Investment cost allocation method for pumped storage power station and water resource allocation combined project

By calculating the total investment cost of pumped storage power stations and sharing them into three costs of water resource allocation projects, the problem of lack of effective investment cost sharing methods in the existing technology is solved, and the project of combining pumped storage power stations and water resource allocation is realized. The investment cost sharing is suitable for engineering projects that combine pumped storage power stations and water resource allocation.

CN119090164APending Publication Date: 2024-12-06CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410948195.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

There is a lack of investment cost sharing methods for projects combining pumped storage power plants and water resource allocation in the prior art, and the existing standards have not effectively solved the cost sharing problem of such projects.

Method used

A method is proposed to calculate the total investment cost of pumped storage power stations, which is divided into three costs of water resource allocation projects: static investment cost of Shangshui Reservoir, investment cost of mechanical and electrical equipment, and investment cost of civil engineering of water transmission and power generation system, respectively. The allocation coefficient and amount of the water resource allocation project is reasonably allocated.

Benefits of technology

A reasonable allocation of investment costs of pumped storage power stations and water resource allocation projects has been achieved, and the technical gap has been filled, providing a technical reference for investment costs for pumped storage power stations. It is suitable for utilizing existing reservoirs or integrating other water conservancy projects. Project developed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119090164A_ABST
    Figure CN119090164A_ABST
Patent Text Reader

Abstract

The invention discloses an investment cost allocation method for a pumped storage power station and water resource allocation combined project. The method comprises the steps that the total investment cost of the pumped storage power station fusing the water resource allocation project is shared into three items, namely the upper reservoir static investment cost, the electromechanical equipment investment cost and the water delivery power generation system civil engineering investment cost; collecting data; then, respectively calculating the apportionment coefficients k1, k2 and k3 of the static investment cost of the reservoir, the investment cost of electromechanical equipment and the civil engineering investment cost of the water delivery and power generation system in the proportion of the water resource allocation project; respectively calculating the amounts Cups, Cturs and Ccivs of the static investment cost of the upper reservoir, the investment cost of electromechanical equipment and the civil engineering investment cost of the water delivery and power generation system shared by the water resource allocation project; and finally, the amount Cws of the total investment cost of the pumped storage power station shared by the water resource allocation project is obtained. The technical blank of the investment cost allocation method of the pumped storage power station and water resource allocation combined project at present is filled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of water conservancy and hydropower, and in particular to a method for allocating investment costs of a pumped storage power station and a water resources allocation combined project. Background Art

[0002] Pumped storage is a power system regulating power source with relatively mature technology, good economic efficiency and large-scale development conditions. It is flexible in operation, fast in startup and has significant dynamic benefits. It can utilize abandoned wind and solar energy to pump and store energy, generate electricity during peak hours, and help improve the utilization efficiency of wind and solar energy resources. Pumped storage power stations usually consist of two upper and lower reservoirs with a certain height difference and a water diversion power generation system. During the trough period of power load, water is pumped from the lower reservoir to the upper reservoir, and the electrical energy is converted into water potential energy and stored. During the peak period of power load, the water in the upper reservoir is released to generate electricity.

[0003] In recent years, with the deepening of resource conservation and intensive utilization, the planning and design concepts of pumped storage power stations have been continuously innovated, and it is proposed to combine the design of pumped storage power stations with water resource allocation projects, requiring the upper reservoir in the pumped storage power station system to provide water for the water resource allocation project, and using the pumped storage power station units to divert water up the mountain. This combination of projects has good economic efficiency, convenient operation and management, and stable and reliable water sources. In this context, pumped storage power stations serve both the power industry and the water conservancy industry, and there is a problem of how to reasonably share investment costs.

[0004] At present, there are the following problems in allocating the investment costs of the combined pumped storage power station and water resources allocation project:

[0005] First, among the existing invention patents and literature on pumped storage, there are few references to the integrated design of pumped storage power stations and water resource allocation projects, and even fewer references to the investment allocation method of pumped storage power stations integrated with water resource allocation projects.

[0006] Second, the relevant standard for the design of pumped-storage power stations, "Economic Evaluation Specifications for Pumped-Storage Power Stations" (NB / T11175-2023), only stipulates national economic evaluation, financial evaluation and other contents, but does not mention the principles and methods of cost sharing.

