Method for optimizing productivity planning of processing machine in automatic carrying system, storage medium and terminal
By dividing processing areas in the automated handling system and optimizing the production capacity of the processing machine, the problems of track congestion and load imbalance are solved, transmission efficiency is improved, and the output capacity of semiconductor manufacturing is improved.
Patent Information
- Application Number
- CN202310667090.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-06
- Publication Date
- 2024-12-06
AI Technical Summary
The transmission efficiency of existing automated handling systems still needs to be improved, especially in dealing with the problems of track congestion and load imbalance in semiconductor manufacturing.
By dividing the processing area in the automated handling system and binding the processing machine and the handling track, simulation optimization is carried out according to the initial production capacity and track transmission rules, the production capacity of each processing machine is adjusted to balance the track load and reduce the average track handling volume.
Effectively reduce track congestion, balance track load, improve transmission efficiency, and improve the output capacity of semiconductor manufacturing.
Smart Images

Figure CN119090162A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of semiconductor manufacturing technology, and in particular to a method, storage medium and terminal for optimizing production capacity planning of processing machines in an automated handling system. Background Art
[0002] With the widespread application of integrated circuits in daily life, semiconductors are beginning to play an increasingly important role in products, and their demand has also increased significantly, thus promoting the vigorous development of the global semiconductor market. In order to meet the large demand for integrated circuits, most semiconductor manufacturers prioritize improving production capacity and qualification rate. In semiconductor manufacturing companies, wafers are usually transported in batches. However, manual handling is not only inefficient, but also prone to danger, and there are uncertainties such as chip contamination and chip collision and breakage during the handling process. In order to solve the risks and uncertainties brought about by manual handling, the automatic handling system (AMHS: Automatic Material Handling System) came into being and has been widely used in the semiconductor manufacturing industry. As the main way of wafer circulation, the transmission efficiency of the automatic handling system will directly determine the time required for wafer circulation, thereby affecting the output capacity of the wafer factory.
[0003] However, the transmission efficiency of the automated handling system in the prior art still needs to be improved. Summary of the invention
[0004] The technical problem solved by the present invention is to provide a method for optimizing the capacity planning of processing machines in an automated handling system, reducing track congestion, and balancing track loads to improve track transmission efficiency.
[0005] In order to solve the above problems, the technical solution of the present invention provides a method for optimizing the capacity planning of processing machines in an automated handling system, wherein the automated handling system has a plurality of handling tracks, including: dividing each of the processing machines into different processing areas according to the positions of the plurality of handling tracks; assigning an initial capacity within a preset time to each of the processing machines; setting a track transmission rule for each of the handling tracks; simulating and obtaining an average track handling volume of the plurality of processing areas based on the initial capacity and the track transmission rule; adjusting the initial capacity of each of the processing machines within the preset time to obtain the optimized capacity of each of the processing machines within the preset time; and Based on the optimized capacity and the track transmission rules, the average track handling volume of several processing areas is simulated and obtained; if the previous average track handling volume is less than the current average track handling volume, the automated handling system is operated with the initial capacity of each processing machine within the preset time; if the previous average track handling volume is greater than the current average track handling volume, the optimized capacity of each processing machine within the preset time is continuously adjusted until the previous average track handling volume is less than the current average track handling volume, and the automated handling system is operated with the previous optimized capacity of each processing machine within the preset time.
[0006] Optionally, the plurality of transport rails include: a plurality of main transport rails and a plurality of branch transport rails; each of the processing areas has at least one main transport rail, and the main transport rail in each of the processing areas is adjacent to the processing machine.
[0007] Optionally, the method of assigning each of the processing machines an initial production capacity within a preset time includes: providing the total production capacity on the same side of all the processing machines within the preset time; obtaining the proportion of the track lengths between the main transport tracks in several processing areas located on the same side; and taking the product of the total production capacity on the same side and the proportion of the track lengths in each processing area as the initial production capacity of each of the processing machines within the preset time.
