Strip threading system, production equipment and strip threading method

By setting multiple overrollers inside the production equipment and using their contact parts to provide driving force, combining anti-slip and anti-drop-proof components, the problems of poor traction effect and insufficient stability in the prior art are solved, and the smooth and efficient tape is achieved delivery.

CN119079653APending Publication Date: 2024-12-06GUANGDONG LYRIC ROBOT INTELLIGENT AUTOMATION CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411384368.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-30
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

In the existing belt-through technology, the driving effect of the long-span material belt traction method is poor, the stability of the flexible traction components is poor, and it is prone to lag and winding problems, resulting in the material belt breakage or unstable transportation.

Method used

The through rollers are arranged along the internal conveying channel by multiple production equipment, and the driving force is provided through the first and second contact parts of the through rollers, so that the traction assembly can pull the tape under the through roller drive, cancel the flexible traction channel, and adopt a rigid support structure. An anti-slip structure and anti-falling components are provided to control the coordinated operation of the unwinding mechanism and the overroller.

Benefits of technology

It realizes smooth conveying during the traction process, avoids lag and winding problems, improves driving effect and stability, ensures that the tape continues to crack during long-distance transportation, and reduces the risk of winding with other components inside the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119079653A_ABST
    Figure CN119079653A_ABST
Patent Text Reader

Abstract

The invention discloses a strip threading system, production equipment and a strip threading method. The strip threading system comprises a traction assembly used for being connected with a material strip and a production equipment passing roller used for driving the traction assembly. The plurality of production equipment passing rollers are arranged along an internal conveying channel of the production equipment; a first contact part is arranged on the outer surface of the production equipment passing roller; the length of the traction assembly is larger than the distance between every two adjacent production equipment passing rollers, so that the traction assembly can be arranged on the production equipment passing rollers in a striding mode. The side, close to the production equipment passing roller, of the traction assembly is provided with a second contact part used for making contact with the first contact part, and the production equipment passing roller makes contact with the second contact part through the first contact part to provide driving force for the traction assembly. And the traction assembly is driven by the passing roller of the production equipment to pull the material belt to pass through an internal conveying channel of the production equipment. The driving device is simple in structure, good in driving effect and high in stability, and the problem that a material belt is stuck in the traction process can be effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of material tape threading, and in particular to a tape threading system, production equipment and a tape threading method. Background Art

[0002] Threading is used to process the material belt before production or during production interruption, that is, the material belt is pulled across the entire production equipment by the threading equipment. Large-scale production equipment is normally more than 10 meters long or even hundreds of meters long. The middle part is isolated from the outside by a tunnel-like passage. It is obviously unrealistic to use manual operation.

[0003] At present, the existing belt threading method usually adopts a winding device and an unwinding device to be respectively arranged at both ends of the production equipment, and a transition traction channel is arranged between the two. The traction component connected to the material belt slides on the transition traction channel and completes the traction of the material belt under the traction of the winding device. However, this method has the following defects: 1. The traction component is pulled by the winding and unwinding devices arranged at both ends of the production equipment. The long-span traction method and the transition traction channel are used in combination with flexibility, which has the problem of poor driving effect; 2. The transition traction channel in the prior art adopts flexible components, such as steel wire or steel rope, which has poor stability and cannot smoothly convey the material belt. In addition, jamming is prone to occur during long-distance transportation, which may cause the material belt to break or entangle other components in the channel. To this end, the present invention proposes a belt threading system, production equipment and belt threading method. Summary of the invention

[0004] The embodiments of the present application provide a belt threading system, production equipment and belt threading method, which have a simple structure, good driving effect and strong stability, and can effectively avoid the problem of the material belt being stuck during the traction process.

[0005] The first aspect of the present application provides a belt threading system, comprising: a traction assembly connected to a material belt and a production equipment roller for driving the traction assembly;

[0006] The number of the production equipment rollers is multiple, and the multiple production equipment rollers are arranged along the internal conveying channel of the production equipment;

[0007] The outer surface of the production equipment roller is provided with a first contact portion;

[0008] The length of the traction assembly is greater than the distance between two adjacent rollers of the production equipment, so that the traction assembly can be arranged across the rollers of the production equipment;

[0009] A second contact portion for contacting the first contact portion is provided on the side of the traction assembly close to the production equipment roller, and the production equipment roller provides driving force for the traction assembly through the contact between the first contact portion and the second contact portion, so that the traction assembly pulls the material belt through the internal conveying channel of the production equipment under the drive of the production equipment roller.

[0010] Optionally, an anti-slip structure is provided on the first contact portion and / or the second contact portion.

