Underground water level detection device for hydrogeological exploration
By introducing obstacle removal, cleaning and stabilization mechanisms into the groundwater level detection device, the problems of water and grass wrapping, rock bumps and mud and sewage adhesion are solved, and the accuracy and stability of groundwater level measurement are achieved, and equipment damage is avoided.
Patent Information
- Application Number
- CN202411371455.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-29
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing groundwater level measuring instruments are easily entangled by aquatic plants or bumped into rocks during the detection process, and the adhesion of mud and sewage affects the accuracy of measurement, and are prone to swaying and damage when the water is large.
A hydrogeological exploration groundwater level detection device was designed, including obstacle removal mechanism, cleaning mechanism, driving mechanism and stabilization mechanism. Through parts such as breaking knives, scraping mechanisms, sliding plugs and rollers, aquatic plants are cut off and cleaned, and the rocks are removed. , prevent mud and stain from adhering, and stabilize down through the roller to avoid swaying.
It effectively avoids the entanglement of aquatic plants and bumps of rocks, ensures the accuracy of measurement data, prevents motor overload and damage, and ensures the smooth drop of the water level measuring instrument, improving the reliability and stability of measurement.
Smart Images

Figure CN119085798A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of groundwater level detection, and in particular to a groundwater level detection device for hydrogeological exploration. Background Art
[0002] Hydrogeology is a branch of geology, referring to the various changes and movements of groundwater in nature. It mainly studies the distribution and formation of groundwater, the physical properties and chemical composition of groundwater, groundwater resources and their rational utilization, the adverse effects of groundwater on engineering construction and mining and their prevention and control, etc.
[0003] At present, when detecting the groundwater level, a water level measuring instrument is usually slowly lowered into an observation well through a hanging rope, and then the water level is measured by the water level measuring instrument. However, the environment in the groundwater is complex, and there are often a large number of aquatic plants and rocks. After the water level measuring instrument is placed underwater, it may be entangled by the aquatic plants, or bump against the rocks, thereby affecting the real data of the water level measurement. In addition, during the descent, mud in the water may also adhere to the surface of the water level measuring instrument, affecting the normal measurement of the water level measuring instrument. In addition, the existing water level measuring instrument is lowered by a hanging rope. If the groundwater flow is large, the water level measuring instrument will be unstable, which is easy to cause it to bump and cause damage to the water level measuring instrument.
[0004] Based on this, we propose a groundwater level detection device for hydrogeological exploration. Summary of the invention
[0005] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a groundwater level detection device for hydrogeological exploration.
[0006] In order to achieve the above object, the present invention adopts the following technical solutions:
[0007] A groundwater level detection device for hydrogeological exploration comprises a mounting column, wherein the side wall of the mounting column is symmetrically provided with two mounting grooves, and water level measuring instruments are fixedly mounted on the inner walls of the two mounting grooves through fixed shafts;
[0008] The obstacle removal mechanism comprises a rotating shaft rotatably connected to the lower end of the mounting column, a plurality of first crushing knives are fixedly connected to the side wall of the rotating shaft, a mounting cavity is provided in the mounting column, the upper end of the rotating shaft extends into the mounting cavity, a hollow rotating rod is rotatably connected to the bottom of the mounting cavity, the lower end of the hollow rotating rod passes through the lower end of the mounting column and is fixedly connected to the plurality of second crushing knives, and the hollow rotating rod is sleeved on the side wall of the rotating shaft;
[0009] The cleaning mechanism comprises two rectangular cavities symmetrically opened in the mounting column, the inner wall of the rectangular cavity is sealingly and slidingly connected with a sliding plug, the sliding plug is symmetrically and fixedly connected with two sliding rods on the side wall near the water level measuring instrument, and the other ends of the two sliding rods extend into the mounting groove and are fixedly connected with a cleaning ring together.
