Water-turbine generator set performance evaluation method and system based on CAE simulation
CAE simulation-based evaluation and optimization of hydro-turbine generator sets address the limitations of traditional methods by providing detailed component analysis and optimization, enhancing performance and stability.
Patent Information
- Application Number
- CN202410942279.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-07-15
AI Technical Summary
Traditional performance evaluation methods for hydro-turbine generator sets are not comprehensive and accurate, lacking detailed analysis and optimization of individual components, and are limited by environmental conditions and test equipment.
A method and system utilizing CAE simulation to traverse component parameters, build a physical dynamic simulation model, set simulation constraints, simulate components, and generate optimization schemes for hydro-turbine generator sets.
Achieves comprehensive and detailed evaluation of hydro-turbine generator set performance, optimizing components based on simulation data to improve efficiency and stability.
Smart Images

Figure CN119089723A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of hydro-generators, and in particular to a method and system for evaluating the performance of a hydro-generator set based on CAE simulation. Background Art
[0002] As global energy demand continues to grow, hydropower, as a clean and renewable form of energy, occupies an increasingly important position in the energy structure. As the core equipment of hydropower generation, the performance of the hydropower generator set directly affects the efficiency and stability of the entire power generation system. Therefore, accurate evaluation and optimization of the performance of the hydropower generator set is of great significance for improving power generation efficiency, reducing operating costs, and ensuring stable operation of the system. Traditional performance evaluation methods mainly rely on experimental tests and field observations, which are not only costly and time-consuming, but also limited by environmental conditions and test equipment. They can only roughly evaluate the overall performance of the unit, and cannot conduct detailed analysis and optimization of each component and link inside the unit, making it difficult to fully reflect the performance characteristics of the unit. Summary of the invention
[0003] The embodiments of the present application provide a method and system for evaluating the performance of a hydro-turbine generator set based on CAE simulation, which solves the technical problem in the prior art that the evaluation of a hydro-turbine generator set is not comprehensive and accurate enough.
[0004] In view of the above problems, an embodiment of the present application provides a method and system for evaluating the performance of a hydro-generator set based on CAE simulation.
[0005] A first aspect of an embodiment of the present application provides a method for evaluating the performance of a hydro-generator set based on CAE simulation, the method comprising:
[0006] Traversing component parameters of a target hydro-generator set to collect and obtain a plurality of component performance parameters, and formulating a plurality of component performance optimization targets according to the plurality of component performance parameters, wherein the plurality of component performance optimization targets correspond to the plurality of component performance parameters;
[0007] Use CAE simulation technology to build a physical dynamic simulation model of the target hydro-generator unit;
[0008] Setting simulation constraints based on the operating data of the target hydro-generator unit;
[0009] According to the simulation constraints, multiple components in the target hydro-generator set are simulated by using the physical dynamic simulation model to obtain a simulation data set;
[0010] Verifying that the simulation data set matches the multiple component performance optimization targets, evaluating component performance of the multiple components, and generating multiple component performance evaluation results;
[0011] An optimization scheme for the multiple components is generated according to the performance evaluation results of the multiple components, and the optimization scheme is executed to optimize and adjust the target hydro-generator set.
[0012] A second aspect of the embodiment of the present application provides a hydro-generator performance evaluation system based on CAE simulation, the system comprising:
[0013] A parameter acquisition module, wherein the parameter acquisition module is used to traverse the component parameters of the target hydro-generator set to acquire a plurality of component performance parameters, and formulate a plurality of component performance optimization targets according to the plurality of component performance parameters, wherein the plurality of component performance optimization targets correspond to the plurality of component performance parameters;
[0014] A model building module, wherein the model building module is used to build a physical dynamic simulation model of a target hydro-generator set using CAE simulation technology;
[0015] A constraint condition setting module, wherein the constraint condition setting module is used to set simulation constraint conditions based on the operating data of the target hydro-generator set;
[0016] A simulation module, wherein the simulation module is used to simulate multiple components in a target hydro-generator set through the physical dynamic simulation model according to the simulation constraints to obtain a simulation data set;
[0017] An evaluation module, the evaluation module is used to verify that the simulation data set matches the multiple component performance optimization targets, evaluate the component performance of the multiple components, and generate multiple component performance evaluation results;
[0018] An optimization module is used to generate an optimization scheme for the multiple components according to the performance evaluation results of the multiple components, and execute the optimization scheme to optimize and adjust the target hydro-generator set.
