Explosive binding device for water conservancy and hydropower blasting and using method

By designing an automated explosive binding device, tape binding technology is used to solve the problems of low explosive binding efficiency and poor effect in humid environments in water conservancy and hydropower construction, efficient and stable explosive fixation is achieved, and efficient binding requirements of engineering needs are met.

CN119103940APending Publication Date: 2024-12-10中国水利水电建设工程咨询北京有限公司
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411399361.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2024-12-10

AI Technical Summary

Technical Problem

At the water conservancy and hydropower construction site, the existing explosive binding method is inefficient and has poor effect under wet geological conditions, resulting in explosives being easily shedded or loses the blasting effect. The artificial binding is complex and dangerous, making it difficult to meet engineering needs.

Method used

An explosive binding device including a front conveyor, a rear conveyor and a binding mechanism was designed. The explosive was tied to the long pole with tape, and uniform distribution and efficient binding were achieved through automatic conveyor and control system, avoiding the wire binding to explosives. Surface damage.

Benefits of technology

It improves the efficiency and effect of explosive binding, ensures the stable fixation of explosives in a humid environment, reduces the complexity and danger of manual operations, and meets the efficient binding requirements of engineering needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119103940A_ABST
    Figure CN119103940A_ABST
Patent Text Reader

Abstract

The explosive binding device comprises a front conveyor (1) and a rear conveyor (2), a binding mechanism (3) is arranged between the front conveyor (1) and the rear conveyor (2), a long rod feeding area (4) is formed at the feeding end of the front conveyor (1), a feeding mechanism (5) is arranged on the rear side of the feeding area (4), and the binding mechanism (3) is arranged on the rear side of the feeding mechanism (5). The feeding mechanism (5) is used for conveying explosives to the front conveyor (1) one by one; the binding mechanism (3) comprises a support (6), a circular ring seat (8) is arranged on one side of the support (6), a first motor (21) with the output end connected with the circular ring seat (8) is arranged on the support (6), three evenly-distributed idler wheels (7) are arranged on the outer side of the circular ring seat (8), rolling shafts of the idler wheels (7) are fixed to the support (6), and an installation mechanism of an adhesive tape roll is arranged on the circular ring seat (8). The binding device has the advantages that the binding effect is good, and the binding efficiency is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an explosive binding device for water conservancy and hydropower blasting and a use method thereof. Background Art

[0002] At the water conservancy and hydropower construction site, there are many places that need to be blasted. The specific blasting method is to first drill a hole at the blasting location. According to the drilling depth, multiple cylindrical explosives (emulsion explosives) are first connected in series with detonating cords, and then multiple explosives are tied to a long pole. The distance between the explosives is kept uniform, and then the long pole is extended into the hole to carry out the blasting. The function of the long pole is to keep the spacing between multiple explosives in the hole fixed. The commonly used raw material of the long pole is bamboo strips.

[0003] At present, a manual method is adopted, in which a steel wire is taken to wrap around the explosives and the long pole, and the two ends of the steel wire are crossed and twisted together, so that the explosives are tied to the long pole by the steel bar. The binding strength depends on the workers, which requires the workers to have rich experience. When the binding strength is too small, the explosives are easy to fall off. When the binding strength is too large, the steel wire is easy to squeeze the plastic film on the surface of the explosives at the twisted position. This will not have much impact when used for blasting in dry holes, but water conservancy and hydropower construction sites often have wet geology, and even groundwater exists at the drilling location, which causes water to enter the explosives and reduces or loses the blasting effect, so the binding effect may be poor.

[0004] Blasting is a very dangerous process, and the corresponding preparation work is also relatively complicated, including reporting to the public security organs and clearing the site equipment and personnel. Each blasting requires a lot of preliminary preparation work. Therefore, centralized blasting is generally adopted, that is, all blasting work is concentrated together as much as possible to reduce the number of preliminary preparations. This results in a large number of explosives required for one blasting, and the efficiency of manual binding is low, which is difficult to meet the needs of the project. Summary of the invention

[0005] The purpose of the present invention is to provide an explosive binding device and a method for use for water conservancy and hydropower blasting. The present invention has the advantages of ensuring good binding effect and high binding efficiency.