[0010] Preferably, the cleaning mechanism further comprises a dirt suction cavity provided in the cleaning collar, a plurality of dirt suction holes are provided on the inner wall of the dirt suction cavity, and the dirt suction cavity is connected with the rectangular cavity through a one-way dirt suction pipe.
[0011] Preferably, a scraping mechanism is installed on the mounting column, and the scraping mechanism includes two cleaning blocks symmetrically fixedly connected to the side wall of the mounting column through a bracket, and the side wall of the cleaning block is provided with a first scraping groove and a second scraping groove, and a pump liquid cavity is provided in the cleaning block, and a plurality of spray holes are provided on the inner wall of the pump liquid cavity, and the other ends of the plurality of spray holes are respectively connected to the first scraping groove and the second scraping groove, and the pump liquid cavity is connected to the rectangular cavity through a one-way pump liquid tube.
[0012] Preferably, a driving mechanism is installed on the rotating shaft, and the driving mechanism includes a first ring fixedly connected to the side wall of the rotating shaft, a first annular rack is fixedly connected to the lower end of the first ring, a second ring is fixedly connected to the upper end of the hollow rotating rod, a second annular rack is fixedly connected to the upper end of the second ring, two first shafts are symmetrically rotatably connected to the inner wall of the mounting cavity, a first gear is fixedly connected to the side wall of the first shaft, the first gear is meshed with the first annular rack and the second annular rack, a motor is fixedly connected to the upper end of the mounting column, and the upper end of the rotating shaft passes through the upper end of the mounting column and is fixedly connected to the output end of the motor.
[0013] Preferably, the driving mechanism also includes a slider slidably connected to the inner wall of the rectangular cavity, and the slider is symmetrically fixedly connected to the side wall of the slider close to the sliding plug. The other ends of the two connecting rods are fixedly connected to the sliding plug. A reciprocating screw is rotatably connected to the inner wall of the rectangular cavity, and the side wall of the reciprocating screw is threadedly connected to the slider. Two grooves are symmetrically opened in the mounting column, and the two grooves are connected to the mounting cavity. One end of the reciprocating screw extends into the groove and is fixedly connected to a second gear, and the second gear is meshed with the first gear.
[0014] Preferably, a stabilizing mechanism is installed on the mounting column, and the stabilizing mechanism includes a plurality of mounting plates fixedly connected to the side walls of the mounting column, the side walls of the mounting plates are rotatably connected to a second axis, the side walls of the second axis are symmetrically fixedly connected to two mounting rods, the side walls of the two mounting rods close to each other are rotatably connected to a third axis, the side walls of the third axis are fixedly connected to a roller, and the side walls of the second axis are symmetrically sleeved with two torsion springs, and the two ends of the torsion springs are respectively fixedly connected to the side walls of the mounting plate and the side walls of the mounting rod.
[0015] Preferably, a waterproof cover is fixedly connected to the upper end of the mounting column, the motor is arranged inside the waterproof cover, and a suspension rope is fixedly connected to the upper end of the waterproof cover.
[0016] The present invention has the following beneficial effects:
[0017] 1. By setting up an obstacle removal mechanism and starting the motor, the first and second crushing knives can be driven to rotate, so as to cut and crush the water plants in the water, thereby preventing the water plants from entangled in the water level measuring instrument and causing inaccurate measurement data. In addition, the first and second crushing knives can also rotate to crush and push away the rocks in the water, further preventing the water level measuring instrument from bumping against it and providing protection for the water level measuring instrument.
