Continuous coking production process modeling and simulation method
By constructing a carbonization chamber and a dual fire channel heat transfer model, and using a coking coal loading plan and switch model, the modeling and simulation of the continuous coking production process of a full coking oven is achieved, and the existing technology cannot fully perform the entire coking production process. The problem of continuous simulation of coke oven realizes dynamic simulation analysis of the coking production process.
Patent Information
- Application Number
- CN202411277647.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-12-06
AI Technical Summary
The existing technology is difficult to conduct continuous time dynamic simulation analysis of the entire coking production process. Only static finite element analysis can be performed on a certain part of the coking oven, and the continuous coking production process simulation of the full coking oven cannot be achieved.
The heat transfer model of the carbonization chamber and the dual fire channel heat transfer model are used to construct the full coke oven heat transfer model, and the heat transfer model of each carbonization chamber is driven by the push-coke coal loading plan table, and the dual fire channel heat transfer model is driven by the switch model. Realize modeling and simulation of the continuous coking production process of a full coking oven.
It realizes the heat transfer process and mutual influence of the full coke oven and its entire process, and has the advantages of full coke oven and full process simulation, and can transfer heat transfer process between the entire carbonization chamber and the combustion chamber of the coke oven during the coking production process. Perform dynamic simulation.
Smart Images

Figure CN119089610A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a modeling and simulation method for a continuous coking production process. Background Art
[0002] Coking production is a typical complex industrial production process, and coke ovens are the main equipment for coking production. Coke ovens are generally divided into horizontal coke ovens and vertical coke ovens, and vertical coke ovens are the mainstream equipment for current coking production. In vertical coke ovens, ramming coke has been widely used because of its advantages of improving coke quality and coking production efficiency. The essence of the coking production process is the conversion process of matter and energy, which is manifested in that various coking coals are mixed and pushed into the coke oven carbonization chamber, and converted into coke by isolating the air and heating. At the same time, the coke oven gas produced by coal distillation is burned in the combustion chamber to produce the heat energy required for coal distillation. Therefore, thermal analysis and calculation are the basic calculations in the coking production process, and provide a theoretical basis for coke oven production, management and maintenance.
[0003] Thermal analysis and simulation calculation of the carbonization chamber and combustion chamber of the coke oven are the main contents of the heat transfer analysis of the coke oven. The fluid thermodynamic analysis method represented by CFD analysis is the main method of heat transfer analysis of the coke oven at present. Through CFD software, a simulation model of the heat transfer process of the coal cake in the carbonization chamber of the coke oven can be constructed, and the temperature distribution characteristics of the vertical fire channel in the combustion chamber of the coke oven can also be analyzed. However, CFD simulation analysis can only perform static finite element analysis on a certain carbonization chamber coal cake or combustion chamber vertical fire channel of the coke oven, and it is difficult to perform continuous time dynamic simulation analysis on the entire coking production process. That is, CFD modeling and simulation based on finite element analysis can only perform fine heat transfer simulation analysis on a certain component of the coke oven, but cannot perform simulation analysis on the continuous coking production process of the entire coke oven.
[0004] MATLAB is an important tool for process modeling and simulation analysis. The existing solution (patent ZL201910700093.1) uses MATLAB / Simulink to build a simulation model of the heat transfer process of the coke oven carbonization chamber, and realizes the simulation of the heat transfer process between the coke oven carbonization chamber wall and 1 / 2 coal cake in a coking cycle, but the solution only models and simulates a single carbonization chamber. Based on this, in order to realize the modeling and simulation of the continuous coking production process, this solution constructs a full coke oven simulation model based on the actual structure of the coke oven, and realizes the continuous coking simulation of the whole process based on the coke pushing and coal loading schedule. Summary of the invention
[0005] In order to solve the above technical problems, the present invention provides a continuous coking production process modeling and simulation method for a full coke oven and the entire coking production process.
[0006] The technical solution of the present invention to solve the above problem is: a continuous coking production process modeling and simulation method, comprising the following steps: S1. The heat transfer model of the whole coke oven is constructed by using the heat transfer model of the carbonization chamber and the heat transfer model of the double-connected fire channel; S2. The heat transfer model of each carbonization chamber is driven by the coke pushing and coal loading schedule, and the heat transfer model of the double fire channel is driven by the switch model; S3. Simulate the continuous coking production process and obtain simulation results.
