Railway tunnel construction rockburst micro-seismic monitoring system and monitoring method
By designing a rock burst microseismic monitoring system during railway tunnel construction and collecting and analyzing rock burst data, dynamic early warning of potential rock burst risks is achieved, problems that are difficult to predict and early warning in the existing technology are solved, and construction safety is improved.
Patent Information
- Application Number
- CN202411161010.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-22
AI Technical Summary
It is difficult to effectively predict and early warning of rock burst events in railway tunnel construction, resulting in potential safety hazards and property losses.
A rock explosion microseismic monitoring system for railway tunnel construction was designed, including a collection and conversion module, an analysis and processing module and an early warning module. The rock explosion data was collected through sensors, and the waveform analysis model was used for physical analysis, positioning the rock explosion points and generating visual analysis data. The early warning module provides dynamic early warning based on the analysis results.
Through real-time monitoring and analysis of rock burst data and early warning, it effectively prevents personal casualties and property losses caused by rock bursts, improving construction safety.
Smart Images

Figure CN119087508A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of tunnel construction safety monitoring, and in particular to a rock burst microseismic monitoring system and a monitoring method for railway tunnel construction. Background Art
[0002] Rockburst refers to the phenomenon of sudden destruction in the open rock mass in the deep underground mining or in the area with high tectonic stress. This phenomenon is also called rock burst. The reason for the occurrence is that the strain energy accumulated in the open rock mass is suddenly and violently released, causing the rock mass to undergo brittle fracture like an explosion. The impact ground pressure causes a large amount of rock to collapse, and produces a huge noise and air wave impact, which can not only destroy the mine, but also endanger the ground buildings with shock waves. Rockburst is one of the main safety hazards faced by deep mines. Minor rockbursts only have rock flakes peeling off without ejection. Severe rockbursts can be measured to have a magnitude of 4.6 and an intensity of 7 to 8 degrees, causing damage to ground buildings and accompanied by a loud noise. Rockbursts can occur suddenly in an instant or last for several days to several months. The condition for rockburst is that there is a high ground stress in the rock mass, which exceeds the strength of the rock itself, and the rock has a high degree of brittleness and elasticity. Under such conditions, once the underground engineering activities destroy the original equilibrium state of the rock mass, the release of energy accumulated in the rock mass will cause rock destruction and throw out the broken rock.
[0003] Rock burst has the following characteristics:
[0004] (1) Sudden
[0005] Before it happens, there are no obvious signs, and you may not even hear any empty sound. Places where it is generally believed that rocks will not fall may suddenly cause rocks to burst, and sometimes the rocks fall down in response to the sound, and sometimes they do not fall for the time being.
[0006] (2) Location Concentration
[0007] Although there are some individual cases where the rockburst occurs far from the newly excavated working face, most of them occur near the newly excavated working face. The most common rockburst locations are the arch or arch waist.
[0008] (3) Time concentration and continuity
[0009] Rockbursts appear one after another after excavation, usually within 24 hours after the blasting, and usually last for 1 to 2 months, and sometimes last for more than 1 year. There are usually no obvious signs beforehand.
[0010] (4) Ejection
[0011] During a rockburst, rock blocks are ejected from the surrounding rock matrix of the cave wall, generally in the form of irregular flakes with thick middle and thin edges.
[0012] In tunnel construction, rock burst is one of the important factors affecting construction safety. Therefore, the prediction of rock burst is urgent to avoid casualties and property losses. Summary of the invention
[0013] The purpose of the present invention is to overcome the deficiency of lack of rock burst prediction analysis in the prior art and to provide a rock burst microseismic monitoring system and a monitoring method for railway tunnel construction.
[0014] In a first aspect, the present invention provides a microseismic monitoring system for rockburst in railway tunnel construction. The microseismic monitoring system for rockburst in railway tunnel construction includes at least: an acquisition and conversion module for acquiring rockburst data at a tunnel target; an analysis and processing module for performing physical analysis on the rockburst data; and an early warning module for dynamically warning potential rockburst risks during tunnel construction according to the results of the analysis and processing module. The physical analysis includes using a waveform analysis model to analyze and process the rockburst data into visual analysis data involving rockburst assessment items, rockburst location items, and rockburst filtering items at the target. The rockburst data includes at least rockburst vibration waves, blasting waves, and rupture waves.
