Water conservancy and hydropower engineering construction management system

By designing a water conservancy and hydropower engineering construction management system that includes project information management and construction site supervision modules, the problem of insufficient functionality of the existing system is solved, timely interaction of construction information and construction safety management is realized, and the efficiency and safety of construction management are improved. sex.

CN119090418APending Publication Date: 2024-12-06李太军 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411082091.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing water conservancy and hydropower engineering construction management system has poor functionality and insufficient coherence between information modules, which leads to increased difficulty in construction management, especially in construction safety and planning, which affects the implementation of the construction management system.

Method used

A water conservancy and hydropower engineering construction management system including project information management module, construction site supervision module and cloud service terminal was designed. Through project plan design, construction site supervision, on-site safety module, progress collection and reporting module, and regular inspection module modules such as grouping realize information interoperability and effective management of construction plans.

Benefits of technology

The timely interaction and management of construction information is realized to ensure construction safety. Through phased division, personnel training and assessment, the occurrence of construction accidents is reduced and the efficiency and safety of construction management is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119090418A_ABST
    Figure CN119090418A_ABST
Patent Text Reader

Abstract

The invention discloses a water conservancy and hydropower engineering construction management system which comprises a project information management module, a construction site supervision module and a cloud service terminal. The project information management module comprises a project scheme design module, a project standard module and a project information module; the construction site supervision module comprises division for obtaining construction project information output stage construction, and the construction site supervision module comprises a site safety module, a constructor information module and a progress collection and report module. Compared with the prior art, the water conservancy and hydropower engineering construction management system has the advantages that information interaction is facilitated, all modules are good in coherence, communication is easy, and a construction plan and progress can be known conveniently.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of water conservancy and hydropower construction management, and in particular to a water conservancy and hydropower project construction management system. Background Art

[0002] Water conservancy projects are the infrastructure for national economic and social development, and the basic conditions for achieving effective allocation of water resources. The success or failure of water conservancy project construction projects is related to the national economy and people's livelihood, as well as social stability. After decades of water conservancy project construction, the flood control systems of major rivers have been gradually improved, and water conservancy project construction projects have evolved from point-to-point project construction to inter-basin and inter-regional water diversion projects and pumped storage projects; the investment scale of a single project has increased from hundreds of millions to tens of billions to tens of billions.

[0003] Therefore, a single project has the characteristics of many points, long lines and wide areas; the difficulty of construction management by the project legal person increases exponentially, and the current construction management means of the project legal person can no longer meet the needs of large-scale water conservancy construction.

[0004] However, the existing water conservancy and hydropower project construction management systems implemented for the above situation are mostly poor in versatility and may be lacking in construction safety or construction planning. At the same time, the information connection and consistency between modules are poor, resulting in the long and wide characteristics of a single project, which seriously affects the implementation of the construction management system. Summary of the invention

[0005] The technical problem to be solved by the present invention is to overcome the above technical defects and provide a water conservancy and hydropower project construction management system that is convenient for information interaction, has good coherence among modules, is easy to communicate, and is convenient for knowing the construction plan and progress.

[0006] In order to solve the above technical problems, the technical solution provided by the present invention is: a water conservancy and hydropower project construction management system, including a project information management module, a construction site supervision module and a cloud service terminal;

[0007] The project information management module includes a project scheme design module, a project standard module, and a project information module;

[0008] The project information module includes inputting construction project information, the project standard module includes inputting project standards according to project requirements, and the project scheme design module designs the construction scheme of the project according to the input project standards and project information. The construction scheme design also includes dividing the construction scheme into phased construction and the project goals of each phased construction;

[0009] The construction site supervision module includes obtaining construction project information and outputting the division of phased construction. The construction site supervision module includes a site safety module, a construction personnel information module, and a progress collection and reporting module.

[0010] Preferably, the construction personnel information module includes inputting the construction personnel information according to the employment contract, and grouping the construction personnel information, wherein the grouping includes a team leader, a deputy team leader, a safety officer and an operator.

