Construction method of heat preservation and sound insulation floor slab structure
By accurately calculating the parameters of steel mesh and insulation sound insulation layer, using wet process and foamed gypsum-based composite materials, the problems of complex construction and high material cost of existing floor slabs are solved, and efficient and optimized insulation effect and Simplified construction.
Patent Information
- Application Number
- CN202411199128.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-29
AI Technical Summary
The insulation and sound insulation treatment of existing floor slabs is complex, the material cost is high, and it is difficult to ensure long-term results. The design is not refined enough, which makes it difficult to quantify and evaluate the insulation and sound insulation effect.
By accurately calculating the parameters of the steel mesh and insulation sound insulation layer, wet process and foamed gypsum-based composite materials are used, combined with mathematical analysis and engineering practice, the construction process is simplified to ensure accurate construction and optimal use of materials.
It significantly improves construction efficiency and quality, reduces material costs, optimizes thermal insulation and sound insulation performance, simplifies the construction process, and effectively prevents floor slabs from getting damp and moldy.
Smart Images

Figure CN119083639A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building construction, and in particular to a construction method of a thermal insulation and sound insulation floor structure. Background Art
[0002] In the prior art, the insulation and sound insulation treatment of the floor slab mostly adopts a multi-layer structure, which is complex to construct and has high material costs, and it is difficult to ensure long-term insulation and sound insulation effects. In addition, during the design and construction process, the design of the insulation and sound insulation structure is not refined enough, resulting in high material costs, inaccurate design, and unable to ensure the quality and life of later use. The construction has problems such as single material performance, complex construction procedures, and difficulty in quantifying and evaluating the insulation and sound insulation effects. Therefore, it is urgent to propose an innovative construction method for insulation and sound insulation floor slab structures. Summary of the invention
[0003] In view of the above-mentioned deficiencies in the prior art, the present invention provides a construction method for a thermal insulation and sound insulation floor structure to improve construction efficiency and quality.
[0004] In order to achieve the above-mentioned object of the invention, the technical solution adopted by the present invention is:
[0005] A construction method for a thermal insulation and sound insulation floor structure is provided, which comprises the following steps:
[0006] S1: Determine the design load on the floor surface according to the purpose of the target floor, based on the maximum crack width ω allowed during use after construction max Calculate the steel bar diameter d required for the steel mesh in the concrete cover 2 ;
[0007] S2: According to the surface area A of the floor, calculate the laying spacing s of the steel bars of the steel mesh on the horizontal plane and the number of steel bars n used;
[0008] S3: Calculate the thickness of the thermal insulation and sound insulation layer based on the thermal insulation and sound insulation material selected for the thermal insulation and sound insulation layer and the designed heat transfer coefficient and sound insulation of the thermal insulation and sound insulation layer;
[0009] S4: Pop up the elevation horizontal lines on the walls around the floor base and check whether they are correct. Then, clean the surface of the floor base to ensure there is no debris.
[0010] S5: Paste vertical sound insulation sheets at the corners and door sills, and then set edge protection layers around the floor and at the junctions of the walls. The edge protection layer uses a matching new EVA insulation and sound insulation membrane. The thickness of the edge protection layer is not less than 3mm, and ensure that the junctions are tightly pasted;
[0011] S6: preparing a thermal insulation and sound insulation layer material, wherein the thermal insulation and sound insulation layer material is a slurry of a foamed gypsum-based composite material, and applying the slurry evenly on the floor base using a wet process to form a thermal insulation and sound insulation layer;
[0012] S7: After the slurry solidifies, use gypsum-based self-leveling with adhesive powder added to evenly brush it on the thermal insulation and sound insulation layer to form a leveling layer, ensuring that the flatness should not be greater than 5mm;
[0013] S8: After the leveling layer is dry, a steel mesh is built on the leveling layer according to the number of steel bars n and the steel bar laying spacing s, and concrete is poured to form a concrete protective layer.
[0014] S9: After the concrete protective layer solidifies, the construction of the thermal insulation and sound insulation floor structure is completed.