[0007] The effect of the present invention is that: for the modeling and simulation problems of coke oven heat transfer and coking production process, compared with the traditional method, the present invention provides a modeling and simulation method for continuous coking production process for the whole coke oven and the whole coking production process. The advantages of this modeling and simulation method are: the whole coke oven model is constructed by a single carbonization chamber heat transfer model and a double fire channel heat transfer model, the coke oven carbonization chamber heat transfer model is driven by a coke pushing and coal loading schedule, and the coke oven double fire channel heat transfer model with an exchange process is combined to achieve the modeling and simulation of the continuous coking production process. The designed model and simulation method can simulate the heat transfer process of all carbonization chambers and combustion chambers of the coke oven during the coking production process and their mutual influence, and has the advantages of full coke oven and full process simulation. BRIEF DESCRIPTION OF THE DRAWINGS
[0008] Figure 1 A schematic structural diagram of the full coke oven in the present invention.
[0009] Figure 2 Flow chart of modeling and simulation of continuous coking production process in the present invention.
[0010] Figure 3 Diagram of the heat transfer model of the carbonization chamber in the present invention.
[0011] Figure 4 Diagram of heat transfer model of double fire channels in the combustion chamber of the present invention.
[0012] Figure 5 Diagram of the heat transfer model of the rising fire channel in the present invention.
[0013] Figure 6 Diagram of the heat transfer model of the descending fire channel in the present invention.
[0014] Figure 7 A complete heat transfer model diagram of the carbonization chamber in the present invention.
[0015] Figure 8 Diagram of heat transfer model of carbonization chamber with triggering in the present invention.
[0016] Fig. 9 A standard carbonization chamber heat transfer model diagram in the present invention.
[0017] Fig.10 A complete combustion chamber double-fire channel heat transfer model diagram of the present invention.
[0018] Fig.11 Graph showing the calculation model for the neutral flue furnace wall surface temperature of the present invention.
[0019] Fig.12 A standard combustion chamber heat transfer model diagram in the present invention.
[0020] Fig.13 Simulation model diagram of 1#~12# carbonization chambers in the present invention.
[0021] Fig.14 Simulation model diagram of combustion chambers 1#~13# in the present invention.
[0022] Fig.15 Continuous simulation model diagram of 1#~12# carbonization chambers and 1#~13# combustion chambers in the present invention.
[0023] Fig.16 Continuous simulation model diagram of 13#~24# carbonization chambers and 14#~26# combustion chambers in the present invention.
[0024] Fig.17 The present invention discloses a timing diagram of the coke pushing and coal loading plan for the 1#~24# carbonization chambers.
[0025] Fig.18 Figure 1. Simulation model diagram of the switch in the present invention.
[0026] Fig.19 The temperature variation curve of coal cakes in 4#~8# carbonization chambers of the present invention.
[0027] Fig. 20 The temperature variation curve of the left and right furnace walls of the 4#~8# combustion chambers in the present invention. DETAILED DESCRIPTION
[0028] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0029] The present invention constructs a continuous coking production process simulation model for the JNDK55-05F ramming coke oven. The structure of the coke oven analyzed is as follows: Figure 1 The coke oven consists of combustion chambers and carbonization chambers arranged alternately, with a total of 65 carbonization chambers and 66 combustion chambers. Each combustion chamber contains 32 vertical fire channels, and every two adjacent vertical fire channels form a set of double fire channels with exhaust gas circulation.
[0030] A continuous coking production process modeling and simulation method of the present invention has a flow chart as shown in Figure 2 As shown, it includes the following steps: S1. The heat transfer model of the whole coke oven is constructed by using the carbonization chamber heat transfer model and the double-fire channel heat transfer model.
