High-frequency power supply device and control method thereof
By using periodic on-off action to prevent overvoltage of the main electrode of the switching element in the E-class inverter of the high-frequency power supply device, the overvoltage problem of the E-class inverter during the intermittent operation is solved, and more efficient Power conversion and stability.
Patent Information
- Application Number
- CN202280094123.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-29
- Publication Date
- 2024-12-06
AI Technical Summary
In a high-frequency power supply device with an E-class inverter, during the timing of transition from the stop period during the intermittent operation period to the stop period, the main electrode voltage of the switching element may increase to greater than or equal to the withstand voltage, resulting in an overvoltage problem.
By periodically performing the on-off operation of the first switching element before the stop period is about to arrive during the operation period, the second switching element is maintained in the off state, thereby preventing overvoltage of the main electrode.
It effectively prevents overvoltage of the main electrode of the switching element, reduces power loss, and improves the stability of the power supply device.
Smart Images

Figure CN119096464A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a high frequency power supply device and a control method thereof. Background Art
[0002] The power transmission device of the wireless power supply system is provided with an inverter circuit that generates high-frequency AC power from a DC power supply.
[0003] Patent document 1 (Japanese Patent No. 5670869) discloses a class E inverter in which the inverter circuit is composed of a class E amplifier. The class E inverter can reduce the loss generated during switching by resonance inside the circuit, and is expected to improve the efficiency and miniaturization of the entire wireless power supply system.
[0004] In a wireless power supply system, it is necessary to control the output power of the inverter circuit according to the load state of the power supply target. As a method for controlling the output power of the inverter circuit, a method using intermittent operation is known. By setting a period of no power output through intermittent operation, the average output power of the inverter circuit can be adjusted without changing the on-off frequency and duty cycle of the switching elements constituting the inverter circuit.
[0005] Patent Document 1: Japanese Patent No. 5670869 Summary of the invention
[0006] If intermittent operation is combined with an E-class inverter, there is a problem that the voltage applied between the main electrodes of the switching elements constituting the E-class inverter increases to a level greater than or equal to the withstand voltage when the E-class inverter transitions from the operating period to the stopping period. In addition, this issue is not limited to power transmission equipment in wireless power supply systems, but is a common issue for high-frequency power supply devices with E-class inverters.
[0007] The present invention has been proposed in consideration of the above-mentioned problems, and one of its purposes is to prevent overvoltage between main electrodes of switching elements constituting an E-class inverter when intermittent operation is performed in a high-frequency power supply device having an E-class inverter.
[0008] A high-frequency power supply device in one embodiment has an E-class inverter, and the E-class inverter has a first switching element, and direct current power is converted into alternating current power by the on-off action of the first switching element. The high-frequency power supply device also has a second switching element and a rectifying element. The second switching element switches the presence or absence of input of direct current power to the E-class inverter. When the second switching element is turned off, the rectifying element flows current from the ground to the E-class inverter. The control unit controls the on-off of the first switching element and the second switching element. The control unit causes the first switching element to periodically perform on-off actions during the operation period of the E-class inverter, and maintains the second switching element in an on state. The control unit causes both the first switching element and the second switching element to maintain an off state during the stop period of the E-class inverter. During the transition period immediately before reaching the stop period during the operation period, the control unit causes the first switching element to periodically perform on-off actions, and maintains the second switching element in an off state.
[0009] Effects of the Invention
[0010] According to the above embodiment, when intermittent operation is performed in a high-frequency power supply device having an E-class inverter, the first switching element is periodically turned on and off during a transition period immediately before reaching a stop period during the operation period, and the second switching element is maintained in an off state. Thus, overvoltage between the main electrodes of the first switching element constituting the E-class inverter can be prevented. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 This is a configuration diagram of a high-frequency power supply device in the first embodiment.
[0012] Figure 2 Yes means Figure 1 Schematic diagram of the first variant of the E-class inverter.
[0013] Figure 3 Yes means Figure 1 A structural diagram of a second variation of an E-class inverter.
[0014] Figure 4 Yes means Figure 1 FIG. 1 is a structural diagram of a third variation of an E-class inverter.
[0015] Figure 5A This is a diagram for explaining the flow of direct current when the switching element SW2 is turned on.
[0016] Figure 5B This is a diagram for explaining the flow of direct current immediately after the switching element SW2 is switched off.
[0017] Figure 6 Yes Figure 1 FIG. 1 is a diagram showing a resonant unit 35 of an E-class inverter 30 taken out.