[0015] Furthermore, the steel bar diameter d 2 The calculation method is:
[0016]
[0017] Among them, α is the stress characteristic coefficient of the concrete cover, ψ is the strain non-uniformity coefficient of the tensile steel bar when cracks occur, σ is the equivalent stress generated by the steel bar, E is the elastic modulus of the steel bar, c is the design thickness of the concrete cover, d is 1 is the equivalent diameter of the steel bar, ρ is the reinforcement ratio, f is the standard value of the tensile strength of the concrete cover, A 1 is the cross-sectional area of the steel bar, A 2 is the cross-sectional area of the concrete cover, v is the relative bonding characteristic coefficient of the steel bar, k 1 is the crack correction factor;
[0018] Furthermore, the method for calculating the laying spacing s of the steel bars of the steel mesh in the horizontal plane and the number of steel bars n used is as follows;
[0019]
[0020] in, To round down, To round up to an integer, L is the length of the floor, W is the width of the floor, Indicates the number of steel bars in the length direction. Indicates the number of steel bars in the width direction. Indicates the number of steel bars in the length direction. It represents the number of steel grids in the width direction, and κ is the construction allowance at the edge of the steel mesh.
[0021] Further, step S3 includes:
[0022] S31: Calculate the thickness N of the thermal insulation layer according to the thermal insulation material selected for the thermal insulation layer. 1 ;
[0023]
[0024] Among them, R 1 is the heat transfer resistance of the floor slab below the thermal insulation layer, R 2 is the heat transfer resistance of the leveling layer above the thermal insulation layer, δ is the unit thickness of the thermal insulation layer, λ is the thermal conductivity of the thermal insulation layer material per unit thickness, a is the correction factor of the thermal conductivity, K 0 The design heat transfer coefficient of the thermal insulation layer;
[0025] S32: Design sound insulation value Y based on thermal insulation layer 0 , calculate the thickness N of the thermal insulation layer 2 ;
[0026]
[0027] Where g is the acceleration due to gravity, ρ 1 is the density of thermal insulation and sound insulation materials, f′ is the frequency of noise sound waves, ρ 0 is the speed of sound waves, C is the air density;
[0028] S33: Take thickness N 2 With N 1 The maximum value between the two values is taken as the thickness of the thermal insulation and sound insulation layer.
[0029] Furthermore, the foamed gypsum-based composite material includes 60 to 85 parts of α-type high-strength gypsum, 0.06 to 0.12 parts of slow-setting water-reducing agent, 30 to 50 parts of water, 0 part < and ≤ 3 parts of waterproofing agent, 1 to 3 parts of composite foaming agent, and 5 to 15 parts of lightweight aggregate.
[0030] Furthermore, the gypsum base includes 100 to 120 parts of phosphogypsum or desulfurized gypsum, 35 to 50 parts of water, 0.26 to 1.12 parts of slow-setting water-reducing agent, 0.2 to 0.8 parts of waterproofing agent, and 0.2 to 0.5 parts of mildewproofing agent.
[0031] The beneficial effects of the present invention are as follows: Based on the performance requirements of the thermal insulation and sound insulation floor structure design, the present invention accurately calculates the construction parameters of each main functional layer, ensures accurate construction, and the effect of use after construction, so that the thermal insulation and sound insulation floor structure can show the best performance with the least material cost. By combining refined mathematical analysis with engineering practice, the thermal insulation and sound insulation performance is optimized, and the construction efficiency and quality level are significantly improved. The thermal insulation and sound insulation layer material provided by the present invention has better thermal insulation performance and sound insulation effect. The construction process is simplified, and the construction difficulty and cost are reduced; the moisture-proof and mildew-proof gypsum self-leveling mortar effectively prevents the problem of moisture and mildew on the floor. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 Flow chart of the construction method of thermal insulation and sound insulation floor structure. DETAILED DESCRIPTION
[0033] The specific implementation modes of the present invention are described below so that those skilled in the art can understand the present invention. However, it should be clear that the present invention is not limited to the scope of the specific implementation modes. For those of ordinary skill in the art, as long as various changes are within the spirit and scope of the present invention as defined and determined by the attached claims, these changes are obvious, and all inventions and creations utilizing the concept of the present invention are protected.