[0018] 2. Since the first crushing knife and the second crushing knife rotate in opposite directions, the left and right torque forces generated when the first crushing knife and the second crushing knife rotate can be offset, so that the installation column will descend more smoothly without shaking;
[0019] 3. By setting a cleaning mechanism, when the first crushing knife and the second crushing knife rotate, they will intermittently enter and exit the first scraping groove and the second scraping groove, so that the first crushing knife and the second crushing knife can be prevented from having the water weeds adhered to them scraped off by the cleaning block, thereby preventing the first crushing knife and the second crushing knife from partially entangled with the surfaces of the first crushing knife and the second crushing knife when crushing the water weeds, affecting the rotation of the first crushing knife and the second crushing knife, increasing the load of the motor, and causing the motor to be overloaded and damaged. In addition, under the action of the sliding plug, the water in the rectangular cavity will be squeezed into the pump liquid cavity through the one-way pump liquid pipe, and then the water in the pump liquid cavity will be sprayed out through multiple spray holes to form a lateral jet in the first scraping groove and the second scraping groove, so that the water weeds remaining in the first scraping groove and the second scraping groove can be cleaned off, thereby preventing the first crushing knife and the second crushing knife from entering the first scraping groove and the second scraping groove. When the water weeds remaining in the first scraping groove and the second scraping groove adhere to the surfaces of the first crushing knife and the second crushing knife again, forming secondary attachment;
[0020] 4. By setting a driving mechanism, when the first gear rotates, it will synchronously drive the second gear to rotate, and then drive the reciprocating screw to rotate, drive the slider to slide back and forth in the rectangular cavity, and the slider will drive the sliding plug to slide back and forth through the connecting rod, and then the sliding plug will drive the cleaning ring to move back and forth through the sliding rod, so that the water weeds attached to the surface of the water level measuring instrument can be scraped off, and when the sliding plug reciprocates and slides, suction will be generated through the one-way suction pipe, and then the sludge attached to the surface of the water level measuring instrument will also be sucked into the suction cavity through the suction hole, and then the sludge and water in the suction cavity will enter the rectangular cavity through the one-way suction pipe, so as to remove the sludge on the surface of the water level measuring instrument and prevent the sludge from affecting the accuracy of the measurement data of the water level measuring instrument;
[0021] 5. By setting up a stabilizing mechanism, when the installation column enters the observation well, the roller will fit with the inner wall of the observation well under the action of the torsion spring. During the descent, the roller will fit with the wall of the observation well and rotate. With the support of multiple rollers, the installation column can descend stably, thereby driving the water level measuring instrument to move downward smoothly, avoiding damage caused by bumps and collisions caused by the swing of the water level measuring instrument, and ensuring stable measurement data of the water level measuring instrument. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 A schematic diagram of the three-dimensional structure of a groundwater level detection device for hydrogeological exploration proposed by the present invention;
[0023] Figure 2 for Figure 1 A top view of the structure in FIG.
[0024] Figure 3 for Figure 1 A schematic cross-sectional view of the structure;
[0025] Figure 4 for Figure 3 A schematic diagram of the structure enlargement at point A;
[0026] Figure 5 for Figure 3 A schematic diagram of the structure at B in FIG.
[0027] Figure 6 for Figure 3 A schematic diagram of the structure at position C in FIG.
[0028] Figure 7 for Figure 3 A schematic diagram of the structure at D in FIG.
[0029] Figure 8 for Figure 1 Schematic diagram of the three-dimensional structure of the central stabilizing mechanism.
[0030] In the figure: 1, mounting column; 2, mounting groove; 3, water level measuring instrument; 4, rotating shaft; 5, first crushing knife; 6, mounting cavity; 7, hollow rotating rod; 8, second crushing knife; 9, rectangular cavity; 10, sliding plug; 11, sliding rod; 12, cleaning collar; 13, sewage suction cavity; 14, sewage suction hole; 15, one-way sewage suction pipe; 16, cleaning block; 17, first scraping groove; 18, second scraping groove; 19, pump liquid cavity; 20, spray hole; 21, first Circular ring; 22, first annular rack; 23, second circular ring; 24, second annular rack; 25, first shaft; 26, first gear; 27, slider; 28, connecting rod; 29, reciprocating screw; 30, groove; 31, second gear; 32, one-way pump liquid pipe; 33, mounting plate; 34, second shaft; 35, mounting rod; 36, third shaft; 37, roller; 38, torsion spring; 39, motor; 40, waterproof cover; 41, lifting rope. DETAILED DESCRIPTION
[0031] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present invention, so the present invention is not limited by the specific implementation disclosed below.