[0031] The heat transfer model of the carbonization chamber refers to the heat transfer model of the carbonization chamber constructed using MATLAB / Simulink. The heat transfer model includes the heat transfer model of the carbonization chamber furnace wall and the heat transfer model of 1 / 2 coal cakes, such as Figure 3 As shown. Among them, the carbonization chamber furnace wall heat transfer model (module Wall_cell_1T10) divides the carbonization chamber furnace wall into 10 plane units evenly in the horizontal direction, and constructs the heat transfer model of each furnace wall plane unit according to the double-layer plane heat transfer theory; the 1 / 2 coal cake heat transfer model (module Coal_cell_1T25, Coal_cell_26T50) divides the 1 / 2 coal cake in the carbonization chamber into 50 plane units evenly in the horizontal direction, and constructs the heat transfer model of each coal cake plane unit according to the double-layer plane heat transfer theory. At the same time, it is considered that at any time point, the material, temperature and morphology in the same coal cake plane unit are consistent, and the thermal physical properties of the coal cake plane unit are determined by the temperature of the plane unit. Figure 3 It also includes the heat transfer model between the furnace wall and the coal cake (module Wall2Coa), as well as the coking heat consumption calculation model of the carbonization chamber heat transfer model (module W_T2Q). Figure 3 In the process, the heat transfer model of the carbonization chamber wall and the 1 / 2 coal cake heat transfer model are connected according to the actual coke oven carbonization chamber structure to realize the heat transfer from the carbonization chamber wall surface on the flue side to the central plane of the carbonization chamber coal cake, and the coking heat consumption of the heat transfer process is fed back to the carbonization chamber wall surface on the flue side.
[0032] Will Figure 3 After the heat transfer model of the carbonization chamber is encapsulated, a standardized heat transfer model of the carbonization chamber is obtained. The model input is the surface temperature of the carbonization chamber wall on the fire channel side (T_W), and the output is the center temperature of the coal cake (T_C_C) and the coking heat consumption (QP). Through the heat transfer model of the carbonization chamber, the temperature change curves of each carbonization chamber wall plane unit and each coal cake plane unit during the coking process can be obtained, and the coking heat consumption curve during the coking process can also be obtained.
[0033] The double-fire channel heat transfer model refers to the double-fire channel heat transfer model of the coke oven combustion chamber built using MATLAB / Simulink. The model divides the double-fire channel of the combustion chamber into 10 heat transfer units evenly in the height direction, and models the ascending fire channel and the descending fire channel respectively. Figure 4 As shown. Figure 4 In the ascending fire channel heat transfer model (module Burning), the ascending fire channel is evenly divided into 10 heat transfer units in the vertical direction. In each heat transfer unit of the ascending fire channel, the coal gas is distributed in proportion and then reacts with the air to release heat energy and heat the remaining coal gas, air and exhaust gas. At the same time, heat is transferred to the furnace walls on both sides by thermal radiation in the heat transfer unit. The internal structure of the ascending fire channel heat transfer model is shown in Figure 1. Figure 5As shown, it includes 10 ascending flue heat transfer unit models (Burning_Cell_1 to Burning_Cell_10). The input of each heat transfer unit model is: unit input gas temperature (Temper_ci), unit input gas volume (V_F_UI), unit input gas total heat (Q_N-1_I), total flow rate of coke oven gas in a single vertical flue (V_G_I), heat absorbed by the left furnace wall (Q_L), and heat absorbed by the right furnace wall (Q_R). The output of the heat transfer unit model is: left furnace wall surface temperature (Temper_L), right furnace wall surface temperature (Temper_R), unit output gas temperature (Temper_co), unit output gas volume (V_F_UO), and unit output gas total heat (Q_N_O). Each heat transfer unit is connected in sequence according to the gas flow direction in the ascending flue to realize continuous exchange of gas and heat energy between units, and output the left and right furnace wall surface temperatures (T_L_Burning and T_R_Burning).
[0034] exist Figure 4 In the downcomer heat transfer model (module Burned), the downcomer is evenly divided into 10 heat transfer units in the height direction. In each heat transfer unit of the downcomer, the exhaust gas and the remaining air transfer heat to the furnace walls on both sides by thermal radiation. The internal structure of the downcomer heat transfer model is shown in Figure 1. Figure 6 As shown, it includes 10 downcomer heat transfer unit models (Burned_Cell_1 to Burned_Cell_10). The input of each heat transfer unit model is: unit input gas volume (V_F_UI), unit input gas temperature (Temper_ci), unit input gas total heat (Q_N-1_I), heat absorbed by the left furnace wall (Q_L), and heat absorbed by the right furnace wall (Q_R). The output of the heat transfer unit model is: left furnace wall surface temperature (Temper_L), right furnace wall surface temperature (Temper_R), unit output gas volume (V_F_UO), unit output gas temperature (Temper_co), and unit output gas total heat (Q_N_O). Each heat transfer unit is connected in sequence according to the gas flow direction in the downcomer to realize the continuous exchange of gas and heat energy between units, and output the left and right furnace wall surface temperatures (T_L_Burned and T_R_Burned).