[0019] One or more technical solutions provided in this application have at least the following technical effects or advantages:
[0020] Traverse the component parameters of the target hydro-turbine generator set to collect, obtain multiple component performance parameters, and formulate multiple component performance optimization targets based on the multiple component performance parameters, wherein the multiple component performance optimization targets correspond to the multiple component performance parameters. Use CAE simulation technology to build a physical dynamic simulation model of the target hydro-turbine generator set, set simulation constraints based on the operating data of the target hydro-turbine generator set, and simulate multiple components in the target hydro-turbine generator set through the physical dynamic simulation model according to the simulation constraints to obtain a simulation data set. Verify that the simulation data set matches the multiple component performance optimization targets, evaluate the component performance of the multiple components, and generate multiple component performance evaluation results. Generate optimization plans for multiple components based on the multiple component performance evaluation results, and execute the optimization plans to optimize and adjust the target hydro-turbine generator set. The technical problem that the evaluation of the hydro-turbine generator set in the prior art is not comprehensive and accurate enough has been solved, and the technical effect of comprehensive and detailed evaluation of the unit performance has been achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0022] Figure 1 A schematic diagram of a flow chart of a method for evaluating the performance of a hydro-generator set based on CAE simulation provided in an embodiment of the present application;
[0023] Figure 2 A schematic diagram of the structure of a hydro-generator performance evaluation system based on CAE simulation provided in an embodiment of the present application.
[0024] Explanation of the accompanying drawings: parameter acquisition module 11, model building module 12, constraint setting module 13, simulation module 14, evaluation module 15, optimization module 16. DETAILED DESCRIPTION
[0025] The embodiments of the present application solve the technical problem that the evaluation of hydro-turbine generator sets in the prior art is not comprehensive and accurate enough by providing a method and system for evaluating the performance of hydro-turbine generator sets based on CAE simulation.
[0026] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0027] It should be noted that the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or server that includes a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or modules that are not explicitly listed or are inherent to these processes, methods, products or devices.
[0028] Embodiment 1
[0029] like Figure 1 As shown, the embodiment of the present application provides a method for evaluating the performance of a hydro-generator set based on CAE simulation, wherein the method comprises:
[0030] Traversing component parameters of a target hydro-generator set to collect and obtain a plurality of component performance parameters, and formulating a plurality of component performance optimization targets according to the plurality of component performance parameters, wherein the plurality of component performance optimization targets correspond to the plurality of component performance parameters;
[0031] The purpose of traversing the component parameters of the target hydro-turbine generator set for collection is to obtain key performance parameters, covering various key components of the generator set, such as turbine speed and torque, generator output power and voltage, bearing friction and wear, blade flow and blade characteristics, etc. These parameters are crucial to the operation and performance of the generator set. Based on the collected performance parameters of multiple components, multiple component performance optimization targets can be formulated, wherein multiple component performance optimization targets have a corresponding relationship with the performance parameters of each component. For example, the turbine speed can be increased to increase the output power of the generator, the bearing friction can be reduced to reduce energy loss, the blade design can be adjusted to optimize water flow, and the efficiency of the turbine can be improved.
[0032] Further, the component parameters of the target hydro-generator set are traversed for collection, a plurality of component performance parameters are obtained, and a plurality of component performance optimization targets are formulated according to the plurality of component performance parameters. The method includes:
[0033] Building a component parameter information library based on the component parameters of the target hydro-generator set;
[0034] Perform performance matching based on the component parameter information library to generate multiple component performance parameters;
[0035] Performing performance efficiency analysis on the multiple component performance parameters to generate multiple performance analysis results;
[0036] Performing optimization evaluation of maximum performance according to the multiple performance analysis results to obtain optimization improvement indicators;
[0037] The plurality of component performance parameters are traversed and compared according to the optimization improvement index to determine the plurality of component performance optimization targets.
[0038] For the component parameters of the target hydro-turbine generator set, a component parameter information library can be constructed, which contains the key parameters of each component and its performance data. By comparing the performance parameters of different components, the correlation and mutual influence between them can be found. For example, the matching relationship between the rotor and the bearing, and their influence on the overall performance of the unit can be analyzed. Through performance matching, multiple component performance parameters can be generated. The performance efficiency analysis of the generated multiple component performance parameters is to evaluate the performance of each combination. By comparing and analyzing the performance data of different components, multiple performance analysis results can be generated. Based on the performance analysis, the maximum performance optimization evaluation is performed to obtain the optimization improvement index, which refers to the maximum efficiency improvement percentage. According to the optimization improvement index, multiple component performance parameters are traversed and compared to determine the performance optimization targets of multiple components.