[0032] Reference Figure 1 - Figure 8 , a groundwater level detection device for hydrogeological exploration, comprising a mounting column 1, the side wall of the mounting column 1 symmetrically opens two mounting grooves 2, the inner walls of the two mounting grooves 2 are both fixedly mounted with a water level measuring instrument 3 through a fixed axis, the water level measuring instrument 3 can detect the water level of groundwater, which is a prior art and will not be described in detail here;
[0033] The obstacle removal mechanism includes a rotating shaft 4 rotatably connected to the lower end of the mounting column 1, a plurality of first crushing knives 5 are fixedly connected to the side wall of the rotating shaft 4, a mounting cavity 6 is opened in the mounting column 1, the upper end of the rotating shaft 4 extends to the mounting cavity 6, a hollow rotating rod 7 is rotatably connected to the bottom of the mounting cavity 6, the lower end of the hollow rotating rod 7 passes through the lower end of the mounting column 1 and is fixedly connected to a plurality of second crushing knives 8, and the hollow rotating rod 7 is sleeved on the side wall of the rotating shaft 4;
[0034] The cleaning mechanism includes two rectangular cavities 9 symmetrically opened in the mounting column 1, the inner wall of the rectangular cavity 9 is sealed and slidably connected with a sliding plug 10, the sliding plug 10 is symmetrically and fixedly connected with two sliding rods 11 near the side wall of the water level measuring instrument 3, and the other ends of the two sliding rods 11 extend into the mounting groove 2 and are fixedly connected with a cleaning ring 12.
[0035] It should be noted that the side wall of the slide rod 11 and the mounting column 1 are in sealed sliding connection, thereby preventing external water from entering the rectangular cavity 9 through the connection between the slide rod 11 and the mounting column 1 .
[0036] The cleaning mechanism also includes a suction chamber 13 opened in the cleaning ring 12, and a plurality of suction holes 14 are opened on the inner wall of the suction chamber 13. The suction chamber 13 is connected to the rectangular chamber 9 through a one-way suction pipe 15. The one-way suction pipe 15 only allows water and sludge in the suction chamber 13 to enter the rectangular chamber 9.
[0037] A scraping mechanism is installed on the mounting column 1, and the scraping mechanism includes two cleaning blocks 16 symmetrically fixedly connected to the side wall of the mounting column 1 through a bracket, and a first scraping groove 17 and a second scraping groove 18 are provided on the side wall of the cleaning block 16. A pump liquid cavity 19 is provided in the cleaning block 16, and a plurality of spray holes 20 are provided on the inner wall of the pump liquid cavity 19. The other ends of the plurality of spray holes 20 are respectively connected with the first scraping groove 17 and the second scraping groove 18. The pump liquid cavity 19 is connected with the rectangular cavity 9 through a one-way pump liquid pipe 32, and the one-way pump liquid pipe 32 only allows water in the rectangular cavity 9 to enter the pump liquid cavity 19.
[0038] Furthermore, when the first crushing knife 5 and the second crushing knife 8 rotate, they will intermittently enter and exit the first scraping groove 17 and the second scraping groove 18, and then under the action of the first scraping groove 17 and the second scraping groove 18, the water plants adhered to the first crushing knife 5 and the second crushing knife 8 will be scraped off by the cleaning block 16, thereby preventing the first crushing knife 5 and the second crushing knife 8 from partially entangled with the surface of the first crushing knife 5 and the second crushing knife 8 when crushing the water plants, thereby affecting the rotation of the first crushing knife 5 and the second crushing knife 8, increasing the load of the motor 39, and easily causing the motor 39 to be overloaded and damaged, and Under the action of the sliding plug 10, the water in the rectangular cavity 9 will be squeezed into the pump liquid cavity 19 through the one-way pump liquid tube 32, and then the water in the pump liquid cavity 19 will be sprayed out through multiple spray holes 20, forming a horizontal jet in the first scraping groove 17 and the second scraping groove 18, which can clean up the remaining water plants in the first scraping groove 17 and the second scraping groove 18, thereby preventing the first crushing knife 5 and the second crushing knife 8 from entering the first scraping groove 17 and the second scraping groove 18. The residual water plants in the first scraping groove 17 and the second scraping groove 18 will adhere to the surface of the first crushing knife 5 and the second crushing knife 8 again, forming secondary attachment.