[0035] Will Figure 4The double-fire channel heat transfer model shown in the figure is encapsulated to form a standardized double-fire channel heat transfer model of the combustion chamber. The input of the model is: the heat absorbed by the left furnace wall of the double fire channel (Q_L), the heat absorbed by the right furnace wall of the double fire channel (Q_R), and the total flow rate of coke oven gas in the double fire channel (V_G_I). The output includes: the surface temperature of the left and right furnace walls of the ascending fire channel (T_L_Burning, T_R_Burning), the surface temperature of the left and right furnace walls of the descending fire channel (T_L_Burned, T_R_Burned), the bottom temperature of the ascending fire channel (T_CO_Burning), and the bottom temperature of the descending fire channel (T_CO_Burned).
[0036] The heat transfer model of the whole coke oven is constructed by using the carbonization chamber heat transfer model and the double fire channel heat transfer model. It means that according to the actual structure of the coke oven, in the mode that the n combustion chamber, the n carbonization chamber, the n+1 combustion chamber, and the n+1 carbonization chamber are connected in sequence, the double fire channel heat transfer model of the n combustion chamber, the heat transfer model of the left furnace wall of the n carbonization chamber, the heat transfer model of the 1 / 2 coal cake on the left side of the n carbonization chamber, the heat transfer model of the 1 / 2 coal cake on the right side of the n carbonization chamber, the heat transfer model of the right furnace wall of the n carbonization chamber, and the double fire channel heat transfer model of the n+1 combustion chamber are connected in sequence. In the constructed heat transfer model of the whole coke oven, each combustion chamber is represented by a double fire channel heat transfer model, and each carbonization chamber contains two Figure 3 The heat transfer models of the carbonization chamber shown are the heat transfer model of the left carbonization chamber and the heat transfer model of the right carbonization chamber.
[0037] Figure 7 The figure shows a complete carbonization chamber heat transfer model constructed, including the left carbonization chamber heat transfer model (W_hC_L) and the right carbonization chamber heat transfer model (W_hC_R). Both models are encapsulated carbonization chamber heat transfer models, and their internal structures are as follows: Figure 3 As shown. Figure 7 After encapsulating the model shown, we get Figure 8 The heat transfer model of the carbonization chamber with trigger function shown in the figure can realize the start and stop control of the heat transfer model of the carbonization chamber based on the coke pushing and coal loading schedule. Figure 8 In the , the coke charging plan is used as the model parameter corresponding to the carbonization chamber and is stored in the clock module (Plan_Timer). Figure 8 After encapsulating the model shown, we get Fig. 9A standard carbonization chamber heat transfer model is shown in FIG. 1 . The parameters of the model are the coke pushing and coal loading schedule of the corresponding furnace number carbonization chamber. The input of the model is: the surface temperature of the furnace wall of the left combustion chamber of the carbonization chamber of the furnace number (T_W_L)|, the surface temperature of the furnace wall of the right combustion chamber of the carbonization chamber of the furnace number (T_W_R)|, and the output of the model is: the coke pushing and coal loading schedule timing of the carbonization chamber of the furnace number (P_P), the center temperature of the coal cake in the carbonization chamber of the furnace number (T_C_C), the heat absorbed by the left combustion chamber wall during the coking process of the carbonization chamber of the furnace number (QP_L), and the heat absorbed by the right combustion chamber wall during the coking process of the carbonization chamber of the furnace number (QP_R).
[0038] Fig.10 The figure shows a complete combustion chamber double-fire channel heat transfer model, including a double-fire channel model (Double_Burn_Ch) and a fire channel furnace wall surface temperature calculation model (Temper_Cal). The double-fire channel model (Double_Burn_Ch) is a packaged double-fire channel heat transfer model. Its internal structure is as follows: Figure 4 The exchange trigger signal (Burn_Stat_Exch) is used to start and stop the dual-fire channel model, and the fire channel selection signal (Exch_Stat) is used to select the temperature output of the rising fire channel or the descending fire channel. Fig.10 The internal structure of the flue wall surface temperature calculation model (Temper_Cal) is as follows: Fig.11 As shown, the temperature of the furnace wall surface of the current fire channel is selected through the fire channel selection signal (Exch_Stat), and the average temperature of the furnace wall surface of the six units in the middle of the fire channel is taken as the temperature of the furnace wall surface of the double fire channel at that moment. Fig.10 After encapsulating the model shown, we get Fig.12 A standard combustion chamber heat transfer model is shown. The input of the model is: exchange trigger signal (Burn_Stat_Exch), fire channel selection signal (Exch_Stat), heat absorbed by the left furnace wall of the combustion chamber (B_Q_L), and heat absorbed by the right furnace wall of the combustion chamber (B_Q_R). The output is: surface temperature of the left furnace wall of the combustion chamber (B_T_L) and surface temperature of the right furnace wall of the combustion chamber (B_T_R).