[0018] Figure 7 Yes Figure 2 FIG. 1 is a diagram showing a resonant unit 36 of an E-class inverter 31 taken out.
[0019] Figure 8 1 is a diagram conceptually showing an example of an on / off control signal of the switching element SW1 and a detection signal of the current detector 41 .
[0020] Fig. 9 It is a diagram conceptually showing the on-off operation signal of the switching element SW2.
[0021] Fig.10 : is a timing chart showing the change of the collector-emitter voltage Vce1 of the switching element SW1 when no advance time is provided.
[0022] Fig.11 : is a timing chart showing the change of the collector-emitter voltage Vce1 of the switching element SW1 when the advance time is provided.
[0023] Fig.12 This is a flowchart showing the control operation of the control unit in the high-frequency power supply device according to the second embodiment. DETAILED DESCRIPTION
[0024] Hereinafter, each embodiment will be described in detail with reference to the drawings. In addition, the same reference numerals are attached to the same or corresponding parts, and their description may not be repeated.
[0025] Implementation Method 1
[0026] [Structure of high frequency power supply device]
[0027] Figure 1 : is a structural diagram of the high frequency power supply device in Embodiment 1. Figure 1 As shown, the high frequency power supply device 10 includes a direct current (DC) power supply 20, a current detector 41, a switching element SW2, a diode D, an E-class inverter 30, a voltage detector 42, and a control unit 40. The E-class inverter 30 includes an input inductor L1, a switching element SW1, a parallel capacitor C1, a resonant inductor L2, and a resonant capacitor C2. The E-class inverter 30 is also referred to as an E-class amplifier. Figure 1 In FIG. 1 , the output capacitance of the switch element SW1 is expressed as Coss. The switch element SW1 is also referred to as a first switch element, and the switch element SW2 is also referred to as a second switch element.
[0028] Hereinafter, first, the connection of the above-mentioned structural elements will be briefly described. The E-class inverter 30 is connected between the input node N1 and the output node N3. The switching element SW2 is connected between the DC power supply 20 and the input node N1. The diode D is connected in a reverse bias direction between the input node N1 and the ground GND. A load R is connected between the output node N3 and the ground GND. The load R may be, for example, an electric motor for consuming power or a battery for storing power. Alternatively, the high-frequency power supply device 10 may also be a structure connected to a wireless power supply system as a load R.
[0029] Regarding the internal connection of the E-class inverter 30, the input inductor L1 is connected between the input node N1 and the intermediate node N2. The switching element SW1 and the parallel capacitor C1 are connected in parallel to each other between the intermediate node N2 and the ground GND. The resonant capacitor C2 and the resonant inductor L2 are connected in series in this order between the intermediate node N2 and the output node N3.
[0030] In the E-class inverter 30, the switch element SW1 is turned on and off in accordance with the resonant frequency of the resonant circuit composed of the capacitor and the inductor. As a result, the switch element SW1 can be turned on (ZVS: zero volt switching) when the voltage between the main electrodes of the switch element SW1 (corresponding to the voltage Vce1 between the collector and the emitter of the bipolar transistor) is 0V. As a result, the power loss generated at the timing when the switch element SW1 is switched on can be reduced.
[0031] The E-class inverter 30 may also be Figure 1 Other structures. Figure 2 to Figure 4 A brief explanation will be given.
[0032] Figure 2 Yes means Figure 1 Schematic diagram of the first variant of the E-class inverter. Figure 2 The E-class inverter 31 of the high frequency power supply device 11 is different from the high frequency power supply device 11 in that it also has an output capacitor C3 connected in parallel with the load R. Figure 1 The E-class inverter 30 of the high-frequency power supply device 10 is different. Figure 2 Other aspects of Figure 1 Therefore, the same reference numerals are given to the same or corresponding parts, and the description thereof will not be repeated.
[0033] Figure 3 Yes means Figure 1 A structural diagram of a second variation of an E-class inverter. Figure 3 The E-class inverter 32 of the high-frequency power supply device 12 is different from the E-class inverter 32 in that it has switch elements SW1a and SW1b of a push-pull structure. Figure 1The E-class inverter 30 of the high-frequency power supply device 10 is different.
[0034] Specifically, if Figure 3 As shown, the E-class inverter 32 includes input inductors L1a, L1b, switching elements SW1a, SW1b, parallel capacitors C1a, C1b, resonant capacitors C2a, C2b, and resonant inductors L2a, L2b. The E-class inverter 32 is connected between the input node N1 and the first and second output nodes N3a, N3b.