[0015] According to a preferred embodiment, the acquisition and conversion module at least includes: a plurality of sensors arranged at the target, for collecting micro-vibration signals at the target; a signal acquisition instrument, for receiving the micro-vibration signals collected by the sensors and converting them into initial vibration waveforms; a central server, for processing the initial vibration waveforms collected by the signal acquisition instrument. The plurality of sensors are communicatively connected to the signal acquisition instrument, and the signal acquisition instrument is communicatively connected to the central server, forming a sensor network.
[0016] According to a preferred implementation manner, the central server converts the micro-vibration signal into the rockburst data by waveform conversion.
[0017] According to a preferred embodiment, the step of performing the waveform conversion by the central server at least includes:
[0018] Read the period T and frequency f of rockburst vibration wave, blasting wave and rupture wave involved in rockburst assessment project, rockburst location project and rockburst filtering project;
[0019] Calculate the phase difference of rockburst vibration wave, the phase difference of rockburst blasting wave and the phase difference of rockburst rupture wave;
[0020] The phase difference of the rockburst vibration wave, the phase difference of the rockburst blasting wave and the phase difference of the rockburst rupture wave are resonated, and the phase difference of the mechanical wave is eliminated, so that the three mechanical waves (rockburst vibration wave, blasting wave and rupture wave) are intuitively and quantitatively compared.
[0021] According to a preferred embodiment, the sensor is wirelessly connected to the central server via a network connection module. The network connection module at least includes a near-end data processing unit and a remote data processing unit. The near-end data processing unit adopts edge computing, and the remote data processing unit adopts IoT computing.
[0022] According to a preferred embodiment, the visual analysis data at least includes the number of microfracture events and the magnitude of microseismic energy.
[0023] According to a preferred implementation, the early warning module performs vector operations on the P-wave and S-wave of the microseismic point, and the report result of the early warning module is a collection of vector operations, and a comprehensive evaluation can be performed through the collection parameters.
[0024] According to a preferred implementation, the vector operation formula of the microseismic point is:
[0025] Y ps =|PScosθ;
[0026] Among them, P is the longitudinal wave of the microseismic point, S is the transverse wave of the microseismic point, and θ is the angle between the P wave and the S wave;
[0027] The aggregate formula for the report results is:
[0028] Y ps1 ∩Y ps2 ∩…∩Y psn ={nn∈p&n∈s}.
[0029] According to a preferred embodiment, the early warning module performs early warning intervention at least according to the aggregated rockburst points.
[0030] The present invention also provides a method for monitoring rockburst microseismicity during railway tunnel construction, which at least comprises the following steps:
[0031] S1. Collect rock burst data at a target location in a tunnel; wherein the rock burst data at least includes rock burst vibration waves, blasting waves and rupture waves;
[0032] S2. Performing physical analysis on the rockburst data;
[0033] S3. Dynamically warning of potential rock burst risks during tunnel construction based on the results of the physical analysis;
[0034] The physical analysis includes using a waveform analysis model to analyze and process the rockburst data into visual analysis data involving rockburst assessment items, rockburst positioning items and rockburst filtering items at the target location.
[0035] Compared with the prior art, the present invention has the following beneficial effects:
[0036] The present invention collects rock burst data such as rock burst vibration waves, blasting waves and rupture waves of tunnel nodes, performs physical analysis on the rock burst data, and locates the waveform, thereby detecting the position of each rock burst point and generating and processing visual analysis data involving rock burst assessment projects, rock burst positioning projects and rock burst filtering projects. Finally, the early warning module intervenes in the project and issues an early warning based on the actual data, thereby preventing personal injury and property loss caused by sudden rock bursts in advance. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 A schematic diagram of the principle of a railway tunnel construction rockburst microseismic monitoring system according to a preferred embodiment of the present invention;
[0038] Figure 2 The present invention is a flowchart of a method for monitoring rockburst microseismicity during railway tunnel construction according to a preferred embodiment of the present invention. DETAILED DESCRIPTION
[0039] The present invention is further described in detail below in conjunction with test examples and specific implementation methods. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.
