Ventilation type cooling tower upgrading and reconstruction construction method

By using the construction method of circulating water pipe brackets, prefabricated wall-through pipes and working platforms in the tower pool on the ventilated cooling tower, combined with the use of rectangular lifting trusses, the problems of low heat exchange efficiency and high operation and maintenance costs of ventilated cooling towers are solved. , achieving more efficient upgrade and transformation and safe installation process.

CN119083791APending Publication Date: 2024-12-06CHINA CHEM ENG SECOND CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411513052.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-28
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The heat exchange efficiency of the ventilation cooling tower is low and the operation and maintenance cost is high, and its upgrade and renovation construction efficiency and quality are difficult to guarantee.

Method used

A construction method including installing the circulating water pipe bracket in the tower pool, prefabricated wall-through pipes, working platforms, dismantling old heat exchangers, installing wall-through pipes and new V-shaped fin heat exchangers, ensuring replacement by rectangular hoisting trusses Heater stability and installation efficiency.

Benefits of technology

It improves the construction efficiency and safety of heat exchanger upgrade and transformation, ensures installation quality and speed, and reduces operation and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083791A_ABST
    Figure CN119083791A_ABST
Patent Text Reader

Abstract

The invention discloses a ventilation type cooling tower upgrading and reconstruction construction method which comprises the following steps: firstly, mounting a circulating water pipeline bracket in a tower pool, and prefabricating a through-wall pipeline; a working platform is mounted on one side of the water cooling tower; dismantling the original heat exchanger, and chiseling through-wall pipe holes; mounting a through-wall pipeline; a novel V-shaped fin type heat exchanger is installed, and circulating water pipelines are all communicated. The operation platform is formed by splicing a plurality of modules, each module is of a frame structure, and checkered plates are laid on the upper portions of the modules. The prefabricated operation platform is hoisted, a cross beam of the prefabricated operation platform is welded to an embedded part on one side of the water cooling tower, and a rectangular hoisting truss is arranged above the V-shaped fin type heat exchanger. The operation platform is prefabricated in advance, so that the upgrading and reconstruction construction efficiency and safety of the heat exchanger are improved. The stability of the hoisted heat exchanger is guaranteed through hoisting of the rectangular truss, and the installation quality and speed are improved. And the construction procedures are closely connected, so that cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cooling tower installation, in particular to a construction method for upgrading and renovating a ventilation cooling tower. Background Art

[0002] At present, the circulating water cooling method mostly adopts ventilation cooling tower technology, which is a technology that uses cooling towers combined with plate heat exchangers to cool the circulating water through direct or indirect contact between water and air. In order to improve the cooling efficiency, the usual practice is to update the cooling tower enclosure, replace the new nozzle, and increase the thickness of the filler. However, due to the inherent characteristics of the plate heat exchanger of the closed cooling tower, the overall heat exchange efficiency is low and the operation and maintenance cost is high.

[0003] In order to solve and improve the problem of low heat exchange efficiency and high operation and maintenance costs of closed cooling towers, the most effective approach is to upgrade the original plate heat exchanger to a new V-shaped fin heat exchanger. In view of the large amount of replacement work, tight construction period and serious construction efficiency reduction in the production area, the renovation of the ventilation cooling tower must adopt reasonable and standardized construction technology to ensure construction quality. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a method for upgrading and renovating a ventilation cooling tower, thereby achieving the purpose of improving the upgrading installation efficiency and ensuring the upgrading installation quality.

[0005] In order to solve the above technical problems, the present invention provides a ventilation cooling tower upgrading and reconstruction construction method, comprising: Step 1: Install the circulating water pipe bracket in the tower pool and prefabricate the wall-penetrating pipe; Step 2: Install a working platform on one side of the cooling tower; Step 3: dismantle the original heat exchanger and drill through the wall pipe hole; Step 4: Install the wall-penetrating pipe; Step 5: Install a new V-shaped fin heat exchanger and connect all circulating water pipes.

