving member 513 can drive the material taking head 512 to rise and fall. The twentieth driving member 513 is provided as a cylinder or the like.
[0076] The first material distribution assembly 520 includes a twenty-first driving member 521, a mounting block 522, and a twenty-second driving member 523. Figure 5 and Figure 7 The twenty-first driving member 521 is arranged on the frame 100, the mounting block 522 is connected to the twenty-first driving member 521, the mounting block 522 is provided with a sliding cavity 522A, a third tube 522B and a fourth tube 522C, the third tube 522B and the fourth tube 522C are both connected to the sliding cavity 522A, the third tube 522B is connected to the second tube 511B through a pipeline, the twenty-second driving member 523 is arranged on the mounting block 522, the twenty-second driving member 523 is provided with a slider 523A slidingly penetrated in the sliding cavity 522A, the slider 523A is provided with a steel ball hole 523A1, the twenty-first driving member 521 can drive the mounting block 522 to rise and fall, and the twenty-second driving member 523 can drive the slider 523A to slide to the third position and the fourth position. Among them, the twenty-first driving member 521 is set as a cylinder, etc.;
[0077] The working process of the upper steel ball mechanism 500 is as follows: 1. The 20th driving member 513 drives the material taking head 512 to rise and fall, so that the steel ball 930 in the second material cavity 511A falls into the material guide groove 512A, and enters the second tube 511B under the guidance of the material guide groove 512A; 2. The steel ball 930 entering the second tube 511B passes through the pipeline and the third tube 522B in sequence, and is received by the steel ball hole 523A1 on the slider 523A located at the third position; 3. The 21st driving member 521 drives the mounting block 522 to descend to the third height, so that the fourth tube 522C and the QCC shell 910 on the first fixture 231 located at the third station S3 have a preset distance; 4. The 22nd driving member 523 drives the slider 523A to slide to the fourth position, so that the received steel ball 930 in the steel ball hole 523A1 passes through the fourth tube 522C and enters the QCC shell 910 on the first fixture 231 of the third station S3.
[0078] The glue particle mechanism 600 includes a first material storage and conveying component 610, a second material distribution component 620, and a fifth material transfer component 630. Figure 8 The first material storage and conveying component 610 is arranged on the frame 100, and the first material storage and conveying component 610 is provided with a first channel 612A. The first material storage and conveying component 610 can store the granular pieces 940 and can drive the granular pieces 940 to move through the first channel 612A. The second material distribution component 620 is arranged on the frame 100, and the second material distribution component 620 can remove the granular pieces 940 removed from the first channel 612A and can close the outlet of the first channel 612A. The fifth material moving component 630 is arranged on the frame 100, and the fifth material moving component 630 can transfer the granular pieces 940 removed by the second material distribution component 620 to the QCC shell 910 on the first fixture 231 of the fourth station S4.
[0079] The first material storage and conveying assembly 610 includes a third vibration plate 611 and a second direct vibration feeder 612. Figure 8 and Fig.11 The third vibration plate 611 and the second direct vibration feeder 612 are both arranged on the frame 100, the third vibration plate 611 and the second direct vibration feeder 612 are connected, the second direct vibration feeder 612 is provided with a third channel 612A, the third vibration plate 611 can store the rubber particles 940, the third vibration plate 611 and the second direct vibration feeder 612 can work to drive the rubber particles 940 on the third vibration plate 611 to move through the third channel 612A.
[0080] The second material distribution assembly 620 includes a twenty-third driving member 621 and a second material distribution block 622. Figure 8 and Fig.11 The twenty-third driving member 621 is arranged on the frame 100, the second material dividing block 622 is connected to the twenty-third driving member 621, the second material dividing block 622 is provided with a sixth slot 622A, and the twenty-third driving member 621 can drive the second material dividing block 622 to move to the fifth position or the sixth position, wherein when the second material dividing block 622 is located at the fifth position, the sixth slot 622A can receive the granular member 940 removed from the third channel 612A; when the second material dividing block 622 is located at the sixth position, the second material dividing block 622 closes the outlet of the third channel 612A, and the granular member 940 on the sixth slot 622A located at the sixth position can be removed by the fifth material moving assembly 630. The twenty-third driving member 621 is configured as a cylinder or the like.
[0081] The fifth material moving assembly 630 includes a twenty-fourth driving member 631, a twenty-fifth driving member 632 and a seventh clamp 633. Figure 8 The twenty-fourth driving member 631 is disposed on the frame 100, the twenty-fourth driving member 631 is connected to the twenty-fifth driving member 632, the seventh clamp 633 is connected to the twenty-fifth driving member 632, the seventh clamp 633 can clamp the rubber particles 940, the twenty-fourth driving member 631 can drive the seventh clamp 633 to move horizontally, and the twenty-fifth driving member 632 can drive the seventh clamp 633 to move vertically. Among them, the seventh clamp 633 is a pneumatic clamp, etc.; the twenty-fifth driving member 632 is set as a linear module; the twenty-fourth driving member 631 is set as a cylinder, etc.