[0006] The technical solution of the present invention is as follows: an explosive binding device for water conservancy and hydropower blasting comprises a front conveyor and a rear conveyor, a binding mechanism is arranged between the front conveyor and the rear conveyor, a feeding end of the front conveyor forms a feeding area of ​​a long rod, a feeding mechanism is arranged at the rear side of the feeding area, a discharging end of the feeding mechanism is located above the rear conveyor, and the feeding mechanism is used to convey the explosives to the front conveyor one by one;

[0007] The binding mechanism includes a bracket, a circular ring seat is provided on one side of the bracket, a first motor with an output end connected to the circular ring seat is provided on the bracket, three evenly distributed rollers are provided on the outer side of the circular ring seat, the roller shafts of the rollers are fixed to the bracket, and a mounting mechanism for a tape roll is provided on the circular ring seat.

[0008] In the aforementioned explosive binding device for water conservancy and hydropower blasting, the installation mechanism includes a sleeve rotatably connected to the circular ring seat, and a detachable baffle is provided at the end of the sleeve.

[0009] In the aforementioned explosive binding device for water conservancy and hydropower blasting, a first shaft is provided on the axis of the sleeve, the first shaft is rotatably connected to the sleeve, a second shaft is provided between the first shaft and the circular ring seat, the second shaft is fixed to the circular ring seat, the second shaft is hinged to the first shaft, a plane is established with the axis of the circular ring seat and the axis of the second shaft, the hinge axis of the second shaft hinged to the first shaft is perpendicular to the plane, so that the sleeve can rotate inward, and a spring is provided between the first shaft and the circular ring seat.

[0010] In the aforementioned explosive binding device for water conservancy and hydropower blasting, both sides of the conveying surface of the front conveyor and both sides of the conveying surface of the rear conveyor are provided with baffle plates, and a channel is formed between the baffle plates on both sides.

[0011] In the aforementioned explosive binding device for water conservancy and hydropower blasting, the feeding mechanism includes an inclined slide plate, a feed hopper is provided at the upper end of the slide plate, the lower end of the slide plate is located above the front conveyor 1, a feed roller is provided on the upper side of the slide plate between the front conveyor and the feed hopper, a plurality of arc-shaped notches are provided on the feed roller, and a second motor with an output end connected to the feed roller is provided on one side of the slide plate.

[0012] In the aforementioned explosive binding device for water conservancy and hydropower blasting, the explosive binding device also includes a control system, the control system includes a controller, the front conveyor, the rear conveyor, the first motor and the second motor are all connected to the controller, the controller is connected with buttons and sensors, and the sensor is arranged between the front conveyor and the rear conveyor.

[0013] In the aforementioned explosive binding device for water conservancy and hydropower blasting, a glue dispenser connected to a controller is provided between the feeding area and the feeding mechanism.

[0014] The method for using the explosive binding device comprises the following steps:

[0015] a. Place multiple explosives on the feeding mechanism, and use the feeding mechanism to uniformly transport the explosives to the front conveyor.

[0016] b. Place the long rod in the loading area.

[0017] c. After tying the explosives to the long poles through the tying mechanism, cut off the tape between adjacent long poles.

[0018] Compared with the prior art, the present invention can use adhesive tape to tie the explosive to the long pole. Compared with steel wire tying, the adhesive tape is soft and does not contact with the explosive, which can avoid the plastic film on the surface of the explosive from breaking, thereby ensuring a good tying effect of the explosive. The long pole is transported by a conveyor, and the explosive is evenly placed on the moving long pole by a feeding mechanism, and the adhesive tape is automatically wound around the long pole by a tying mechanism, so that the explosive and the long pole are automatically tied, thereby improving the tying efficiency. Therefore, the present invention has the advantages of ensuring a good tying effect and high tying efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a top view of the present invention.

[0020] Figure 2 It is a front view of the lashing mechanism.

[0021] Figure 3 It is the left side view of the sleeve.

[0022] Figure 4 It is a top view of the sleeve.

[0023] Figure 5 It is the front view of the feeding mechanism.

[0024] Figure 6 It is the schematic diagram of the control system.

[0025] Figure 7 This is a schematic diagram of the distribution of explosives on the long rod.