[0035] Regarding the internal connection of the E-class inverter 32, the input inductor L1a is connected between the input node N1 and the first intermediate node N2a. The input inductor L1b is connected between the input node N1 and the second intermediate node N2b. The switching elements SW1a and SW1b are connected in series between the intermediate nodes N2a and N2b. The two emitters of the switching elements SW1a and SW1b are connected to the common connection node N4. The connection node N4 is connected to the ground GND. The parallel capacitor C1a is connected in parallel to the switching element SW1a, and the parallel capacitor C1b is connected in parallel to the switching element SW1b. The resonant capacitor C2a and the resonant inductor L2a are connected in sequence between the first intermediate node N2a and the first output node N3a. The resonant capacitor C2b and the resonant inductor L2b are connected in sequence between the second intermediate node N2b and the second output node N3b. The load R is connected between the first output node N3a and the second output node N3b.
[0036] Figure 4 Yes means Figure 1 FIG. 1 is a structural diagram of a third variation of an E-class inverter. Figure 4 The E-class inverter 33 of the high frequency power supply device 13 is Figure 3 The E-class inverter 32 of the high-frequency power supply device 12 is a deformed structure. Specifically, Figure 4 The E-class inverter 33 is different from the inverter 31 in that it also has output capacitors C3a and C3b. Figure 3 The output capacitor C3a is connected between the first output node N3a and the ground GND. The output capacitor C3b is connected between the second output node N3b and the ground GND.
[0037] As another modification, the class E inverter may be a circuit obtained by improving the basic circuit structure of the class E amplifier circuit.
[0038] return Figure 1 The DC power supply 20 is a circuit that outputs DC power. The DC power supply 20 may include, for example, a switching circuit such as a DC / DC converter, or may be a circuit that rectifies AC power from a power system and outputs DC power.
[0039] The input inductor L1 functions as an input filter that allows only a direct current to pass, thereby suppressing a ripple current generated by the on-off operation of the switching element SW1 .
[0040] As switch elements SW1 and SW2, Figure 1 , an NPN-type bipolar transistor is shown, but the present invention is not limited thereto. For example, the switch elements SW1 and SW2 may be MOSFETs (Metal Oxide Semiconductor Field-Effect Transistors) or IGBTs (Insulated Gate Bipolar Transistors).
[0041] The switching elements SW1 and SW2 are switched on and off based on the control signal supplied from the control unit 40. The switching element SW2 is switched on and off in synchronization with the intermittent operation of the E-class inverter 30 as described later. The switching element SW1 repeatedly performs on-off operation according to a control signal with a constant duty cycle of 50% at the basic frequency f0, for example. If the inductance of the resonant inductor L2 is set to L2 and the resistance value of the load R is set to R, then ω=2π·f0, and the Q value is expressed by Q=ω·L2 / R. The inductance L2 and the resistance value R are designed so that the Q value is large enough at the basic frequency f0 of the E-class inverter 30.
[0042] The function of the diode D is different when the switching element SW2 is turned on and when it is turned off. Figure 5A 1 is a diagram for explaining the flow of direct current when the switch element SW2 is turned on. Figure 5A As shown, the diode D prevents current from flowing from the collector of the switching element SW2 to the ground when the switching element SW2 is turned on.
[0043] on the other hand, Figure 5B 1 is a diagram for explaining the flow of direct current immediately after the switch element SW2 is switched off. Immediately after the switch element SW2 is switched off, the current that continues to flow through the input inductor L1 flows from the ground GND via the diode D.
[0044] return Figure 1 , a switching element SW3 (so-called synchronous rectification element) composed of a MOSFET, a bipolar transistor, or an IGBT etc. may be used instead of the diode D. When the switching element SW3 is used, the timing of turning on and off of the switching element SW3 is the timing after the timing of turning on and off of the switching element SW2 is reversed. In the present invention, the diode D and the switching element SW3 for synchronous rectification are collectively referred to as rectification elements.
[0045] Next, Figure 1A method for designing each component of the resonance unit of the E-class inverter 30 will be described in more detail.
[0046] Figure 6 Yes Figure 1 The resonance unit 35 of the E-class inverter 30 is taken out and shown in FIG. Figure 6 In FIG. 1 , the output capacitance of the switching element SW1 is set to Coss, the capacitance of the parallel capacitor C1 is set to C1, the capacitance of the resonant capacitor C2 is set to C2, and the inductance of the resonant inductor L2 is set to L2.
