Coke oven gas system and naphthalene crystal removal method

By using a purge pipeline in the coke oven gas system to heat purify the naphthalene crystals, the problem of naphthalene crystals blocking the water filter is solved, and the stability and production efficiency of the system are improved.

CN119081741APending Publication Date: 2024-12-06CERI ENERGY & AIR PROTECTION TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411206901.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

Naphthalene crystals in coke oven gas system are prone to precipitation and block the water filter, resulting in unstable system operation and affecting production efficiency.

Method used

A coke oven gas system is designed, including combustion pipelines, circulating water pipelines and purge pipelines. The purge gas is transported through the purge pipeline to heat blow the blocked filters to sublimate the naphthalene crystals into gas to avoid them. Accumulate in the filter to ensure the stable operation of the system.

Benefits of technology

It effectively prevents naphthalene crystal blockage, improves the operating stability of the coke oven gas system, and ensures the normal operation and production efficiency of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119081741A_ABST
    Figure CN119081741A_ABST
Patent Text Reader

Abstract

The invention provides a coke oven gas system and a naphthalene crystal removal method, and relates to the technical field of steel production, the coke oven gas system comprises a combustion pipeline, a heat supply pipeline, a circulating water pipeline, a purging pipeline and a gas return pipeline, the combustion pipeline is provided with a first-stage compression section, a second-stage compression section and a heat exchanger; an inlet of the heat supply pipeline communicates with the combustion pipeline, an outlet of the heat supply pipeline is connected with the heat exchanger, and a heating device is arranged on the heat supply pipeline. The circulating water pipeline is connected with the first-stage compression section and / or the second-stage compression section in a heat exchange manner; a cooler, a first control valve, a filter and a water pump are arranged on the circulating water pipeline; a second control valve is arranged on the purging pipeline; an inlet of the air return pipeline communicates with the circulating water pipeline, and a third control valve is arranged on the air return pipeline. According to the invention, the purging gas can be conveyed through the purging pipeline so as to carry out hot purging on the position where naphthalene crystals are easy to appear, so that the naphthalene crystals blocked at the filter are sublimated into gas, thereby ensuring the operation stability of the coke oven gas system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel production, and in particular to a coke oven gas system and a method for removing naphthalene crystals. Background Art

[0002] Coke oven gas is a major byproduct produced during the coking process. Coke oven gas is rich in hydrogen and methane, making it a fuel with great energy value. In addition, the amount of coke oven gas produced is huge. If coke oven gas can be recycled and utilized, it will have a positive role in promoting energy conservation and emission reduction in coking enterprises, and can play a role in resource conservation and environmental protection. The existing way to utilize coke oven gas as a resource is: first purify and refine it, then use its rich hydrogen, methane, carbon monoxide and other components for catalytic conversion, and finally produce high value-added chemical products such as methane, methanol, and ethylene glycol. Compared with using coke oven gas as a fuel, the resource utilization of coke oven gas can not only significantly reduce greenhouse gas emissions, but also convert a resource that was originally wasted into valuable chemical raw materials. It is a new path for emission reduction and resource utilization that is both reasonable and effective.

[0003] Although the main components of coke oven gas include hydrogen, methane, carbon monoxide, nitrogen and carbon dioxide, it can be used for power generation, hydrogen extraction, methanol production, etc. However, coke oven gas also contains impurities such as tar, naphthalene, benzene, sulfur, hydrogen cyanide, ammonia, etc., which increases the difficulty of utilization and is harmful to equipment pipelines. In the process of coke oven gas compression, as the gas pressure increases, the saturated partial pressure of components such as tar and naphthalene increases, causing them to easily precipitate and combine with dust to form agglomerates, thereby increasing the frequency of coke oven gas compressor failures. Although oil-free screw compressors can tolerate impurities and show good applicability in the initial compression by washing the gas with water. However, since naphthalene is slightly soluble in water and the water spraying process produces sewage, naphthalene gradually increases in these sewage in the internal circulation, and finally causes naphthalene crystals to precipitate, thereby clogging the water filter. When the naphthalene content is high, this clogging phenomenon will occur frequently, which will affect the actual production and reduce the operating stability of the system. Therefore, how to prevent naphthalene crystals from clogging the water filter to improve the operating stability has become a technical problem that is currently in urgent need. Summary of the invention

[0004] In order to overcome the above-mentioned defects of the prior art, the technical problem to be solved by the embodiments of the present invention is to provide a coke oven gas system and a naphthalene crystal removal method, which are used to prevent naphthalene crystals from clogging the water filter to improve the operation stability.