[0007] Third, water resources allocation projects are generally used for comprehensive utilization. The Economic Evaluation Code for Water Conservancy Construction Projects (SL 72-2013) proposes five cost allocation methods applicable to water conservancy construction projects: ① Allocation according to certain indicators (such as water volume, reservoir capacity, etc.) of each function utilization construction project; ② Allocation according to the proportion of the present value of the benefits that can be obtained by each function; ③ When the primary and secondary relationships of the various functions of the project are obvious, and the benefits that can be obtained by the main function account for a large proportion of the total benefits of the project, the main function of the project can bear most of the costs, and the secondary function only bears the separable costs or its special engineering costs; ④ Allocation according to the "separable costs-residual benefits method"; ⑤ Allocation according to the proportion of the present value of the costs of the optimal equivalent alternative solutions for each function. However, pumped storage power stations are hydropower construction projects, which have obvious engineering differences from water conservancy construction projects, and the design and operation of pumped storage power stations that integrate water resources allocation projects are more complicated, so the above cost allocation methods cannot be directly applied. Summary of the invention

[0008] In view of the shortcomings of the existing technology, the present invention proposes a method for allocating the investment cost of a pumped-storage power station and a water resources allocation integrated project, which can provide a technical reference for the investment cost allocation of a pumped-storage power station that utilizes existing reservoirs or integrates other water conservancy projects. It fills the current technical gap in the method for allocating the investment cost of a pumped-storage power station and a water resources allocation integrated project, and has great value for engineering application and promotion.

[0009] To achieve the above-mentioned purpose, the present invention is designed to allocate the investment cost of a pumped storage power station and a water resources allocation project, which is particularly characterized in that it is used to calculate the amount of the total investment cost of the pumped storage power station integrated with the water resources allocation project allocated to the water resources allocation project, and includes the following steps:

[0010] S1) According to the technical design and operation characteristics of the pumped storage power station and water resources allocation combined engineering scheme, it is proposed that the investment costs to be shared by the water resources allocation project should include at least three items: the static investment cost of the upper reservoir, the investment cost of electromechanical equipment and the civil construction investment cost of the water transmission and power generation system; among them, when calculating the allocation of the static investment cost of the upper reservoir, the static investment cost of the upper reservoir of the pumped storage power station technical scheme with special water resources storage capacity and the static investment cost of the upper reservoir of the pumped storage power station technical scheme without special water resources storage capacity should be included;

[0011] The special water resource storage capacity is the special storage capacity set up by the upper reservoir for the water resource allocation project;

[0012] S2) Collect data, including the static investment cost C of the upper reservoir of the pumped storage power station technology solution with dedicated water storage capacity up , the static investment cost C of the upper reservoir of the pumped storage power station technology solution without dedicated water resource storage capacity * up, The average annual water diversion volume of water resources allocation projects over the years corresponds to the pumping time T w , Designed annual utilization hours of pumped storage power station T g , The design annual utilization hours of the pumped storage power station correspond to the pumping time T p , the average annual water diversion volume of water resources allocation projects over the years W w , the designed annual power generation time of the pumped storage power station corresponds to the water discharge volume W g , the designed annual pumping duration of the pumped storage power station corresponds to the pumping volume W p , Mechanical and electrical equipment investment cost C tur , Civil construction investment cost of water transmission and power generation system C civ ;

[0013] S3) respectively calculating the allocation coefficient k1 of the static investment cost of the reservoir for the proportion of water resources allocation project, the allocation coefficient k2 of the investment cost of electromechanical equipment for the proportion of water resources allocation project, and the allocation coefficient k3 of the civil construction investment cost of the water transmission and power generation system for the proportion of water resources allocation project;

[0014] The allocation coefficient k1 of the static investment cost of the reservoir in the proportion of the water resources allocation project is obtained by the following formula:

[0015]

[0016] In the formula,

[0017] k1 is the allocation coefficient of the static investment cost of the reservoir in terms of the proportion of water resources allocation projects,

[0018] C up is the static investment cost of the upper reservoir of the pumped storage power station with dedicated water storage capacity, C * up The static investment cost of the upper reservoir of the pumped storage power station technology solution without dedicated storage capacity for water resources;

[0019] The apportionment coefficient k2 of the water resources allocation project to the electromechanical equipment investment cost is obtained by the following formula:

[0020]

[0021] In the formula,

[0022] k2 is the allocation coefficient of the investment cost of electromechanical equipment in the proportion of water resources allocation projects,

[0023] T w The average annual water diversion volume of water resources allocation projects over the years corresponds to the pumping time.