[0047] exist Figure 6 , the resonance frequency f1 of the resonance unit 35 is obtained. Specifically, the parallel composite capacitance between the output capacitor Coss and the parallel capacitor C1 is C1+Coss. The series composite capacitance between the parallel composite capacitance and the resonance capacitor C2 is 1 / [1 / (C1+Coss)+1 / C2]. f1 is defined as the resonance frequency between the series composite capacitance and the resonance inductor L2. In this case, the capacitance of the parallel capacitor C1, the capacitance of the resonance capacitor C2, and the inductance of the resonance inductor L2 are designed in such a way that the resonance frequency f1 becomes f1≥f0 relative to the basic frequency f0.
[0048] Furthermore, if the resonant frequency between the resonant capacitor C2 and the resonant inductor L2 is f2, the capacitance of the resonant capacitor C2 and the inductance of the resonant inductor L2 are designed so that the resonant frequency f2 satisfies f2 ≤ f0 with respect to the fundamental frequency f0. And, as described above, the Q value (=ω·L2 / R) is made sufficiently large.
[0049] Figure 7 Yes Figure 2 FIG. 1 is a diagram showing a resonant unit 36 of an E-class inverter 31 taken out. Figure 2 The parallel circuit of the output capacitor C3 and the load R Figure 7 The impedance is equivalently transformed into a series circuit between the output capacitor C3' and the load resistance R'. The load resistance R' and the output capacitor C3' capacitance C3' after the impedance transformation are given as ω = 2π·f0.
[0050] R'=R / (1+(ω·C3·R) 2 )…(1)
[0051] C3'=R 2 / (1+(ω·C3·R) 2 )…(2).
[0052] and Figure 6Similarly, the resonance frequency of the resonance unit 36 is set to f1, and the resonance frequencies of the resonance capacitor C2, the resonance inductor L2, and the output capacitor C3' are set to f2. The capacitances of the parallel capacitor C1, the resonance capacitor C2, and the output capacitor C3, and the inductance of the resonance inductor L2 are designed so that f0≤f1 and f0≥f2 are satisfied and the Q value (=ω·L2 / R') is sufficiently large.
[0053] By satisfying the reference Figure 6 and Figure 7 According to the above-described design conditions, the voltage between the main electrodes of the switching element SW1 (the collector-emitter voltage Vce1 in the case of a bipolar transistor) becomes 0 V before the switching element SW1 is turned on. In addition, before the collector-emitter voltage Vce1 starts to increase again from 0 V, the switching element SW1 is turned on (ZVS). As a result, the power loss generated at the timing when the switching element SW1 is switched on is reduced.
[0054] Refer again Figure 1 The current detector 41 detects the input current Iin input from the DC power supply 20 to the switching element SW2. The current detector 41 inputs a detection signal indicating the value of the detected input current Iin to the control unit 40. The current detector 41 may be, for example, a sensor that detects a DC current, such as a Hall element or a Rogowski coil. Alternatively, the current detector 41 may be configured as a detector that detects a voltage generated on a shunt resistor inserted in a DC line.
[0055] The voltage detector 42 detects the voltage of the intermediate node N2, that is, the voltage between the main electrodes of the switching element SW1 (collector-emitter voltage Vce1 in the case of a bipolar transistor), and inputs a detection signal indicating the value of the detected voltage to the control unit 40.
[0056] The control unit 40 may be formed based on a computer including a CPU (Central Processing Unit) and a memory that operates according to a program, may be formed by an FPGA (Field Programmable Gate Array), or may be formed by a dedicated circuit. Alternatively, the control unit 40 may be formed by a combination of these, and its hardware structure is not particularly limited.
[0057] [Control operation of the control unit]
[0058] Next, the control operation of the control unit 40 will be described. A signal indicating the value of the input current Iin detected by the current detector 41 is input to the control unit 40. The control unit 40 also outputs a control signal for controlling the on and off of each of the switching elements SW1 and SW2.
[0059] Figure 8 1 is a diagram conceptually showing an example of an on / off control signal of the switching element SW1 and a detection signal of the current detector 41 .
[0060] Reference Figure 8 , the control unit 40 outputs an on / off signal of the basic frequency f0 to the switch element SW1. And, the control unit 40 performs control, for example, such that the switching element SW1 is repeatedly switched on and off at a frequency fx (corresponding to the period Tx) less than or equal to 1 / 10 of the basic frequency f0 and the switching element SW1 is stopped. In the present invention, the switching operation at the frequency fx is referred to as an intermittent operation.