[0011] Optionally, the anti-slip structure is a rough surface, an anti-slip coating or an anti-slip rubber layer.

[0012] Optionally, the traction assembly is a foldable structure.

[0013] Optionally, it further comprises: an anti-drop component arranged in the internal conveying channel of the production equipment;

[0014] The anti-drop component is used to prevent the traction component from falling into the gap between the rollers of the production equipment during movement.

[0015] Optionally, the anti-drop assembly includes side wall convex rails symmetrically arranged on the inner walls of both sides of the conveying channel inside the production equipment;

[0016] The traction assembly is overlapped on the side wall convex rail, and the traction assembly is slidably connected with the side wall convex rail.

[0017] Optionally, it further includes: a reeling mechanism disposed at one end of the production equipment, the reeling mechanism being used to unroll the material strip.

[0018] Optionally, it also includes: a support component arranged between the production equipment and the unwinding mechanism, and the support component is used to support the material tape to run between the production equipment and the unwinding mechanism.

[0019] Optionally, it also includes: a control device;

[0020] The control device is electrically connected to the production equipment and the unwinding mechanism respectively, and is used to control the rotation direction and rotation speed of the production equipment roller, and control the unwinding speed of the unwinding mechanism, so as to ensure the coordinated operation of the production equipment roller and the unwinding mechanism.

[0021] A second aspect of the present application provides a production device, which adopts the above-mentioned belt threading system, and the production equipment is a sheet production equipment, which is selected from any one of an oven, a coater, and a sheet cutting equipment.

[0022] A third aspect of the present application provides a belt threading method based on the above-mentioned belt threading system, comprising the following steps:

[0023] S1, connect the free end of the material belt to the traction assembly;

[0024] S2. The rollers of the production equipment drive the traction assembly to move with the interaction force, so that the traction assembly passes through the internal conveying channel of the production equipment.

[0025] Optionally, step S2 further includes: when the traction assembly reaches the initial position, controlling the unwinding mechanism to unwind the material belt at a first rotation speed.

[0026] Optionally, in step S2, the rotation directions of the plurality of production equipment rollers are the same, and the plurality of production equipment rollers have a plurality of second rotational speeds when driven by their respective self-rotation driving forces.

[0027] Optionally, in step S2, when the unwinding mechanism and the production equipment rollers are both in the started state, the first rotational speed of the unwinding mechanism and the second rotational speed of each of the production equipment rollers are obtained, and the direction and magnitude of the first rotational speed and the second rotational speed are controlled so that the production equipment rollers rotate in the same direction as the unwinding mechanism, and the first linear speed of the unwinding mechanism is less than or equal to the second linear speed of the production equipment rollers.

[0028] Optionally, in step S2, when the traction assembly moves to the climbing section of the internal conveying channel of the production equipment, the second linear speed is greater than the first linear speed;

[0029] When the traction assembly moves to the horizontal section of the internal conveying channel of the production equipment, the second linear speed is equal to the first linear speed.

[0030] It can be seen from the above technical solutions that the embodiments of the present application have the following advantages: the present belt threading system changes the indirect traction method of two-end drive used in the prior art, and drives the traction by directly acting on the traction component through the roller of the production equipment, which has a good driving effect, and because of the rigid conveying support method, it can avoid the material belt from getting stuck during the traction process, and at the same time, it can keep the material belt flat and move along the surface of the roller of the production equipment during the traction process. In addition, because the present belt threading system eliminates the use of a transition traction channel, there is no need to use a flexible traction component structure such as steel wire or steel rope, which can effectively avoid entanglement with other equipment components in the internal channel of the production equipment during long-distance traction movement, causing belt lead failure. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 This is a schematic diagram of the structure of the belt threading system in the embodiment of the present application;

[0032] Figure 2 This is a schematic diagram of the structure of the traction assembly in the embodiment of the present application;

[0033] Figure 3 This is a schematic diagram of the position of the first contact portion in the embodiment of the present application;

[0034] Figure 4 This is a schematic diagram of the structure of the second contact portion in an embodiment of the present application;

[0035] Wherein, the accompanying drawings are marked as follows:

[0036] 1- traction assembly, 11- step assembly, 12- second contact portion, 13- anti-slip structure, 2- production equipment roller, 21- first contact portion, 3- material belt. DETAILED DESCRIPTION

[0037] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0038] In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present application. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0039] Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0040] This application provides an embodiment of a strapping system. Figure 1 , Figure 3 and Figure 4 .