[0011] Preferably, the progress collection and reporting module includes collecting the construction information reported by each team leader on a daily basis for aggregation and reporting.

[0012] Preferably, the on-site safety module includes a comprehensive site layout BIM model based on the construction site, and performs three-dimensional planning of the construction site, including the construction site and surrounding road conditions and the coverage of surveillance cameras and voice speakers in the entire area.

[0013] Preferably, the project scheme design module also includes engineering cost accounting for construction materials.

[0014] Preferably, the construction site supervision module also includes a scheduled inspection module, which includes a vibrator controlled by the Internet of Things, and vibrates to warn according to an established inspection cycle, and the warning includes safety hazard inspection and construction quality inspection.

[0015] Preferably, the construction personnel information module also includes an assessment module and a training module, which regularly conducts safety construction training and assessment on the construction personnel, and suspends the construction personnel's work for special training when the assessment fails.

[0016] The advantages of the present invention compared with the prior art are: in the present invention, information exchange between the project construction design and the project construction management process is carried out through the targeted project information management module and the construction site supervision module, and the targeted division of phased construction, grouping of construction personnel, and reporting and registration of construction information are carried out, which facilitates timely exchange of construction information and construction management. Among them, targeted training and assessment of personnel ensure construction safety and prevent construction safety accidents caused by improper construction operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of a water conservancy and hydropower project construction management system. DETAILED DESCRIPTION

[0018] References to embodiments of the present invention will now be provided in detail, one or more examples of which are described below. Each example is provided as an explanation rather than a limitation of the present invention. In fact, it will be apparent to those skilled in the art that various modifications and variations may be made to the present invention without departing from the scope or spirit of the present invention. For example, a feature illustrated or described as part of one embodiment may be used in another embodiment to produce a further embodiment.

[0019] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0020] Except as indicated in the operating examples or otherwise, all numbers used in the specification and claims expressing quantities of ingredients, physicochemical properties, etc., are understood to be modified in all instances by the term "about." For example, therefore, unless otherwise indicated, the numerical parameters set forth in the foregoing specification and the appended claims are approximate values, which those skilled in the art will be able to appropriately vary in order to obtain the desired properties sought to be obtained utilizing the teachings disclosed herein.

[0021] Combination Figure 1 As shown, a water conservancy and hydropower project construction management system includes a project information management module, a construction site supervision module and a cloud service terminal; the project information management module includes a project scheme design module, a project standard module and a project information module; the project information module includes entering construction project information, the project standard module includes entering project standards according to project requirements, the project scheme design module designs the project construction scheme according to the entered project standards and project information, the construction scheme design also includes dividing the construction scheme into phased construction and the project goals of each phased construction, and the construction site supervision module includes obtaining the construction project information and outputting the phased construction division, and the construction site supervision module includes a site safety module, a construction personnel information module, and a progress collection and reporting module.

[0022] In specific construction management, in order to ensure construction safety and the uploading of construction information, the construction personnel information module includes entering the construction personnel information according to the employment contract, and grouping the construction personnel information. The grouping includes team leaders, deputy team leaders, safety officers and operators, and different responsibilities are divided through different positions, so that the entire construction project can proceed in an orderly manner.

[0023] The progress collection and reporting module includes daily collection of construction information reported by each team leader for summary and reporting. The site safety module includes a comprehensive site layout BIM model based on the construction site, which conducts three-dimensional planning of the construction site, including the construction site and surrounding road conditions and the coverage of surveillance cameras and voice speakers in the entire area.

[0024] The project design module also includes the engineering cost accounting for construction materials, and the construction site supervision module also includes a scheduled inspection module. The scheduled inspection module includes a vibrator controlled by the Internet of Things, which vibrates and warns according to the established inspection cycle. The warnings include safety hazard inspections and construction quality inspections.

[0025] The construction personnel information module also includes an assessment module and a training module, which regularly conducts safety construction training and assessment on construction personnel. When the assessment fails, the construction personnel's work is suspended for special training.