[0061] exist Figure 8 In the example shown, the period from time t1 to time t3 is the on-off operation period of the switch element SW1, and the period from time t3 to time t4 is the stop period of the on-off operation. The period from time t1 to time t4 corresponds to the cycle Tx of the intermittent operation.
[0062] In addition, the control unit 40 obtains the current detection value from the current detector 41 at a certain time interval and accumulates the obtained current detection value. After accumulating the current detection value multiple times, the control unit 40 obtains the average value of the input current by dividing the accumulated value by the number of accumulations. In addition, the control unit 40 changes the duty ratio d of the intermittent operation in such a way that the obtained current average value approaches the target current value.
[0063] Here, the duty cycle d is the ratio of the period during which the switching element SW1 performs on-off operation at the frequency f0 to the entire period Tx of the intermittent operation. Figure 8 As shown, the on-off operation period (also referred to as "operation period") is represented by the product of the duty ratio d and the period Tx of the intermittent operation (d×Tx). In addition, if the value of the input current during the on-off operation period of the switching element SW1 is set to I, the average current is represented by I×d.
[0064] Fig. 9 1 is a diagram conceptually showing the on-off action signal of the switching element SW2. Fig. 9 In FIG. 1 , the on-off action signal of the switch element SW1 is represented by a solid line, and the on-off action signal of the switch element SW2 is represented by a dotted line.
[0065] Reference Fig. 9, the control unit 40 outputs an on-off signal of a frequency fx (period Tx) synchronized with the intermittent operation of the switch element SW1 to the switch element SW2. Here, the timing at which the switch element SW2 is switched on coincides with the timing at which the on-off operation period of the switch element SW1 begins. On the other hand, the timing at which the switch element SW2 is switched off is earlier than the timing at which the on-off operation of the switch element SW1 stops by the amount of time toff (hereinafter referred to as "advance time toff"). Fig.10 and Fig.11 , the effect of setting the advance time toff is described. In addition, in the following description, the period corresponding to the advance time toff is called a transition period. The transition period is a period during which the switch element SW2 is controlled to be in an off state during the on-off operation period of the switch element SW1, and is a period immediately before the stop period of the on-off operation of the switch element SW1.
[0066] Fig.10 : is a timing chart showing the change of the collector-emitter voltage Vce1 of the switching element SW1 when no advance time is provided. Fig.10 , an on / off signal (solid line) of the switching element SW1 , an on / off signal (dashed line) of the switching element SW2 , a collector-emitter voltage Vce1 of the switching element SW1 , and an input current Iin are shown from the top.
[0067] like Fig.10 As shown, since the advance time toff=0, at the time t3 when the switch element SW1 is switched from the on-off action period (also referred to as the "action period") to the on-off action stop period (also referred to as the "stop period"), the switch element SW2 is also switched from on to off. In this case, at the timing when the switch element SW1 is switched from the on-off action period to the on-off action stop period (immediately after the time t3), the collector-emitter voltage Vce1 increases and exceeds the predetermined allowable limit, that is, the upper limit value Vth. As a result, a voltage greater than or equal to the element withstand voltage may be applied to the switch element SW1. Fig.10 The waveform of the input current Iin is similar to Figure 8 The situation is the same, so it will not be repeated.
[0068] Fig.11 : is a timing chart showing the change of the collector-emitter voltage Vce1 of the switching element SW1 when the advance time is provided. Fig.10 , an on / off signal (solid line) of the switching element SW1 , an on / off signal (dashed line) of the switching element SW2 , a collector-emitter voltage Vce1 of the switching element SW1 , and an input current Iin are shown from the top.
[0069] like Fig.11As shown, the switch element SW2 is switched off at a time t2 earlier than the time t3 at which the switch element SW1 is switched from the on-off operation period to the off-operation period by the advance time toff. Fig.10 Compared with the case where , the peak value of the collector-emitter voltage Vce1 can be made lower than the upper limit value Vth.
[0070] exist Fig.11 In the example, the average value of the input current Iin is given by I×(d×Tx-toff) / Tx. When the advance time toff=0, the value of the average current is as follows: Fig.10 The shown value is I×d.
[0071] The value of the advance time toff is determined, for example, by circuit analysis, so that the peak value of the collector-emitter voltage Vce1 does not exceed a predetermined upper limit value Vth when the switching element SW1 is switched from the on-off operation period to the off-off operation period. The upper limit value Vth is set to a voltage value less than or equal to 80% of the element withstand voltage of the switching element, for example.