[0024] T g Design annual utilization hours for pumped storage power stations,

[0025] Tp The design annual utilization hours for the pumped storage power station correspond to the pumping time;

[0026] The apportionment coefficient k3 of the water resources allocation project to the civil construction investment cost of the water transmission and power generation system is obtained by the following formula:

[0027]

[0028] In the formula,

[0029] k3 is the allocation coefficient of the civil construction investment cost of the water resources allocation project to the water transmission and power generation system.

[0030] W w The average annual water diversion volume for water resource allocation projects over the years.

[0031] W g Design the annual power generation time corresponding to the water discharge volume of the pumped storage power station.

[0032] W p Design the annual pumping duration corresponding to the pumping volume for the pumped storage power station;

[0033] S4) Calculate the amount of static investment cost of the reservoir shared by the water resources allocation project C ups , the amount of mechanical and electrical equipment investment cost apportioned to the water resources allocation project C turs 2. The amount of civil engineering investment cost of water transmission and power generation system shared by water resources allocation project C civs ;

[0034] S5) Calculate the amount of total investment cost of pumped storage power stations that are shared by water resources allocation projects and integrated into water resources allocation projects C ws , that is, C ws =C ups +C turs +C civs .

[0035] Furthermore, in step S4), the amount C of the static investment cost of the reservoir shared by the water resources allocation project is ups Obtained by the following formula,

[0036] C ups =k1×C up

[0037] In the formula,

[0038] C ups The amount of static investment cost of the reservoir allocated to the water resources allocation project,

[0039] k1 is the allocation coefficient of the static investment cost of the reservoir in terms of the proportion of water resources allocation projects,

[0040] Cup It is the static investment cost of the upper reservoir of the technical solution of a pumped-storage power station with dedicated water storage capacity.

[0041] Furthermore, in step S4), the amount of electromechanical equipment investment cost apportioned to the water resources allocation project is C turs Obtained by the following formula,

[0042] C turs =k2×C tur

[0043] In the formula,

[0044] C turs The amount of investment cost of electromechanical equipment allocated to water resource allocation projects,

[0045] k2 is the allocation coefficient of the investment cost of electromechanical equipment in the proportion of water resources allocation projects,

[0046] C tur The investment cost of electromechanical equipment.

[0047] Furthermore, in step S4), the amount of civil construction investment cost of the water resource allocation project to be shared by the water transmission and power generation system is C civs Obtained by the following formula,

[0048] C civs =k3×C civ .

[0049] In the formula,

[0050] C civs The amount of civil construction investment cost of the water transmission and power generation system allocated to the water resources allocation project,

[0051] k3 is the allocation coefficient of the civil construction investment cost of the water resources allocation project to the water transmission and power generation system.

[0052] C civ It is the civil construction investment cost of the water transmission and power generation system.

[0053] The advantages of the present invention are:

[0054] 1. The present invention is the first to create an investment cost allocation method for a pumped storage power station combined with a water resources allocation project. According to the technical design and operation characteristics of the pumped storage power station combined with a water resources allocation project, it is proposed that the investment cost allocated to the water resources allocation project is divided into at least three items, namely, the static investment cost of the upper reservoir, the investment cost of electromechanical equipment, and the civil construction investment cost of the water transmission and power generation system; then the allocation coefficients k1, k2, and k3 of the static investment cost of the upper reservoir, the investment cost of electromechanical equipment, and the civil construction investment cost of the water transmission and power generation system are calculated respectively; then, according to the allocation coefficients of each item, the amount C of the static investment cost of the upper reservoir, the investment cost of electromechanical equipment, and the civil construction investment cost of the water transmission and power generation system allocated to the water resources allocation project is calculated respectively. ups , C turs , C civs ; Finally, the three amounts C ups , C turs , C civs Add them together to get the amount of total investment cost of pumped storage power station shared by water resources allocation project C ws ;