[0034] like Figure 1 As shown, a construction method of a thermal insulation and sound insulation floor structure comprises the following steps:
[0035] S1: Determine the design load on the floor surface according to the purpose of the target floor, based on the maximum crack width ω allowed during use after construction max Calculate the steel bar diameter d required for the steel mesh in the concrete cover 2 ; Steel bar diameter d 2 The calculation method is:
[0036]
[0037] Among them, α is the stress characteristic coefficient of the concrete cover, ψ is the strain non-uniformity coefficient of the tensile steel bar when cracks occur, which is generally taken as 1.0, σ is the equivalent stress generated by the steel bar, E is the elastic modulus of the steel bar, c is the design thickness of the concrete cover, d 1 is the equivalent diameter of the steel bar, ρ is the reinforcement ratio, which can represent the distribution density of the steel bar on the cross section of the concrete cover, f is the standard value of the tensile strength of the concrete cover, A 1 is the cross-sectional area of the steel bar, A 2 is the cross-sectional area of the concrete cover, v is the relative bonding characteristic coefficient of the steel bar, k 1is the crack correction coefficient, which is generally 0.8-0.6 to reduce the risk of accidental errors;
[0038] S2: According to the surface area A of the floor, calculate the laying spacing s of the steel bars of the steel mesh on the horizontal plane and the number of steel bars n used;
[0039]
[0040] in, To round down, To round up to an integer, L is the length of the floor, W is the width of the floor, Indicates the number of steel bars in the length direction. Indicates the number of steel bars in the width direction. Indicates the number of steel bars in the length direction. It represents the number of steel grids in the width direction, and κ is the construction allowance at the edge of the steel mesh.
[0041] First, calculate the number of grids in the length direction (including the grids at both ends), and then calculate the number of grids in the width direction. However, it should be noted that this calculation method is actually an estimate because it does not take into account the actual staggering or overlapping between the steel bars, nor does it take into account the gaps between the steel bars. This scheme assumes that the arrangement of the steel bars is uniformly parallel for calculation.
[0042] S3: Calculate the thickness of the thermal insulation and sound insulation layer based on the thermal insulation and sound insulation material selected for the thermal insulation and sound insulation layer and the designed heat transfer coefficient and the designed sound insulation of the thermal insulation and sound insulation layer; Step S3 specifically includes:
[0043] S31: Calculate the thickness N of the thermal insulation layer according to the thermal insulation material selected for the thermal insulation layer. 1 ;
[0044]
[0045] Among them, R 1 is the heat transfer resistance of the floor slab below the thermal insulation layer, generally 0.17, R 2 is the heat transfer resistance of the leveling layer above the thermal insulation layer, which is generally taken as 0.16, δ is the unit thickness of the thermal insulation layer, λ is the thermal conductivity of the thermal insulation layer material per unit thickness, a is the correction factor of the thermal conductivity, K 0 The design heat transfer coefficient of the thermal insulation layer;
[0046] S32: Design sound insulation value Y based on thermal insulation layer 0 , calculate the thickness N of the thermal insulation layer 2 ;
[0047]
[0048] Where g is the acceleration due to gravity, ρ 1 is the density of thermal insulation and sound insulation materials, f′ is the frequency of noise sound waves, ρ 0 is the speed of sound waves, C is the air density;
[0049] S33: Take thickness N 2 With N 1 The maximum value between the two values is taken as the thickness of the thermal insulation and sound insulation layer.
[0050] S4: Pop up the elevation horizontal lines on the walls around the floor base and check whether they are correct. Then, clean the surface of the floor base to ensure there is no debris.