[0039] Use CAE simulation technology to build a physical dynamic simulation model of the target hydro-generator unit;
[0040] CAE simulation technology is a method of simulating and analyzing product performance and design on a computer. For complex systems such as hydro-turbine generator sets, it provides an effective tool to predict and optimize their performance. Using CAE simulation software, a physical dynamic simulation model of a hydro-turbine generator set can be constructed.
[0041] Furthermore, CAE simulation technology is used to construct a physical dynamic simulation model of the target hydro-generator set, and the method includes:
[0042] Retrieve the structural dimension information set of the target hydro-generator unit and construct a three-dimensional model of the unit;
[0043] Meshing the three-dimensional model of the unit based on the component attribute mapping diagram to generate a plurality of mesh space data, wherein each mesh space data in the plurality of mesh space data contains the physical attributes of the corresponding component;
[0044] Based on the historical operation data of the target hydro-generator set, the plurality of grid space data are activated in sequence to perform dynamic simulation, and a plurality of dynamic simulation results are obtained;
[0045] The precision of the plurality of grid space data is adjusted based on the plurality of dynamic simulation results, and a plurality of grid space adjustment results are generated to output the physical dynamic simulation model.
[0046] The structural dimension information set of the target hydro-turbine generator set is retrieved, including the dimensions of the main components of the unit, assembly relationships, and overall structural layout. The three-dimensional model of the unit is constructed using the structural dimension information set, and the three-dimensional model of the unit reflects the real geometric shape of the unit and the relative position relationship between the components. The three-dimensional model of the unit is meshed based on the component attribute mapping diagram. The component attribute mapping diagram is a tool that maps the physical properties of the component to the three-dimensional model to determine the physical properties of the component contained in each grid space data. Through meshing, the three-dimensional model is divided into multiple grid space data, each grid space data contains the physical properties of the corresponding component, such as material properties, density, thermal conductivity, etc. After obtaining multiple grid space data, the historical operation data of the target hydro-turbine generator set is used to activate these grid space data in turn for dynamic simulation. The historical operation data includes the operating parameters, load changes, environmental conditions, etc. of the unit under different working conditions. By activating the grid space data and simulating these historical operating conditions, multiple dynamic simulation results can be obtained, and the dynamic simulation results reflect the performance of the unit under different operating conditions. Based on multiple dynamic simulation results, the accuracy of multiple grid space data is adjusted. By comparing and analyzing the differences between the simulation results and the actual running data, the inaccuracies in the simulation model can be found, and the accuracy of the grid space data can be adjusted accordingly. Through continuous adjustment and optimization, multiple grid space adjustment results can be generated and output to the physical dynamic simulation model.
[0047] Setting simulation constraints based on the operating data of the target hydro-generator unit;
[0048] Simulation constraints refer to simulation boundaries. Setting simulation constraints based on the operating data of the target hydro-generator set can ensure that the simulation model is simulated under real working conditions and improve the accuracy and reliability of the simulation results.
[0049] Furthermore, the simulation constraint conditions are set based on the operating data of the target hydro-generator set, and the method includes:
[0050] Real-time monitoring of water level changes of target hydro-generator units and preset water flow velocity ranges;
[0051] Perform flow analysis based on the water flow velocity interval to determine fluid dynamics constraint information;
[0052] According to the material properties of the target hydro-generator set, collect and obtain the operating vibration data and operating noise data;
[0053] According to the operation vibration data and the operation noise data, the structural displacement safety interval is limited to determine the structural mechanics constraint information;
[0054] Extracting operating environment information of the target hydro-generator set, wherein the operating environment information includes operating temperature data, operating humidity data, and operating air pressure data;
[0055] Determine operating environment constraint information based on the operating temperature data, the operating humidity data, and the operating air pressure data;
[0056] The simulation constraint conditions are set by integrating the fluid dynamics constraint information, the structural mechanics constraint information, and the operating environment constraint information.