[0040] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all expressions based on the orientation or position relationship shown in the drawings, or the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, rather than indicating or implying that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.
[0041] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.
[0042] In addition, the expressions “first”, “second”, “third”, etc. that appear in the terms are merely descriptions used to distinguish the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.
[0043] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.
[0044] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.
[0045] Example 1
[0046] The present embodiment provides a rockburst microseismic monitoring system for railway tunnel construction. The rockburst microseismic monitoring system for railway tunnel construction may include: an acquisition and conversion module for acquiring rockburst data at the target location of the tunnel; an analysis and processing module for performing physical analysis on the rockburst data; and an early warning module for dynamically warning of potential rockburst risks during tunnel construction based on the results of the analysis and processing module. The physical analysis includes using a waveform analysis model to analyze and process the rockburst data into visual analysis data involving rockburst assessment items at the target location, rockburst positioning items, and rockburst filtering items. Rockburst data may include rockburst vibration waves, blasting waves, and rupture waves.
[0047] The present invention collects rock burst data such as rock burst vibration waves, blasting waves and rupture waves of tunnel nodes, performs physical analysis on the rock burst data, and locates the waveform, thereby detecting the position of each rock burst point and generating and processing visual analysis data involving rock burst assessment projects, rock burst positioning projects and rock burst filtering projects. Finally, the early warning module intervenes in the project and issues an early warning based on the actual data, thereby preventing personal injury and property loss caused by sudden rock bursts in advance.
[0048] Example 2
[0049] This embodiment is a further improvement of Embodiment 1, and repeated contents will not be repeated. This embodiment provides a rock burst microseismic monitoring system for railway tunnel construction. In this embodiment, the acquisition and conversion module may include: a number of sensors arranged at the target, for collecting microvibration signals at the target; a signal acquisition instrument, for receiving the microvibration signals collected by the sensor and converting them into initial vibration waveforms; a central server, for processing the initial vibration waveforms collected by the signal acquisition instrument. A number of sensors are communicatively connected to the signal acquisition instrument, and the signal acquisition instrument is communicatively connected to the central server to form a sensor network.
[0050] Preferably, the central server converts the micro-vibration signal into rock burst data by waveform conversion.
[0051] Preferably, the step of waveform conversion performed by the central server may include:
[0052] Read the period T and frequency f of rockburst vibration wave, blasting wave and rupture wave involved in rockburst assessment project, rockburst location project and rockburst filtering project;
[0053] Calculate the phase difference of rockburst vibration wave, the phase difference of rockburst blasting wave and the phase difference of rockburst rupture wave;
[0054] The phase difference of the rockburst vibration wave, the phase difference of the rockburst blasting wave and the phase difference of the rockburst rupture wave are resonated, and the phase difference of the mechanical wave is eliminated, so that the three mechanical waves (rockburst vibration wave, blasting wave and rupture wave) are intuitively and quantitatively compared.
[0055] Preferably, the sensor is wirelessly connected to the central server via a network connection module. The network connection module may include a near-end data processing unit and a remote data processing unit. The near-end data processing unit adopts edge computing, and the remote data processing unit adopts IoT computing.
[0056] Preferably, the visual analysis data may include the number of microfracture events and the magnitude of microseismic energy.
[0057] Preferably, the early warning module performs vector operations on the P-wave and S-wave of the microseismic point, and the report result of the early warning module is a collection of vector operations, and a comprehensive evaluation can be performed through the collection parameters.
[0058] Preferably, the vector operation formula of the microseismic point is:
[0059] Y ps =|PScosθ;
[0060] Among them, P is the longitudinal wave of the microseismic point, S is the transverse wave of the microseismic point, and θ is the angle between the P wave and the S wave;
[0061] The aggregate formula for reporting results is:
[0062] Y ps1 ∩Y ps2 ∩…∩Y psn ={nn∈p&n∈s}.