[0026] When the present invention is implemented, the project information is first input and the project construction standards are formulated. The project information includes name, location, budget, scale, and construction period. According to the project requirements and relevant specifications, specific project standards are input, including quality standards, safety standards, and environmental standards.

[0027] The project plan design module designs a detailed construction plan based on the entered project information and standards. The plan should include the division of phased construction, the goals of each phase, the construction methods, and the required resources. At the same time, the construction phases should be clearly divided in the plan, and specific project goals should be set for each phase.

[0028] After the planning is completed, construction management is carried out. According to the employment contract, the basic information of the construction workers is entered and grouped. The responsibilities of the team leader, deputy team leader, safety officer and operator are clarified. The construction workers are regularly trained in safe construction and assessed through the assessment module. Those who fail the assessment will have their work suspended and special training will be arranged to ensure the overall quality of the construction team. The construction site supervision module obtains and outputs the division information of phased construction according to the construction plan design to ensure that the construction is carried out according to the established plan.

[0029] Utilize the BIM model in the on-site safety module to carry out three-dimensional planning of the construction site, monitor the construction site and surrounding road conditions, and ensure full coverage of surveillance cameras and voice speakers, thereby facilitating irregular video surveillance inspections and voice warnings. Among them, the scheduled inspection module, through the vibrator controlled by the Internet of Things, automatically sends out vibration warnings within the set inspection cycle, reminding relevant personnel to conduct safety hazard inspections and construction quality inspections.

[0030] During the construction process, the collected progress information is regularly summarized to form a progress report, which is submitted to the project management personnel to facilitate timely adjustment of the construction plan and resource allocation.

[0031] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.

[0032] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0033] The present invention and its implementation methods are described above, and such description is not restrictive. In short, if ordinary technicians in the field are inspired by it, without departing from the purpose of the invention, they can design structures and embodiments similar to the technical solution without creativity, which should all fall within the protection scope of the present invention.

Claims

1. A water conservancy and hydropower project construction management system, characterized by: Including project information management module, construction site supervision module and cloud service terminal; The project information management module includes a project scheme design module, a project standard module, and a project information module; The project information module includes inputting construction project information, the project standard module includes inputting project standards according to project requirements, and the project scheme design module designs the construction scheme of the project according to the input project standards and project information. The construction scheme design also includes dividing the construction scheme into phased construction and the project goals of each phased construction; The construction site supervision module includes obtaining construction project information and outputting the division of phased construction. The construction site supervision module includes a site safety module, a construction personnel information module, and a progress collection and reporting module.

2. A water conservancy and hydropower project construction management system according to claim 1, characterized in that: The construction personnel information module includes inputting the construction personnel information according to the employment contract, and grouping the construction personnel information, wherein the grouping includes a team leader, a deputy team leader, a safety officer and an operator.

3. A water conservancy and hydropower project construction management system according to claim 2, characterized in that: The progress collection and reporting module includes collecting the construction information reported by each team leader on a daily basis for aggregation and reporting.

4. A water conservancy and hydropower project construction management system according to claim 1, characterized in that: The on-site safety module includes a comprehensive site layout BIM model based on the construction site, which performs three-dimensional planning of the construction site, including the construction site and surrounding road conditions and the coverage of surveillance cameras and voice speakers in the entire area.

5. A water conservancy and hydropower project construction management system according to claim 1, characterized in that: The project design module also includes engineering cost accounting for construction materials.

6. A water conservancy and hydropower project construction management system according to claim 1, characterized in that: The construction site supervision module also includes a scheduled inspection module, which includes a vibrator controlled by the Internet of Things, and vibrates to warn according to the established inspection cycle. The warnings include safety hazard inspections and construction quality inspections.

7. A water conservancy and hydropower project construction management system according to claim 2, characterized in that: The construction personnel information module also includes an assessment module and a training module, which regularly conduct safety construction training and assessment on construction personnel. When the assessment fails, the construction personnel's work is suspended for special training.