[0057] The water level data and flow rate data of the target hydro-turbine generator set are collected in real time through water level sensors and flow rate monitoring equipment. The water level sensor can accurately measure the change of water level, while the flow rate monitoring equipment can obtain dynamic information of water flow rate. Based on the collected water flow rate data, a reasonable water flow rate range is preset. The setting of the water flow rate range needs to consider factors such as the design requirements, operating conditions and safety restrictions of the hydro-turbine generator set. By comparing and analyzing historical data, industry standards and unit performance curves, a water flow rate range that meets the unit operation requirements and ensures safety can be determined. After determining the water flow rate range, flow analysis is performed to obtain fluid dynamic constraint information. Flow analysis mainly evaluates the impact of water flow on unit performance by calculating and analyzing parameters such as the flow state, velocity distribution, and pressure change of water flow inside the unit. By analyzing the flow data, the optimal operating conditions of the unit at different flow rates and possible fluid dynamic problems such as eddy currents and scouring can be determined. At the same time, according to the material properties of the target hydro-turbine generator set, the operation vibration data and operation noise data are collected and obtained. These data can reflect the dynamic performance and structural state of the unit during operation. By analyzing vibration and noise data, the structural stability, running stability, and possible faults or hidden dangers of the unit can be evaluated. In addition, it is necessary to extract the operating environment information of the target hydro-turbine generator unit, including operating temperature data, operating humidity data, and operating air pressure data. By analyzing the operating environment data, the performance of the unit under different environmental conditions and possible environmental adaptability problems can be understood, thereby determining the operating environment constraint information. The fluid dynamics constraint information, structural mechanics constraint information, and operating environment constraint information are integrated to comprehensively set simulation constraint conditions. The constraint conditions will be used to guide the construction and operation of the simulation model to ensure that the simulation results can truly reflect the actual operation and performance characteristics of the target hydro-turbine generator unit.
[0058] According to the simulation constraints, multiple components in the target hydro-generator set are simulated by using the physical dynamic simulation model to obtain a simulation data set;
[0059] According to the simulation constraints, multiple components in the target hydro-generator set are simulated through the physical dynamic simulation model, and the simulation data set is obtained.
[0060] Furthermore, according to the simulation constraints, multiple components in the target hydro-generator set are simulated by the physical dynamic simulation model to obtain a simulation data set, and the method includes:
[0061] Setting a simulation time step based on the simulation constraint conditions and obtaining initial simulation parameters;
[0062] Calculating mutual influence coefficients between the plurality of components in the target hydro-generator set;
[0063] Based on the mutual influence coefficient, the physical dynamic simulation model is started to simulate the initial simulation parameters according to the simulation time step, and the simulation operation data is recorded in real time to obtain the simulation parameter change trend;
[0064] The simulation data of the multiple components are determined based on the simulation parameter change trend to generate the simulation data set.
[0065] According to the simulation constraints, combined with the actual operating characteristics and simulation accuracy requirements of the target hydro-turbine generator set, a reasonable simulation time step is set. The selection of the time step needs to ensure that the important dynamic changes in the unit operation process can be captured without losing key information due to too large a step. According to the simulation constraints and the design parameters and historical operation data of the unit, the initial simulation parameters are determined, including the initial speed, flow, water level, temperature, etc. of the unit. There are complex interactions and influences between multiple components in the target hydro-turbine generator set. In order to simulate these influences more accurately, the mutual influence coefficient between components can be calculated by analyzing the structure, working principle and historical operation data of the unit. The mutual influence coefficient reflects the quantitative index of the relationship between components. Based on the set simulation time step and simulation initial parameters, the physical dynamic simulation model is started for simulation operation. During the simulation process, the simulation data such as the operating status and performance parameters of each component are recorded in real time. By gradually advancing the simulation time, the simulation parameter change trend is recorded. According to the simulation parameter change trend, the simulation data of multiple components are determined, including the operating status and performance parameters of each component at different time steps, and these data are organized into simulation data sets.
[0066] Verifying that the simulation data set matches the multiple component performance optimization targets, evaluating component performance of the multiple components, and generating multiple component performance evaluation results;
[0067] The optimization goal is achieved by verifying whether the simulation data set matches the performance optimization goals of multiple components. The performance of multiple components of the target hydro-generator unit is evaluated, including analyzing the key indicators such as the operating status, efficiency, and stability of each component, and generating multiple component performance evaluation results.
[0068] Further, verifying that the simulation data set matches the multiple component performance optimization targets, evaluating the component performance of the multiple components, and generating multiple component performance evaluation results, the method includes:
[0069] Extracting first component simulation data based on the simulation data set, matching the first component simulation data with the multiple component performance optimization targets, and acquiring a first component performance optimization target;
[0070] Verifying whether the first component simulation data meets the first component performance optimization goal;
[0071] If the verification is satisfied, a fluid mechanics evaluation is performed on the component performance of the first component to generate a first component fluid evaluation result, a mechanical strength evaluation is performed on the component performance of the first component to generate a first component mechanical strength evaluation result, and an operating environment evaluation is performed on the component performance of the first component to generate a first component operating environment evaluation result;
[0072] The first component fluid evaluation result, the first component mechanical strength evaluation result, and the first component operating environment evaluation result are added to the plurality of component performance evaluation results.
