Construction method of continuous casting foundation ladle turret structure platform top plate

By using a combination of prefabricated steel support frame and steel pipe support frame in the roof construction of the continuous casting foundation large-bundled rotary table structural platform, efficient and safe construction is achieved, solving the problems of load concentration and low construction efficiency in traditional methods, significantly shortening it The construction cycle was completed.

CN119083724APending Publication Date: 2024-12-06SHANGHAI BAOYE GRP CORP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411372175.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-29
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

During the construction of the roof of the large-block rotary table structural platform of the continuous casting foundation, traditional methods lead to concentrated loads, large support loads, high support heights, high construction risks, and low installation efficiency of steel pipe support frames, making it difficult to shorten the project construction period.

Method used

Prefabricated steel support frames are used as the foundation, and steel pipe support frames are erected around the steel support frames, formwork and reinforced concrete are installed layer by layer, and construction safety and efficiency are ensured by combining prefabricated steel support frames and steel pipe support frames in advance.

Benefits of technology

It effectively shortens the construction cycle, improves construction efficiency, ensures load safety, provides a support system with double insurance, and solves the problems of low construction efficiency and insufficient safety in traditional methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083724A_ABST
    Figure CN119083724A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for a continuous casting foundation ladle turret structure platform top plate. The construction method comprises the steps that a profile steel supporting frame is prefabricated; the profile steel supporting frame is hoisted to the lower layer of a structural plate of the foundation anchor bolt base of the continuous casting machine, and the profile steel supporting frame serves as a support under the foundation anchor bolt base of the continuous casting machine; erecting a steel pipe support frame around the profile steel support frame; mounting a template; mounting a foundation anchor bolt base of the continuous casting machine; installation of continuous casting machine foundation anchor bolt base structural slab steel bars is completed in a layered mode from bottom to top; pouring of concrete of the foundation anchor bolt base structural slab of the continuous casting machine is completed in a layered mode from bottom to top; and the profile steel supporting frame and the steel pipe supporting frame are dismantled, and construction of the continuous casting foundation bale turret structure platform top plate is completed. According to the construction method for the continuous casting foundation bale turret structure platform top plate, the profile steel supporting frame is prefabricated in advance, the construction amount of the steel pipe supporting frame can be reduced, the construction efficiency is improved, and the construction efficiency is greatly improved on the premise that safety and reliability of a supporting system are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of metallurgical construction technology, and in particular to a construction method for a top plate of a continuous casting foundation ladle turntable structure platform, which has the advantages of short construction period, high construction efficiency, good construction safety and can effectively meet load requirements. Background Art

[0002] During the construction of the continuous casting process in the metallurgical industry, the area of ​​the continuous casting foundation ladle turntable is the key area of ​​the entire process. However, the load on the top plate of the continuous casting machine foundation ladle turntable structure platform includes the weight of the anchor bolt base, the deadweight of the reinforced concrete structure, and the construction load. The anchor bolt base is a pre-buried steel base in the platform plate of the ladle base structure, with a total weight of about 13.166t, a thickness of the reinforced concrete slab in the base area of ​​1.600m, and a total load of about 82.268t in the area. The platform plate has a net height of 3.980m and a total height of 11.580m at the top of the plate. Therefore, the anchor bolt base and its area of ​​the continuous casting foundation ladle turntable have unfavorable conditions such as concentrated load, large support load, high support height, and high construction risk during the entire construction process of formwork support frame installation, steel bar installation, and concrete pouring. At the same time, the traditional construction method uses steel pipe scaffolding. In order to meet the calculated load requirements, it is necessary to adopt the method of increasing the horizontal, vertical and step distance of the steel pipe support frame. However, reducing the horizontal, vertical and step distance of the steel pipe support frame also reduces the installation working surface of the support frame, making it difficult for installation workers to operate and reducing construction efficiency. In addition, the steel pipe support frame must be erected on-site to meet the working surface conditions and cannot be prefabricated, which is not conducive to reasonably shortening the project construction period.

[0003] Therefore, it is of great practical significance to develop a construction method for the top plate of the continuous casting foundation turntable structure platform with a short construction period, high construction efficiency, good construction safety and the ability to effectively meet the load requirements. Summary of the invention

[0004] Due to the above-mentioned defects in the prior art, the present invention provides a construction method for the top plate of the structural platform of the continuous casting foundation ladle turntable, which has the advantages of short construction period, high construction efficiency, good construction safety and can effectively meet the load requirements, so as to overcome the defect that the current casting of the top plate of the structural platform of the continuous casting foundation ladle turntable is difficult to take into account high construction efficiency, high construction safety and large load requirements.