[0008] Optionally, the track transmission rules include: when the material goes to the processing machine, select the path that is closest and least affected by the loading and unloading of the processing machine; when the material is processed, leave through the path that is closest and least affected by the loading and unloading of the processing machine; when there are multiple paths to choose from, randomly select one.
[0009] Optionally, the material includes: wafers.
[0010] Optionally, the method for obtaining the optimized production capacity of each of the processing machines within the preset time includes: simulating and obtaining the total track transport volume of each of the processing areas; obtaining the ranking of the total track transport volume of each of the processing areas located on the same side; obtaining the load share between the total track transport volumes of the processing areas located on the same side; multiplying the total production capacity on the same side by the load share of each of the processing areas located on the same side to obtain a number of optimized production capacities; and assigning the several optimized production capacities to the processing machines in each of the processing areas in order from low to high and in ascending order according to the ranking of the total track transport volume of each of the processing areas located on the same side, as the optimized production capacity of each processing machine within the preset time.
[0011] Optionally, the method for obtaining the average orbital transport volume of several of the processing areas includes: obtaining the sum of the total orbital transport volumes of several of the processing areas; dividing the sum of the total orbital transport volumes of several of the processing areas by the number of the processing areas to obtain the average orbital transport volume of several of the processing areas.
[0012] Correspondingly, the technical solution of the present invention further provides a storage medium on which computer instructions are stored, characterized in that the steps of any of the above methods are executed when the computer instructions are executed.
[0013] Correspondingly, the technical solution of the present invention also provides a terminal, including a memory and a processor, wherein the memory stores computer instructions that can be executed on the processor, and is characterized in that the processor executes the steps of any of the above methods when running the computer instructions.
[0014] Compared with the prior art, the technical solution of the present invention has the following advantages:
[0015] In the method for planning the production capacity of processing machines in an optimized automated handling system of the technical solution of the present invention, each of the processing machines is divided into different processing areas according to the positions of several of the handling rails, and the production capacity of the processing machines in each of the processing areas is bound to the handling rails. By continuously adjusting the production capacity of each of the processing machines within the preset time, the average rail handling volume of several of the processing areas is obtained, and the average rail handling volume of two adjacent processing areas is compared to obtain the minimum average rail handling volume of the processing area, thereby effectively reducing rail congestion and balancing the rail load to improve rail transmission efficiency.
[0016] Furthermore, the method for obtaining the optimized capacity of each processing machine within the preset time includes: simulating and obtaining the total track handling volume of each processing area; obtaining the ranking of the total track handling volume of each processing area on the same side; obtaining the load ratio between the total track handling volumes of the processing areas on the same side; multiplying the total capacity on the same side by the load ratio of each processing area on the same side to obtain a number of optimized capacities; assigning the several optimized capacities to the processing machines in each processing area from low to high and in the positive order of the ranking of the total track handling volume of each processing area on the same side, as the optimized capacity of each processing machine within the preset time. By assigning the least optimized capacity to the processing machines in the processing area with a higher ranking of the total track handling volume, and assigning the most optimized capacity to the processing machines in the processing area with a lower ranking of the total track handling volume, the handling volume of the transport tracks in each processing area can be quickly balanced, thereby reducing the average track handling volume and reducing the number of optimizations. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 is a flow chart of a method for optimizing the capacity planning of processing machines in an automated handling system according to an embodiment of the present invention;
[0018] Figures 2 to 4 It is a schematic diagram of the structure of each step of the method for optimizing the capacity planning of processing machines in an automated handling system in an embodiment of the present invention. DETAILED DESCRIPTION
[0019] As described in the background art, the transmission efficiency of the automated handling system in the prior art still needs to be improved, which will be described in detail below.
[0020] Since the operating speed of the automated handling system is fixed, when a certain section of the handling track in the automated handling system has a large workload, congestion will occur, which will in turn affect the transmission efficiency of the automated handling system.