[0073] Extract simulation data about the first component from the simulation data set, for example, it can be a runner, a guide vane or other key components. Match the extracted simulation data of the first component with multiple pre-set component performance optimization targets to obtain the performance optimization target of the first component. By comparing the simulation data with the actual operation data, industry standards or design requirements, it is verified whether the extracted simulation data of the first component meets the performance optimization target of the first component. If it is verified that the performance optimization target is met, the performance of the first component is further evaluated in multiple dimensions. Fluid mechanics evaluation is used to analyze the performance of the first component under the action of fluid, such as flow field distribution, pressure loss, energy conversion efficiency, etc., and generate the fluid evaluation result of the first component. Mechanical strength evaluation is used to evaluate the strength and stability of the first component under mechanical load, including stress analysis, fatigue life prediction, etc. For key mechanical components, such as bearings, gears and rotors, finite element analysis (FEA) or other structural mechanics analysis tools can be used to evaluate their stress, strain and fatigue life, and generate the mechanical strength evaluation result of the first component. Operation environment evaluation is used to evaluate the adaptability of the first component in the operation environment, such as the influence of factors such as temperature, humidity, corrosion, etc. on component performance, and generate the operation environment evaluation result of the first component. The fluid evaluation result, the mechanical strength evaluation result and the operating environment evaluation result of the first component are added to the multiple component performance evaluation result sets to form a complete data set including the multiple component performance evaluation results.
[0074] Furthermore, the method further comprises:
[0075] If it is verified that the simulation data of the first component does not meet the performance optimization target of the first component, an abnormal label is generated to identify the first component and an identification result is generated;
[0076] performing a numerical addition operation on the execution priority of the first component according to the identification result;
[0077] According to the execution priorities of the multiple components, the components are serially sorted in descending order to determine an execution sequence;
[0078] Performing performance screening on the multiple components of the target hydro-generator set based on the execution sequence to obtain multiple performance screening results;
[0079] The plurality of performance screening results are added to the plurality of component performance evaluation results.
[0080] If the verification finds that the simulation data of the first component does not meet the performance optimization target of the first component, an abnormal label is generated to identify that the performance of the first component does not meet expectations, that is, the identification result. According to the identification result, the execution priority of the first component is numerically added. The execution priority means that since the performance of the first component has not reached the target, the first component needs to be optimized in the subsequent operation, so the execution priority needs to be increased. The higher the priority, the higher the priority. By increasing the value of the execution priority, it can be ensured that the first component occupies a higher position in the processing sequence. According to the execution priority of multiple components, the descending serialization is sorted to determine a clear execution sequence. According to the determined execution sequence, the performance of multiple components of the target hydro-generator set is screened to determine whether the component performance of multiple components is consistent with the simulation data in the simulation data set. If they are consistent, it means that the simulation data is accurate and the performance of the component does need to be optimized. If they are inconsistent, it is necessary to screen whether the actual performance is good enough. If it is good, the simulation data set needs to be updated and the priority is lowered. The performance screening results of multiple components are added to the original component performance evaluation results.
[0081] An optimization scheme for the multiple components is generated according to the performance evaluation results of the multiple components, and the optimization scheme is executed to optimize and adjust the target hydro-generator set.
[0082] Based on the performance evaluation results of multiple components, optimization schemes for these components can be further generated, and actual optimization adjustments can be made to the target hydro-turbine generator set accordingly.
[0083] In summary, the embodiments of the present application have at least the following technical effects:
[0084] Traverse the component parameters of the target hydro-turbine generator set to collect, obtain multiple component performance parameters, and formulate multiple component performance optimization targets based on the multiple component performance parameters, wherein the multiple component performance optimization targets correspond to the multiple component performance parameters. Use CAE simulation technology to build a physical dynamic simulation model of the target hydro-turbine generator set, set simulation constraints based on the operating data of the target hydro-turbine generator set, and simulate multiple components in the target hydro-turbine generator set through the physical dynamic simulation model according to the simulation constraints to obtain a simulation data set. Verify that the simulation data set matches the multiple component performance optimization targets, evaluate the component performance of the multiple components, and generate multiple component performance evaluation results. Generate optimization plans for multiple components based on the multiple component performance evaluation results, and execute the optimization plans to optimize and adjust the target hydro-turbine generator set. The technical problem that the evaluation of the hydro-turbine generator set in the prior art is not comprehensive and accurate enough has been solved, and the technical effect of comprehensive and detailed evaluation of the unit performance has been achieved.