[0005] In order to achieve the above object, the present invention provides the following technical solutions:

[0006] A construction method for a top plate of a continuous casting base turntable structure platform comprises the following steps:

[0007] (1) Prefabricated steel support frame;

[0008] (2) hoisting the steel support frame onto the lower layer of the structural plate of the base of the continuous casting machine foundation anchor bolts, and using the steel support frame as a support directly below the base of the continuous casting machine foundation anchor bolts;

[0009] (3) Erect a steel pipe support frame around the steel support frame;

[0010] (4) Install the template;

[0011] (5) Install the anchor bolt base of the continuous casting machine foundation;

[0012] (6) Complete the installation of the continuous casting machine foundation anchor bolts and base structure plate steel bars layer by layer from bottom to top;

[0013] (7) Complete the pouring of concrete for the base structural slab of the continuous casting machine foundation anchor bolts from bottom to top;

[0014] (8) Remove the steel support frame and steel pipe support frame and complete the construction of the top plate of the continuous casting foundation turntable structure platform.

[0015] The construction method of the top plate of the continuous casting foundation ladle turntable structure platform of the present invention prefabricates the steel support frame in advance, which can greatly reduce the construction volume of the steel pipe support frame and speed up the construction efficiency. Under the premise of ensuring the safety and reliability of the support system, the construction efficiency is greatly improved. The construction period is short and the load requirements can be effectively met. The safety of the high formwork support when the top plate of the continuous casting foundation ladle turntable structure platform is cast can be effectively ensured, and the application prospect is very bright.

[0016] As the preferred technical solution:

[0017] A construction method for the top plate of the continuous casting base turntable structure platform as described above, wherein the steel support frame includes a crossbeam and a column;

[0018] The columns are arranged vertically, the tops of adjacent columns are connected by cross beams, and the adjacent columns are connected by inter-column scissor braces.

[0019] In the construction method of the top plate of the continuous casting foundation ladle turntable structure platform as described above, there are four columns in total and the four columns are arranged in a square shape;

[0020] A column base plate is welded at the bottom of the column to increase the contact area of ​​the bottom of the column.

[0021] In the construction method of the top plate of the continuous casting foundation turntable structure platform as described above, the steel support frame is hoisted after the lower layer of the base structure plate of the continuous casting machine foundation anchor bolts is completed and reaches the design strength value;

[0022] Before hoisting the steel support frame, the positioning line is marked on the lower layer of the structural plate of the anchor bolt base of the continuous casting machine foundation and its elevation is remeasured to avoid large elevation deviation of the support frame position affecting the construction of the upper anchor bolt base and the reinforced concrete structure top plate.

[0023] In the construction method of the top plate of the continuous casting foundation ladle turntable structure platform as described above, the longitudinal and transverse spacing of the steel pipe support frame is 500 mm, and the step distance is 1200 mm.

[0024] A construction method for the top plate of the continuous casting foundation ladle turntable structure platform as described above, wherein the template includes a template main beam, a template secondary beam and a template panel;

[0025] The bottom elevation of the template main beam is the same as the top elevation of the steel support frame.

[0026] In the construction method of the top plate of the continuous casting foundation turntable structure platform described above, the operation of installing the continuous casting machine foundation anchor bolt base is specifically as follows:

[0027] First mark the positioning line of the continuous casting machine foundation anchor bolt base, then remeasure the elevation of the continuous casting machine foundation anchor bolt base, and hoist the continuous casting machine foundation anchor bolt base after the remeasurement is correct.

[0028] As described above, a construction method for the top plate of the continuous casting foundation turntable structure platform is provided, and before pouring the concrete of the continuous casting machine foundation anchor bolt base structural plate, the opening of the continuous casting machine foundation anchor bolt base is temporarily blocked and protected to prevent the mortar from falling during the concrete pouring and causing the opening to be blocked and difficult to clean.

[0029] In the construction method of the top plate of the continuous casting foundation turntable structure platform as described above, the concrete is cured before the steel support frame and the steel pipe support frame are removed.