[0039] To facilitate model management, Fig. 9 The single standard carbonization chamber heat transfer models shown are numbered in sequence and put together to obtain the full coke oven carbonization chamber model. Fig.13 The simulation model diagram of carbonization chambers No. 1 to No. 12 is shown. Fig.12 The single standard combustion chamber heat transfer models shown are numbered in sequence and put together to obtain the full coke oven combustion chamber model. Fig.14 Shown is a simulation model diagram of combustion chambers No. 1 to No. 13.
[0040] In the constructed full coke oven heat transfer model, the connection between each combustion chamber and the carbonization chamber and its coal cake is established through heat transfer, specifically, the n combustion chamber transfers heat energy to the n-1 carbonization chamber and the n carbonization chamber respectively, that is, the double fire channel heat transfer model of the n combustion chamber radiates heat energy to the left furnace wall, which is used as the heat energy input of the right heat transfer model of the n-1 carbonization chamber, and further transfers heat to the right 1 / 2 coal cake of the n-1 carbonization chamber through the right furnace wall of the n-1 carbonization chamber. At the same time, the double fire channel heat transfer model of the n combustion chamber radiates heat energy to the right furnace wall, and further transfers heat to the left 1 / 2 coal cake of the n carbonization chamber through the left furnace wall of the n carbonization chamber. In the full coke oven heat transfer model, the central layer of coal cakes in each carbonization chamber is set as an insulation layer, and the left and right 1 / 2 coal cakes in each carbonization chamber are independently simulated for coking heat transfer, but the initial composition and parameters of the coal cakes in each carbonization chamber are consistent.
[0041] According to the above-mentioned method of constructing the full coke oven heat transfer model, Fig.15 The simulation model diagram of the carbonization chambers 1 to 12 (Coking1_12) and the combustion chambers 1 to 13 (Burning1_13) is shown, where the carbonization chamber model (Coking1_12) is composed of Fig.13 The simulation model shown is encapsulated, and the combustion chamber model (Burning1_13) is obtained by Fig.14 The simulation model shown is encapsulated. Taking into account the heat dissipation characteristics of the side fire channel, the heat absorbed by the left wall of combustion chamber No. 1 is given by the constant module (B_Q_Side), while the heat absorbed by the right wall comes from the left wall of carbonization chamber No. 1 (QP_L1). The corresponding surface temperature of the right wall of combustion chamber No. 1 (B_T_R1) is used as the input of the surface temperature of the left wall of carbonization chamber No. 1. Similarly, the connection between the input and output of each carbonization chamber and the combustion chamber is completed through signal labels. According to Fig.15 The connection method shown is used to complete the modeling and connection of 65 carbonization chambers and 66 combustion chambers of the whole coke oven. Fig.16 Shown are simulation model diagrams of carbonization chambers No. 13 to 24 (Coking13_24) and combustion chambers No. 14 to 26 (Burning14_26). The simulation model diagrams of other carbonization chambers and combustion chambers are not listed one by one.
[0042] S2. The heat transfer model of each carbonization chamber is driven by the coke pushing and coal loading schedule, and the heat transfer model of the double-connected fire channel is driven by the switch model.