[0041] The belt threading system in this embodiment includes: a traction component 1 for connecting with the material belt 3 and a production equipment roller 2 for driving the traction component 1, the number of the production equipment rollers 2 is multiple, and the multiple production equipment rollers 2 are arranged along the internal conveying channel of the production equipment; a first contact portion 21 is provided on the outer surface of the production equipment roller 2, and the length of the traction component 1 is greater than the spacing between two adjacent production equipment rollers 2, so that the traction component 1 can be arranged across the production equipment roller 2; a second contact portion 12 for contacting with the first contact portion 21 is provided on the side of the traction component 1 close to the production equipment roller 2, and the production equipment roller 2 provides a driving force for the traction component 1 through the mutual contact between the first contact portion 21 and the second contact portion 12, so that the traction component 1 pulls the material belt 3 through the internal conveying channel of the production equipment under the drive of the production equipment roller 2.

[0042] It should be noted that: the present belt threading system changes the indirect traction method of two-end drive adopted in the prior art, and drives the traction by directly acting on the traction component 1 through the production equipment roller 2, and has a good driving effect. Moreover, due to the use of a rigid conveying support method, the material belt 3 can be prevented from getting stuck during the traction process, and the material belt 3 can be kept flat and moved along the surface of the production equipment roller 2 during the traction process. In addition, since the present belt threading system eliminates the use of a transition traction channel, there is no need to use a flexible traction component 1 structure such as steel wire or steel rope, and it can effectively avoid entanglement with other equipment components in the internal channel of the production equipment during long-distance traction movement, causing belt lead failure.

[0043] The above is an embodiment of a strapping system provided in the embodiment of the present application. The following is an embodiment of a strapping system provided in the embodiment of the present application. For details, please refer to Figures 1 to 4 .

[0044] The belt threading system in this embodiment includes: a traction assembly 1 for connecting with the material belt 3 and a production equipment roller 2 for driving the traction assembly 1, the number of the production equipment rollers 2 is multiple, and the multiple production equipment rollers 2 are evenly arranged along the internal conveying channel of the production equipment; the outer surface of the production equipment roller 2 is provided with a first contact portion 21, the length of the traction assembly 1 (i.e., the length of the traction assembly 1 along the conveying direction in the traction state) is greater than the spacing between two adjacent production equipment rollers 2, so that the traction assembly 1 can be arranged across the production equipment roller 2; the traction assembly 1 is provided with a second contact portion 12 for contacting with the first contact portion 21 on one side close to the production equipment roller 2, and the production equipment roller 2 provides the driving force of the traction assembly 1 through the mutual contact between the first contact portion 21 and the second contact portion 12, so that the traction assembly 1 pulls the material belt 3 through the internal conveying channel of the production equipment under the drive of the production equipment roller 2. Specifically, the traction assembly 1 is arranged on the upper surface of the production equipment roller 2, and the production equipment roller 2 provides the driving force and the supporting force to the traction assembly 1 through the self-rotation of the production equipment roller 2.

[0045] It can be understood that the present belt threading system directly drives the traction component 1 by utilizing the existing production equipment roller 2 inside the production equipment. It has a simple structure, good driving effect and strong stability, and can effectively avoid the problem of the material belt 3 being stuck during the traction process.

[0046] The first contact portion 21 and / or the second contact portion 12 is provided with an anti-skid structure 13. By providing the anti-skid structure 13, the friction driving force during the movement of the traction component 1 can be enhanced, thereby providing driving effect and stability.

[0047] The anti-skid structure 13 may be a rough surface, an anti-skid coating or an anti-skid rubber layer.

[0048] The traction assembly 1 may be a foldable structure, specifically, the traction assembly 1 includes a plurality of step assemblies 11, the plurality of step assemblies 11 are interlocked, and two adjacent step assemblies 11 are rotatably connected, so that the traction assembly 1 can be bent along the conveying direction to facilitate the movement and retraction of the traction assembly 1. Specifically, the plate-like length of the traction assembly 1 in the traction state is greater than the spacing between the rollers 2 of the production equipment.

[0049] It also includes: an anti-drop component arranged in the internal conveying channel of the production equipment, and the anti-drop component is used to prevent the traction component 1 from falling into the gap between the rollers 2 of the production equipment during movement.

[0050] Specifically, the anti-drop component includes side wall convex rails symmetrically arranged on the inner walls on both sides of the conveying channel inside the production equipment, the traction component 1 is overlapped on the side wall convex rails, and the traction component 1 is slidably connected to the side wall convex rails, wherein the side wall convex rails are used to support both ends of the traction component 1 to prevent the traction component 1 from falling into the gap between the rollers 2 of the production equipment during movement, resulting in the inability to complete the belt threading in one go.