[0051] S5: Paste vertical sound insulation sheets at the corners and door sills, and then set edge protection layers around the floor and at the junctions of the walls. The edge protection layer uses a matching new EVA insulation and sound insulation membrane. The thickness of the edge protection layer is not less than 3mm, and ensure that the junctions are tightly pasted;
[0052] S6: Prepare thermal insulation and sound insulation layer materials, which are slurry of foamed gypsum-based composite materials. The slurry is evenly spread on the floor base using a wet process to form a thermal insulation and sound insulation layer. The foamed gypsum-based composite material includes 60 to 85 parts of α-type high-strength gypsum, 0.06 to 0.12 parts of slow-setting water-reducing agent, 30 to 50 parts of water, 0 parts < and ≤ 3 parts of waterproofing agent, 1 to 3 parts of composite foaming agent, and 5 to 15 parts of lightweight aggregate.
[0053] S7: After the slurry solidifies, use a gypsum-based self-leveling agent with added adhesive powder to evenly brush it on the thermal insulation and sound insulation layer for leveling to form a leveling layer, ensuring that the flatness should not be greater than 5mm; the gypsum base includes 100 to 120 parts of phosphogypsum or desulfurized gypsum, 35 to 50 parts of water, 0.26 to 1.12 parts of slow-setting water-reducing agent, 0.2 to 0.8 parts of waterproofing agent, and 0.2 to 0.5 parts of mildew inhibitor.
[0054] S8: After the leveling layer is dry, a steel mesh is built on the leveling layer according to the number of steel bars n and the steel bar laying spacing s, and concrete is poured to form a concrete protective layer.
[0055] S9: After the concrete protective layer solidifies, the construction of the thermal insulation and sound insulation floor structure is completed.
[0056] The present invention is based on the performance requirements of the thermal insulation and sound insulation floor structure design, accurately calculates the construction parameters of each main functional layer, ensures accurate construction, and the effect of use after construction, so that the thermal insulation and sound insulation floor structure can show the best performance with the least material cost. By combining refined mathematical analysis with engineering practice, the thermal insulation and sound insulation performance is optimized, and the construction efficiency and quality level are significantly improved. The thermal insulation and sound insulation layer material provided by the present invention has better thermal insulation performance and sound insulation effect. The construction process is simplified, and the construction difficulty and cost are reduced; the moisture-proof and mildew-proof gypsum self-leveling mortar effectively prevents the problem of moisture and mildew on the floor.
Claims
1. A construction method for a thermal insulation and sound insulation floor structure, characterized in that: The following steps are involved: S1: Determine the design load on the floor surface according to the purpose of the target floor, based on the maximum crack width ω allowed during use after construction max Calculate the steel bar diameter d2 required for the steel mesh in the concrete cover; S2: According to the surface area A of the floor, calculate the laying spacing s of the steel bars of the steel mesh on the horizontal plane and the number of steel bars n used; S3: Calculate the thickness of the thermal insulation and sound insulation layer based on the thermal insulation and sound insulation material selected for the thermal insulation and sound insulation layer and the designed heat transfer coefficient and sound insulation of the thermal insulation and sound insulation layer; S4: Pop up the elevation horizontal lines on the walls around the floor base and check whether they are correct. Then, clean the surface of the floor base to ensure there is no debris. S5: Paste vertical sound insulation sheets at the corners and door sills, and then set edge protection layers around the floor and at the junctions of the walls. The edge protection layer uses a matching new EVA insulation and sound insulation membrane. The thickness of the edge protection layer is not less than 3mm, and ensure that the junctions are tightly pasted; S6: preparing a thermal insulation and sound insulation layer material, wherein the thermal insulation and sound insulation layer material is a slurry of a foamed gypsum-based composite material, and applying the slurry evenly on the floor base using a wet process to form a thermal insulation and sound insulation layer; S7: After the slurry solidifies, use a gypsum-based self-leveling agent with adhesive powder added to evenly brush it on the thermal insulation and sound insulation layer to form a leveling layer, ensuring that the flatness should not be greater than 5mm; S8: After the leveling layer is dry, a steel mesh is built on the leveling layer according to the number of steel bars n and the steel bar laying spacing s, and concrete is poured to form a concrete protective layer. S9: After the concrete protective layer solidifies, the construction of the thermal insulation and sound insulation floor structure is completed.
