Subway station structure and construction method thereof
By combining open excavation and concealed excavation construction methods in subway stations, and using the warehouse jump method to expand the concealed excavation area, the problems of high construction risks and low economic benefits caused by insufficient open excavation conditions are solved, and rapid and low-risk construction is achieved. And improve the utilization rate of underground space.
Patent Information
- Application Number
- CN202411157173.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-12-06
AI Technical Summary
During the construction of subway stations, when the conditions for open excavation are insufficient, the use of concealed excavation method leads to high construction risks, long construction cycles and low economic benefits.
The structure of open excavation area and hidden excavation area is adopted, and the main body of open excavation is constructed by open excavation method, and the hidden excavation area is horizontally expanded by the warehouse jump method at the bottom of the open excavation structure, forming a rectangular section and setting up a small ahead conduit to realize light and dark excavation. Interface support beam and step method to excavate the hidden excavation channel.
It effectively reduces construction risks, shortens construction cycles, improves economic benefits, and increases the utilization rate of underground space, providing new construction methods for the expansion of subway stations.
Smart Images

Figure CN119083489A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of subway design and construction, and in particular to a subway station structure and a construction method thereof. Background Art
[0002] The construction methods of subway stations include open excavation and dark excavation. When open excavation conditions are available, the open excavation method is generally used for subway station construction, which has low construction difficulty, fast construction speed and high economic benefits. However, with the rapid development of cities, the construction environment around subway stations has become more and more complex, and the conditions for open excavation construction have become increasingly insufficient. Under this premise, if all subway stations are constructed using dark excavation, there will be disadvantages such as high construction risks, long construction periods and low economic benefits.
[0003] Therefore, how to provide a subway station structure and a construction method thereof to achieve rapid, low-risk and high-economic-efficiency subway station construction under insufficient open-cut construction conditions has become a difficult problem to be solved urgently by technical personnel in this field. Summary of the invention
[0004] The purpose of the present invention is to provide a subway station structure and a construction method thereof, so as to solve the problems of high construction risk, long construction period and low economic benefit caused by the concealed excavation method used in existing subway stations when open excavation conditions are insufficient.
[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0006] The present invention provides a subway station structure, comprising an open-cut area and a dark-cut area connected to the open-cut area; the dark-cut area is located below a ground building; the open-cut area has a layered open-cut main body, and an open-cut and dark-cut interface support beam is arranged on the open-cut main body of the third underground floor, and the dark-cut section of the dark-cut area is rectangular.
[0007] Preferably, the opening of the dark excavation area is located within the station track area within the open excavation area.
[0008] Preferably, the top of the dark excavation area is provided with a transversely arranged advance small duct, and the inside of the side wall of the dark excavation area is provided with an obliquely arranged advance small duct.
[0009] Preferably, the length of the advance small catheter is 5m.
[0010] The present invention also provides a subway station construction method, comprising the following steps:
[0011] Step 1: Complete the open-cut structure construction of the subway station according to the subway open-cut construction process;
[0012] Preferably, the step 1 comprises the following sub-steps:
[0013] Step 1.1: Open excavation of foundation pit;
[0014] Step 1.2, constructing the station floor at the bottom of the open excavation pit;
[0015] Step 1.3, erecting temporary columns on the station floor;
[0016] Step 1.4, constructing an open and concealed excavation interface to support the replacement beam on the temporary column;
[0017] Step 1.5, constructing side walls and various floor slabs in the open excavation pit;
[0018] Step 1.6: construct concealed excavation retaining piles inside the open excavation pit.
[0019] Step 2: horizontally expand the dark excavation area at the bottom of the open-cut structure using the skipping method to complete the dark excavation structure construction of the subway station.
[0020] Preferably, step 2 comprises the following sub-steps:
[0021] Step 2.1, after the open-cut structure reaches the design strength, a horse head gate advance support is applied at the station track area within the open-cut structure;
[0022] Step 2.2, use the jump-bin method to break the horse head door, and use the step method to excavate the upper step of the dark excavation channel in the single-bin channel broken by the jump-bin method, and excavate until the end steel is sealed;
[0023] Preferably, the step method comprises:
[0024] Step 2.21, erect the steel frame;
[0025] Step 2.22, set the locking foot;
[0026] Step 2.23, set up cross braces at the top of the passages of the upper step, middle step and lower step;
[0027] Step 2.24, excavate the passages of the upper step, the middle step and the lower step until the end steel sections are sealed.