[0051] It also includes: a reeling mechanism arranged at one end of the production equipment, and the reeling mechanism is used to unfold the material strip 3.

[0052] It also includes: a support component arranged between the production equipment and the unwinding mechanism, and the support component is used to support the material strip 3 to travel between the production equipment and the unwinding mechanism.

[0053] It also includes: a control device for controlling the belt threading system, which is electrically connected to the production equipment and the unwinding mechanism, and is used to control the rotation direction and rotation speed of the production equipment roller 2, as well as the unwinding speed of the unwinding mechanism, so as to ensure the coordinated operation of the production equipment roller 2 and the unwinding mechanism.

[0054] It can be understood that by using the control device to adjust the pace synchronism between the various speeds, equipment operation problems caused by different pace directions of the various speeds can be avoided.

[0055] The present application also provides a production device, which adopts the above-mentioned belt threading system, wherein the production device is a sheet production device, which can be selected from any one of an oven, a coater, and a sheet cutting device. Specifically, the production device includes a conveying component, and the conveying component includes the above-mentioned production device roller 2 and a support component.

[0056] The present application also provides a belt threading method based on the above-mentioned belt threading system, and the method specifically comprises the following steps:

[0057] S1. Connect the free end of the material belt 3 to the traction component 1, wherein the connection can be achieved by pasting, gluing, or clamping. When connected, the material belt 3 and the traction component 1 are in a relatively static state;

[0058] S2. The roller 2 of the production equipment drives the traction assembly 1 to move with the interaction force, so that the traction assembly 1 passes through the internal conveying channel of the production equipment.

[0059] Specifically, step S2 further includes: when the traction assembly 1 reaches the initial position, controlling the unwinding mechanism to unwind the material belt 3 at a first rotation speed.

[0060] It is understandable that the traction assembly 1 can be placed in the initial position directly manually, or the traction assembly 1 can be driven to the initial position by the production equipment roller 2. Specifically, the free end of the material belt 3 can be connected to the traction assembly 1 first, and then the traction assembly 1 connected with the material belt 3 can be manually placed in the initial position of the internal conveying channel of the production equipment. Alternatively, the traction assembly 1 can be placed in the internal conveying channel of the production equipment in advance, and then a length of the material belt 3 is first released by the unwinding mechanism, and then the free end of the released material belt 3 is connected to the traction assembly 1, and the traction assembly 1 is driven to the initial position by the production equipment roller 2, so that the first released material belt 3 is conveyed and flattened. When the traction component 1 reaches the initial position, the unwinding mechanism can be manually controlled to unwind the material belt 3 at the first rotational speed, or the unwinding mechanism can be automatically controlled by a program to unwind the material belt 3 at the first rotational speed. Specifically, when automatic control is adopted, a sensor device (the sensor device can be a photoelectric sensor, a pressure sensor, an ultrasonic sensor, etc.) or a monitoring device (the monitoring device can be a camera) can be set in the production equipment to identify whether the traction component 1 has reached the initial position. When the sensor device or the monitoring device identifies that the traction component 1 has reached the initial position, a signal is sent to the control device, and the control device controls the unwinding mechanism to start and unwind the material belt 3 at the first rotational speed.

[0061] In step S2, the rotation directions of the rollers 2 of multiple production equipment are the same (clockwise rotation or counterclockwise rotation is set according to the conveying direction), and the rollers 2 of multiple production equipment have multiple second speeds under the drive of their own rotation driving force, wherein the multiple second speeds can be different, or the linear speed can increase sequentially.

[0062] It should be noted that: during the rotation process, the production equipment roller 2 generates a reverse force on the traction component 1 (which is in a plate-shaped state during the traction process), so that the traction component 1 can move on the production equipment roller 2.

[0063] In step S2, when the unwinding mechanism and the production equipment roller 2 are both in the starting state, the first rotational speed of the unwinding mechanism and the second rotational speed of each production equipment roller 2 are obtained, and the direction and magnitude of the first rotational speed and the second rotational speed are controlled so that the production equipment roller 2 rotates in the same direction as the unwinding mechanism, and the first linear speed of the unwinding mechanism is less than or equal to the second linear speed of the production equipment roller 2.

[0064] Specifically, in step S2, when the traction assembly 1 moves to the climbing section of the internal conveying channel of the production equipment, the second linear speed is greater than the first linear speed; when the traction assembly 1 moves to the horizontal section of the internal conveying channel of the production equipment, the second linear speed is equal to the first linear speed.