[0005] The above-mentioned object of the present invention can be achieved by adopting the following technical scheme. The present invention provides a coke oven gas system, comprising:

[0006] A combustion pipeline, the combustion pipeline is used to transport coke oven gas, and the combustion pipeline is sequentially provided with a primary compression section, a secondary compression section and a heat exchanger;

[0007] A heat supply pipeline, the inlet of which is connected to the combustion pipeline and is placed between the primary compression section and the secondary compression section, the outlet of which is connected to the heat exchanger, and a heating device is provided on the heat supply pipeline;

[0008] A circulating water pipeline is heat exchangeably connected to the primary compression section and / or the secondary compression section, and a cooler, a first control valve, a filter and a water pump are sequentially arranged on the circulating water pipeline;

[0009] a purge pipeline, the outlet of which is connected to the circulating water pipeline and is disposed between the first control valve and the filter, and a second control valve is disposed on the purge pipeline;

[0010] An air return pipeline, the inlet of which is connected to the circulating water pipeline and is placed between the filter and the water pump, and a third control valve is provided on the air return pipeline.

[0011] In a preferred embodiment of the present invention, the inlet of the purge pipeline is connected to the combustion pipeline and is placed between the secondary compression section and the heat exchanger.

[0012] In a preferred embodiment of the present invention, the outlet of the return air pipeline is connected to the heating pipeline and is placed upstream of the heating device.

[0013] In a preferred embodiment of the present invention, a processing unit is further provided on the combustion pipeline, and the processing unit is arranged upstream of the first-stage compression section, and the processing unit is used to purify the coke oven gas.

[0014] In a preferred embodiment of the present invention, the coke oven gas system further comprises a water supply pipeline, the outlet of the water supply pipeline is connected to the circulating water pipeline and is placed between the filter and the water pump, and the inlet of the water supply pipeline is used to connect to an external water source.

[0015] In a preferred embodiment of the present invention, a first inspection valve and a second inspection valve are also provided on the circulating water pipeline, the first inspection valve is arranged between the cooler and the first control valve, and the second inspection valve is arranged between the filter and the water supply pipeline.

[0016] In a preferred embodiment of the present invention, two groups of the circulating water pipelines between the cooler and the water pump are arranged in parallel, and two purge pipelines are correspondingly arranged.

[0017] In a preferred embodiment of the present invention, the coke oven gas system further comprises a combustion device, and the outlet of the combustion pipeline is connected to the combustion device.

[0018] In a preferred embodiment of the present invention, the combustion device comprises a vertical furnace connected to the outlet of the combustion pipeline.

[0019] In a preferred embodiment of the present invention, the coke oven gas system further comprises a venting pipeline, and the venting pipeline is connected to the vertical furnace.

[0020] In a preferred embodiment of the present invention, the coke oven gas system also includes a top gas return pipeline, the inlet of the top gas return pipeline is connected to the vertical furnace, the outlet of the top gas return pipeline is connected to the combustion pipeline and is placed downstream of the heat exchanger, and a reflux compressor is provided on the top gas return pipeline.

[0021] In a preferred embodiment of the present invention, the heating device includes a heating furnace arranged on the heating pipeline.

[0022] In a preferred embodiment of the present invention, the following steps are included:

[0023] When the filter in operation is blocked by naphthalene crystals to a critical value, the filter is subjected to a flow interception treatment; wherein the critical value is that the flow in the filter does not meet the cooling capacity demand of the compression section;

[0024] Starting the standby filter and using the standby filter to continue filtering cooling water, thereby providing cooling capacity for the compression section;

[0025] The blocked filter is hot-blown by conveying purge gas through a purge pipeline, so that the naphthalene crystals in the filter are sublimated until the pressure difference before and after the filter is less than a preset value.

[0026] In a preferred embodiment of the present invention, the following steps are also included:

[0027] When the standby filter in operation is blocked by naphthalene crystals to the critical value, the standby filter is subjected to a flow interception process; wherein the critical value is that the flow in the standby filter does not meet the cooling capacity demand of the compression section;

[0028] Starting the filter and using the filter to continue filtering cooling water, thereby providing cooling capacity for the compression section;

[0029] The purge gas is delivered by the purge pipeline to perform hot blowing on the blocked spare filter, so that the naphthalene crystals in the spare filter are sublimated until the pressure difference before and after the spare filter is less than a preset value.