[0006] As a preferred embodiment, the circulating water pipeline includes a DN200 water inlet pipeline and a DN200 water outlet pipeline.

[0007] As a preferred embodiment, the working platform described in step 2 is assembled from a plurality of modules, each of which is a frame structure with a patterned plate laid on the upper portion.

[0008] As a preferred implementation, in step 2, the prefabricated working platform is hoisted and its crossbeams are welded to the embedded parts on one side of the cooling tower. After the working platform is installed, the width of the suspended part exposed outside the foundation is 2 meters.

[0009] As a preferred implementation, in step five, a rectangular lifting truss is set above the V-shaped fin heat exchanger. After the V-shaped fin heat exchanger is lifted to the installation position, the upper part of the V-shaped fin heat exchanger is first connected to the reserved structure of the concrete foundation, and then the lower part is connected, and finally the waist is connected. After inspection, the crane is removed.

[0010] Compared with the prior art, the present invention improves the efficiency and safety of heat exchanger upgrading and reconstruction by cleverly designing and prefabricating the operating platform in advance. The use of rectangular trusses for hoisting ensures the stability of the hoisted heat exchanger and improves the installation quality and speed. The construction process is closely connected, which is conducive to cost saving. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] The drawings herein are used to provide further explanation of the present invention and constitute a part of this application. The illustrative embodiments of the present invention and their description are used to explain the present invention and do not constitute improper limitations on the present invention.

[0012] Figure 1 is a schematic structural diagram of a novel V-shaped fin heat exchanger involved in the embodiment; Figure 2 This is the construction process for upgrading and renovating the ventilation cooling tower described in the present invention; Figure 3 It is a structural diagram of the working platform; Figure 4 It is a schematic diagram of the overall operation installation.

[0013] In the figure: 1-DN200 circulating water outlet, 2-DN200 circulating water pipe inlet, 3-cooling tower, 4-working platform, 5-embedded parts, 6-V-shaped fin heat exchanger, 7-rectangular lifting truss, 8-lifting rope, 9-12# channel steel. DETAILED DESCRIPTION

[0014] In order to make those skilled in the art better understand the present invention, the present invention is further clearly and completely described below in conjunction with the accompanying drawings and embodiments. It should be noted that, in the absence of conflict, the features in the embodiments and examples of this application can be combined with each other.

[0015] The basic concept of the present invention is to install a working platform 4 on one side of the cooling tower 3 in advance, to provide a safe and reliable working surface for replacing and installing a new type of finned heat exchanger during construction, and to directly serve as a formal maintenance platform after the construction is completed.

[0016] The use of temporarily fabricated rectangular trusses for hoisting can improve the installation efficiency and quality of the new V-fin heat exchanger 6 .

[0017] like Figure 1As shown, the novel V-shaped fin heat exchanger 6 involved in this embodiment has two DN200 circulating water inlet pipes and two DN200 circulating water outlet pipes, and the inlet and outlet pipe openings follow the principle of low inlet and high outlet.

[0018] like Figure 2 As shown, the main process flow of upgrading and renovating the ventilation cooling tower can be summarized as installing the DN200 circulating water supply and return pipe bracket in the tower pool → prefabricating the through-wall pipe → installing the working platform 4 → removing the old heat exchanger → drilling the DN200 through-wall pipe → installing the DN200 through-wall pipe → installing the new V-shaped fin heat exchanger 6 → connecting all the circulating water pipes → welding seam repairing and anti-corrosion.

[0019] Specifically, this embodiment provides a ventilation cooling tower upgrading and reconstruction construction method, which includes the following steps.

[0020] 1. Install the DN200 circulating water supply and return pipe bracket in the tower pool and prefabricate the DN200 wall-penetrating pipe.

[0021] 2. Prefabricate and install the working platform 4 on one side of the cooling tower 3.