[0055] 2. The present invention refers to the comparison method for calculating the static investment cost k1 of the reservoir in terms of the proportion of water resource allocation projects; the present invention refers to the machine time allocation method for calculating the electromechanical equipment investment cost k2 in terms of the proportion of water resource allocation projects, and calculates according to the proportion of the pumping time of the water resource allocation project to the total pumping time of the pumped storage power station unit; the present invention refers to the machine time allocation method for calculating the civil construction investment cost k3 of the water transmission and power generation system in terms of the proportion of the water resource allocation project in terms of the proportion of the civil construction scale of the water transmission and power generation system and the water diversion volume, and apportions the civil construction investment of the water transmission and power generation system according to the proportion of the average water diversion volume of the water resource allocation project over many years in the annual total water pumping volume of the pumped storage power station;

[0056] The method for allocating investment costs of a pumped-storage power station and a water resources allocation combined project proposed in the present invention is suitable for a pumped-storage power station which, after completion, mainly serves the electric power system and provides water sources for the water resources allocation project at the same time. It fills the current technical gap in the method for allocating investment costs of a pumped-storage power station and a water resources allocation combined project, and can provide a technical reference for the allocation of investment costs of pumped-storage power stations that utilize existing reservoirs or integrate other water conservancy projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0057] Figure 1 It is a flow chart of the present invention. DETAILED DESCRIPTION

[0058] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0059] like Figure 1As shown, the investment cost allocation method of the pumped storage power station and the water resources allocation project of the present invention is used to calculate the amount of the total investment cost of the pumped storage power station integrated with the water resources allocation project to be allocated to the water resources allocation project, and includes the following steps:

[0060] S1) According to the technical design and operation characteristics of the engineering scheme combining pumped-storage power station with water resources allocation, it is proposed that the investment costs that should be shared by the water resources allocation project include at least three items: the static investment cost of the upper reservoir, the investment cost of electromechanical equipment and the civil construction investment cost of the water transmission and power generation system; among them, when calculating the allocation of the static investment cost of the upper reservoir, it is necessary to include the static investment cost of the upper reservoir of the pumped-storage power station technical scheme with special water resource storage capacity and the static investment cost of the upper reservoir of the pumped-storage power station technical scheme without special water resource storage capacity.

[0061] The special water resource storage capacity is the special storage capacity set up by the upper reservoir for the water resource allocation project.

[0062] S2) Collect data, including the static investment cost C of the upper reservoir of the pumped storage power station technology solution with dedicated water storage capacity up , the static investment cost C of the upper reservoir of the pumped storage power station technology solution without dedicated water resource storage capacity * up , The average annual water diversion volume of water resources allocation projects over the years corresponds to the pumping time T w , Designed annual utilization hours of pumped storage power station T g , The design annual utilization hours of the pumped storage power station correspond to the pumping time T p , the average annual water diversion volume of water resources allocation projects over the years W w , the designed annual power generation time of the pumped storage power station corresponds to the water discharge volume W g , the designed annual pumping duration of the pumped storage power station corresponds to the pumping volume W p , Mechanical and electrical equipment investment cost C tur , Civil construction investment cost of water transmission and power generation system C civ .

[0063] Among them, C up The unit is ten thousand yuan, C * up The unit is ten thousand yuan, T w The unit is h, T g The unit is h, T p The unit is h, W w Unit: 10,000 m 3 , W g Unit: 10,000 m 3 , W p Unit: 10,000 m 3 , C tur The unit is ten thousand yuan, C civ The unit is ten thousand yuan.

[0064] This example takes the planned pumped storage power station A (with an installed capacity of 2400MW) in a certain region as an example. The upper reservoir regulation capacity of the pumped storage power station A with a dedicated water resource storage capacity is 8.65 million m 3 , of which 740,000 m3 is dedicated to the water resources allocation project. 3 .

[0065] Designed annual utilization hours of pumped storage power station A T g The corresponding discharge volume W of the designed annual power generation time of pumped storage power station A is 1000.0h g 914 million m 3 , The design annual utilization hours of pumped storage power station A corresponds to the pumping time T p The designed annual pumping time of pumped-storage power station A corresponds to the pumping volume W p 914 million m 3 .

[0066] The average annual water diversion volume of water resources allocation projects over the years W w 141 million m 3 , The average annual water diversion volume of water resources allocation projects over the years corresponds to the pumping time T w It is 206.0h.