[0072] As another method for determining the advance time toff, the following method may be used. First, the control unit 40 sets the initial value of the advance time toff to a value between 0 and d×Tx. Next, the control unit 40 drives the high-frequency power supply device 10 and detects the value of the collector-emitter voltage Vce1 through the voltage detector 42. When the peak value of the collector-emitter voltage Vce1 exceeds a predetermined upper limit value Vth after the switch element SW2 is switched from on to off, the control unit 40 increases the value of the advance time toff by one cycle of the clock. On the contrary, when the peak value of the collector-emitter voltage Vce1 does not exceed the above upper limit value Vth after the switch element SW2 is switched from on to off, the control unit 40 decreases the value of the advance time toff by one cycle of the clock. However, when the advance time toff is less than or equal to 0, the advance time toff is set to 0.
[0073] As for the control related to the change of the duty ratio d of the intermittent action and the control related to the change of the advance time toff, the advance time toff may be fixed and the control of changing the duty ratio d of the intermittent action may be performed first, and then the control of changing the advance time toff may be performed while the duty ratio d is fixed. Alternatively, the control may be performed in the opposite order, and the control of changing the duty ratio d and the advance time toff may be performed simultaneously. Figure 3 and Figure 4Also for the push-pull structured E-class inverters 32 and 33 described above, the duty ratio d and the advance time toff can be determined using the same design method as described above.
[0074] [Effects of Embodiment 1]
[0075] As described above, according to the high frequency power supply devices 10 to 13 of the first embodiment, the switch element SW2 is switched from the on state to the off state earlier than the timing of switching the switch element SW1 from the on-off action period to the on-off action stop period by the advance time toff. Thus, it is possible to suppress the increase in the collector-emitter voltage Vce1 at the timing when the switch element SW1 is switched from the on-off action period to the on-off action stop period, and prevent the application of an overvoltage greater than or equal to the element withstand voltage to the switch element SW1.
[0076] In addition, by performing control such that the advance time toff is increased when the peak value of the collector-emitter voltage Vce1 of the switching element SW1 exceeds the upper limit value Vth, and the advance time toff is reduced when the peak value of the collector-emitter voltage Vce1 does not exceed the upper limit value Vth, it is not necessary to determine the appropriate advance time toff in advance by circuit analysis, etc. Therefore, it is possible to prevent overvoltage from being applied to the switching element SW1 when the operation of the high-frequency power supply devices 10 to 13 changes due to load fluctuations or component failures.
[0077] Implementation Method 2
[0078] In the second embodiment, the advance time toff is not preset. Instead, when the collector-emitter voltage Vce1 exceeding the predetermined upper limit value Vth is detected, the control unit 40 controls the switch element SW1 to continue the on-off operation and only turns off the switch element SW2 (i.e., transitions to the transition period). Hereinafter, such control is referred to as the protection mode. The protection mode prevents the switch element SW1 from being subjected to an overvoltage greater than or equal to the element withstand voltage.
[0079] The basic structure of the high frequency power supply device of the second embodiment is the same as that of the high frequency power supply devices 10 to 13 described in the first embodiment. In addition, as in the first embodiment, the control unit 40 controls the duty ratio d of the intermittent operation so that the average value of the input current Iin approaches the target current value.
[0080] [Control operation of the control unit]
[0081] Fig.12 This is a flowchart showing the control operation of the control unit in the high-frequency power supply device according to the second embodiment.
[0082] The control unit 40 performs the operation in units of one cycle of the clock signal. Fig.12 The voltage detector 42 detects the collector-emitter voltage Vce1 of the switching element SW1, and the control unit 40 obtains the detection value of the collector-emitter voltage Vce1 from the voltage detector 42 at a certain interval. The control unit 40 accumulates the acquired voltage detection values, and obtains the average value of the collector-emitter voltage Vce1 by dividing the accumulated value obtained after multiple accumulations by the number of accumulations.
[0083] In the initial state (step ST10), the time t is set to 0 and the protection mode is set to off. The control unit 40 increments the time t by 1 in units of 1 clock cycle (NO in step ST90). When the time t reaches the period Tx of the intermittent operation (YES in step ST90), the control unit 40 initializes the time t to 0 and restores the protection mode to off when it is on.
[0084] The control unit 40 advances the process to step S30 when the protection mode is off (NO in step ST20 ), and advances the process to step ST70 when the protection mode is on (YES in step ST20 ).
[0085] In step ST30, the control unit 40 determines whether the peak value of the collector-emitter voltage Vce1 of the switching element SW1 is greater than the upper limit value Vth. When the peak value of the collector-emitter voltage Vce1 of the switching element SW1 is greater than the upper limit value Vth (YES in step ST30), the control unit 40 switches the protection mode to on and causes the process to enter step ST70 (i.e., transition to the transition period).