[0030] In a preferred embodiment of the present invention, the preset value is no greater than 1.5 kPa.

[0031] The technical solution of the present invention has the following significant beneficial effects:

[0032] When the coke oven gas system of the present invention is used, the coke oven gas is compressed in sequence through the primary compression section and the secondary compression section through the combustion pipeline, and then heated through the heat exchanger and output for supplying fuel to the combustion device. Circulating water can be transported through the circulating water pipeline to provide interstage cooling for the compression process of the primary compression section and / or the secondary compression section. In addition, a cooler and a filter are also provided on the circulating water pipeline. The cooler can be used to reduce the temperature of the circulating water, and the filter can be used to filter the circulating water.

[0033] After the circulating water temperature is reduced, naphthalene in the circulating water is easy to precipitate crystals in the filter, thereby gradually blocking the filter, and further affecting the operational stability of the system. In order to avoid the above problems, the present invention is also provided with a purge pipeline, through which purge gas can be conveyed to perform thermal purge on the position where naphthalene crystals are likely to occur, so that the naphthalene crystals blocked at the filter are sublimated into gas, and then the sublimated naphthalene gas can be mixed with coke oven gas and discharged, thereby preventing the problem of naphthalene crystals occurring at the filter, and ensuring the operational stability of the coke oven gas system. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0035] The accompanying drawings described herein are only for explanation purposes and are not intended to limit the scope of the present invention in any way. In addition, the shapes and proportional dimensions of the various components in the figures are only schematic, used to help understand the present invention, and are not specifically limited to the shapes and proportional dimensions of the various components of the present invention. Those skilled in the art can select various possible shapes and proportional dimensions to implement the present invention according to the teachings of the present invention.

[0036] Figure 1 The system diagram of an embodiment of the coke oven gas system of the present invention.

[0037] Reference numerals in the above drawings:

[0038] 100, combustion pipeline; 110, primary compression section; 120, secondary compression section; 130, heat exchanger; 140, processing unit;

[0039] 200, heating pipeline; 210, heating device;

[0040] 300, circulating water pipeline; 310, cooler; 320, first control valve; 330, filter; 340, water pump; 350, first inspection valve; 360, second inspection valve;

[0041] 400, purge pipeline; 410, second control valve;

[0042] 500, air return line; 510, third control valve;

[0043] 600, water supply pipeline;

[0044] 700, vent the pipeline;

[0045] 800, furnace top gas reflux pipeline; 810, reflux compressor;

[0046] 900. Combustion device. DETAILED DESCRIPTION

[0047] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0048] Implementation Method 1

[0049] Please refer to Figure 1As shown, an embodiment of the present invention provides a coke oven gas system, which includes a combustion pipeline 100, a heating pipeline 200, a circulating water pipeline 300, a purge pipeline 400, and a return gas pipeline 500. The combustion pipeline 100 is used to transport coke oven gas. The combustion pipeline 100 is provided with a primary compression section 110, a secondary compression section 120 and a heat exchanger 130 in sequence; the inlet of the heating pipeline 200 is connected to the combustion pipeline 100 and is placed between the primary compression section 110 and the secondary compression section 120, the outlet of the heating pipeline 200 is connected to the heat exchanger 130, and the heating pipeline 200 is provided with A heating device 210; a circulating water pipeline 300 is heat exchangeably connected to the primary compression section 110 and / or the secondary compression section 120, and a cooler 310, a first control valve 320, a filter 330 and a water pump 340 are sequentially arranged on the circulating water pipeline 300; an outlet of the purge pipeline 400 is connected to the circulating water pipeline 300 and is arranged between the first control valve 320 and the filter 330, and a second control valve 410 is arranged on the purge pipeline 400; an inlet of the return air pipeline 500 is connected to the circulating water pipeline 300 and is arranged between the filter 330 and the water pump 340, and a third control valve 510 is arranged on the return air pipeline 500.

[0050] In general, when the coke oven gas system is used, the coke oven gas is compressed in sequence through the primary compression section 110 and the secondary compression section 120 via the combustion pipeline 100, and then heated and outputted through the heat exchanger 130 to supply fuel to the combustion device 900. Circulating water can be transported through the circulating water pipeline 300 to provide interstage cooling for the compression process of the primary compression section 110 and / or the secondary compression section 120. In addition, a cooler 310 and a filter 330 are also provided on the circulating water pipeline 300. The cooler 310 can be used to reduce the temperature of the circulating water, and the filter 330 can be used to filter the circulating water.