[0085] Embodiment 2
[0086] Based on the same inventive concept as the hydro-generator performance evaluation method based on CAE simulation in the aforementioned embodiment, Figure 2 As shown, the present application provides a hydro-generator performance evaluation system based on CAE simulation, and the system and method embodiments in the present application embodiments are based on the same inventive concept. The system includes:
[0087] A parameter acquisition module 11, wherein the parameter acquisition module 11 is used to traverse the component parameters of the target hydro-generator set to acquire a plurality of component performance parameters, and formulate a plurality of component performance optimization targets according to the plurality of component performance parameters, wherein the plurality of component performance optimization targets correspond to the plurality of component performance parameters;
[0088] A model building module 12, wherein the model building module 12 is used to build a physical dynamic simulation model of a target hydro-generator set using CAE simulation technology;
[0089] A constraint condition setting module 13, wherein the constraint condition setting module 13 is used to set simulation constraint conditions based on the operation data of the target hydro-generator set;
[0090] A simulation module 14, wherein the simulation module 14 is used to simulate multiple components in a target hydro-generator set through the physical dynamic simulation model according to the simulation constraints to obtain a simulation data set;
[0091] An evaluation module 15, the evaluation module 15 is used to verify that the simulation data set matches the multiple component performance optimization targets, evaluate the component performance of the multiple components, and generate multiple component performance evaluation results;
[0092] The optimization module 16 is used to generate optimization schemes for the multiple components according to the performance evaluation results of the multiple components, and execute the optimization schemes to optimize and adjust the target hydro-generator set.
[0093] Furthermore, the parameter acquisition module 11 is used to execute the following method:
[0094] Building a component parameter information library based on the component parameters of the target hydro-generator set;
[0095] Perform performance matching based on the component parameter information library to generate multiple component performance parameters;
[0096] Performing performance efficiency analysis on the multiple component performance parameters to generate multiple performance analysis results;
[0097] Performing optimization evaluation of maximum performance according to the multiple performance analysis results to obtain optimization improvement indicators;
[0098] The plurality of component performance parameters are traversed and compared according to the optimization improvement index to determine the plurality of component performance optimization targets.
[0099] Furthermore, the model building module 12 is used to execute the following method:
[0100] Retrieve the structural dimension information set of the target hydro-generator unit and construct a three-dimensional model of the unit;
[0101] Meshing the three-dimensional model of the unit based on the component attribute mapping diagram to generate a plurality of mesh space data, wherein each mesh space data in the plurality of mesh space data contains the physical attributes of the corresponding component;
[0102] Based on the historical operation data of the target hydro-generator set, the plurality of grid space data are activated in sequence to perform dynamic simulation, and a plurality of dynamic simulation results are obtained;
[0103] The precision of the plurality of grid space data is adjusted based on the plurality of dynamic simulation results, and a plurality of grid space adjustment results are generated to output the physical dynamic simulation model.
[0104] Furthermore, the constraint condition setting module 13 is used to execute the following method:
[0105] Real-time monitoring of water level changes of target hydro-generator units and preset water flow velocity ranges;
[0106] Perform flow analysis based on the water flow velocity interval to determine fluid dynamics constraint information;
[0107] According to the material properties of the target hydro-generator set, collect and obtain the operating vibration data and operating noise data;
[0108] According to the operation vibration data and the operation noise data, the structural displacement safety interval is limited to determine the structural mechanics constraint information;
[0109] Extracting operating environment information of the target hydro-generator set, wherein the operating environment information includes operating temperature data, operating humidity data, and operating air pressure data;
[0110] Determine operating environment constraint information based on the operating temperature data, the operating humidity data, and the operating air pressure data;
[0111] The simulation constraint conditions are set by integrating the fluid dynamics constraint information, the structural mechanics constraint information, and the operating environment constraint information.
[0112] Furthermore, the simulation module 14 is used to execute the following method:
[0113] Setting a simulation time step based on the simulation constraint conditions and obtaining initial simulation parameters;
[0114] Calculating mutual influence coefficients between the plurality of components in the target hydro-generator set;
[0115] Based on the mutual influence coefficient, the physical dynamic simulation model is started to simulate the initial simulation parameters according to the simulation time step, and the simulation operation data is recorded in real time to obtain the simulation parameter change trend;
[0116] The simulation data of the multiple components are determined based on the simulation parameter change trend to generate the simulation data set.