[0063] Preferably, the early warning module can perform early warning intervention according to the collected rock burst points.
[0064] Example 3
[0065] This embodiment is a further improvement of Embodiment 1 and Embodiment 2, and the repeated contents are not repeated here. This embodiment provides a rock burst microseismic monitoring system for railway tunnel construction. Figure 1 The railway tunnel construction rockburst microseismic monitoring system provided in this embodiment may include a collection and conversion module, an analysis and processing module, and an early warning module.
[0066] The collection and conversion module includes a sensor network which is arranged at the target location (tunnel node) and is used for the collection and conversion of micro-vibrations.
[0067] The sensor network includes several sensors that collect micro-vibrations, a collector that receives and processes the sensor signals, and a central server that processes the signals. The collector can obtain the parameters captured by the sensors. The central server can connect the signals of each collector and perform centralized processing.
[0068] The sensor is connected to the data collector by signal. The data collector and the central server are connected by wireless communication through a communication system built on the basis of the network connection module to form a sensor network, which can realize signal transmission and time synchronization between the data collector and the central server. The sensor and the data collector can be connected by wired connection. The data collector continuously obtains the micro-vibration parameters captured by the sensor to obtain the initial vibration waveform. The data collector transmits the initial vibration waveform to the central server for waveform storage.
[0069] The rockburst assessment project, rockburst location project and rockburst filtering project all undergo waveform conversion through the central server. The converted waveforms are processed by the analysis and processing module to display the visualized analysis data. The converted waveforms include rockburst vibration waves, blasting waves and rupture waves.
[0070] The central server performs waveform conversion on the stored initial vibration waveform to obtain rockburst vibration wave, blasting wave and rupture wave.
[0071] The analysis and processing module may include a processor for physically analyzing micro-vibrations. Specifically, the processor performs physical analysis on rock burst vibration waves, blasting waves, and rupture waves.
[0072] The rockburst assessment project mainly deals with the possibility and degree of rockburst at the target location; the rockburst positioning project mainly determines the target location; and the rockburst filtering project mainly processes the parameters of the generated rockburst.
[0073] The analysis and processing module is equipped with a waveform analysis model of tunnel rockburst, which is used to effectively analyze rockburst vibration waves, blasting waves and rupture waves.
[0074] The early warning module actively warns of potential or obvious rock burst risks in tunnels.
[0075] The network connection module includes a proximal data processing unit and a remote data processing unit. The proximal data processing unit uses edge computing, and the remote data processing unit uses IoT computing. Both IoT computing and edge computing comply with the MQTT protocol, and IOT computing also complies with HTTP and CoAP protocols, so that the network connection module can be compatible with communication in multiple network communication modes to maximize communication possibilities and prevent signal interruption and disconnection problems.
[0076] The rockburst assessment project, rockburst location project and rockburst filtering project all undergo waveform conversion through the central server. The waveform is displayed as visualized analysis data after passing through the analysis and processing module. The waveform conversion includes the vibration wave, blasting wave and rupture wave of the rockburst. The visualized analysis data includes the number of microfracture events and the size of microseismic energy.
[0077] Specifically, the central server performs waveform conversion by reading the period T and frequency f of the rockburst vibration wave, blasting wave and rupture wave involved in the rockburst assessment project, rockburst location project and rockburst filtering project, and then calculates the phase of the waveform, and then performs waveform conversion from the rockburst assessment project to the rockburst location project, the rockburst location project to the rockburst filtering project, and the rockburst assessment project to the rockburst filtering project, including:
[0078] Phase calculation:
[0079] Where φ is the wavelength, X 1 and X2 Respectively represent the positions of the two waves involved at the calculation time; among them, X 1 and X 2 It is two of the three waveforms of rock burst vibration wave, blasting wave and rupture wave, namely, X 1 is the wave at time 1 that can be designated as a vibration wave, blast wave, or rupture wave of rockburst, X 2 It is a wave at time 2 that can be designated as a vibration wave, blasting wave or rupture wave of rockburst. The specific combination is selected according to the project content.