[0051] After the circulating water temperature is lowered, naphthalene in the circulating water is easy to precipitate crystals in the filter 330, thereby gradually blocking the filter 330, and further affecting the operational stability of the system. In order to avoid the above problems, the present invention is further provided with a purge pipeline 400, through which purge gas can be transported to perform thermal purge on the position where naphthalene crystals are likely to occur, so that the naphthalene crystals blocked at the filter 330 are sublimated into gas, and then the sublimated naphthalene gas can be mixed with the coke oven gas and discharged, thereby preventing the problem of naphthalene crystals occurring at the filter 330 and ensuring the operational stability of the coke oven gas system.

[0052] The designer may adjust the specific model and structure of the second control valve 410 according to the use requirements, and no specific limitation is made here. Preferably, the second control valve 410 is a pneumatic regulating valve.

[0053] In an embodiment of the present invention, the circulating water pipeline 300 is heat exchangeably connected to the primary compression section 110 and the secondary compression section 120, so that inter-stage cooling can be provided for the primary compression section 110 and the secondary compression section 120 through the circulating water pipeline 300.

[0054] The designer can adjust the specific structure of the primary compression section 110 and the secondary compression section 120 according to the use requirements, and no specific limitation is made here. For example, the primary compression section 110 includes a primary compressor, and the secondary compression section 120 includes a secondary compressor.

[0055] In an embodiment of the present invention, an inlet of the purge pipeline 400 is connected to the combustion pipeline 100 , and is disposed between the secondary compression section 120 and the heat exchanger 130 .

[0056] By connecting the inlet of the purge pipeline 400 with the combustion pipeline 100, part of the coke oven gas compressed in the first compression section 110 can be transported to the purge pipeline 400, and then the purge pipeline 400 can purge this part of the coke oven gas into the filter 330 on the circulating water pipeline 300, so that the naphthalene crystals blocked in the filter 330 are sublimated into gas, and the sublimated naphthalene gas can be mixed with the coke oven gas compressed in the first compression section 110 in the purge pipeline 400 and discharged, thereby ensuring the operating stability of the filter 330.

[0057] Of course, in other feasible embodiments, designers can adjust the source of the purge gas in the purge pipeline 400 according to usage requirements, and no specific limitation is made here.

[0058] In an embodiment of the present invention, the outlet of the return air pipeline 500 is connected to the heating pipeline 200 and is placed upstream of the heating device 210 .

[0059] By connecting the outlet of the return air pipeline 500 with the heating pipeline 200, the sublimated naphthalene gas and the part of the coke oven gas can automatically flow back to the heating pipeline 200 under the action of the pressure difference, and then enter the heating device 210 to burn to generate heat, thereby wasting the naphthalene gas and the part of the coke oven gas in the heat purge process, and avoiding the problem of naphthalene gas and the part of the coke oven gas polluting the air.

[0060] Of course, in other feasible embodiments, designers can adjust the destination of the gas in the return air pipeline 500 according to usage requirements, and no specific limitation is made here.

[0061] The designer may adjust the specific structure of the heating device 210 according to the use requirements, and no specific limitation is made here. Preferably, the heating device 210 includes a heating furnace arranged on the heating pipeline 200 .

[0062] Part of the coke oven gas after primary compression is transported to the heating furnace through the heating pipeline 200 for combustion, and the heat generated by the heating furnace can reheat the coke oven gas after secondary compression through the heat exchanger 130.

[0063] In an embodiment of the present invention, a processing unit 140 is further provided on the combustion pipeline 100. The processing unit 140 is arranged upstream of the primary compression section 110. The processing unit 140 is used to purify the coke oven gas.

[0064] Specifically, the processing unit 140 is a coke oven gas comprehensive processing unit, through which the coke oven gas can be deeply purified. Designers can adjust the specific structure of the coke oven gas comprehensive processing unit according to usage needs, and no specific restrictions are made here.

[0065] In an embodiment of the present invention, the coke oven gas system further comprises a water supply pipeline 600, the outlet of the water supply pipeline 600 is connected to the circulating water pipeline 300 and is disposed between the filter 330 and the water pump 340, and the inlet of the water supply pipeline 600 is used to connect to an external water source.