[0021] On this basis, the present invention provides a method for optimizing the capacity planning of processing machines in an automated handling system, wherein each processing machine is divided into different processing areas according to the positions of several handling rails, and the capacity of the processing machines in each processing area is bound to the handling rails. By continuously adjusting the capacity of each processing machine within a preset time, the average rail handling volume of several processing areas is obtained, and the average rail handling volume of two adjacent processing areas is compared to obtain the average rail handling volume of the smallest processing area, thereby effectively reducing rail congestion and balancing the rail load to improve rail transmission efficiency.
[0022] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0023] Figure 1 1 is a flow chart of a method for optimizing the capacity planning of processing machines in an automated handling system according to an embodiment of the present invention, specifically comprising:
[0024] start;
[0025] Step S101, dividing each of the processing machines into different processing areas according to the positions of the plurality of transport rails;
[0026] Step S102, assigning each processing machine an initial production capacity within a preset time;
[0027] Step S103, setting a track transmission rule for each of the transport tracks;
[0028] Step S104, based on the initial production capacity and the track transmission rule, simulate and obtain the average track transport volume of several processing areas;
[0029] Step S105, adjusting the initial production capacity of each processing machine within the preset time to obtain the optimized production capacity of each processing machine within the preset time;
[0030] Step S106, based on the optimized capacity and the track transmission rule, simulate and obtain the average track handling volume of several processing areas;
[0031] Step S107: determining whether the previous average track transport volume is less than the current average track transport volume;
[0032] When the average track handling volume of the previous time is less than the average track handling volume of the current time, step S108 is executed, and step S108 includes: running the automated handling system with the production capacity of each of the processing machines in the previous time within the preset time, and ending;
[0033] When the average track handling volume of the current time is greater than the average track handling volume of the current time, step S109 is executed, and step S109 includes: adjusting the optimized production capacity of each processing machine within the preset time;
[0034] After executing step S109, the process returns to step S107 for re-judgment until the previous average track transport volume is smaller than the current average track transport volume, and then returns to step S108.
[0035] The following describes in detail the steps of the method for optimizing the capacity planning of processing machines in an automated handling system in conjunction with the accompanying drawings.
[0036] Figures 2 to 4 It is a schematic diagram of the structure of each step of the method for optimizing the capacity planning of processing machines in an automated handling system in an embodiment of the present invention.
[0037] Please refer to Figure 2 The automated transport system has a plurality of transport tracks, and each processing machine (not shown) is divided into different processing areas according to the positions of the plurality of transport tracks.
[0038] In this embodiment, taking the example of dividing each processing machine into five different processing areas by a number of transport rails, namely processing area A, processing area B, processing area C, processing area D and processing area E, the several transport rails are respectively defined as a1, a2, a3, b1, b2, b3, c1, c2, c3, d1 and e1, totaling 11 sections.
[0039] In this embodiment, the plurality of transport rails include: a plurality of main transport rails and a plurality of branch transport rails; each processing area has at least one main transport rail, and the main transport rail in each processing area is adjacent to the processing machine, and the production capacity of the processing machine in each processing area is transported by the main transport rail.
[0040] In this embodiment, there are three transport rails a1, a2 and a3 in the processing area A, among which the transport rail a1 is the main transport rail of the processing area A; there are three transport rails b1, b2 and b3 in the processing area B, among which the transport rail b1 is the main transport rail of the processing area B; there are three transport rails c1, c2 and c3 in the processing area C, among which the transport rail c1 is the main transport rail of the processing area C; there is one transport rail d1 in the processing area D, and the transport rail d1 is the main transport rail of the processing area D; there is one transport rail e1 in the processing area E, and the transport rail e1 is the main transport rail of the processing area E.
[0041] Please continue to refer to Figure 2 , giving each processing machine an initial production capacity within a preset time.
[0042] In this embodiment, the method of assigning each processing machine an initial production capacity within a preset time includes: providing the total production capacity of all processing machines on the same side within the preset time; obtaining the proportion of track lengths between main transport tracks in several processing areas located on the same side; and multiplying the total production capacity on the same side by the proportion of track lengths in each processing area as the initial production capacity of each processing machine within the preset time.