[0080] The phase difference δ of the rockburst vibration wave-project A, the rockburst blasting wave-project B and the rockburst blasting wave-project C is calculated by taking different X values, and input into the central server for conversion.
[0081] Table 1
[0082]
[0083]
[0084] See Table 1, in which item A is the vibration wave of rock burst, item B is the blasting wave of rock burst, item C is the rupture wave of rock burst, and X 1 and X 2 are the positions of project A, project B, and project C at time 1 and time 2.
[0085] Referring to the table, it can be seen that the phase difference of project A, project B, and project C are 0.897, 0.6484, and 0.981, respectively. After the value is input into the central server for resonance processing (i.e., any one of the data of the rockburst assessment project, the rockburst positioning project, and the rockburst filtering project is used as a reference to calculate the other two data), three waveform conversion diagrams are obtained for user reference and use. Since the simple harmonic waveforms between project A, project B, and project C are different, this embodiment can calculate the simple harmonic waveforms between project A, project B, and project C in the same phase after mathematical calculation and phase difference calculation processing.
[0086] As a further solution of the present invention: a rock burst microseismic monitoring system based on railway tunnel construction, the early warning module is subject to vector calculation, the vector calculation is the vector operation of the P wave and the S wave of the microseismic point, the early warning module report result is a collection of vector operations, and the vector operation formula of the microseismic point is:
[0087] Y ps =|PScosθ;
[0088] Among them, P is the longitudinal wave of the microseismic point, S is the transverse wave of the microseismic point, and θ is the angle between the P wave and the S wave;
[0089] The aggregate formula for reporting the results is
[0090] Y ps1 ∩Y ps2 ∩…∩Y psn ={nn∈p&n∈s};
[0091] Specifically, the method of calculating the microseismic point through the vector belongs to the formula for calculating the microseismic point in the prior art, but the formula only calculates one microseismic point, and the sample is small. Therefore, this embodiment can expand the sample capacity and improve the accuracy of microseismic point calculation by performing a set calculation on the microseismic points.
[0092] Please see attached Figure 1 , the figure shows the path of the P wave and S wave when the rock burst point occurs. It can be seen from the figure that the path of the P wave and the S wave is relatively disordered, and the instantaneous time is short and difficult to collect when the rock burst point occurs. Therefore, the present application records the occurrence of each rock burst point and forms a collection, and then stores each data in the collection. After the storage is completed, waveform analysis is performed to effectively simulate and locate the rock burst point, and the early warning module can perform effective early warning intervention based on the rock burst point of the collection.
[0093] Specifically, the essence of the tunnel rockburst incubation process is a series of rock mass rupture events. After these rock mass ruptures occur, the generated vibration waves propagate outward along the surrounding medium. The sensors placed in the hole close to the rock wall receive the original micro-vibration signals and convert them into electrical signals, which are then sent to the signal acquisition instrument; the data signals are then transmitted to the central server through the communication system. The micro-vibration signals can be processed and analyzed in many aspects through the analysis and processing software to achieve the positioning of microseismic / acoustic emission events, obtain source parameters, trend tracking, etc., and the located microseismic / acoustic emission events can be physically demonstrated in three-dimensional space and time, and finally the rock mass rupture microseismic events in the rockburst incubation process are obtained. The early warning module issues early warnings based on the visualized data related to the rockburst assessment project, rockburst location project, and rockburst filtering project. The early warning module can dynamically warn of the potential rockburst risk during tunnel excavation by real-time analyzing the number of microseismic events and the spatiotemporal evolution characteristics of their corresponding source parameters (such as energy, apparent volume, etc.) during the excavation of deep buried tunnels.