[0066] By connecting the water replenishment pipeline 600 to the circulating water pipeline 300 and an external water source, the water replenishment pipeline 600 can replenish water to the circulating water pipeline 300 , thereby ensuring the operational stability of the circulating water pipeline 300 .

[0067] In addition, a water replenishment valve may be provided on the water replenishment pipeline 600, so as to facilitate the control of the water replenishment state of the water replenishment pipeline 600. The designer may adjust the specific model structure of the water replenishment valve according to the use requirements, and no specific limitation is made here.

[0068] Furthermore, a first inspection valve 350 and a second inspection valve 360 ​​are also provided on the circulating water pipeline 300 . The first inspection valve 350 is provided between the cooler 310 and the first control valve 320 , and the second inspection valve 360 ​​is provided between the filter 330 and the water supply pipeline 600 .

[0069] By arranging the first inspection valve 350 and the second inspection valve 360 ​​on the circulating water pipeline 300, the circulating water pipeline 300 can be cut off by closing the first inspection valve 350 and the second inspection valve 360 ​​to perform heat blowing on the filter 330, or to inspect and maintain the cooler 310, the filter 330 and other devices, thereby improving the convenience of use.

[0070] Specifically, the first inspection valve 350 and the second inspection valve 360 ​​can be set as stop valves. In addition, the first control valve 320 can be set as an electric butterfly valve. Of course, the designer can adjust the specific model structure of the first control valve 320, the first inspection valve 350 and the second inspection valve 360 ​​according to the use requirements, and no specific limitation is made here.

[0071] Furthermore, a flow meter may be provided on the circulating water pipeline 300 to measure the flow rate, thereby facilitating the on-off state of the circulating water pipeline 300 to be controlled in coordination with the first control valve 320 .

[0072] Specifically, when the filter 330 in operation is blocked by naphthalene crystals to a critical value, that is, when the flow meter measures that the cooling water in the circulating water pipeline 300 cannot meet the cooling capacity demand of the first-stage compressor or the second-stage compressor, an electrical signal will be released to the electric butterfly valve, thereby intercepting the cooling water that needs to be filtered.

[0073] At the same time, the blockage signal released by the running filter 330 will also be transmitted to the electric butterfly valve matched with the spare filter 330, and then the electric butterfly valve will be opened, so that the cooling water to be filtered can be filtered through the spare filter 330, thereby supplying circulating cooling water to the first-stage compressor or the second-stage compressor.

[0074] In actual use, the filter 330 on the circulating water pipeline 300 needs to filter the circulating cooling water, so that impurities are easily accumulated in the filter 330 and the filtering effect of the filter 330 is reduced. When the filtering effect of the filter 330 is lower than the preset target, the filter 330 needs to be repaired and replaced. At this time, the circulating water pipeline 300 cannot operate, which reduces the operating stability of the system.

[0075] In order to avoid the above problems, in an embodiment of the present invention, two groups of circulating water pipelines 300 are arranged in parallel between the cooler 310 and the water pump 340, and two purge pipelines 400 are correspondingly arranged.

[0076] By arranging the first inspection valve 350, the second inspection valve 360, the filter 330 and the first control valve 320 in parallel in two groups, when one group needs to be inspected, the other group can be put into operation as a backup, thereby ensuring the operational stability of the system.

[0077] In an embodiment of the present invention, the coke oven gas system further includes a combustion device 900 , and an outlet of the combustion pipeline 100 is connected to the combustion device 900 .

[0078] By connecting the outlet of the combustion pipeline 100 to the combustion device 900 , the coke oven gas in the combustion pipeline 100 can enter the combustion device 900 for combustion, so that the combustion device 900 can provide heat for subsequent production.

[0079] The designer can adjust the specific model and structure of the combustion device 900 according to the use requirements, and no specific limitation is made here. Preferably, the combustion device 900 includes a vertical furnace connected to the outlet of the combustion pipeline 100 .

[0080] Furthermore, the coke oven gas system further comprises a venting pipeline 700, which is connected to the vertical furnace. Part of the flue gas generated during the combustion of the vertical furnace can be discharged through the venting pipeline 700.

[0081] In an embodiment of the present invention, the coke oven gas system further comprises a top gas return pipeline 800, the inlet of the top gas return pipeline 800 is connected to the vertical furnace, the outlet of the top gas return pipeline 800 is connected to the combustion pipeline 100 and is placed downstream of the heat exchanger 130, and a reflux compressor 810 is provided on the top gas return pipeline 800.