[0043] Driving the heat transfer model of each carbonization chamber with a coke-pushing and coal-loading schedule means starting and stopping the heat transfer model of each carbonization chamber for simulation according to the coke-pushing and coal-loading schedule. The coke-pushing and coal-loading schedule is arranged in chronological order, and the coal-loading time and coking time of each carbonization chamber are given, wherein the coal-loading time indicates the time when the simulation of the heat transfer model of the carbonization chamber is started, and the coking time indicates the duration of the simulation of the heat transfer model of the carbonization chamber, and the coal-loading time plus the coking time is the coke-pushing time of the carbonization chamber. The coke-pushing and coal-loading schedule is based on a typical coke oven production process, adopts a 5-2 series sequence, and can be adjusted by the owner as the input of the simulation model of the continuous coking production process. In order to meet the requirements of the full coke oven simulation, the production plan duration corresponding to the coke-pushing and coal-loading schedule includes at least two coking cycles. Fig.17 is the start and stop signal of the carbonization chamber simulation model generated by the coke pushing and coal loading schedule. For each carbonization chamber simulation model, 1 means starting the simulation, and 0 means stopping the simulation. In the figure, after the 1# carbonization chamber starts the simulation after the coal loading, the 6# carbonization chamber starts the simulation, and then the 11# carbonization chamber starts the simulation, which satisfies the 5-2 sequence. After the 2# carbonization chamber pushes the coke, there is nearly half an hour of shift change time. Fig.17 This process is also reflected in the timing of .
[0044] Driving the dual-fire channel heat transfer model with a switch model means realizing the exchange of the ascending fire channel and the descending fire channel in the dual-fire channel model according to the gas exchange cycle given by the user.
[0045] exist Fig.15 In the example, the exchange model (Exchange_Process) implements the exchange process and outputs the exchange trigger signal (Burn_Stat_Exch) and the fire channel selection signal (Exch_Stat). The internal structure of the exchange model is as follows: Fig.18 As shown, based on the working principle of the coke oven exchanger, the system simulation time is taken as the remainder of the gas interaction cycle to determine whether the vertical fire channel corresponding to the current simulation time is an ascending fire channel or a descending fire channel, and a fire channel selection signal (Exch_Stat) is given. At the same time, considering the action time of the exchanger, an exchange trigger signal (Burn_Stat_Exch) is given, and the dual-fire channel simulation is started after the exchange is completed, and the simulation is stopped during the exchange process.
[0046] S3. Conduct a continuous coking production process simulation and obtain simulation results.
[0047] The continuous coking production process simulation refers to the continuous simulation according to the fixed simulation step size. When the system simulation time is consistent with the coal loading time of a carbonization chamber in the coking coal loading schedule, the simulation model of the carbonization chamber is started for simulation. When the system simulation time is consistent with the coking time of the carbonization chamber, the carbonization chamber simulation model is stopped until the system simulation time is consistent with the next coal loading time of the carbonization chamber. Then the carbonization chamber simulation model is reinitialized and started, so as to realize the start and stop simulation of each carbonization chamber of the whole coke oven according to the coking coal loading schedule. The continuous coking production process simulation also includes the continuous interaction process of the double fire channel. The system simulation time is taken as the remainder of the gas interaction period to determine whether the vertical fire channel corresponding to the current simulation time is an ascending fire channel or a descending fire channel, and the corresponding temperature is further selected by the selection switch as the output of the heat transfer unit of the vertical fire channel at the simulation time.
[0048] exist Fig.15 In the simulation model shown, the system simulation parameters are: simulation step (Ts) is 1s, gas exchange cycle (C_T_C) is 30 minutes, exchange process time (C_TP_C) is 46s, carbonization chamber wall thickness is 90mm, coal cake thickness is 500mm, coal cake initial temperature is 30 degrees, combustion chamber height is 4.7m, excess air coefficient is 1.25, exhaust gas circulation volume is 0.5, and coke oven gas initial temperature is 45 degrees.
[0049] Acquiring simulation results means that the following simulation results can be obtained through simulation analysis: the coking process of coal cakes in each carbonization chamber of the whole coke oven at a certain point in time and the coking heat consumption curve of the whole coke oven, the temperature change curve of coal cakes in a certain carbonization chamber during the coking process and the coking heat consumption of the carbonization chamber during the coking process, the temperature distribution of the double fire channels in each combustion chamber of the whole coke oven at a certain point in time, the influence of the coking process of a certain carbonization chamber on the temperature of the furnace wall of the adjacent double fire channels, the influence of the coke pushing and coal loading schedule on the heat consumption of the whole coke oven and the smooth operation of the coke oven, etc.