[0065] As described above, the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. A belt threading system, characterized in that: include: A traction assembly (1) for connecting to a material belt (3) and a production equipment roller (2) for driving the traction assembly (1); The number of the production equipment rollers (2) is multiple, and the multiple production equipment rollers (2) are arranged along the internal conveying channel of the production equipment; The outer surface of the production equipment roller (2) is provided with a first contact portion (21); The length of the traction assembly (1) is greater than the distance between two adjacent production equipment rollers (2), so that the traction assembly (1) can be arranged across the production equipment rollers (2); A second contact portion (12) for contacting the first contact portion (21) is provided on a side of the traction component (1) close to the production equipment roller (2); the production equipment roller (2) provides a driving force for the traction component (1) through the mutual contact between the first contact portion (21) and the second contact portion (12), so that the traction component (1) pulls the material belt (3) through the internal conveying channel of the production equipment under the drive of the production equipment roller (2).

2. The strapping system according to claim 1, characterized in that: An anti-slip structure (13) is provided on the first contact portion (21) and / or the second contact portion (12).

3. The strapping system according to claim 2, characterized in that: The anti-slip structure (13) is a rough surface, an anti-slip coating or an anti-slip rubber layer.

4. The strapping system according to claim 1, characterized in that: The traction component (1) is a foldable structure.

5. The strapping system according to claim 4, characterized in that: Also includes: An anti-drop component provided in the internal conveying channel of the production equipment; The anti-drop component is used to prevent the traction component (1) from falling into the gap between the rollers (2) of the production equipment during movement.

6. The strapping system according to claim 5, characterized in that: The anti-drop assembly includes side wall convex rails symmetrically arranged on the inner walls of both sides of the conveying channel inside the production equipment; The traction assembly (1) is overlapped on the side wall convex rail, and the traction assembly (1) is slidably connected to the side wall convex rail.

7. The strapping system according to claim 1, characterized in that: Also includes: An unwinding mechanism is arranged at one end of the production equipment, and the unwinding mechanism is used to unwind the material strip.

8. The strapping system according to claim 7, characterized in that: Also includes: A support component is arranged between the production equipment and the unwinding mechanism, and is used to support the material strip (3) to run between the production equipment and the unwinding mechanism.

9. The strapping system according to claim 7, characterized in that: Also includes: Control devices; The control device is electrically connected to the production equipment and the unwinding mechanism respectively, and is used to control the rotation direction and rotation speed of the production equipment roller (2), and control the unwinding speed of the unwinding mechanism, so as to ensure the coordinated operation of the production equipment roller (2) and the unwinding mechanism.

10. A production equipment, characterized in that: Using the belt threading system as described in any one of claims 1 to 9, the production equipment is sheet production equipment, selected from any one of an oven, a coater, and a sheet cutting equipment.

11. A method for threading a belt based on the threading system according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1, connecting the free end of the material belt (3) to the traction assembly (1); S2. The roller (2) of the production equipment drives the traction component (1) to move by means of interaction force, so that the traction component (1) passes through the internal conveying channel of the production equipment.

12. The belt threading method according to claim 11, characterized in that: Step S2 further comprises: when the traction assembly (1) reaches the initial position, controlling the unwinding mechanism to unwind the material belt (3) at a first rotation speed.

13. The belt threading method according to claim 12, characterized in that: In step S2, the rotation directions of the plurality of production equipment rollers (2) are the same, and the plurality of production equipment rollers (2) have a plurality of second rotation speeds when driven by their own rotation driving forces.

14. The belt threading method according to claim 13, characterized in that: In step S2, when the unwinding mechanism and the production equipment roller (2) are both in the start-up state, the first rotational speed of the unwinding mechanism and the second rotational speed of each of the production equipment rollers (2) are obtained, and the direction and magnitude of the first rotational speed and the second rotational speed are controlled so that the production equipment roller (2) rotates in the same direction as the unwinding mechanism, and the first linear speed of the unwinding mechanism is less than or equal to the second linear speed of the production equipment roller (2).

15. The belt threading method according to claim 14, characterized in that: In step S2, when the traction component (1) moves to the climbing section of the internal conveying channel of the production equipment, the second linear speed is greater than the first linear speed; When the traction assembly (1) moves to the horizontal section of the internal conveying channel of the production equipment, the second linear speed is equal to the first linear speed.

Citation Information

Patent Citations

  • Automatic cutting machine for net film

    CN114291632A

  • Metal belt traction device and metal belt production line

    CN115301743A

  • Material belt traction conveying device

    CN213445399U

  • Material belt threading device

    CN219448715U

  • Strip storage device

    CN219620484U