[0043] In this embodiment, the initial production capacity of each processing machine within a preset time is shown in Table 1:
[0044] Processing area The proportion of the main transport track length on the same side Initial production capacity of processing machines A 0.4 0.4X B 0.2 0.2X C 0.4 0.4X D 0.5 0.5X E 0.5 0.5X
[0045] Table 1
[0046] In this embodiment, please refer to Table 1, taking the preset time as 1 hour, the processing machines in the processing area A, the processing machines in the processing area B, and the processing machines in the processing area C are located on the same side, the processing machines in the processing area D and the processing machines in the processing area E are located on the same side, and the total production capacity of all the processing machines on the same side within 1 hour is X as an example.
[0047] Please continue to refer to Figure 2 , set the track transfer rules for each handling track.
[0048] In this embodiment, the track transmission rules include: when the material goes to the processing machine, select the path that is closest and least affected by the loading and unloading of the processing machine; when the material is processed, leave through the path that is closest and least affected by the loading and unloading of the processing machine; when there are multiple paths to choose from, randomly select one.
[0049] In this embodiment, the material is a wafer.
[0050] For example, in a specific embodiment, when the wafer enters from the a1 section transport track and needs to go to the processing area C for processing, if it passes through the a2 section transport track, it will affect the loading and unloading of processing machines in the processing area A and the processing area B, so the a3 section transport track will be selected to transfer it to the processing area C, and leave from the c3 section transport track after the processing is completed.
[0051] Please refer to Figure 3 , based on the initial capacity and track transport rules, the average track handling volume of several processing areas is simulated.
[0052] In this embodiment, the average track handling volume of several processing areas is simulated and obtained as shown in Table 2:
[0053]
[0054]
[0055] Table 2
[0056] In this embodiment, please refer to Table 2. The total production capacity X of the processing machines in processing area A, processing area B and processing area C on the same side within 1 hour is input by the a1 section transport track, so the 1-hour track transport capacity of the a1 section transport track is 1X.
[0057] Since the initial capacity of the processing machine in processing area A is 0.4X, and the a2-section transport track is the main transport track of processing area A, 0.4X of the total capacity X on the same side needs to be transported to the a2-section transport track. Because the b2-section transport track is the main transport track of processing area B, and only the a2-section transport track can transport materials to the b2-section transport track, the initial capacity of the processing machine in processing area B, 0.2X, also needs to be transported to the b2-section transport track through the a2-section transport track. Finally, 0.6X of the total capacity X on the same side is transported to the a2-section transport track. Therefore, the 1-hour track transportation volume of the a2-section transport track is 0.6X.
[0058] Based on the track transmission rules, the remaining unprocessed 0.4X capacity of the total capacity X on the same side needs to be transported to the a3 section transport track. Therefore, the one-hour track transportation volume of the a3 section transport track is 0.4X.
[0059] After the material is processed by the processing machine in the processing area A, based on the track transmission rules, the processed 0.4X material is transported to the b2 section transport track, and the material on the a3 section transport track can only be transported to the b2 section transport track. Therefore, the 1-hour track transportation volume of the b2 section transport track is 0.8X.
[0060] The total capacity X of the processing machines in the processing area D and the processing area E on the same side within 1 hour is input by the e1 section transport track, so the 1-hour track transport capacity of the e1 section transport track is 1X.
[0061] After 0.5X of the production capacity is processed in processing area E, the remaining unprocessed 0.5X production capacity is transported to the processing machine in processing area D for processing. The initial production capacity of the processing machine in processing area D is also 0.5X. Therefore, the final 1-hour track transportation volume of section d1 of the transport track is 0.5X.
[0062] Based on the track transmission rules, the processed and unprocessed production capacity in the b2 section transport track and the e1 section transport track are all transported to the b3 section transport track. Therefore, the one-hour track transportation volume of the b3 section transport track is 1.3X.
[0063] There is 0.4X unprocessed capacity in the b3 section transport track that needs to be transported to the c1 section transport track, and then processed by the processing machine in the processing area C. The remaining capacity in the b3 section transport track is all processed and is transported to the c2 section transport track based on the track transmission rules. Therefore, the 1-hour track transportation volume of the c2 section transport track is 0.9X.