[0039] A driving mechanism is installed on the rotating shaft 4, and the driving mechanism includes a first ring 21 fixedly connected to the side wall of the rotating shaft 4, a first annular rack 22 fixedly connected to the lower end of the first ring 21, a second ring 23 fixedly connected to the upper end of the hollow rotating rod 7, a second annular rack 24 fixedly connected to the upper end of the second ring 23, two first shafts 25 are symmetrically connected to the inner wall of the mounting cavity 6 for rotation, a first gear 26 is fixedly connected to the side wall of the first shaft 25, the first gear 26 is meshed with the first annular rack 22 and the second annular rack 24, a motor 39 is fixedly connected to the upper end of the mounting column 1, and the upper end of the rotating shaft 4 passes through the upper end of the mounting column 1 and is fixedly connected to the output end of the motor 39.
[0040] Furthermore, when the motor 39 is started, the motor 39 will drive the rotating shaft 4 to rotate, and then drive the first crushing knife 5 to rotate. The rotation of the rotating shaft 4 will also drive the first ring 21 to rotate, drive the first annular rack 22 to rotate, and drive the first gear 26 to rotate, and then drive the second annular rack 24 to rotate, so that the second ring 23 rotates, thereby driving the hollow rotating rod 7 to rotate, and then drive multiple second crushing knives 8 to rotate, and the rotation direction of the second crushing knife 8 is opposite to that of the first crushing knife 5. Under the action of the first crushing knife 5 and the second crushing knife 8, the aquatic plants in the water will be broken and cut off, thereby preventing the aquatic plants from entangled in the water level measuring instrument 3 and causing inaccurate measurement data. In addition, the rotation of the first crushing knife 5 and the second crushing knife 8 can also break and push away the rocks in the water, further preventing the water level measuring instrument 3 from bumping against it, and providing protection for the water level measuring instrument 3.
[0041] It is worth mentioning that since the first crushing knife 5 and the second crushing knife 8 rotate in opposite directions, the left and right torque forces generated when the first crushing knife 5 and the second crushing knife 8 rotate can be offset, so that the installation column 1 can descend more smoothly without shaking.
[0042] The driving mechanism also includes a slider 27 slidably connected to the inner wall of the rectangular cavity 9. The slider 27 is symmetrically fixedly connected to the side wall of the slide plug 10 with two connecting rods 28. The other ends of the two connecting rods 28 are fixedly connected to the slide plug 10. A reciprocating screw 29 is rotatably connected to the inner wall of the rectangular cavity 9. The side wall of the reciprocating screw 29 is threadedly connected to the slider 27. Two grooves 30 are symmetrically opened in the mounting column 1. The two grooves 30 are connected to the mounting cavity 6. One end of the reciprocating screw 29 extends into the groove 30 and is fixedly connected to a second gear 31. The second gear 31 is meshed with the first gear 26.
[0043] Furthermore, when the first gear 26 rotates, it will synchronously drive the second gear 31 to rotate, and then drive the reciprocating screw 29 to rotate, and drive the slider 27 to slide back and forth in the rectangular cavity 9. The slider 27 will drive the sliding plug 10 to slide back and forth in a sealed manner through the connecting rod 28, and then the sliding plug 10 will drive the cleaning ring 12 to move back and forth through the sliding rod 11, so that the water plants attached to the surface of the water level measuring instrument 3 can be scraped off, and when the sliding plug 10 slides back and forth in a sealed manner, suction will be generated through the one-way suction pipe 15, and then the sludge attached to the surface of the water level measuring instrument 3 will also be sucked into the suction cavity 13 through the suction hole 14, and then the sludge and water in the suction cavity 13 will enter the rectangular cavity 9 through the one-way suction pipe 15, thereby removing the sludge on the surface of the water level measuring instrument 3 and preventing the sludge from affecting the accuracy of the measurement data of the water level measuring instrument 3.