[0026] The marks in the accompanying drawings are: 1-front conveyor, 2-rear conveyor, 3-binding mechanism, 4-loading area, 5-loading mechanism, 6-bracket, 7-roller, 8-ring seat, 9-sleeve, 10-baffle, 11-first axis, 12-second axis, 13-spring, 14-baffle plate, 15-slide plate, 16-feeding roller, 17-arc notch, 18-second motor, 19-button, 20-sensor, 21-first motor, 22-gear, 23-feed hopper, 24-dispensing machine, 25-controller, 26-explosive, 27-long rod. DETAILED DESCRIPTION

[0027] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.

[0028] Embodiment. Explosive binding device for water conservancy and hydropower blasting, such as Figure 1As shown, it includes a front conveyor 1 and a rear conveyor 2, both of which are belt conveyors. The distance between the front conveyor 1 and the rear conveyor 2 is about twice the length of the explosive 26. A binding mechanism 3 is provided between the front conveyor 1 and the rear conveyor 2. The feeding end of the front conveyor 1 forms a loading area 4 for a long rod 27. A loading mechanism 5 is provided on the rear side of the loading area 4. The discharging end of the loading mechanism 5 is located above the rear conveyor 2. The loading mechanism 5 is used to transport the explosives 26 one by one to the front conveyor 1.

[0029] The tying mechanism 3 includes a bracket 6, which is fixed to the ground or to the frames of the front conveyor 1 and the rear conveyor 2. A circular ring seat 8 is provided on one side of the bracket 6, and a plurality of evenly distributed teeth are provided on the inner side of the circular ring seat 8, so that the circular ring seat 9 forms a gear ring. A first motor 21 is provided on the bracket 6, and a gear 22 matching the teeth is provided at the output end of the first motor 21. The first motor 21 drives the circular ring seat 8 to rotate through the gear 22.

[0030] Three rollers 7 are evenly distributed on the outside of the ring seat 8. An annular groove matching the rollers 7 is provided on the outer circumference of the ring seat 8. The roller shaft of the roller 7 is fixed to the bracket 6, and the rotating part of the roller 7 rotates around the roller shaft. The three rollers 7 ensure that the ring seat 8 will not be displaced in the axial and radial directions and can only perform rotational motion.

[0031] The circular seat 8 is provided with a mounting mechanism for the adhesive tape roll. The mounting mechanism comprises a sleeve 9 rotatably connected to the circular seat 8, the inner side end of the sleeve 9 radially extends outward to form a protrusion, and the outer side end of the sleeve 9 is provided with a baffle 10, which is threadedly connected to the sleeve 9. A first shaft 11 is provided on the axis of the sleeve 9, the first shaft 11 is rotatably connected to the sleeve 9, a second shaft 12 is provided between the first shaft 11 and the circular seat 8, the second shaft 12 is fixed to the circular seat 8, the second shaft 12 is hinged to the first shaft 11, and a plane is established with the axis of the circular seat 8 and the axis of the second shaft 12, and the hinge axis of the second shaft 12 and the first shaft 11 is perpendicular to the plane, so that the sleeve 9 can rotate inward, and a spring 13 is provided between the first shaft 11 and the circular seat 8, and when the sleeve 9 is not subjected to force, the spring 13 keeps the first shaft 11 and the second shaft 12 coaxial. After removing the baffle 10, put the tape roll (large roll of electrical tape) onto the sleeve 9, and then put the baffle 10 back to complete the installation of the tape roll. The width of the tape on the tape roll should not be too large, otherwise the disengagement force will be too large and will give the long rod 27 a greater resistance to movement. If the width is too small, it is easy to be pulled and deformed. A width of 2 cm is more appropriate.

[0032] Both sides of the conveying surface of the front conveyor 1 and the conveying surface of the rear conveyor 2 are provided with blocking plates 14, which are fixed to the frame of the front conveyor 1 or the rear conveyor 2, and a channel is formed between the blocking plates 14 on both sides, the channel is located on the axis of the circular ring seat 8, and the width of the channel matches the diameter of the explosive 26. The blocking plates 14 are used to prevent the long rod 27 and the explosive 26 from moving laterally and falling out.