[0064] Since the 0.2X production capacity that has been completed in the b1-section transport track can only be transported to the c1-section transport track, in addition to transporting the initial capacity of 0.4X of the processing machines in the processing area C, the c1-section transport track also needs to transport the 0.2X production capacity transported by the b1-section transport track. Therefore, the 1-hour track transportation volume of the c1-section transport track is 0.6X.
[0065] All the production capacity of the c1 section transport track and the c2 section transport track ultimately needs to be output from the c3 section transport track, so the 1-hour track handling capacity of the c3 section transport track is 1.5X.
[0066] It should be noted that in this embodiment, when calculating the total track transport capacity of the area, it is necessary to divide it by the number of branches of the transport track in each processing area. Processing area A, processing area B and processing area C all have double-branch transport tracks, and processing area D and processing area E have single-row transport tracks.
[0067] For processing area A, the total track throughput is (0.6X+0.4X+1X) / 2, which is equal to 1X. The total track throughput on the same side ranks 3.
[0068] For processing area B, the total track throughput is (0.2X+0.8X+1.3X) / 2, which is equal to 1.15X, and the total track throughput on the same side ranks 2.
[0069] For processing area C, the total track throughput is (0.6X+0.9X+1.5X) / 2, which is equal to 1.5X, and the total track throughput on the same side ranks 1.
[0070] For processing area D, the total track throughput is 0.5X / 1, which is equal to 0.5X, and the total track throughput on the same side ranks 2.
[0071] For processing area E, the total track throughput is 1X / 1, which is equal to 1X, and the total track throughput on the same side ranks 1.
[0072] In this embodiment, for processing area A, the load ratio between the total track handling volume of the same side area is 1X / (1X+1.15X+1.5X), which is rounded off to 0.3.
[0073] For processing area B, the load ratio between the total track handling volume of the same side area is 1.15X / (1X+1.15X+1.5X), which is rounded to 0.3.
[0074] For processing area C, the load ratio between the total track handling volume of the same side area is 1.5X / (1X+1.15X+1.5X), which is rounded to 0.4.
[0075] For processing area D, the load ratio between the total track handling volume of the same side area is 0.5X / (0.5X+1X), which is rounded to 0.35.
[0076] For processing area E, the load ratio between the total track handling volume of the same side area is 1X / (0.5X+1X), which is rounded to 0.65.
[0077] In this embodiment, the method for obtaining the average orbital transport capacity of several processing areas includes: obtaining the sum of the total orbital transport capacity of several processing areas; dividing the sum of the total orbital transport capacity of several processing areas by the number of processing areas to obtain the average orbital transport capacity of several processing areas, and the average orbital transport capacity is (1X+1.15X+1.5X+0.5X+1X) / 5, which is equal to 1.03X.
[0078] Please continue to refer to Figure 3 , adjust the initial production capacity of each processing machine within the preset time, and obtain the optimized production capacity of each processing machine within the preset time.
[0079] In this embodiment, the method for obtaining the optimized production capacity of each processing machine within a preset time includes: simulating and obtaining the total track transport volume of each processing area; obtaining the ranking of the total track transport volume of each processing area located on the same side; obtaining the load share between the total track transport volumes of the processing areas located on the same side; multiplying the total capacity on the same side by the load share of each processing area located on the same side to obtain a number of optimized capacities; and assigning the several optimized capacities to the processing machines in each processing area from low to high and in ascending order according to the ranking of the total track transport volume of each processing area located on the same side, as the optimized capacity of each processing machine within the preset time.
[0080] In this embodiment, by assigning the least optimized capacity to the processing machines in the processing area with a higher total track handling volume ranking, and assigning the most optimized capacity to the processing machines in the processing area with a lower total track handling volume ranking, the handling volume of the transport rails in each processing area can be quickly balanced, thereby reducing the average track handling volume and reducing the number of optimization times.