[0094] The working principle of the present invention is as follows: in the present application, sensors are placed in tunnel nodes to collect rock burst data, and then a signal acquisition instrument is used to collect rock burst vibration waves, blasting waves and rupture waves on a large scale. Each rock burst point collected is recorded and formed into a collection, and then the central server converts and stores all waveforms, and the waveform post-processor intervenes to locate the waveform, thereby detecting the position of each rock burst point and generating visual data of the rock burst project. Finally, the early warning module intervenes in the project and issues an early warning based on the actual data. The specific process is as follows: after these rock mass ruptures occur, the generated vibration waves propagate outward along the surrounding medium, and the sensors placed in the hole close to the rock wall receive their original micro-vibration signals and convert them into electrical signals, which are then sent to the signal acquisition instrument; after that, the data signals are transmitted to the central server through the communication system, and the micro-vibration signals can be processed and analyzed in many aspects through the analysis and processing software to realize the positioning of microseismic / acoustic emission events, obtain source parameters, trend tracking, etc., and the located microseismic / acoustic emission events can be physically demonstrated in three-dimensional space and time, and finally the rock mass rupture microseismic events in the process of rock burst incubation are obtained. By real-time analyzing the number of microseismic events and the spatiotemporal evolution characteristics of their corresponding source parameters (such as energy, apparent volume, etc.) during deep tunnel excavation, dynamic early warning of potential rock burst risks during tunnel excavation can be provided to prevent personal injury and property loss caused by sudden rock bursts in advance.
[0095] Example 4
[0096] This embodiment provides a method for monitoring rockburst and microseismic monitoring of railway tunnel construction, which can be implemented using the railway tunnel construction rockburst and microseismic monitoring systems provided in Embodiments 1, 2, and 3.
[0097] Example 5
[0098] This embodiment is a further improvement of Embodiment 4, and the repeated contents are not repeated here. This embodiment provides a method for monitoring rockburst microseismicity during railway tunnel construction.
[0099] Please see attached Figure 2 , the specific methods include:
[0100] Step S1, placing sensors in tunnel nodes to collect rock burst data;
[0101] Step S2, the signal acquisition instrument works to collect waveforms;
[0102] Step S3: The central server performs waveform conversion and storage;
[0103] Step S4: The processor intervenes to perform waveform positioning;
[0104] Step S5: The processor analyzes and generates visualization data;
[0105] Step S6: The early warning module intervenes to issue an early warning.
[0106] Among them, the physical analysis includes rock burst assessment projects at the target, rock burst positioning projects and rock burst filtering projects. The three projects are reference factors for active early warning. Among them, the rock burst assessment project specifically requires a comprehensive rock burst risk assessment of the mine before formulating a rock burst plan to understand the current risk situation and provide a basis for formulating appropriate prevention and control plans.
[0107] Rockburst risk assessment mainly includes the following steps:
[0108] Determine the assessment object: Select the object of risk assessment, which can be the entire mine, a specific working face or a rock mass area.
[0109] Collect information: Collect data related to rock burst, including geological features, groundwater conditions, mining methods, rock properties, etc.
[0110] Assess risk level: Based on the collected information, conduct a qualitative or quantitative assessment of the rockburst risk and give a corresponding risk level.
[0111] Identify the main risk factors: Analyze the assessment results and determine the main factors affecting rockburst risk to facilitate subsequent prevention and control work.
[0112] Make recommendations: Make corresponding rockburst prevention and control recommendations based on the assessment results, including engineering measures, management measures, etc.
[0113] According to the above-listed conditions, it is necessary to make prevention and control measures for rock burst risk assessment and reduce the probability and degree of harm of rock burst. For example, in the prior art, the probability of rock burst is prevented by optimizing mining methods and strengthening support measures. Therefore, the present application creatively proposes a systematic rock burst assessment scheme, which does not interfere with the progress of rock burst operations and has the advantages of high prediction accuracy and good prediction effect.
[0114] As for the rockburst locating project, the existing technology has a positioning mode through machine learning. This mode builds the MSlocation Net fully convolutional neural network, uses the waveform as the input of the neural network, and uses the three-dimensional Gauss function of the study area as the output of the neural network, and finally realizes rockburst positioning and rockburst grade prediction. However, the cost of the rockburst positioning project is relatively high. Therefore, the rockburst positioning and rockburst risk assessment in this solution are used to effectively save R&D and use costs.