[0022] Specifically, Figure 3 As shown, the entire platform is assembled from multiple modules with specifications of 6m*2.4m. Each module is composed of 4 12# channel steels 9 with a length of 2.4m and 2 12# channel steels 9 with a length of 6m. The frame is paved with patterned plates and tightly spliced ​​together. All joints and welds are painted with epoxy zinc-rich primer, and glass glue is applied at the joints to achieve waterproof and moisture-proof effects. The embedded parts 5 and the entire platform are painted with epoxy zinc-rich primer, epoxy micaceous iron intermediate paint and aliphatic polyurethane topcoat.

[0023] Before installing the working platform 4, on the concrete foundation surface at the bottom of the old heat exchanger, the original embedded parts 5 are polished until the metallic luster is completely exposed. Then the prefabricated working platform 4 is hoisted to the installation height and its crossbeams are welded to the embedded parts 5. After the installation of the working platform 4 is completed, the width of the suspended part exposed outside the foundation is 2 meters.

[0024] 3. Remove the old heat exchanger and drill holes through the wall for the pipes.

[0025] The original plate heat exchanger is connected to the foundation with bolts through embedded parts. First, remove the bolts on both sides of the heat exchanger, then hang a hook on the top of the old heat exchanger to make the heat exchanger bear the lifting traction first, set a traction rope at the center of gravity of the heat exchanger, and one end of the traction rope is pulled by two workers, and then slowly loosen the fixing bolts at the bottom of the heat exchanger. The heat exchanger will tend to fall due to its own weight. At this time, the crane slightly increases the force to ensure that the heat exchanger is in a stable state. Finally, loosen the bolts on the top of the heat exchanger and remove the old heat exchanger. Use the hole after removing the old heat exchanger to transport the DN200 pipe into the tower pool.

[0026] 4. Install DN200 through-wall pipe.

[0027] 5. Install the new V-shaped fin heat exchanger 6 and connect all the circulating water pipes.

[0028] Specifically, the rectangular hoisting truss 7 is connected to the new V-shaped finned heat exchanger 6 through the hoisting rope 8, and the rectangular hoisting truss 7 is connected to the hoisting machine through the hoisting rope 8. After the V-shaped finned heat exchanger 6 is hoisted to the installation position, the upper part is first connected to the reserved structure of the concrete foundation, and then the lower part is connected, and finally the waist is connected. The crane can be removed after inspection. All DN200 circulating water pipes are connected and the welds are anti-corrosive.

[0029] The scope of protection claimed by the present invention is not limited to the above specific embodiments. For those skilled in the art, the present invention may have various deformations and changes. Any modifications, improvements and equivalent substitutions made within the concept and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A construction method for upgrading and renovating a ventilation cooling tower, characterized in that: include: Step 1: Install the circulating water pipe bracket in the tower pool and prefabricate the wall-penetrating pipe; Step 2: Install a working platform on one side of the cooling tower; Step 3: dismantle the original heat exchanger and drill through the wall pipe hole; Step 4: Install the wall-penetrating pipe; Step 5: Install a new V-shaped fin heat exchanger and connect all circulating water pipes.

2. The method for upgrading and renovating a ventilated cooling tower according to claim 1, characterized in that: The circulating water pipeline includes a DN200 water inlet pipeline and a DN200 water outlet pipeline.

3. The method for upgrading and renovating a ventilated cooling tower according to claim 1 or 2, characterized in that: The work platform described in step 2 is assembled from a plurality of modules, each of which is a channel steel frame structure with patterned plates evenly laid on the upper portion.

4. The method for upgrading and renovating a ventilated cooling tower according to claim 3, characterized in that: In step 2, the prefabricated working platform is hoisted and its crossbeams are welded to the embedded parts on one side of the cooling tower. After the working platform is installed, the width of the suspended part exposed outside the foundation is 2 meters.

5. The method for upgrading and renovating a ventilated cooling tower according to claim 1 or 4, characterized in that: In step five, a rectangular hoisting truss is set above the V-shaped fin heat exchanger. After the V-shaped fin heat exchanger is hoisted to the installation position, the upper part of the V-shaped fin heat exchanger is first connected to the reserved structure of the concrete foundation, and then the lower part is connected, and finally the waist is connected. After inspection, the crane is removed.