[0082] The working process of the upper rubber particle mechanism 600 is: 1. The sixth groove 622A on the second dividing block 622 located at the fifth position receives the rubber particle 940 moved out from the third channel 612A; 2. The twenty-third driving member 621 drives the second dividing block 622 to move to the sixth position; 3. The seventh clamp 633 clamps the rubber particle 940 on the second dividing block 622 at the sixth position; 4. The twenty-fourth driving member 631 drives the seventh clamp 633 to move horizontally, and the twenty-fifth driving member 632 drives the seventh clamp 633 to move vertically, so that the rubber particle 940 clamped by the seventh clamp 633 is transferred to the QCC shell 910 on the first fixture 231 of the fourth station S4.
[0083] The present invention also provides a valve assembly production line, which includes the above-mentioned flow-through installation piece assembly equipment.
[0084] Of course, the present invention is not limited to the above-mentioned embodiments, and those skilled in the art may make equivalent modifications or substitutions without violating the spirit of the present invention. These equivalent modifications and substitutions are all included in the scope defined by the claims of this application.
Claims
1. A flow-through mounting assembly device, characterized in that: include Rack(100); A moving mechanism (200) is arranged on the frame (100), the moving mechanism (200) is provided with a first fixture (231), and the moving mechanism (200) can drive the first fixture (231) to move to a first station (S1), a second station (S2), a third station (S3), and a fourth station (S4) in sequence; an upper QCC shell mechanism (300), disposed on the frame (100), the upper QCC shell mechanism (300) being capable of storing the QCC shell (910) and transferring the QCC shell (910) to the first fixture (231) of the first station (S1); An upper spring mechanism (400) is disposed on the frame (100), and the upper spring mechanism (400) is capable of storing a spring (920) and transferring the spring (920) to a QCC shell (910) on the first fixture (231) at the second station (S2); an upper steel ball mechanism (500) disposed on the frame (100), the upper steel ball mechanism (500) being capable of storing steel balls (930) and transferring the steel balls (930) to the QCC shell (910) on the first fixture (231) at the third station (S3); A glue particle loading mechanism (600) is disposed on the frame (100), and the glue particle loading mechanism (600) is capable of storing glue particles (940) and transferring the glue particles (940) to the QCC shell (910) on the first fixture (231) at the fourth station (S4); An upper air inlet nozzle mechanism group is arranged on the frame (100), and the upper air inlet nozzle mechanism group is capable of removing the QCC shell (910) on which the spring (920), the steel ball (930) and the rubber particle part (940) are installed on the first fixture (231), and can insert the stored air inlet nozzle (950) into the QCC shell (910).
2. The device for assembling a flow-through installation member according to claim 1, characterized in that: The upper air inlet nozzle mechanism group comprises: A detection mechanism (700) is disposed on the frame (100), and the detection mechanism (700) is capable of removing the QCC shell (910) on which the spring (920), the steel ball (930) and the granular part (940) are installed from the first fixture (231), and is capable of performing flow detection on the QCC shell (910); A loading mechanism (800) is arranged on the frame (100), and the loading mechanism (800) can remove the QCC shell (910) after being inspected by the inspection mechanism (700), and can insert the stored air intake nozzle (950) into the QCC shell (910).
3. The device for assembling a flow-through installation member according to claim 2, characterized in that: The moving mechanism (200) is capable of driving the first fixture (231) to move to the first station (S1), the second station (S2), the third station (S3), the fourth station (S4) and the fifth station (S5) in sequence, and the detection mechanism (700) comprises: A first moving assembly (710) is disposed on the frame (100), the first moving assembly (710) is provided with a second fixture (711), and the first moving assembly (710) can drive the second fixture (711) to move to the sixth station (S6), the seventh station (S7), and the eighth station (S8) in sequence; a first material transfer assembly (720), disposed on the frame (100), and capable of transferring the QCC shell (910) on the first fixture (231) at the fifth station (S5) to the second fixture (711) at the sixth station (S6); A detection component (730) is provided on the frame (100), and the detection component (730) is capable of performing flow detection on the QCC shell (910) on the second fixture (711) of the seventh station (S7), wherein: The loading mechanism (800) is capable of removing the QCC shell (910) on the second fixture (711) of the eighth station (S8).