[0086] When the protection mode is turned on, the control unit 40 determines whether the average value of the collector-emitter voltage Vce1 of the switching element SW1 is less than a reference value near 0V in step ST70. The reference value is set to, for example, 1 / 10 of the upper limit value Vth. When the average value of the collector-emitter voltage Vce1 of the switching element SW1 is greater than or equal to the reference value (NO in step ST70), the control unit 40 maintains the on-off action of the basic frequency f0 of the switching element SW1 and turns off the switching element SW2 (step ST80). That is, the transition period is continued. On the other hand, when the average value of the collector-emitter voltage Vce1 of the switching element SW1 is lower than the reference value (YES in step ST70), the control unit 40 stops the on-off action of the switching element SW1 and maintains the off state, and keeps the switching element SW2 off (step ST60). That is, the transition period is switched to the stop period. As a result, the protection mode is turned off. However, the control unit 40 may control the switching element SW1 to continue the on-off operation and maintain the protection mode (ie, the transition period) regardless of the average value of the collector-emitter voltage Vce1 of the switching element SW1 .
[0087] When the protection mode is off (NO in step ST20), when the peak value of the collector-emitter voltage Vce1 of the switching element SW1 is lower than the upper limit value Vth (NO in step ST30), the control unit 40 performs the same control as when the advance time toff is 0 in the first embodiment. Specifically, when the time t is less than d×Tx (NO in step ST40), that is, during the on-off operation of the switching element SW1, the control unit 40 repeatedly turns on and off the switching element SW1 at the basic frequency f0, and sets the switching element SW2 to the on state (step ST50). On the other hand, when the time t is greater than or equal to d×Tx and less than Tx (YES in step ST40), that is, during the stop period of the on-off operation of the switching element SW1, the control unit 40 keeps both the switching elements SW1 and SW2 in the off state (step ST60).
[0088] [Effects of Embodiment 2]
[0089] As described above, according to the high-frequency power supply device of the second embodiment, when the voltage between the main electrodes of the switching element SW1 (the voltage between the collector and the emitter Vce1) exceeding the predetermined upper limit value Vth is detected, the switching element SW1 is controlled to continue the on-off operation and only the switching element SW2 is turned off. Thus, it is possible to prevent an overvoltage greater than or equal to the element withstand voltage from being applied to the switching element SW1.
[0090] In the above control, in the intermittent operation, even during the period when the switching element SW1 is originally stopped, the switching element SW1 is controlled to continue the switching operation and only the switching element SW2 is in the off state. And, after the average value of the collector-emitter voltage Vce1 of the switching element SW1 reaches a reference value near 0V, the switching element SW1 is stopped. Thus, even if the advance time toff in the first embodiment is not set in advance, the switching element SW2 can be controlled to be in the off state earlier than the timing when the switching element SW1 is switched from the on-off operation period to the on-off operation stop period. As a result, the increase of the collector-emitter voltage Vce1 of the switching element SW1 at the timing when the switching element SW1 is switched from the on-off operation period to the on-off operation stop period can be suppressed, thereby preventing the switching element SW1 from being applied with an overvoltage greater than or equal to the element withstand voltage.
[0091] In order to make the switch element SW1 perform the on-off operation, in addition to the power mainly input from the DC power supply 20, the power for the gate drive signal is also required. In this embodiment, after the switch element SW2 is controlled to be in the off state, after the average value of the collector-emitter voltage Vce1 of the switch element SW1 reaches near 0V, the on-off operation of the switch element SW1 is stopped, so that the period of the on-off operation of the switch element SW1 can be reduced. As a result, the power of the gate drive signal required for the on-off operation of the switch element SW1 can be reduced.
[0092] The embodiments disclosed this time should be considered as illustrative in all aspects and not restrictive. The scope of the present invention is indicated by the claims rather than the above description, and is intended to include all modifications within the meaning and scope equivalent to the claims.
[0093] Description of the label
[0094] 10-13 high-frequency power supply device, 20 direct current power supply, 30-33 class E inverter, 35, 36 resonance unit, 40 control unit, 41 current detector, 42 voltage detector, C1 parallel capacitor, C2 resonance capacitor, C3 output capacitor, Coss output capacitor of switch element SW1, D diode, GND ground, L1 input inductor, L2 resonance inductor, N1 input node, N2 intermediate node, N3 output node, N4 connection node, R load, SW1, SW2 switch elements, Tx intermittent control period, Vce1 collector-emitter voltage, Vth upper limit value, d duty cycle, f0 basic frequency, f1, f2 resonance frequencies, toff advance time.