[0044] A stabilizing mechanism is installed on the mounting column 1, and the stabilizing mechanism includes a plurality of mounting plates 33 fixedly connected to the side wall of the mounting column 1, the side wall of the mounting plate 33 is rotatably connected to a second shaft 34, the side wall of the second shaft 34 is symmetrically fixedly connected to two mounting rods 35, the side walls of the two mounting rods 35 close to each other are rotatably connected to a third shaft 36, the side wall of the third shaft 36 is fixedly connected to a roller 37, the side wall of the second shaft 34 is symmetrically sleeved with two torsion springs 38, and the two ends of the torsion spring 38 are respectively fixedly connected to the side wall of the mounting plate 33 and the side wall of the mounting rod 35.
[0045] Furthermore, when the installation column 1 enters the observation well, the roller 37 will fit against the inner wall of the observation well under the action of the torsion spring 38. During the descent, the roller 37 rotates in accordance with the wall of the observation well. With the support of multiple rollers 37, the installation column 1 can descend stably, thereby driving the water level measuring instrument 3 to move downward smoothly, avoiding damage caused by bumps and collisions caused by the swing of the water level measuring instrument 3, and ensuring that the water level measuring instrument 3 measures data stably.
[0046] A waterproof cover 40 is fixedly connected to the upper end of the mounting column 1, and the motor 39 is arranged inside the waterproof cover 40. A suspension rope 41 is fixedly connected to the upper end of the waterproof cover 40, and the other end of the suspension rope 41 is connected to an external winch device. By starting the winch device to retract and release the suspension rope 41, the mounting column 1 can be raised or lowered.
[0047] In the present invention, the other end of the lifting rope 41 is fixed to an external winch device, and the winch device is driven to operate, and the lifting rope 41 is slowly released to slowly place the installation column 1 into the observation well. When the installation column 1 enters the observation well, the roller 37 will fit with the inner wall of the observation well under the action of the torsion spring 38. During the descent, the roller 37 rotates in accordance with the wall of the observation well. With the support of multiple rollers 37, the installation column 1 can descend stably, thereby driving the water level measuring instrument 3 to move downward smoothly, avoiding damage caused by the shaking of the water level measuring instrument 3, and ensuring that the water level measuring instrument 3 measures data stably.
[0048] During the process of the mounting column 1 descending, the motor 39 is started synchronously, and the motor 39 will drive the rotating shaft 4 to rotate, and then drive the first crushing knife 5 to rotate. The rotation of the rotating shaft 4 will also drive the first ring 21 to rotate, drive the first annular rack 22 to rotate, drive the first gear 26 to rotate, and then drive the second annular rack 24 to rotate, drive the second ring 23 to rotate, drive the hollow rotating rod 7 to rotate, and then drive multiple second crushing knives 8 to rotate, and the rotation direction of the second crushing knife 8 is opposite to that of the first crushing knife 5. Under the action of the first crushing knife 5 and the second crushing knife 8, the aquatic plants in the water will be broken and cut off, thereby preventing the aquatic plants from entangled with the water level measuring instrument 3 and causing inaccurate measurement data. In addition, the rotation of the first crushing knife 5 and the second crushing knife 8 can also break and push away the rocks in the water, further preventing the water level measuring instrument 3 from bumping against it, and providing protection for the water level measuring instrument 3.
[0049] In addition, since the first crushing knife 5 and the second crushing knife 8 rotate in opposite directions, the left and right torque forces generated when the first crushing knife 5 and the second crushing knife 8 rotate can be offset, so that the installation column 1 can be lowered more smoothly without shaking.