[0082] By connecting the top gas return pipeline 800 to the vertical furnace and the combustion pipeline 100, part of the flue gas generated during the combustion of the vertical furnace can be compressed by the return compressor 810 and then returned to the combustion pipeline 100, and then the part of the flue gas can be mixed with the coke oven gas in the combustion pipeline 100 to increase the temperature of the coke oven gas, and then the mixed coke oven gas is transported to the vertical furnace for combustion.

[0083] Implementation Method 2

[0084] Please refer to Figure 1 As shown, an embodiment of the present invention also discloses a method for removing naphthalene crystals using a coke oven gas system, comprising the following steps:

[0085] Step 10: When the filter 330 in operation is blocked by naphthalene crystals to a critical value, the filter 330 is subjected to a flow interception process; wherein the critical value is that the flow in the filter 330 does not meet the cooling capacity demand of the compression section. Specifically, the compression section includes a primary compression section 110 and / or a secondary compression section 120.

[0086] Step 20: Start the standby filter and continue to filter the cooling water using the standby filter to provide cooling capacity for the compression section.

[0087] Step 30: Use the purge pipeline 400 to deliver purge gas to heat-blow the clogged filter 330, so that the naphthalene crystals in the filter 330 are sublimated, until the pressure difference before and after the filter 330 is less than a preset value.

[0088] The specific structure, working principle and beneficial effects of the coke oven gas system are the same as those in the first embodiment, and will not be described in detail here. Among them, the operator can pre-store the corresponding mathematical relationship between the flow rate in the filter 330 and the cooling demand of the primary compression section 110 and / or the secondary compression section 120, so that the cooling water can be judged based on the flow rate in the filter 330 to meet the cooling demand of the primary compression section 110 and / or the secondary compression section 120.

[0089] Of course, in other feasible embodiments, designers can adjust the specific size of the critical value according to usage requirements, and no specific limitation is made here.

[0090] In an embodiment of the present invention, the following steps are also included:

[0091] Step 40: When the standby filter in operation is clogged by naphthalene crystals to a critical value, the standby filter is subjected to a flow interception treatment; wherein the critical value is that the flow in the standby filter 330 does not meet the cooling capacity demand of the compression section.

[0092] Step 50: Start the filter 330 and continue to filter the cooling water using the filter 330 to provide cooling capacity for the compression section.

[0093] Step 60: Use the purge pipeline 400 to deliver purge gas to heat-blow the clogged spare filter, so that the naphthalene crystals in the spare filter are sublimated, until the pressure difference before and after the spare filter is less than a preset value.

[0094] In the implementation manner of the present invention, the preset value is not greater than 1.5 kPa. Of course, in other feasible embodiments, designers can adjust the specific numerical value of the preset value according to usage requirements, and no specific limitation is made here.

[0095] Specifically, the coke oven gas is introduced into the processing unit 140 through the plant area pipeline network for deep purification. The purified coke oven gas is introduced into the primary compression section 110 and the secondary compression section 120 in sequence through the combustion pipeline 100 for compression treatment.

[0096] Part of the coke oven gas compressed by the primary compression section 110 is transported to the heating device 210 through the heat supply pipeline 200 for combustion, and the other part of the coke oven gas is transported to the secondary compression section 120 through the combustion pipeline 100. The inter-stage cooling during the compression process is provided by circulating cooling water.

[0097] The coke oven gas after secondary compression is transported to the heat exchanger 130 , and part of the coke oven gas after primary compression is burned in the heating device 210 to provide heat for the heat exchanger 130 , thereby preheating the coke oven gas after secondary compression through the heat exchanger 130 .

[0098] The coke oven gas preheated by the heat exchanger 130 is injected into the vertical furnace for steelmaking. In addition, part of the waste gas generated after steelmaking, i.e., the top gas, is pressurized by the reflux compressor 810 on the top gas reflux pipeline 800 as circulating gas and merged with the coke oven gas entering the vertical furnace, and the other part is input into the waste gas treatment system through the vent pipeline 700.

[0099] The circulating cooling water providing cold flows out of the primary compression section 110 and the secondary compression section 120 and enters the cooler 310 as sewage for cooling, and then enters the filter 330 for filtering. As the temperature of the circulating water decreases, naphthalene will adhere to the mesh structure of the filter 330 to precipitate crystals, thereby slowly clogging the filter 330.