[0028] Step 2.3, using the step method to respectively excavate the middle step and the lower step of the dark excavation channel in the single-chamber channel, and excavate until the end of the steel section is sealed, so that the upper step section, the middle step section and the lower step section of the excavation channel are closed into a ring;
[0029] Step 2.4: After the dark excavation structure excavated by the skip-bin method and the step method reaches the designed strength, repeat steps 2.1 to 2.3 to horizontally expand the unexcavated part of the dark excavation area.
[0030] Preferably, when the step method is used to excavate the dark tunnel, core soil is reserved in front of the next wall in the construction of the horizontal tunnel.
[0031] Compared with the prior art, the beneficial technical effects of the present invention are:
[0032] The present invention utilizes the skipping chamber method to horizontally expand the dark excavation area at the bottom of the open excavation structure of the subway station, effectively solving the problems of high construction risk, long construction period and low economic benefit caused by the dark excavation method used in existing subway stations when open excavation conditions are insufficient, reducing the impact on the surrounding environment during the construction process, increasing the utilization rate of the underground space, and providing a new construction method for subsequent new construction projects and expansion projects that increase the use function of subway stations. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] The present invention will be further described below in conjunction with the accompanying drawings.
[0034] Figure 1 The cross section of the open and dark excavation joint of the present invention is shown in FIG. Figure 1 ;
[0035] Figure 2 The cross section of the open and dark excavation joint of the present invention is shown in FIG. Figure 2 ;
[0036] Figure 3 This is a schematic diagram of the construction area division of the skip bin method of the present invention;
[0037] Figure 4 It is a schematic diagram of the construction steps of the step method in a single-bin channel of the present invention.
[0038] Explanation of the accompanying reference numerals: 1. Open excavation area; 2. Concealed excavation area; 3. Single-bin passage; 11. Open excavation body; 12. Open and concealed excavation interface support beam; 21. Concealed excavation section; 22. Advance small guide tube; 23. Temporary column; 31. Upper step; 32. End steel sealing; 33. Middle step; 34. Lower step; 35. Cross brace; 36. Core soil. DETAILED DESCRIPTION
[0039] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0040] like Figure 1-4As shown, the present invention provides a subway station structure, including an open-cut area 1 and a dark-cut area 2 connected to the open-cut area 1; the dark-cut area 2 is located below the ground building; the open-cut area 1 has a layered open-cut body 11, and an open-cut and dark-cut interface replacement beam 12 is arranged on the open-cut body 11 of the third underground floor, and the dark-cut section 21 of the dark-cut area 2 is rectangular.
[0041] Specifically, the opening of the dark excavation area is located within the station track area within the open excavation area.
[0042] Specifically, the top of the dark excavation area is provided with a transversely arranged advance small conduit 22, and the inside of the side wall of the dark excavation area is provided with an obliquely arranged advance small conduit 22.
[0043] Specifically, the length of the leading small conduits 22 is 5 m. The leading small conduits 22 arranged transversely are arranged in double rows.
[0044] The present invention also provides a subway station construction method, comprising the following steps:
[0045] Step 1: Complete the open-cut structure construction of the subway station according to the subway open-cut construction process;
[0046] Specifically, the step 1 includes the following sub-steps:
[0047] Step 1.1: Open excavation of foundation pit;
[0048] Step 1.2, constructing the station floor at the bottom of the open excavation pit;
[0049] Step 1.3, erecting temporary columns 23 on the station floor;
[0050] Step 1.4, constructing an open and concealed excavation interface to support the beam 12 on the temporary column 23;
[0051] Step 1.5, constructing side walls and various floor slabs in the open excavation pit;
[0052] Step 1.6: construct concealed excavation retaining piles inside the open excavation pit.
[0053] Among them, the various layers of slabs constructed in step 1.5 are the middle slabs in the open-cut main structure.
[0054] Step 2: horizontally expand the dark excavation area at the bottom of the open-cut structure using the skipping method to complete the dark excavation structure construction of the subway station.
[0055] Specifically, the step 2 includes the following sub-steps:
[0056] Step 2.1, after the open-cut structure reaches the design strength, a horse head gate advance support is applied at the station track area within the open-cut structure;
[0057] Step 2.2, using the jump-bin method to break the horse head door, and using the step method to excavate the upper step 31 of the dark excavation channel in the single-bin channel 3 broken by the jump-bin method, and excavate to the end steel end 32; specifically, the step method includes:
[0058] Step 2.21, erect the steel frame;
[0059] Step 2.22, set the locking foot;
[0060] Step 2.23, erecting a cross brace 35 at the top of the passage of the upper step 31, the middle step 33 and the lower step 34;
[0061] Step 2.24, excavating the passages of the upper step 31, the middle step 33 and the lower step 34 to the end steel end cap 32.