[0067] The total static investment cost of the pumped storage power station A with dedicated water storage capacity is RMB 4834.83 million, of which the static investment cost of the upper reservoir is RMB 20. up The investment cost of electromechanical equipment is RMB 1032.51 million. tur The civil engineering investment cost of the water transmission and power generation system is C civ The static investment C of the upper reservoir corresponding to the pumped storage power station A technical solution without dedicated water resource storage capacity is 907.62 million yuan. * up It is 1,000.44 million yuan.

[0068] S3) The static investment cost C of the upper reservoir of the pumped storage power station technology solution with dedicated water storage capacity up The static investment cost C of the upper reservoir of the pumped storage power station technical solution without dedicated water resource storage capacity * up By comparison, calculate the allocation coefficient k1 of the static investment cost of the reservoir based on the proportion of water resources allocation projects.

[0069] Specifically, the allocation coefficient k1 of the static investment cost of the reservoir in the proportion of the water resources allocation project is obtained by the following formula:

[0070]

[0071] In the formula,

[0072] k1 is the allocation coefficient of the static investment cost of the reservoir in terms of the proportion of water resources allocation projects,

[0073] C up is the static investment cost of the upper reservoir of the pumped storage power station with dedicated water storage capacity, C * up It is the static investment cost of the upper reservoir of the technical solution of a pumped-storage power station with no dedicated storage capacity for water resources.

[0074] In this embodiment, k1=(103251-100044) / 103251=0.03106.

[0075] According to the machine time allocation method, the average annual water diversion volume of the water resources allocation project corresponds to the pumping time T w The allocation coefficient k2 of the investment cost of electromechanical equipment for water resource allocation project is calculated based on the proportion of total pumping time of pumped-storage power station units.

[0076] Specifically, the allocation coefficient k2 of the water resources allocation project to the electromechanical equipment investment cost is obtained by the following formula:

[0077]

[0078] In the formula,

[0079] k2 is the allocation coefficient of the investment cost of electromechanical equipment in the proportion of water resources allocation projects,

[0080] T w The average annual water diversion volume of water resources allocation projects over the years corresponds to the pumping time.

[0081] T g Design annual utilization hours for pumped storage power stations,

[0082] T p The designed annual utilization hours for a pumped-storage power station correspond to the pumping time.

[0083] In this embodiment, k2=206 / (1000+1333.3+206)=0.08112.

[0084] Considering that the civil engineering scale of the water transmission and power generation system is positively correlated with the water diversion volume, according to the machine time allocation method, the average water diversion volume W of the water resources allocation project over many years is calculated. w The civil engineering investment cost of the water transmission and power generation system is allocated based on the proportion of the annual total water pumping volume of the pumped-storage power station, and the allocation coefficient k3 of the civil engineering investment cost of the water transmission and power generation system as a proportion of the water resources allocation project is calculated.

[0085] Specifically, the allocation coefficient k3 of the water resources allocation project to the civil construction investment cost of the water transmission and power generation system is obtained by the following formula:

[0086]

[0087] In the formula,

[0088] k3 is the allocation coefficient of the civil construction investment cost of the water resources allocation project to the water transmission and power generation system.

[0089] W w The average annual water diversion volume for water resource allocation projects over the years.

[0090] W g Design the annual power generation time corresponding to the water discharge volume of the pumped storage power station.

[0091] W p Design the annual pumping time corresponding to the pumping volume for a pumped-storage power station.

[0092] In this embodiment, k3=1.41 / (9.14+9.14+1.41)=0.07161.

[0093] S4) Calculate the amount of static investment cost of the reservoir shared by the water resources allocation project C ups , the amount of mechanical and electrical equipment investment cost apportioned to the water resources allocation project C turs 2. The amount of civil engineering investment cost of water transmission and power generation system shared by water resources allocation project C civs .

[0094] Specifically, the amount of static investment cost of the reservoir shared by the water resources allocation project is C ups Obtained by the following formula,

[0095] C ups =k1×C up

[0096] In the formula,

[0097] C ups The amount of static investment cost of the reservoir allocated to the water resources allocation project,

[0098] k1 is the allocation coefficient of the static investment cost of the reservoir in terms of the proportion of water resources allocation projects,

[0099] C up It is the static investment cost of the upper reservoir of the technical solution of a pumped-storage power station with dedicated water storage capacity.