[0050] Fig.19 The figure shows the coal cake center temperature and surface temperature curve of the continuous coking production process of 4#~8# carbonization chambers. In the figure, the dotted line represents the surface temperature of the coal cake, and the solid line represents the center temperature of the coal cake. It can be seen from the figure that each carbonization chamber performs coking simulation according to the coke pushing and coal loading schedule. When the coal cake of a carbonization chamber is in the final stage of coking, the coal cake of the adjacent carbonization chamber is in the middle stage of coking, which is consistent with the actual coking production process and can meet the requirements of continuous simulation of the whole coke oven. Fig. 20 This is a temperature curve of the furnace wall surface in the middle of the vertical flue during the continuous coking production process of the 4#~8# combustion chambers. As can be seen from the figure, the flue wall surface temperature changes in an interactive cycle due to the influence of the gas exchange process of the double flue. Fig.19From the coking process in the carbonization chamber, it can be seen that the surface temperatures of the left and right furnace walls of the fire channel are respectively affected by the coking process of the corresponding carbonization chamber. The macroscopic curve shows a "W" shape, and after the corresponding carbonization chamber is loaded with coal, the surface temperatures of the left and right furnace walls of the fire channel both drop significantly, which is also in line with the actual coking production process.
Claims
1. A continuous coking production process modeling and simulation method, characterized in that: The following steps are involved: S1. The heat transfer model of the whole coke oven is constructed by using the heat transfer model of the carbonization chamber and the heat transfer model of the double-connected fire channel; The carbonization chamber heat transfer model refers to a carbonization chamber heat transfer model constructed using MATLAB / Simulink, which includes a carbonization chamber furnace wall heat transfer model and a 1 / 2 coal cake heat transfer model; wherein, the carbonization chamber furnace wall heat transfer model divides the carbonization chamber furnace wall into a number of plane units uniformly in the horizontal direction, and constructs a heat transfer model of each furnace wall plane unit according to the double-layer plane heat transfer theory; the 1 / 2 coal cake heat transfer model divides the 1 / 2 coal cake in the carbonization chamber into a number of plane units uniformly in the horizontal direction, and constructs a heat transfer model of each coal cake plane unit according to the double-layer plane heat transfer theory, and at the same time, it is considered that at any time point, the same The material, temperature and shape in the coal cake plane unit are consistent, and the thermal physical parameters of the coal cake plane unit are determined by the temperature of the plane unit; the carbonization chamber furnace wall heat transfer model and the 1 / 2 coal cake heat transfer model are connected together according to the actual coke oven carbonization chamber structure to realize the heat transfer from the carbonization chamber furnace wall surface on the fire channel side to the central plane of the carbonization chamber coal cake, and the coking heat consumption of the heat transfer process is fed back to the carbonization chamber furnace wall surface on the fire channel side; the temperature change curves of each carbonization chamber furnace wall plane unit and each coal cake plane unit during the coking process can be obtained through the carbonization chamber heat transfer model, and the coking heat consumption curve during the coking process can be obtained; The double-fire channel heat transfer model refers to a double-fire channel heat transfer model of a coke oven combustion chamber constructed using MATLAB / Simulink. The model divides the double-fire channel of the combustion chamber into a number of heat transfer units evenly in the height direction, and models the ascending fire channel and the descending fire channel respectively; in each heat transfer unit model of the ascending fire channel, the coal gas is distributed in proportion and then reacts with the air to release heat energy and heat the remaining coal gas, air and exhaust gas, and at the same time, heat is transferred to the furnace walls on both sides by thermal radiation in the heat transfer unit; in each heat transfer unit of the descending fire channel, the exhaust gas and the remaining air transfer heat to the furnace walls on both sides by thermal radiation; The heat transfer model of the whole coke oven is constructed by using the carbonization chamber heat transfer model and the double fire channel heat transfer model, which means that according to the actual structure of the coke oven, the double fire channel heat transfer model of the n combustion chamber, the heat transfer model of the left furnace wall of the n carbonization chamber, the heat transfer model of the 1 / 2 coal cake on the left side of the n carbonization chamber, the heat transfer model of the 1 / 2 coal cake on the right side of the n carbonization chamber, the heat transfer model of the right furnace wall of the n carbonization chamber, and the double fire channel heat transfer model of the n+1 combustion chamber are connected in sequence in accordance with the mode that the n combustion chamber, the n carbonization chamber, the n+1 combustion chamber, and the n+1 carbonization chamber are connected in sequence; in the heat transfer model of the whole coke oven, each combustion chamber is represented by a double fire channel heat transfer model, and each carbonization chamber includes two carbonization chamber