2. The construction method of the thermal insulation and sound insulation floor structure according to claim 1, characterized in that: The calculation method of the steel bar diameter d2 is: Among them, α is the stress characteristic coefficient of the concrete cover, ψ is the strain non-uniformity coefficient of the tensile steel bar when cracks occur, σ is the equivalent stress generated by the steel bar, E is the elastic modulus of the steel bar, c is the design thickness of the concrete cover, d1 is the equivalent diameter of the steel bar, ρ is the reinforcement ratio, f is the standard value of the tensile strength of the concrete cover, A1 is the cross-sectional area of the steel bar, A2 is the cross-sectional area of the concrete cover, v is the relative bonding characteristic coefficient of the steel bar, and k1 is the crack correction coefficient.
3. The construction method of the thermal insulation and sound insulation floor structure according to claim 1, characterized in that: The method for calculating the laying spacing s of the steel bars of the steel mesh on the horizontal plane and the number of steel bars n used is: in, To round down, To round up to an integer, L is the length of the floor, W is the width of the floor, Indicates the number of steel bars in the length direction. Indicates the number of steel bars in the width direction. Indicates the number of steel bars in the length direction. It represents the number of steel grids in the width direction, and κ is the construction allowance at the edge of the steel mesh.
4. The construction method of the thermal insulation and sound insulation floor structure according to claim 1, characterized in that: The step S3 comprises: S31: Calculate the thickness N1 of the thermal insulation and sound insulation layer according to the thermal insulation and sound insulation material selected for the thermal insulation and sound insulation layer; Wherein, R1 is the heat transfer resistance of the floor base below the thermal insulation layer, R2 is the heat transfer resistance of the leveling layer above the thermal insulation layer, δ is the unit thickness of the thermal insulation layer, λ is the thermal conductivity of the thermal insulation layer material per unit thickness, a is the correction factor of the thermal conductivity, and K0 is the design heat transfer coefficient of the thermal insulation layer; S32: Calculate the thickness N2 of the thermal insulation and sound insulation layer based on the designed sound insulation value Y0 of the thermal insulation and sound insulation layer; Among them, g is the acceleration of gravity, ρ1 is the density of the thermal insulation material, f' is the frequency of the noise sound wave, ρ0 is the speed of the sound wave, and C is the air density; S33: Take the maximum value between thickness N2 and N1 as the thickness of the thermal insulation layer.
5. The construction method of the thermal insulation and sound insulation floor structure according to claim 1, characterized in that: The foamed gypsum-based composite material comprises 60 to 85 parts of α-type high-strength gypsum, 0.06 to 0.12 parts of slow-setting water-reducing agent, 30 to 50 parts of water, 0 to 3 parts of waterproofing agent, 1 to 3 parts of composite foaming agent, and 5 to 15 parts of lightweight aggregate.
6. The construction method of the thermal insulation and sound insulation floor structure according to claim 1, characterized in that: The gypsum base includes 100 to 120 parts of phosphogypsum or desulfurized gypsum, 35 to 50 parts of water, 0.26 to 1.12 parts of slow-setting water-reducing agent, 0.2 to 0.8 parts of waterproofing agent, and 0.2 to 0.5 parts of mildewproofing agent.
Citation Information
Patent Citations
Composition (floor) slab of steel bar welding orthogonal net rack and concrete
CN102776973A
Floating-constructed thermal-insulating and sound-insulating floorslab system and construction method thereof
CN108385934A
Gypsum-based composite sound insulation terrace and construction method thereof
CN113175180A
Phosphogypsum-based sound insulation self-leveling mortar and application thereof
CN114573314A
Gypsum-based sound insulation and heat preservation floor slab system and construction method thereof
CN115897942A