[0100] In this embodiment, the amount of static investment cost of the reservoir shared by the water resources allocation project is C ups =0.03106*103251=3207 (10,000 yuan).

[0101] Specifically, the amount of electromechanical equipment investment cost apportioned to the water resources allocation project is Cturs Obtained by the following formula,

[0102] C turs =k2×C tur

[0103] In the formula,

[0104] C turs The amount of investment cost of electromechanical equipment allocated to water resource allocation projects,

[0105] k2 is the allocation coefficient of the investment cost of electromechanical equipment in the proportion of water resources allocation projects,

[0106] C tur The investment cost of electromechanical equipment.

[0107] In this embodiment, the amount of electromechanical equipment investment cost apportioned to the water resources allocation project is C turs =0.08112*123611=10027 (10,000 yuan).

[0108] Specifically, the amount of civil engineering investment cost of the water transmission and power generation system shared by the water resources allocation project is C civs Obtained by the following formula,

[0109] C civs =k3×C civ

[0110] In the formula,

[0111] C civs The amount of civil construction investment cost of the water transmission and power generation system allocated to the water resources allocation project,

[0112] k3 is the allocation coefficient of the civil construction investment cost of the water resources allocation project to the water transmission and power generation system.

[0113] C civ It is the civil construction investment cost of the water transmission and power generation system.

[0114] In this embodiment, the amount of civil engineering investment cost of the water transmission and power generation system shared by the water resources allocation project is C civs =0.07161*90762=6499 (10,000 yuan).

[0115] S5) Calculate the amount of total investment cost of pumped storage power stations that are shared by water resources allocation projects and integrated into water resources allocation projects C ws , that is, C ws =C ups +C turs +C civs .

[0116] In this embodiment, the water resources allocation project apportions the static investment cost of the upper reservoir, the investment cost of electromechanical equipment, and the civil construction investment cost of the water transmission and power generation system, that is, the water resources allocation project apportions the total investment cost of the pumped storage power station integrated with the water resources allocation project by an amount C ws =3207+10027+6499=19733 (million yuan). In other words, the static investment cost of pumped storage power station A that should be shared by the water resources allocation project is 197.33 million yuan, accounting for 4% of the total static investment cost.

[0117] The investment cost allocation method for the combined project of a pumped-storage power station and water resource allocation of the present invention is suitable for a pumped-storage power station which, after completion, mainly serves the electric power system and provides water sources for the water resource allocation project at the same time. It fills the current technical gap in the investment cost allocation method for the combined project of a pumped-storage power station and water resource allocation, and provides a technical reference for the investment cost allocation of a pumped-storage power station which utilizes existing reservoirs or integrates other water conservancy projects.

[0118] The above embodiments are preferred implementation modes of the present invention, but the implementation modes of the present invention are not limited to the above embodiments. Any other changes, modifications, substitutions, combinations, and simplifications that do not deviate from the spirit and principles of the present invention should be equivalent replacement methods and are included in the protection scope of the present invention.