[0117] Furthermore, the evaluation module 15 is used to perform the following method:
[0118] Extracting first component simulation data based on the simulation data set, matching the first component simulation data with the multiple component performance optimization targets, and acquiring a first component performance optimization target;
[0119] Verifying whether the first component simulation data meets the first component performance optimization goal;
[0120] If the verification is satisfied, a fluid mechanics evaluation is performed on the component performance of the first component to generate a first component fluid evaluation result, a mechanical strength evaluation is performed on the component performance of the first component to generate a first component mechanical strength evaluation result, and an operating environment evaluation is performed on the component performance of the first component to generate a first component operating environment evaluation result;
[0121] The first component fluid evaluation result, the first component mechanical strength evaluation result, and the first component operating environment evaluation result are added to the plurality of component performance evaluation results.
[0122] Furthermore, the evaluation module 15 is used to perform the following method:
[0123] If it is verified that the simulation data of the first component does not meet the performance optimization target of the first component, an abnormal label is generated to identify the first component and an identification result is generated;
[0124] performing a numerical addition operation on the execution priority of the first component according to the identification result;
[0125] According to the execution priorities of the multiple components, the components are serially sorted in descending order to determine an execution sequence;
[0126] Performing performance screening on the multiple components of the target hydro-generator set based on the execution sequence to obtain multiple performance screening results;
[0127] The plurality of performance screening results are added to the plurality of component performance evaluation results.
[0128] It should be noted that the above-mentioned sequence of the embodiments of the present application is only for description and does not represent the advantages and disadvantages of the embodiments. And the above-mentioned specific embodiments of this specification are described. Other embodiments are within the scope of the attached claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0129] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.
[0130] This specification and the drawings are merely exemplary illustrations of the present application and are deemed to cover any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, those skilled in the art may make various modifications and variations to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.
Claims
1. A method for evaluating the performance of a hydro-generator set based on CAE simulation, characterized in that: The method comprises: Traversing component parameters of a target hydro-generator set to collect and obtain a plurality of component performance parameters, and formulating a plurality of component performance optimization targets according to the plurality of component performance parameters, wherein the plurality of component performance optimization targets correspond to the plurality of component performance parameters; Use CAE simulation technology to build a physical dynamic simulation model of the target hydro-generator unit; Setting simulation constraints based on the operating data of the target hydro-generator unit; According to the simulation constraints, multiple components in the target hydro-generator set are simulated by using the physical dynamic simulation model to obtain a simulation data set; Verifying that the simulation data set matches the multiple component performance optimization targets, evaluating component performance of the multiple components, and generating multiple component performance evaluation results; An optimization scheme for the multiple components is generated according to the performance evaluation results of the multiple components, and the optimization scheme is executed to optimize and adjust the target hydro-generator set.
2. The method according to claim 1, characterized in that Traversing component parameters of a target hydro-generator set to collect and obtain a plurality of component performance parameters, and formulating a plurality of component performance optimization targets according to the plurality of component performance parameters, the method comprising: Building a component parameter information library based on the component parameters of the target hydro-generator set; Perform performance matching based on the component parameter information library to generate multiple component performance parameters; Performing performance efficiency analysis on the multiple component performance parameters to generate multiple performance analysis results; Performing optimization evaluation of maximum performance according to the multiple performance analysis results to obtain optimization improvement indicators; The plurality of component performance parameters are traversed and compared according to the optimization improvement index to determine the plurality of component performance optimization targets.
3. The method according to claim 1, characterized in that The physical dynamic simulation model of the target hydro-generator set is constructed using CAE simulation technology, and the method includes: Retrieve the structural dimension information set of the target hydro-generator unit and construct a three-dimensional model of the unit; Based on the component attribute mapping diagram, the three-dimensional model of the unit is gridded to generate a plurality of grid space data, wherein each grid space data in the plurality of grid space data contains the physical attributes of the corresponding component; Based on the historical operation data of the target hydro-generator set, the plurality of grid space data are activated in sequence to perform dynamic simulation, and a plurality of dynamic simulation results are obtained; The precision of the plurality of grid space data is adjusted based on the plurality of dynamic simulation results, and a plurality of grid space adjustment results are generated to output the physical dynamic simulation model.