Claims
1. A high frequency power supply device, comprising: An E-class inverter having a first switching element, which converts DC power into AC power by switching the first switching element on and off; a second switching element for switching the presence or absence of input of the DC power to the E-class inverter; a rectifying element that flows a current from ground to the E-class inverter when the second switching element is turned off; as well as a control unit that controls the on and off of the first switching element and the second switching element, During the operation of the E-class inverter, the control unit causes the first switching element to periodically perform an on-off operation and causes the second switching element to maintain an on state. The control unit maintains both the first switching element and the second switching element in an off state during the stop of the E-class inverter. The control unit causes the first switching element to periodically perform on-off operations and maintains the second switching element in an off state during a transition period immediately before the stop period in the operation period.
2. The high frequency power supply device according to claim 1, wherein: further comprising a current detector for detecting a direct current input to the E-class inverter via the second switching element, The control unit controls a ratio between a length of the operation period and a length of the stop period such that an average value of the detected input current becomes equal to a target value.
3. The high frequency power supply device according to claim 1 or 2, wherein: The length of the transition period is set so that a peak value of a voltage applied between the main electrodes of the first switching element does not exceed a predetermined upper limit value when switching from the operation period to the stop period.
4. The high frequency power supply device according to claim 3, wherein: further comprising a voltage detector for detecting a voltage applied between the main electrodes of the first switching element, The control unit sets an initial value for the length of the transition period, and when the peak value of the detected voltage exceeds the upper limit value, increases the length of the transition period from the current set value, and when the peak value of the detected voltage does not exceed the upper limit value, decreases the length of the transition period from the current set value.
5. The high frequency power supply device according to claim 1 or 2, wherein: further comprising a voltage detector for detecting a voltage applied between main electrodes of the first switching element, The control unit shifts to the transition period when the peak value of the detected voltage is greater than or equal to a predetermined upper limit value.
6. The high frequency power supply device according to claim 5, wherein: The control unit continues the periodic on-off operation of the first switching element during the transition period until the average value of the detected voltage is less than or equal to a reference value, and transitions to the stop period if the average value of the detected voltage is less than or equal to the reference value.
7. A method for controlling a high-frequency power supply device, wherein: The high frequency power supply device comprises: An E-class inverter having a first switching element, which converts DC power into AC power by switching the first switching element on and off; a second switching element that switches the presence or absence of input of the DC power to the E-class inverter; and a rectifying element that flows a current from ground to the E-class inverter when the second switching element is turned off, The control method comprises the following steps: During the operation of the E-class inverter, the first switching element is periodically switched on and off, and the second switching element is maintained in an on state; During the stop of the E-class inverter, the first switching element and the second switching element are both maintained in an off state; as well as In a transition period immediately before the stop period in the operation period, the first switching element is periodically turned on and off, and the second switching element is maintained in an off state.
8. The control method of a high frequency power supply device according to claim 7, wherein: It also has the following steps: detecting a direct current input to the E-class inverter via the second switching element; and The ratio between the length of the operation period and the length of the stop period is controlled so that the average value of the detected input current becomes equal to a target value.
9. The control method of a high frequency power supply device according to claim 7 or 8, wherein: The length of the transition period is set so that a peak value of a voltage applied between the main electrodes of the first switching element does not exceed a predetermined upper limit value when switching from the operation period to the stop period.
10. The control method of a high frequency power supply device according to claim 9, wherein: It also has the following steps: detecting a voltage between the main electrodes applied to the first switching element; Setting an initial value for the length of the transition period; When the peak value of the detected voltage exceeds the upper limit value, increasing the length of the transition period from a current set value; as well as When the peak value of the detected voltage does not exceed the upper limit value, the length of the transition period is reduced from the current set value.
11. The control method of a high frequency power supply device according to claim 7 or 8, wherein: It also has the following steps: detecting a voltage applied between main electrodes of the first switching element; and When the peak value of the detected voltage is greater than or equal to a predetermined upper limit value, the transition is made to the transition period.
12. The control method of a high frequency power supply device according to claim 11, wherein: It also has the following steps: During the transition period, until the average value of the detected voltage is less than or equal to a reference value, the periodic on-off operation of the first switching element is continued; as well as If the average value of the detected voltage is less than or equal to the reference value, the process transitions to the stop period.