[0062] When the lower step 34 of the single-bin passage is excavated, in addition to setting up a cross brace 35 at the top of the lower step 34 passage, an initial substrate slab is also set at the bottom of the lower step 34.
[0063] Step 2.3, using the step method to respectively excavate the middle step 33 and the lower step 34 of the dark excavation channel in the single-chamber channel, and excavate to the end steel end 32, so that the upper step section, the middle step section and the lower step section of the excavation channel are closed into a ring;
[0064] Step 2.4: After the dark excavation structure excavated by the skip-bin method and the step method reaches the designed strength, repeat steps 2.1 to 2.3 to horizontally expand the unexcavated part of the dark excavation area.
[0065] Specifically, when the step method is used to excavate the dark tunnel, core soil 36 is reserved in front of the next wall in the construction cross tunnel.
[0066] Specifically, when the single-bin channel is secretly excavated using the skip-bin method, 25# I-beams are used to support the single-bin channel.
[0067] Take the subway station under construction on the first ring line as an example:
[0068] The station is 217m long, 25.3m wide, and 27.2m deep. The station is laid out from north to south. The west side of the station is a city wall site (cultural relic), and the east side is a ground parking lot of the property unit. It is impossible to use the open-cut method for all construction. After the open-cut structure of the subway station is completed by the open-cut method, the underground excavation area is horizontally expanded at the bottom of the open-cut structure using the skipping method. The underground excavation section is a flat-top straight wall with a net width of 3.3m, a height of 10m, and a length of 50m. When the adjustment method is used for construction, the width of each excavation section is 3.7m, and the construction is carried out at intervals.
[0069] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0070] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A subway station structure, characterized in that: The invention comprises an open cut area (1) and a dark cut area (2) connected to the open cut area (1); the dark cut area (2) is located below a ground building; the open cut area (1) has a layered open cut body (11), and an open-dark cut interface underpinning beam (12) is arranged on the open cut body (11) of the third underground floor; the dark cut section (21) of the dark cut area (2) is rectangular.
2. The subway station structure according to claim 1, characterized in that: The opening of the dark excavation area is located in the station track area within the open excavation area.
3. The subway station structure according to claim 1, characterized in that: The top of the dark excavation area is provided with a transversely arranged small leading conduit (22), and the inside of the side wall of the dark excavation area is provided with an obliquely arranged small leading conduit (22).
4. The subway station structure according to claim 3, characterized in that: The length of the leading small conduit (22) is 5m.
5. A subway station construction method, characterized in that: The following steps are involved: Step 1: Complete the open-cut structure construction of the subway station according to the subway open-cut construction process; Step 2: horizontally expand the dark excavation area at the bottom of the open-cut structure using the skipping method to complete the dark excavation structure construction of the subway station.
6. The subway station construction method according to claim 5, characterized in that: The step 1 comprises the following sub-steps: Step 1.1: Open excavation of foundation pit; Step 1.2, constructing the station floor at the bottom of the open excavation pit; Step 1.3, erecting temporary columns (23) on the station floor; Step 1.4, constructing an open and concealed excavation interface to support the beam (12) on the temporary column (23); Step 1.5, constructing side walls and various floor slabs in the open excavation pit; Step 1.6: construct concealed excavation retaining piles inside the open excavation pit.
7. The subway station construction method according to claim 5, characterized in that: The step 2 comprises the following sub-steps: Step 2.1, after the open-cut structure reaches the design strength, a horse head gate advance support is applied at the station track area within the open-cut structure; Step 2.2, using the jump-bin method to break the horse head door, and using the step method to excavate the upper step (31) of the dark excavation channel in the single-bin channel (3) opened by the jump-bin method, and excavate to the end steel end (32); Step 2.3, using the step method to respectively excavate the middle step (33) and the lower step (34) of the dark excavation channel in the single-chamber channel, and excavate to the end steel sealing end (32), so that the upper step section, the middle step section and the lower step section of the excavation channel are closed into a ring; Step 2.4: After the dark excavation structure excavated by the skip-bin method and the step method reaches the designed strength, repeat steps 2.1 to 2.3 to horizontally expand the unexcavated part of the dark excavation area.
8. The subway station construction method according to claim 7, characterized in that: The step method comprises: step 2.21, erecting a steel frame; Step 2.22, set the locking foot; Step 2.23, erecting a cross brace (35) at the top of the passages of the upper step (31), the middle step (33) and the lower step (34); Step 2.24, excavating the passages of the upper step (31), the middle step (33) and the lower step (34) to the end steel capping (32).
9. The subway station construction method according to claim 7, characterized in that: When the step method is used to excavate the dark tunnel, core soil (36) is reserved in front of the next wall in the construction cross tunnel.