[0030] A construction method for the top plate of the continuous casting foundation turntable structure platform as described above, first dismantling the steel pipe support frame and then dismantling the steel support frame;

[0031] The dismantling of the steel pipe support frame follows the principle of top-down, first support and then dismantling, and then dismantling the rear support first;

[0032] The steel support frame uses the hole after the anchor bolt base is demolded as the hanging point, and adopts manual combined with hand winches to remove the beams, column scissors braces and columns in turn.

[0033] The above technical solution is only a feasible technical solution of the present invention, and the protection scope of the present invention is not limited thereto. Those skilled in the art can reasonably adjust the specific design according to actual needs.

[0034] The above invention has the following advantages or beneficial effects:

[0035] (1) The construction method of the top plate of the continuous casting foundation turntable of the present invention combines a prefabricated steel support frame on the basis of a conventional simple steel pipe support frame. In the template support system, the steel support frame mainly bears the anchor bolt base load and a part of the reinforced concrete deadweight load, and the steel pipe support frame mainly bears a part of the reinforced concrete deadweight load, which solves the problem that the horizontal and vertical distances of the simple steel pipe support frame are too dense and there is no operating space for erection. At the same time, the combination of the steel support frame and the steel pipe support frame provides double insurance for the construction of the upper anchor bolt base and the structural plate, and has good reliability;

[0036] (2) In the construction method of the top plate of the continuous casting foundation turntable structure platform of the present invention, the steel support frame is prefabricated in advance and hoisted into place at one time, which can improve the efficiency of the support system erection, reduce the difficulty of erecting the steel pipe support frame, and help to reasonably shorten the construction period;

[0037] (3) The construction method of the top plate of the continuous casting foundation turntable structure platform of the present invention has a short construction period, high construction efficiency, good construction safety and can effectively meet the load requirements, and has great application prospects. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] The present invention and its features, aspects and advantages will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings, in which like reference numerals indicate like parts throughout the drawings, with emphasis placed on illustrating the gist of the present invention.

[0039] Figure 1 This is a schematic diagram of the top plate of the continuous casting base turntable structure platform;

[0040] Figure 2 Plan view of the base of anchor bolts for the steel support frame supporting the continuous casting machine foundation;

[0041] Figure 3 Elevation view of the base of anchor bolts for the continuous casting machine foundation supported by the steel support frame;

[0042] Among them, 1-continuous casting machine foundation anchor bolt base, 2-continuous casting machine foundation anchor bolt base structural plate lower layer, 3-steel support frame, 31-crossbeam, 32-column, 33-scissors brace between columns. DETAILED DESCRIPTION

[0043] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but they are not intended to limit the present invention.

[0044] Example 1

[0045] A continuous casting base ladle turntable structure platform top plate (such as Figure 1 The construction method of the present invention comprises the following steps:

[0046] (1) Prefabrication of steel support frame

[0047] Steel support frame Figures 2-3 As shown, it is mainly composed of beams 31, columns 32 and inter-column scissor braces 33. The beams 31 and columns 32 are made of H-shaped steel HW250×250×9×14, and the inter-column scissor braces 33 are made of angle steel 100×10. First, four beams 31 are assembled into a square frame platform according to the size of the anchor bolt base, and four columns 32 are connected at the corners of each square frame platform. The height of the column is determined according to the net height of the support space. A 300mm long, 300mm wide, and 12mm thick steel plate is welded at the bottom of the column as a column foot plate to increase the contact area of ​​the bottom of the column. The steel support frame mainly bears the anchor bolt base load, reinforced concrete deadweight load and construction load in the large package turntable area. The steel support frame is prefabricated outside the area to solve the problems of low construction efficiency and long construction period of the steel pipe scaffolding support frame.

[0048] (2) Installation of steel support frame

[0049] After the lower 2 structure of the structural plate of the base of the continuous casting machine foundation anchor bolts is completed and reaches the design strength value, the prefabricated steel support frame will be hoisted into place in advance. Before hoisting into place, the positioning line will be marked on the bottom concrete surface and the bottom layer elevation will be re-measured to avoid large deviations in the elevation of the support frame position that will affect the construction of the upper anchor bolt base and the reinforced concrete structure top plate.