[0081] In this embodiment, the optimized production capacity of each processing machine within a preset time is shown in Table 3:
[0082]
[0083]
[0084] Table 3
[0085] In this embodiment, please refer to Table 3. The optimized production capacities calculated for processing area A, processing area B and processing area C on the same side are 0.3*1X, 0.3*1X and 0.4*1X, that is, 0.3X, 0.3X and 0.4X.
[0086] Since the total track handling volume on the same side of processing area C ranks 1, the corresponding minimum optimized capacity of 0.3X needs to be assigned to the processing machines in processing area C.
[0087] Since the total track handling volume on the same side of processing area B ranks 2, the second highest optimized capacity 0.3X needs to be assigned to the processing machines in processing area B.
[0088] Since the total track handling volume on the same side of processing area A ranks 3, the highest optimized capacity 0.4X needs to be assigned to the processing machines in processing area A.
[0089] In this embodiment, please continue to refer to Table 3. The processing area D and the processing area E located on the same side are calculated to obtain several optimized production capacities: 0.35*1X and 0.35*1X, that is, 0.35X and 0.65X.
[0090] Since the total track handling volume on the same side of processing area E ranks 1, the corresponding minimum optimized capacity of 0.35X needs to be assigned to the processing machines in processing area E.
[0091] Since the total track handling volume on the same side of processing area D ranks 2, the corresponding highest optimized capacity of 0.65X needs to be assigned to the processing machines in processing area D.
[0092] Please refer to Figure 4 , based on the optimized capacity and track transport rules, the average track handling volume of several processing areas is simulated.
[0093] In this embodiment, the average track handling volume of several processing areas is simulated and obtained as shown in Table 4:
[0094]
[0095]
[0096] Table 4
[0097] In this embodiment, for the specific analysis of the data in Table 4, please refer to the relevant description of Table 2, which will not be repeated here.
[0098] In this embodiment, since the previous average orbital transport volume 1.03X is greater than the current average orbital transport volume 1.005X, it is necessary to continue to adjust the optimized production capacity of each processing machine within the preset time until the previous average orbital transport volume is less than the current average orbital transport volume, and operate the automated transport system with the previous optimized production capacity of each processing machine within the preset time.
[0099] In other embodiments, if the previous average track handling volume is less than the current average track handling volume, the automated handling system is operated with the initial production capacity of each processing machine within a preset time.
[0100] In this embodiment, the optimized production capacity of each processing machine within the preset time is adjusted based on the data in Table 4, as shown in Table 5:
[0101]
[0102]
[0103] Table 5
[0104] In this embodiment, for the specific analysis of the data in Table 5, please refer to the relevant description of Table 3, which will not be repeated here.
[0105] In this embodiment, after obtaining the re-adjusted optimized capacity as shown in Table 5, the average track handling volume of several processing areas is continuously simulated based on the optimized capacity and track transmission rules, as shown in Table 6:
[0106]
[0107]
[0108] Table 6
[0109] In this embodiment, for the specific analysis of the data in Table 6, please refer to the relevant description of Table 2, which will not be repeated here.
[0110] At this point, since the previous average track handling volume 1.005X is less than the current average track handling volume 1.01X, the automated handling system is operated with the optimized capacity of each of the processing machines in the previous preset time (as shown in Table 5).
[0111] In this embodiment, each processing machine is divided into different processing areas according to the positions of several transport rails, and the production capacity of the processing machines in each processing area is bound to the transport rails. By continuously adjusting the production capacity of each processing machine within a preset time, the average rail transport volume of several processing areas is obtained, and the average rail transport volume of two adjacent processing areas is compared to obtain the minimum average rail transport volume of the processing area, thereby effectively reducing rail congestion and balancing the rail load to improve rail transmission efficiency.
[0112] Correspondingly, an embodiment of the present invention further provides a storage medium on which computer instructions are stored, and the steps of the above-mentioned method are executed when the computer instructions are executed.