4. The device for assembling a flow-through installation member according to claim 2, characterized in that: The feeding mechanism (800) comprises: A second moving assembly (810) is disposed on the frame (100), the second moving assembly (810) is provided with a third fixture (811), and the second moving assembly (810) can drive the third fixture (811) to move to the ninth station (S9), the tenth station (S10), and the eleventh station (S11) in sequence; a second material transfer assembly (820), disposed on the frame (100), the second material transfer assembly (820) being capable of transferring the QCC shell (910) after being inspected by the inspection mechanism (700) to the third fixture (811) of the ninth station (S9); an upper air inlet nozzle assembly (830), arranged on the frame (100), the upper air inlet nozzle assembly (830) being capable of storing an air inlet nozzle (950) and transferring the air inlet nozzle (950) to the third fixture (811) of the tenth station (S10); A press-fitting device (840) is disposed on the frame (100), and the press-fitting device (840) can press the air inlet nozzle (950) on the third fixture (811) of the eleventh station (S11) so that the air inlet nozzle (950) is inserted into the QCC shell (910).
5. The device for assembling a flow-through installation member according to claim 1, characterized in that: The moving mechanism (200) can drive the first jig (231) to move to the first station (S1), the twelfth station (S12), the second station (S2), the third station (S3) and the fourth station (S4) in sequence. The frame (100) is provided with a deburring mechanism (110). The deburring mechanism (110) can remove burrs from the side wall of the gas channel (911) of the QCC shell (910) on the first jig (231) at the twelfth station (S12).
6. The device for assembling a flow-through installation member according to claim 1, characterized in that: The upper QCC shell mechanism (300) comprises: A first material rack assembly (310), arranged on the frame (100), the first material rack assembly (310) being capable of storing a material tray equipped with a QCC shell (910); A tray moving assembly (320) is arranged on the frame (100), the tray moving assembly (320) is provided with a bearing seat, and the tray moving assembly (320) can drive the bearing seat to move to the first material rack assembly (310) to support and receive the material tray moved by the first material rack assembly (310); The third material moving assembly (330) is arranged on the frame (100), and the plate moving assembly (320) can drive the supporting seat to move to the third material moving assembly (330), so that the third material moving assembly (330) can remove the QCC shell (910) located on the material tray on the supporting seat, and can transfer the QCC shell (910) to the first fixture (231) of the first station (S1).
7. The device for assembling a flow-through installation member according to claim 1, characterized in that: The upper spring mechanism (400) comprises: a first vibration plate (410), arranged on the frame (100), the first vibration plate (410) being provided with a first tube (411) communicating with its inner cavity, the first vibration plate (410) being operable to drive a spring (920) stored in its inner cavity to move through the first tube (411); A fourth material moving assembly (420) is disposed on the frame (100), and the fourth material moving assembly (420) is capable of transferring the spring (920) moved out of the first tube (411) to the QCC shell (910) on the first fixture (231) of the second station (S2).
8. The device for assembling a flow-through installation member according to claim 1, characterized in that: The upper steel ball mechanism (500) comprises: A second material rack component (510), disposed on the frame (100), the second material rack component (510) being capable of storing steel balls (930); The first material dividing component (520) is arranged on the frame (100), and the first material dividing component (520) is connected to the second material rack component (510). The first material dividing component (520) can receive the steel balls (930) delivered by the second material rack component (510), and can transfer the steel balls (930) to the QCC shell (910) on the first fixture (231) of the third station (S3).
9. The device for assembling a flow-through installation member according to claim 1, characterized in that: The glue particle member mechanism (600) comprises: A first material storage and conveying assembly (610) is disposed on the frame (100), the first material storage and conveying assembly (610) being provided with a first channel (612A), the first material storage and conveying assembly (610) being capable of storing the rubber particles (940) and driving the rubber particles (940) to move through the first channel (612A); A second material distribution component (620) is disposed on the frame (100), and the second material distribution component (620) is capable of removing the granular pieces (940) removed from the first channel (612A) and is capable of closing the outlet of the first channel (612A); The fifth material transfer component (630) is arranged on the frame (100), and the fifth material transfer component (630) can transfer the granular parts (940) removed by the second material distribution component (620) to the QCC shell (910) on the first fixture (231) of the fourth station (S4).
10. Valve assembly production line, characterized by: It comprises an over-current mounting piece assembly device as described in any one of claims 1-9.
Citation Information
Patent Citations
Rotating disc type rapid connector assembling machine
CN105499991A
Automatic assembling and detecting device for pressure regulating valve flow limiting seat component
CN107042406A
Group valve production line
CN116329948A
Button switch automatic assembly equipment
CN208163032U
Overflow mounting part assembling equipment and valve assembly production line
CN223289319U