[0050] When the first gear 26 rotates, it will synchronously drive the second gear 31 to rotate, and then drive the reciprocating screw 29 to rotate, and drive the slider 27 to slide back and forth in the rectangular cavity 9. The slider 27 will drive the sliding plug 10 to slide back and forth in a sealed manner through the connecting rod 28, and then the sliding plug 10 will drive the cleaning ring 12 to move back and forth through the sliding rod 11, so that the water plants attached to the surface of the water level measuring instrument 3 can be scraped off, and when the sliding plug 10 slides back and forth in a sealed manner, suction will be generated through the one-way sewage suction pipe 15, and then the sludge attached to the surface of the water level measuring instrument 3 will also be sucked into the sewage suction chamber 13 through the sewage suction hole 14, and then the sludge and water in the sewage suction chamber 13 will enter the rectangular cavity 9 through the one-way sewage suction pipe 15, thereby removing the sludge on the surface of the water level measuring instrument 3 and preventing the sludge from affecting the accuracy of the measurement data of the water level measuring instrument 3.
[0051] In addition, when the first crushing knife 5 and the second crushing knife 8 rotate, they will intermittently enter and exit the first scraping groove 17 and the second scraping groove 18, and then under the action of the first scraping groove 17 and the second scraping groove 18, the water plants adhered to the first crushing knife 5 and the second crushing knife 8 will be scraped off by the cleaning block 16, thereby preventing the first crushing knife 5 and the second crushing knife 8 from partially entangled with the surface of the first crushing knife 5 and the second crushing knife 8 when crushing the water plants, thereby affecting the rotation of the first crushing knife 5 and the second crushing knife 8, increasing the load of the motor 39, and easily causing the motor 39 to be overloaded and damaged, and Under the action of the plug 10, the water in the rectangular cavity 9 will be squeezed into the pump liquid cavity 19 through the one-way pump liquid tube 32, and then the water in the pump liquid cavity 19 will be sprayed out through the multiple spray holes 20, forming a horizontal jet in the first scraper groove 17 and the second scraper groove 18, which can clean up the remaining water plants in the first scraper groove 17 and the second scraper groove 18, thereby preventing the first crushing knife 5 and the second crushing knife 8 from entering the first scraper groove 17 and the second scraper groove 18. The residual water plants in the first scraper groove 17 and the second scraper groove 18 will adhere to the surface of the first crushing knife 5 and the second crushing knife 8 again, forming secondary attachment.
[0052] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A groundwater level detection device for hydrogeological exploration, characterized in that: include: A mounting column (1), wherein two mounting grooves (2) are symmetrically provided on the side wall of the mounting column (1), and water level measuring instruments (3) are fixedly mounted on the inner walls of the two mounting grooves (2) via fixed shafts; An obstacle removal mechanism, the obstacle removal mechanism comprising a rotating shaft (4) rotatably connected to the lower end of a mounting column (1), a plurality of first crushing knives (5) being fixedly connected to the side wall of the rotating shaft (4), a mounting cavity (6) being provided in the mounting column (1), the upper end of the rotating shaft (4) extending into the mounting cavity (6), a hollow rotating rod (7) being rotatably connected to the bottom of the mounting cavity (6), the lower end of the hollow rotating rod (7) passing through the lower end of the mounting column (1) and being fixedly connected to a plurality of second crushing knives (8), and the hollow rotating rod (7) being sleeved on the side wall of the rotating shaft (4); A cleaning mechanism, the cleaning mechanism comprising two rectangular cavities (9) symmetrically opened in the mounting column (1), the inner wall of the rectangular cavity (9) being sealingly and slidably connected to a sliding plug (10), the sliding plug (10) being symmetrically and fixedly connected to the side wall of the water level measuring instrument (3) with two sliding rods (11), the other ends of the two sliding rods (11) extending into the mounting groove (2) and being fixedly connected to a cleaning collar (12) together.