[0033] The feeding mechanism 5 includes an inclined slide plate 15, a shelf connected to the ground is provided at the bottom of the slide plate 15, a feed hopper 23 with a square cross-section is provided at the upper end of the slide plate 15, and the lower end of the feed hopper 23 is a flat outlet, and the outlet width matches the diameter of the explosive 26. The lower end of the slide plate 15 is located above the front conveyor 1, and a feed roller 16 located on the upper side of the slide plate 15 is provided between the front conveyor 1 and the feed hopper 23. The feed roller 16 is provided with a plurality of arc notches 17. A second motor 18 with an output end connected to the feed roller 16 is provided on one side of the slide plate 15, and the second motor 18 is fixed to the shelf at the bottom of the slide plate 15.

[0034] The explosive binding device also includes a control system, which includes a controller 25. The front conveyor 1, the rear conveyor 2, the first motor 21 and the second motor 18 are all connected to the controller 25. The controller 25 is connected with a button 19 and a sensor 20. The sensor 20 is arranged between the front conveyor 1 and the rear conveyor 2 and can be fixed to the bracket 6. The sensor 20 can be a rotatable distance sensor, etc. As long as it can detect whether there is explosive 26 at the position of the long rod 27 pointed to by the sensor 20, skilled technicians can select the corresponding sensor model according to common sense.

[0035] A glue dispensing machine 24 connected to a controller 25 is provided between the feeding area 4 and the feeding mechanism 5. The glue dispensing machine 24 is a glue dispensing machine dedicated to quick-drying glue and is an existing device. The glue dispensing head on the glue dispensing machine can be raised and lowered.

[0036] Usage: 1) Pile the explosive 26 into the feed hopper 23, and note that the length direction of the explosive 26 is perpendicular to the length direction of the slide plate 15.

[0037] 2) Place the long rods 27 in the loading area 4 in sequence, and the long rods 27 cannot overlap and the distance between them should be kept below 1 cm. The long rods 27 are formed by split bamboo pieces, with a circular arc cross section and a width 1-2 mm less than the width between the two side baffles 14. A detonating cord needs to be placed on each long rod 27.

[0038] After each long rod 27 and detonating cord are placed, button 19 is pressed once and controller 25 receives a signal. Each time controller 25 receives a signal, front conveyor 1 and rear conveyor 2 are started simultaneously for a period of time with the same conveying speeds. During this period of time, the moving stroke of long rod 27 is required to be substantially equal to the length of long rod 27 itself.

[0039] Each time the controller 25 receives a signal, it periodically starts the second motor 18 for multiple times. Each time the second motor 18 is started, the feed roller 16 rotates a certain angle, which allows only one explosive 26 to pass through the feed roller 16 and slide to the front conveyor 1, while the remaining explosives 26 are blocked by the feed roller 16 and cannot continue to slide down. Of course, the second motor 18 can also rotate continuously for a period of time, and the speed of continuous rotation should be relatively slow, so that the delivered explosives 26 form a certain interval on the long rod 27.

[0040] Each time the controller 25 receives a signal, the glue dispenser 24 periodically performs glue dispensing, and the frequency of the glue dispensing matches the starting frequency of the second motor 18, which is an integer multiple, so that the sliding explosive 26 is glued to the long rod 27. The best option is that the front and rear ends and the middle of the explosive 26 are glued to the long rod 27 by three-point glue, which is only a preliminary fixation. When the long rod 27 passes through the slide plate 15, multiple explosives 26 are evenly fixed on the long rod 27 to form a whole.

[0041] Every time the controller 25 receives a signal, it starts the first motor 21 for a period of time. The starting time of the first motor 21 is the same as the starting time of the front and rear conveyors, so that the binding mechanism 3 only works during the movement of the long rod 27. Once the long rod 27 stops moving, the binding mechanism 3 also stops working, avoiding waste of tape and reducing the binding cost.

[0042] The long rod 27 moves at a constant speed from the front conveyor 1 to the rear conveyor 2. When passing through the binding mechanism 3, it is tied with tape. The tape is wound with a large pitch on the position of the long rod 27 where there is no explosive 26 to reduce the amount of tape used. It is wound with a small pitch on the position where there is explosive 26 to better protect the explosive 26 and ensure that the explosive 26 and the long rod 27 are reliably fixed.

[0043] The tape between the front and rear long rods 27 is cut off after the next long rod 27 is also moved to the rear conveyor 2. This also means that when tying explosives 26 to multiple long rods 27, the tape on the tying mechanism 3 only needs to be manually fixed once at the front end of the first long rod 27, and there is no need to manually operate the tape later.