[0100] When the filter 330 in operation is clogged by naphthalene crystals to a critical value, that is, when the flow meter measures that the cooling water cannot meet the cooling capacity demand of the compressor, an electrical signal will be released to the matching electric butterfly valve, thereby cutting off the cooling water that needs to be filtered.

[0101] At the same time, the blockage signal released by the running filter 330 will also be transmitted to the matching electric butterfly valve of the standby filter, thereby opening the electric butterfly valve, so that the cooling water that needs to be filtered can supply water to the compressor through the standby filter.

[0102] Further, the pneumatic regulating valve is opened, and a stream of coke oven gas is introduced to heat-blow the blocked filter 330, so that all the naphthalene crystals are sublimated, that is, the pressure difference before and after the filter 330 is less than 1.5 KPa or lower. In addition, the purge gas is transported to the heat supply pipeline 200 through the return gas pipeline 500, and then sent to the heating furnace for heating and combustion.

[0103] When the standby filter is clogged, the aforementioned steps are repeated to remove the naphthalene crystals in the standby filter, and the stable operation of the coke oven gas system can be ensured by the cooperation of the two filters 330 .

[0104] In one possible embodiment, if Figure 1 In the embodiment shown, the gas path process includes: atmospheric pressure coke oven gas at about 40°C first enters the processing unit 140 for deep purification, and then enters the primary compression section 110 for compression to about 0.2Mpa, wherein a stream of coke oven gas at about 0.2Mpa merges with the coke oven gas for hot blowing and then passes to the heating furnace for combustion, providing heat for the heat exchanger 130 before the vertical furnace.

[0105] The remaining vast majority of coke oven gas at about 0.2Mpa continues to be introduced into the secondary compression section 120 and compressed to about 0.7Mpa. The coke oven gas at about 0.7Mpa is led out of two bypasses and used as purge gas to heat-blow the filter 330 blocked by naphthalene crystals. The connection point of the two purge pipelines 400 is located at the opening of the middle pipeline between the filter 330 and the matching electric butterfly valve. After passing through the filter 330, the two are combined into one, and finally merged with the above coke oven gas at about 0.2Mpa and transported to the heating furnace for combustion treatment.

[0106] The remaining coke oven gas of about 0.7 MPa is heated by the heat exchanger 130 and then introduced into the vertical furnace for injection and ironmaking. Most of the waste gas (top gas) generated is returned to the heat exchanger 130 and merged with the coke oven gas. The remaining small part of the top gas is vented.

[0107] The water process includes: fresh water at about 40℃ is provided by the factory area to compensate for the loss of the process circulating water system. After the fresh water and the circulating water are merged, they are sent to the primary and secondary compression sections through the circulating water pump 340 to provide cooling capacity, and then sent to the circulating water cooler 310 with sewage at about 60℃ to cool it to about 40℃, and finally introduced into the filter 330 for impurity removal and sent to the circulating water pump 340 for the second time to form a cycle.

[0108] All articles and references disclosed, including patent applications and publications, are incorporated herein by reference for various purposes. The term "consisting essentially of ... " describing a combination should include determined elements, ingredients, parts or steps and other elements, ingredients, parts or steps that do not substantially affect the basic novel features of the combination. The use of the terms "comprising" or "including" to describe the combination of elements, ingredients, parts or steps here also contemplates the implementation method consisting essentially of these elements, ingredients, parts or steps. Here, by using the term "may", it is intended to illustrate that any attribute described that "may" includes is optional. Multiple elements, ingredients, parts or steps can be provided by a single integrated element, ingredient, part or step. Alternatively, a single integrated element, ingredient, part or step can be divided into separate multiple elements, ingredients, parts or steps. The disclosure "one" or "one" used to describe an element, ingredient, part or step is not said to exclude other elements, ingredients, parts or steps.

[0109] Each embodiment in this specification is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same and similar parts between the embodiments can be referred to each other. The above embodiments are only for illustrating the technical concept and features of the present invention. The purpose is to enable people familiar with this technology to understand the content of the present invention and implement it accordingly, and it cannot be used to limit the scope of protection of the present invention. Any equivalent changes or modifications made according to the spirit of the present invention should be covered within the scope of protection of the present invention.