2. A groundwater level detection device for hydrogeological exploration according to claim 1, characterized in that: in: The cleaning mechanism also includes a dirt suction chamber (13) provided in the cleaning collar (12), a plurality of dirt suction holes (14) being provided on the inner wall of the dirt suction chamber (13), and the dirt suction chamber (13) being connected to the rectangular chamber (9) via a one-way dirt suction pipe (15).
3. A groundwater level detection device for hydrogeological exploration according to claim 2, characterized in that: in: A scraping mechanism is installed on the mounting column (1), and the scraping mechanism comprises two cleaning blocks (16) symmetrically fixedly connected to the side wall of the mounting column (1) through a bracket, the side wall of the cleaning block (16) is provided with a first scraping groove (17) and a second scraping groove (18), a pump liquid cavity (19) is provided in the cleaning block (16), and a plurality of liquid spray holes (20) are provided on the inner wall of the pump liquid cavity (19), and the other ends of the plurality of liquid spray holes (20) are respectively connected to the first scraping groove (17) and the second scraping groove (18), and the pump liquid cavity (19) is connected to the rectangular cavity (9) through a one-way pump liquid pipe (32).
4. A groundwater level detection device for hydrogeological exploration according to claim 3, characterized in that: in: The rotating shaft (4) is provided with a driving mechanism, the driving mechanism comprising a first circular ring (21) fixedly connected to the side wall of the rotating shaft (4), the lower end of the first circular ring (21) being fixedly connected to a first annular rack (22), the upper end of the hollow rotating rod (7) being fixedly connected to a second circular ring (23), the upper end of the second circular ring (23) being fixedly connected to a second annular rack (24), the inner wall of the mounting cavity (6) being symmetrically rotatably connected to two first shafts (25), the side wall of the first shaft (25) being fixedly connected to a first gear (26), the first gear (26) being meshingly connected to both the first annular rack (22) and the second annular rack (24), the upper end of the mounting column (1) being fixedly connected to a motor (39), the upper end of the rotating shaft (4) passing through the upper end of the mounting column (1) and being fixedly connected to an output end of the motor (39).
5. The groundwater level detection device for hydrogeological exploration according to claim 4, characterized in that: in: The driving mechanism further comprises a slider (27) slidably connected to the inner wall of the rectangular cavity (9); the slider (27) is symmetrically fixedly connected to two connecting rods (28) near the side wall of the sliding plug (10); the other ends of the two connecting rods (28) are fixedly connected to the sliding plug (10); the inner wall of the rectangular cavity (9) is rotatably connected to a reciprocating screw (29); the side wall of the reciprocating screw (29) is threadedly connected to the slider (27); two grooves (30) are symmetrically provided in the mounting column (1); the two grooves (30) are communicated with the mounting cavity (6); one end of the reciprocating screw (29) extends into the groove (30) and is fixedly connected to a second gear (31); the second gear (31) is meshedly connected to the first gear (26).
6. The groundwater level detection device for hydrogeological exploration according to claim 5, characterized in that: in: A stabilizing mechanism is installed on the mounting column (1), and the stabilizing mechanism comprises a plurality of mounting plates (33) fixedly connected to the side wall of the mounting column (1); the side wall of the mounting plate (33) is rotatably connected to a second shaft (34); the side wall of the second shaft (34) is symmetrically fixedly connected to two mounting rods (35); the side walls of the two mounting rods (35) close to each other are rotatably connected to a third shaft (36); the side wall of the third shaft (36) is fixedly connected to a roller (37); the side wall of the second shaft (34) is symmetrically sleeved with two torsion springs (38); the two ends of the torsion spring (38) are respectively fixedly connected to the side wall of the mounting plate (33) and the side wall of the mounting rod (35).
7. The groundwater level detection device for hydrogeological exploration according to claim 6, characterized in that: in: The upper end of the mounting column (1) is fixedly connected to a waterproof cover (40), the motor (39) is arranged inside the waterproof cover (40), and the upper end of the waterproof cover (40) is fixedly connected to a suspension rope (41).