[0050] (3) Erection of steel pipe support frame

[0051] Because the spacing between the anchor bolt base beams is large, and the anchor bolt base structural plate is 1.600m thick, during the concrete construction process, the mid-span disturbance between the beams will occur due to the heavy weight of the plate, which will seriously cause the support formwork and the primary and secondary ribs to break and leak. For this reason, after the steel support frame is in place, it must be combined with the steel pipe support frame. The vertical and horizontal spacing of the steel pipe support frame is 500mm, and the step distance is 1200mm. It is erected according to the unified standard of construction scaffolding safety technology. The steel support frame bears the load of the anchor bolt base and part of the reinforced concrete load, which makes the horizontal and vertical step distance of the steel pipe support frame convenient to set up. At the same time, the combination of the steel support frame and the steel pipe support frame provides double insurance for the construction of the upper anchor bolt base and the structural plate.

[0052] (4) Template installation

[0053] The main beam of the formwork is made of Φ48.3×3.0 steel pipe, the secondary beam is made of 35×85 square wood, and the panel is made of 15mm plywood. The top elevation of the steel support frame is the same as the bottom elevation of the main beam supported by the formwork, that is, the main beam supported by the formwork is above the steel support frame.

[0054] (5) Anchor bolt base installation

[0055] After the template is installed, the anchor bolt base 1 of the continuous casting machine foundation is hoisted into place. Before hoisting into place, the anchor bolt base positioning line is marked, and the anchor bolt base elevation is remeasured to ensure the pre-embedded installation accuracy of the anchor bolt base. After the installation remeasurement is correct, the base position elevation is fixed in the next construction process to prevent deviations in the base position elevation. At the same time, the anchor bolt base hole is temporarily blocked to prevent mortar from falling during concrete pouring, causing the hole to be blocked and difficult to clean.

[0056] (6) Steel bar installation

[0057] After the continuous casting machine foundation anchor bolt base 1 is installed and fixed, the anchor bolt base structural plate steel bar installation is carried out. The steel bars are installed from bottom to top, layer by layer, and are anchored and connected in accordance with the specifications and models required by the design specifications.

[0058] (7) Concrete pouring

[0059] The thickness of the bolt base structure plate is large, so it should be poured and vibrated in layers, with each layer of 500mm. The ash outlet is not concentrated at one point, but poured in a dispersed manner. The concrete vibration points are uniform and the spacing is not greater than 500mm. The layered pouring is divided into vibration, and the vibration should be inserted into the next layer of concrete 50mm to eliminate the joints between the two layers.

[0060] (8) Concrete curing

[0061] Concrete curing should choose reasonable curing methods according to climate and on-site construction conditions to ensure that the temperature difference between the concrete surface and the internal center is no more than 25℃, and the temperature difference between the concrete surface and the outside temperature is no more than 25℃.

[0062] (9) Removal of steel support frame and steel pipe support frame

[0063] The bolt base structural plate is tested for rebound and the same condition test block. When the concrete structure reaches 100% of the design strength, the steel support frame and steel pipe support frame are removed. The removal order should be to remove the steel pipe support frame first and then the steel support frame. The steel pipe support removal follows the principle of top-to-bottom, first support and then removal, and then the latter support and first removal. The steel support frame uses the hole after the anchor bolt base is demolded as the hanging point, and the crossbeam, column scissor support and column are removed in turn by manual combined with hand winch.

[0064] It has been verified that the construction method of the top plate of the structural platform of the turntable of the continuous casting foundation package of the present invention is based on the conventional simple steel pipe support frame and combined with the prefabricated steel support frame in advance. In the formwork support system, the steel support frame mainly bears the anchor bolt base load and a part of the reinforced concrete deadweight load, and the steel pipe support frame mainly bears a part of the reinforced concrete deadweight load, which solves the problem that the horizontal and vertical steps of the simple steel pipe support frame are too dense and there is no erection operation space. At the same time, the combination of the steel support frame and the steel pipe support frame provides double insurance for the construction of the upper anchor bolt base and the structural plate, and has good reliability; the steel support frame is prefabricated in advance and hoisted into place at one time, which can improve the erection efficiency of the support system, reduce the difficulty of erecting the steel pipe support frame, and is conducive to reasonably shortening the construction period; the construction period is short, the construction efficiency is high, the construction safety is good, and the load requirements can be effectively met, and it has great application prospects.

[0065] Those skilled in the art should understand that those skilled in the art can implement variations by combining the prior art and the above embodiments, which will not be described in detail here. Such variations do not affect the essential content of the present invention, and will not be described in detail here.