Claims

1. A coke oven gas system, characterized in that: include: A combustion pipeline, the combustion pipeline is used to transport coke oven gas, and the combustion pipeline is sequentially provided with a primary compression section, a secondary compression section and a heat exchanger; A heat supply pipeline, the inlet of which is connected to the combustion pipeline and is placed between the primary compression section and the secondary compression section, the outlet of which is connected to the heat exchanger, and a heating device is provided on the heat supply pipeline; A circulating water pipeline is heat exchangeably connected to the primary compression section and / or the secondary compression section, and a cooler, a first control valve, a filter and a water pump are sequentially arranged on the circulating water pipeline; a purge pipeline, the outlet of which is connected to the circulating water pipeline and is disposed between the first control valve and the filter, and a second control valve is disposed on the purge pipeline; An air return pipeline, the inlet of which is connected to the circulating water pipeline and is placed between the filter and the water pump, and a third control valve is provided on the air return pipeline.

2. The coke oven gas system according to claim 1, characterized in that: The inlet of the purge pipeline is connected to the combustion pipeline and is placed between the secondary compression section and the heat exchanger.

3. The coke oven gas system according to claim 1, characterized in that: The outlet of the return air pipeline is connected to the heat supply pipeline and is placed upstream of the heating device.

4. The coke oven gas system according to claim 1, characterized in that: The combustion pipeline is also provided with a processing unit, which is arranged upstream of the first-stage compression section and is used for purifying the coke oven gas.

5. The coke oven gas system according to claim 1, characterized in that: The coke oven gas system further comprises a water supply pipeline, the outlet of which is connected to the circulating water pipeline and is arranged between the filter and the water pump, and the inlet of which is used to connect to an external water source.

6. The coke oven gas system according to claim 5, characterized in that: The circulating water pipeline is also provided with a first inspection valve and a second inspection valve. The first inspection valve is provided between the cooler and the first control valve, and the second inspection valve is provided between the filter and the water supply pipeline.

7. The coke oven gas system according to claim 6, characterized in that: Two groups of the circulating water pipelines between the cooler and the water pump are arranged in parallel, and two purge pipelines are correspondingly arranged.

8. The coke oven gas system according to claim 1, characterized in that: The coke oven gas system further comprises a combustion device, and the outlet of the combustion pipeline is connected to the combustion device.

9. The coke oven gas system according to claim 8, characterized in that: The combustion device comprises a vertical furnace connected to the outlet of the combustion pipeline.

10. The coke oven gas system according to claim 9, characterized in that: The coke oven gas system further comprises a venting pipeline, and the venting pipeline is connected to the vertical furnace.

11. The coke oven gas system according to claim 9, characterized in that: The coke oven gas system also includes a top gas return pipeline, the inlet of the top gas return pipeline is connected to the vertical furnace, the outlet of the top gas return pipeline is connected to the combustion pipeline and is placed downstream of the heat exchanger, and a return compressor is provided on the top gas return pipeline.

12. The coke oven gas system according to claim 1, characterized in that: The heating device comprises a heating furnace arranged on the heat supply pipeline.

13. A method for removing naphthalene crystals from a coke oven gas system, characterized in that: The steps include: When the filter in operation is blocked by naphthalene crystals to a critical value, the filter is subjected to a flow interception treatment; wherein the critical value is that the flow in the filter does not meet the cooling capacity demand of the compression section; Starting the standby filter and using the standby filter to continue filtering cooling water, thereby providing cooling capacity for the compression section; The blocked filter is hot-blown by conveying purge gas through a purge pipeline, so that the naphthalene crystals in the filter are sublimated until the pressure difference before and after the filter is less than a preset value.

14. The method for removing naphthalene crystals from a coke oven gas system according to claim 13, wherein: The following steps are also included: When the standby filter in operation is blocked by naphthalene crystals to the critical value, the standby filter is subjected to a flow interception process; wherein the critical value is that the flow in the standby filter does not meet the cooling capacity demand of the compression section; Starting the filter and using the filter to continue filtering cooling water, thereby providing cooling capacity for the compression section; The purge gas is delivered by the purge pipeline to perform hot blowing on the blocked spare filter, so that the naphthalene crystals in the spare filter are sublimated until the pressure difference before and after the spare filter is less than a preset value.

15. The method for removing naphthalene crystals from a coke oven gas system according to claim 13 or 14, characterized in that: The preset value is no greater than 1.5 kPa.