heat transfer models, namely the left carbonization chamber heat transfer model and the right carbonization chamber heat transfer model; in the heat transfer model of the whole coke oven, the heat transfer model of the double fire channel is constructed by heat transfer. Establish the connection between each combustion chamber and the carbonization chamber and its coal cakes, specifically, combustion chamber No. n transfers heat energy to carbonization chamber No. n-1 and carbonization chamber No. n respectively, that is, the double fire channel heat transfer model of combustion chamber No. n radiates heat energy to the left furnace wall, and this heat energy is used as the heat energy input of the right heat transfer model of carbonization chamber No. n-1, and further transfers heat to the right 1 / 2 coal cakes of carbonization chamber No. n-1 through the right furnace wall of carbonization chamber No. n-1; at the same time, the double fire channel heat transfer model of combustion chamber No. n radiates heat energy to the right furnace wall, and further transfers heat to the left 1 / 2 coal cakes of carbonization chamber No. n through the left furnace wall of carbonization chamber No. n; in the full coke oven heat transfer model, the central layer of coal cakes in each carbonization chamber is set as an insulating layer, and the left and right 1 / 2 coal cakes in each carbonization chamber are independently subjected to coking heat transfer simulation, but the initial composition and parameters of coal cakes in each carbonization chamber are consistent; S2. The heat transfer model of each carbonization chamber is driven by the coke pushing and coal loading schedule, and the heat transfer model of the double fire channel is driven by the switch model; S3. Simulate the continuous coking production process and obtain simulation results.
2. A continuous coking production process modeling and simulation method according to claim 1, characterized in that: In the step S2, driving the heat transfer model of each carbonization chamber with the coke pushing and coal loading schedule means starting and stopping the heat transfer model of each carbonization chamber for simulation according to the coke pushing and coal loading schedule, the coke pushing and coal loading schedule is arranged in chronological order, and gives the coal loading time and coking time of each carbonization chamber, wherein the coal loading time indicates the time when the simulation of the heat transfer model of the carbonization chamber is started, and the coking time indicates the duration of the simulation of the heat transfer model of the carbonization chamber, and the coal loading time plus the coking time is the coke pushing time of the carbonization chamber; the coke pushing and coal loading schedule is based on the typical coke oven production process, adopts a 5-2 series sequence, and can be adjusted by the owner as the input of the continuous coking production process simulation model; in order to meet the requirements of the full coke oven simulation, the production plan duration corresponding to the coke pushing and coal loading schedule includes at least two coking cycles; driving the double fire channel heat transfer model with the switch model means realizing the exchange of the ascending fire channel and the descending fire channel in the double fire channel model according to the gas exchange cycle given by the user; In the step S3, the continuous coking production process simulation refers to continuous simulation according to a fixed simulation step size. When the system simulation time is consistent with the coal loading time of a certain carbonization chamber in the coke pushing and coal loading schedule, the simulation model of the carbonization chamber is started for simulation. When the system simulation time is consistent with the coke pushing time of the carbonization chamber, the carbonization chamber simulation model is stopped until the system simulation time is consistent with the next coal loading time of the carbonization chamber, and then the carbonization chamber simulation model is reinitialized and started, so as to realize the start and stop simulation of each carbonization chamber of the whole coke oven according to the coke pushing and coal loading schedule; the continuous coking production process simulation also includes the continuous interaction process of the double fire channel, taking the remainder of the system simulation time to the gas interaction period, determining whether the vertical fire channel corresponding to the current simulation time is an ascending fire channel or a descending fire channel, and further selecting the corresponding temperature as the output of the heat transfer unit of the vertical fire channel at the simulation time through the selection switch; In the step S3, obtaining the simulation results means that the following simulation results can be obtained through simulation analysis: the coking process of coal cakes in each carbonization chamber of the whole coke oven at a certain point in time and the coking heat consumption curve of the whole coke oven, the temperature change curve of coal cakes in a certain carbonization chamber during the coking process and the coking heat consumption of the carbonization chamber during the coking process, the temperature distribution of the double fire channels in each combustion chamber of the whole coke oven at a certain point in time, the influence of the coking process of a certain carbonization chamber on the temperature of the furnace wall of the adjacent double fire channels, the influence of the coke pushing and coal loading schedule on the heat consumption of the whole coke oven and the smooth operation of the coke oven, etc.
Citation Information
Patent Citations
Coke oven carbonization chamber heat transfer process modeling and simulation method
CN110442955A