4. The method according to claim 1, characterized in that The simulation constraint conditions are set based on the operation data of the target hydro-generator set, and the method includes: Real-time monitoring of water level changes of target hydro-generator units and preset water flow velocity ranges; Perform flow analysis based on the water flow velocity interval to determine fluid dynamics constraint information; According to the material properties of the target hydro-generator set, collect and obtain the operating vibration data and operating noise data; According to the operation vibration data and the operation noise data, the structural displacement safety interval is limited to determine the structural mechanics constraint information; Extracting operating environment information of the target hydro-generator set, wherein the operating environment information includes operating temperature data, operating humidity data, and operating air pressure data; Determine operating environment constraint information based on the operating temperature data, the operating humidity data, and the operating air pressure data; The simulation constraint conditions are set by integrating the fluid dynamics constraint information, the structural mechanics constraint information, and the operating environment constraint information.
5. The method according to claim 1, characterized in that According to the simulation constraints, multiple components in the target hydro-generator set are simulated by the physical dynamic simulation model to obtain a simulation data set, the method comprising: Setting a simulation time step based on the simulation constraint conditions and obtaining initial simulation parameters; Calculating mutual influence coefficients between the plurality of components in the target hydro-generator set; Based on the mutual influence coefficient, the physical dynamic simulation model is started to simulate the initial simulation parameters according to the simulation time step, and the simulation operation data is recorded in real time to obtain the simulation parameter change trend; The simulation data of the multiple components are determined based on the simulation parameter change trend to generate the simulation data set.
6. The method according to claim 1, characterized in that Verifying that the simulation data set matches the multiple component performance optimization targets, evaluating component performance of multiple components, and generating multiple component performance evaluation results, the method includes: Extracting first component simulation data based on the simulation data set, matching the first component simulation data with the multiple component performance optimization targets, and acquiring a first component performance optimization target; Verifying whether the first component simulation data meets the first component performance optimization goal; If the verification is satisfied, a fluid mechanics evaluation is performed on the component performance of the first component to generate a first component fluid evaluation result, a mechanical strength evaluation is performed on the component performance of the first component to generate a first component mechanical strength evaluation result, and an operating environment evaluation is performed on the component performance of the first component to generate a first component operating environment evaluation result; The first component fluid evaluation result, the first component mechanical strength evaluation result, and the first component operating environment evaluation result are added to the plurality of component performance evaluation results.
7. The method according to claim 6, characterized in that Methods include: If it is verified that the simulation data of the first component does not meet the performance optimization target of the first component, an abnormal label is generated to identify the first component and an identification result is generated; performing a numerical addition operation on the execution priority of the first component according to the identification result; According to the execution priorities of the multiple components, the components are serially sorted in descending order to determine an execution sequence; Performing performance screening on the multiple components of the target hydro-generator set based on the execution sequence to obtain multiple performance screening results; The plurality of performance screening results are added to the plurality of component performance evaluation results.
8. The hydro-generator performance evaluation system based on CAE simulation is characterized by: The system is used to implement the hydro-generator performance evaluation method based on CAE simulation according to any one of claims 1 to 7, and comprises: A parameter acquisition module, wherein the parameter acquisition module is used to traverse the component parameters of the target hydro-generator set to acquire a plurality of component performance parameters, and formulate a plurality of component performance optimization targets according to the plurality of component performance parameters, wherein the plurality of component performance optimization targets correspond to the plurality of component performance parameters; A model building module, wherein the model building module is used to build a physical dynamic simulation model of a target hydro-generator set using CAE simulation technology; A constraint condition setting module, wherein the constraint condition setting module is used to set simulation constraint conditions based on the operating data of the target hydro-generator set; A simulation module, wherein the simulation module is used to simulate multiple components in a target hydro-generator set through the physical dynamic simulation model according to the simulation constraints to obtain a simulation data set; An evaluation module, the evaluation module is used to verify that the simulation data set matches the multiple component performance optimization targets, evaluate the component performance of the multiple components, and generate multiple component performance evaluation results; An optimization module is used to generate an optimization scheme for the multiple components according to the performance evaluation results of the multiple components, and execute the optimization scheme to optimize and adjust the target hydro-generator set.
Citation Information
Patent Citations
Numerical simulation method of flexible rolling and forming process of curved-surface part
CN108108582A
Equipment health monitoring method based on rapid simulation digital twinning technology
CN113190886A
Vehicle performance analysis optimization method and device, equipment and storage medium
CN115186547A
Commercial vehicle door and vehicle body clearance surface difference matching design optimization method
CN115270306A
CAD model simulation method for maintaining design features based on expansion voxels
CN116090313A
Cited By
Performance test method and platform for electric hammer
CN119414146A
A performance testing method and platform for electric hammer
CN119414146B