[0113] Correspondingly, an embodiment of the present invention further provides a terminal, including a memory and a processor, wherein the memory stores computer instructions that can be executed on the processor, and the processor executes the steps of the above-mentioned method when executing the computer instructions.
[0114] Although the present invention is disclosed as above, the present invention is not limited thereto. Any person skilled in the art can make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the scope defined by the claims.
Claims
1. A method for optimizing the capacity planning of processing machines in an automated handling system, wherein the automated handling system has a plurality of handling tracks, characterized in that: include: Dividing each of the processing machines into different processing areas according to the positions of the plurality of transport rails; Assigning each of the processing machines an initial production capacity within a preset time; Setting track transmission rules for each of the transport tracks; Based on the initial production capacity and the track transmission rule, simulating and obtaining the average track handling volume of several processing areas; Adjusting the initial production capacity of each processing machine within the preset time to obtain the optimized production capacity of each processing machine within the preset time; Based on the optimized production capacity and the track transmission rules, simulating and obtaining the average track handling volume of several processing areas; If the previous average track handling volume is less than the current average track handling volume, operating the automated handling system with the initial capacity of each processing machine within the preset time; If the previous average orbital transport volume is greater than the current average orbital transport volume, continue to adjust the optimized production capacity of each processing machine within the preset time until the previous average orbital transport volume is less than the current average orbital transport volume, and operate the automated transport system with the previous optimized production capacity of each processing machine within the preset time.
2. The method for optimizing the capacity planning of processing machines in an automated handling system according to claim 1, characterized in that: The plurality of transport rails include: a plurality of main transport rails and a plurality of branch transport rails; each of the processing areas has at least one main transport rail, and the main transport rail in each of the processing areas is adjacent to the processing machine.
3. The method for optimizing the capacity planning of processing machines in an automated handling system according to claim 2, characterized in that: The method for assigning each of the processing machines an initial production capacity within a preset time includes: providing the total production capacity on the same side of all the processing machines within the preset time; obtaining the proportion of the track lengths between the main transport tracks in several processing areas on the same side; and taking the product of the total production capacity on the same side and the proportion of the track lengths in each processing area as the initial production capacity of each of the processing machines within the preset time.
4. The method for optimizing the capacity planning of processing machines in an automated handling system according to claim 1, characterized in that: The track transmission rules include: when the material goes to the processing machine, select the path that is closest and least affected by the loading and unloading of the processing machine; when the material is processed, leave through the path that is closest and least affected by the loading and unloading of the processing machine; when there are multiple paths to choose from, randomly select one.
5. The method for optimizing the capacity planning of processing machines in an automated handling system according to claim 4, characterized in that: The materials include: wafers.
6. The method for optimizing the capacity planning of processing machines in an automated handling system according to claim 4, characterized in that: The method for obtaining the optimized production capacity of each processing machine within the preset time includes: simulating and obtaining the total track transport volume of each processing area; obtaining the ranking of the total track transport volume of each processing area located on the same side; obtaining the load ratio between the total track transport volumes of the processing areas located on the same side; multiplying the total production capacity on the same side by the load ratio of each processing area located on the same side to obtain a number of optimized production capacities; and assigning the several optimized production capacities to the processing machines in each processing area in order from low to high and in the positive order of the ranking of the total track transport volume of each processing area located on the same side as the optimized production capacity of each processing machine within the preset time.
7. The method for optimizing the capacity planning of processing machines in an automated handling system according to claim 6, characterized in that: The method for obtaining the average orbital transport volume of several processing areas includes: obtaining the sum of the total orbital transport volume of several processing areas; dividing the sum of the total orbital transport volume of several processing areas by the number of several processing areas to obtain the average orbital transport volume of several processing areas.
8. A storage medium having computer instructions stored thereon, characterized in that: When the computer instructions are executed, the steps of the method according to any one of claims 1 to 7 are executed.
9. A terminal comprising a memory and a processor, wherein the memory stores computer instructions that can be executed on the processor, characterized in that: When the processor runs the computer instructions, the steps of the method according to any one of claims 1 to 7 are performed.