Claims

1. A method for allocating investment costs of a pumped storage power station combined with a water resources allocation project, characterized in that: The calculation of the total investment cost of the pumped storage power station integrated with the water resource allocation project to allocate the amount of the water resource allocation project includes the following steps: S1) According to the technical design and operation characteristics of the pumped storage power station and water resources allocation combined engineering scheme, it is proposed that the investment costs to be shared by the water resources allocation project should include at least three items: the static investment cost of the upper reservoir, the investment cost of electromechanical equipment and the civil construction investment cost of the water transmission and power generation system; among them, when calculating the allocation of the static investment cost of the upper reservoir, the static investment cost of the upper reservoir of the pumped storage power station technical scheme with special water resources storage capacity and the static investment cost of the upper reservoir of the pumped storage power station technical scheme without special water resources storage capacity should be included; The special water resource storage capacity is the special storage capacity set for the water resource allocation project in the upper reservoir regulation storage capacity; S2) Collect data, including the static investment cost C of the upper reservoir of the pumped storage power station technology solution with dedicated water storage capacity up , the static investment cost C of the upper reservoir of the pumped storage power station technology solution without dedicated water resource storage capacity * up , The average annual water diversion volume of water resources allocation projects over the years corresponds to the pumping time T w , Designed annual utilization hours of pumped storage power station T g , The design annual utilization hours of the pumped storage power station correspond to the pumping time T p , the average annual water diversion volume of water resources allocation projects over the years W w , the designed annual power generation time of the pumped storage power station corresponds to the water discharge volume W g , Pumping time of pumped storage power station corresponds to the pumping volume W p , Mechanical and electrical equipment investment cost C tur , Civil construction investment cost of water transmission and power generation system C civ ; S3) respectively calculating the allocation coefficient k1 of the static investment cost of the reservoir for the proportion of water resources allocation project, the allocation coefficient k2 of the investment cost of electromechanical equipment for the proportion of water resources allocation project, and the allocation coefficient k3 of the civil construction investment cost of the water transmission and power generation system for the proportion of water resources allocation project; The allocation coefficient k1 of the static investment cost of the reservoir in the proportion of the water resources allocation project is obtained by the following formula: In the formula, k1 is the allocation coefficient of the static investment cost of the reservoir in terms of the proportion of water resources allocation projects, C up The static investment cost of the upper reservoir of the pumped storage power station with dedicated water storage capacity, C * up The static investment cost of the upper reservoir of the pumped storage power station technology solution without dedicated storage capacity for water resources; The apportionment coefficient k2 of the water resources allocation project to the electromechanical equipment investment cost is obtained by the following formula: In the formula, k2 is the allocation coefficient of the investment cost of electromechanical equipment in the proportion of water resources allocation projects, T w The average annual water diversion volume of water resources allocation projects over the years corresponds to the pumping time. T g Design annual utilization hours for pumped storage power stations, T p The design annual utilization hours for the pumped storage power station correspond to the pumping time; The apportionment coefficient k3 of the water resources allocation project to the civil construction investment cost of the water transmission and power generation system is obtained by the following formula: In the formula, k3 is the allocation coefficient of the civil construction investment cost of the water resources allocation project to the water transmission and power generation system. W w The average annual water diversion volume for water resource allocation projects over the years. W g Design the annual power generation time corresponding to the water discharge volume of the pumped storage power station. W p The pumping time corresponds to the pumping volume of the pumped storage power station; S4) Calculate the amount of static investment cost of the reservoir shared by the water resources allocation project C ups , the amount of mechanical and electrical equipment investment cost apportioned to the water resources allocation project C turs 2. The amount of civil engineering investment cost of water transmission and power generation system shared by water resources allocation project C civs ; S5) Calculate the amount of total investment cost of pumped storage power stations that are shared by water resources allocation projects and integrated into water resources allocation projects C ws , that is, C ws =C ups +C turs +C civs .

2. The method for allocating investment costs of a pumped storage power station and a water resources allocation project according to claim 1, characterized in that: In step S4), the amount C of the static investment cost of the reservoir shared by the water resources allocation project ups Obtained by the following formula, C ups =k1×C up In the formula, C ups The amount of static investment cost of the reservoir allocated to the water resources allocation project, k1 is the allocation coefficient of the static investment cost of the reservoir in terms of the proportion of water resources allocation projects, C up It is the static investment cost of the upper reservoir of the technical solution of a pumped-storage power station with dedicated water storage capacity.

3. The method for allocating investment costs of a pumped storage power station and a water resources allocation combined project according to claim 1, characterized in that: In step S4), the amount of electromechanical equipment investment cost apportioned to the water resources allocation project is C turs Obtained by the following formula, C turs =k2×C tur In the formula, C turs The amount of investment cost of electromechanical equipment allocated to water resource allocation projects, k2 is the allocation coefficient of the investment cost of electromechanical equipment in the proportion of water resources allocation projects, C tur The investment cost of electromechanical equipment.

4. The method for allocating investment costs of a pumped storage power station and a water resources allocation project according to claim 1, characterized in that: In step S4), the amount of civil construction investment cost of the water resources allocation project to be shared by the water transmission and power generation system is C civs Obtained by the following formula, C civs =k3×C civ In the formula, C civs The amount of civil construction investment cost of the water transmission and power generation system allocated to the water resources allocation project, k3 is the allocation coefficient of the civil construction investment cost of the water resources allocation project to the water transmission and power generation system. C civ It is the civil construction investment cost of the water transmission and power generation system.