[0066] The above describes the preferred embodiments of the present invention. It should be understood that the present invention is not limited to the above-mentioned specific embodiments, and the devices and structures that are not described in detail should be understood to be implemented in a common manner in the art; any technician familiar with the art can use the above-disclosed methods and technical contents to make many possible changes and modifications to the technical solutions of the present invention without departing from the scope of the technical solutions of the present invention, or modify them into equivalent embodiments of equivalent changes, which does not affect the essential content of the present invention. Therefore, any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solutions of the present invention are still within the scope of protection of the technical solutions of the present invention.

Claims

1. A construction method for the top plate of the continuous casting base turntable structure platform, Features: The following steps are involved: (1) Prefabricated steel support frame; (2) hoisting the steel support frame onto the lower layer of the structural plate of the base of the continuous casting machine foundation anchor bolts, and using the steel support frame as a support directly below the base of the continuous casting machine foundation anchor bolts; (3) Erect a steel pipe support frame around the steel support frame; (4) Install the template; (5) Install the anchor bolt base of the continuous casting machine foundation; (6) Complete the installation of the continuous casting machine foundation anchor bolts and base structure plate steel bars layer by layer from bottom to top; (7) Complete the pouring of concrete for the base structural slab of the continuous casting machine foundation anchor bolts from bottom to top; (8) Remove the steel support frame and steel pipe support frame and complete the construction of the top plate of the continuous casting foundation turntable structure platform.

2. A construction method for a top plate of a continuous casting base turntable structure platform according to claim 1, It is characterized in that The steel support frame includes a crossbeam and a column; The columns are arranged vertically, the tops of adjacent columns are connected by cross beams, and the adjacent columns are connected by inter-column scissor braces.

3. The construction method of the top plate of the continuous casting base turntable structure platform according to claim 2, It is characterized in that There are four pillars in total and the four pillars are arranged in a square shape; A column base plate is welded to the bottom of the column.

4. The construction method of the top plate of the continuous casting base turntable structure platform according to claim 1, It is characterized in that The hoisting of the steel support frame is carried out after the lower layer of the base structure plate of the continuous casting machine foundation anchor bolts is completed and reaches the design strength value; Before hoisting the steel support frame, mark the positioning line on the lower layer of the base structure plate of the continuous casting machine foundation anchor bolts and remeasure its elevation.

5. The construction method of the top plate of the continuous casting base turntable structure platform according to claim 1, It is characterized in that The longitudinal and transverse spacing of the steel pipe support frame is 500 mm, and the step distance is 1200 mm.

6. The construction method of the top plate of the continuous casting base turntable structure platform according to claim 1, It is characterized in that The template includes a template main beam, a template secondary beam and a template panel; The bottom elevation of the template main beam is the same as the top elevation of the steel support frame.

7. The construction method of the top plate of the continuous casting base turntable structure platform according to claim 1, It is characterized in that The specific operation of installing the continuous casting machine foundation anchor bolt base is: First mark the positioning line of the continuous casting machine foundation anchor bolt base, then remeasure the elevation of the continuous casting machine foundation anchor bolt base, and hoist the continuous casting machine foundation anchor bolt base after the remeasurement is correct.

8. The construction method of the top plate of the continuous casting base turntable structure platform according to claim 1, It is characterized in that Before pouring the concrete of the structural slab of the base of the continuous casting machine foundation anchor bolts, the openings of the base of the continuous casting machine foundation anchor bolts are temporarily blocked and protected.

9. The construction method of the top plate of the continuous casting base turntable structure platform according to claim 1, It is characterized in that The concrete is cured before removing the steel support frame and steel pipe support frame.

10. The construction method of the top plate of the continuous casting base turntable structure platform according to claim 1, It is characterized in that First remove the steel pipe support frame and then remove the steel support frame; The dismantling of the steel pipe support frame follows the principle of top-down, first support and then dismantling, and then dismantling the rear support first; The steel support frame uses the hole after the anchor bolt base is demolded as the hanging point, and adopts manual combined with hand winches to remove the beams, column scissors braces and columns in turn.

Citation Information

Patent Citations

  • Combination hoisting mounting method of continuous casting ladle turret

    CN106865414A

  • Ladle turret mounting method

    CN112692269A

  • Method for fixing steel ladle turret split bolt positioning formwork

    CN117266225A

  • Locating rack of firmware installation accuracy is watered in assurance

    CN206034931U