[0115] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A railway tunnel construction rockburst microseismic monitoring system, characterized in that: The railway tunnel construction rockburst microseismic monitoring system at least includes: The acquisition and conversion module is used to collect rock burst data at the tunnel target; An analysis and processing module, used for performing physical analysis on the rockburst data; An early warning module, used to dynamically warn of potential rock burst risks during tunnel construction according to the results of the analysis and processing module; Wherein, the physical analysis includes using a waveform analysis model to analyze and process the rockburst data into visual analysis data involving rockburst assessment items, rockburst location items, and rockburst filtering items at the target location; The rockburst data at least includes rockburst vibration wave, blasting wave and rupture wave.
2. A railway tunnel construction rockburst microseismic monitoring system according to claim 1, characterized in that: The acquisition and conversion module at least includes: A plurality of sensors arranged at the target, for collecting micro-vibration signals at the target; A signal collector, used to receive the micro-vibration signal collected by the sensor and convert it into an initial vibration waveform; A central server, used for processing the initial vibration waveform collected by the signal collector; A plurality of the sensors are communicatively connected to the signal acquisition instrument, and the signal acquisition instrument is communicatively connected to the central server to form a sensor network.
3. A railway tunnel construction rockburst microseismic monitoring system according to claim 2, characterized in that: The central server converts the initial vibration waveform collected by the signal acquisition instrument into the rock burst data by waveform conversion.
4. A railway tunnel construction rockburst microseismic monitoring system according to claim 3, characterized in that: The steps of the central server performing the waveform conversion at least include: Read the period T and frequency f of rockburst vibration wave, blasting wave and rupture wave involved in rockburst assessment project, rockburst location project and rockburst filtering project; Calculate the phase difference of rockburst vibration wave, the phase difference of rockburst blasting wave and the phase difference of rockburst rupture wave; The phase difference of the rockburst vibration wave, the phase difference of the rockburst blasting wave and the phase difference of the rockburst rupture wave are subjected to resonance processing.
5. A railway tunnel construction rockburst microseismic monitoring system according to claim 2, characterized in that: The sensor is wirelessly connected to the central server via a network connection module; The network connection module at least includes a proximal data processing unit and a remote data processing unit; The proximal data processing unit adopts edge computing, and the remote data processing unit adopts IoT computing.
6. A railway tunnel construction rockburst microseismic monitoring system according to claim 1, characterized in that: The visual analysis data at least includes the number of microfracture events and the magnitude of microseismic energy.
7. A railway tunnel construction rockburst microseismic monitoring system according to claim 1, characterized in that: The early warning module performs vector operations on the P-wave and S-wave of the microseismic point to generate a set of vector operations, and can perform comprehensive early warning evaluation through the parameters of the set.
8. A railway tunnel construction rockburst microseismic monitoring system according to claim 7, characterized in that: The vector operation formula of the microseismic point is: Y ps =|PScosθ; Among them, P is the longitudinal wave of the microseismic point, S is the transverse wave of the microseismic point, and θ is the angle between the P wave and the S wave; The aggregate formula for the report results is: AND ps1 ∩And ps2 ∩…∩And psn ={nn∈p&n∈s}。 9. A railway tunnel construction rockburst microseismic monitoring system according to claim 8, characterized in that: The early warning module performs early warning intervention at least according to the collected rock burst points.
10. A method for monitoring rockburst microseismicity during railway tunnel construction, characterized in that: At least the following steps are included: S1. Collect rock burst data at a target location in a tunnel; wherein the rock burst data at least includes rock burst vibration waves, blasting waves and rupture waves; S2. Performing physical analysis on the rockburst data; S3. Dynamically warning of potential rock burst risks during tunnel construction based on the results of the physical analysis; The physical analysis includes using a waveform analysis model to analyze and process the rockburst data into visual analysis data involving rockburst assessment items, rockburst positioning items and rockburst filtering items at the target location.
Citation Information
Patent Citations
Tunnel rockburst micro-seismic monitoring, identifying and early warning construction method
CN111577390A
Drilling and blasting method tunnel strain-structural plane slippage type rock burst failure mechanism analysis method
CN117738677A
Tunnel rockburst early warning method and system based on comprehensive rock mass fracture mechanism
CN118259355A