[0044] The working principle of the binding mechanism 3 is as follows: the first motor 21 drives the gear 22 to rotate, the gear 22 drives the annular seat 8 to rotate, the annular seat 8 drives the tape roll to rotate around the long rod 27 through the sleeve 9, so that the tape is spirally wound on the long rod 27. When the explosive 26 is not detected by the sensor 20, the controller 25 makes the first motor 21 rotate at a low speed, and the tape is wound on the long rod 27 with a large pitch. When the explosive 26 is detected by the sensor 20, the controller 25 makes the first motor 21 rotate at a high speed, and the tape is wound on the long rod 27 with a small pitch.

[0045] When the tape is wound on the long rod 27 with a large pitch, the long rod 27 gives a large axial traction to the tape roll, and there is a small angle between the drawn tape and the long rod 27. At this time, since the first axis 11 and the second axis 12 are hinged, the sleeve 9 will rotate, so that the tape roll and the drawn tape are basically maintained in the same plane, avoiding the drawn tape from twisting and self-adhesion, thereby improving the binding effect.

Claims

1. Explosive binding device for water conservancy and hydropower blasting, Features: The utility model comprises a front conveyor (1) and a rear conveyor (2), a tying mechanism (3) is arranged between the front conveyor (1) and the rear conveyor (2), a feeding end of the front conveyor (1) forms a long rod loading area (4), a loading mechanism (5) is arranged on the rear side of the loading area (4), a discharging end of the loading mechanism (5) is located above the rear conveyor (2), and the loading mechanism (5) is used to transport the explosives one by one to the front conveyor (1); The binding mechanism (3) comprises a bracket (6), a circular ring seat (8) is provided on one side of the bracket (6), a first motor (21) whose output end is connected to the circular ring seat (8) is provided on the bracket (6), three rollers (7) evenly distributed are provided on the outer side of the circular ring seat (8), the roller shafts of the rollers (7) are fixed to the bracket (6), and a mounting mechanism for a tape roll is provided on the circular ring seat (8).

2. The explosive binding device for water conservancy and hydropower blasting according to claim 1, Features: The mounting mechanism comprises a sleeve (9) rotatably connected to the annular seat (8), and a detachable baffle (10) is provided at the end of the sleeve (9).

3. The explosive binding device for water conservancy and hydropower blasting according to claim 2, Features: A first shaft (11) is arranged on the axis of the sleeve (9), the first shaft (11) is rotatably connected to the sleeve (9), a second shaft (12) is arranged between the first shaft (11) and the circular ring seat (8), the second shaft (12) is fixed to the circular ring seat (8), the second shaft (12) is hinged to the first shaft (11), a plane is established by the axis of the circular ring seat (8) and the axis of the second shaft (12), the hinge axis of the second shaft (12) and the first shaft (11) is perpendicular to the plane, so that the sleeve (9) can rotate inwardly, and a spring (13) is arranged between the first shaft (11) and the circular ring seat (8).

4. The explosive binding device for water conservancy and hydropower blasting according to claim 1, Features: Material blocking plates (14) are provided on both sides of the conveying surface of the front conveyor (1) and on both sides of the conveying surface of the rear conveyor (2), and a channel is formed between the material blocking plates (14) on both sides.

5. The explosive binding device for water conservancy and hydropower blasting according to claim 1, Features: The feeding mechanism (5) comprises an inclined slide plate (15), a feed hopper (23) is provided at the upper end of the slide plate (15), the lower end of the slide plate (15) is located above the front conveyor (1), a feed roller (16) is provided between the front conveyor (1) and the feed hopper (23) and is located on the upper side of the slide plate (15), a plurality of arc surface notches (17) are provided on the feed roller (16), and a second motor (18) with an output end connected to the feed roller (16) is provided on one side of the slide plate (15).

6. The explosive binding device for water conservancy and hydropower blasting according to claim 1, Features: The explosive binding device also includes a control system, which includes a controller (25). The front conveyor (1), the rear conveyor (2), the first motor (21) and the second motor (18) are all connected to the controller (25). The controller (25) is connected to a button (19) and a sensor (20). The sensor (20) is arranged between the front conveyor (1) and the rear conveyor (2).

7. The explosive binding device for water conservancy and hydropower blasting according to claim 6, Features: A glue dispenser (24) connected to a controller (25) is provided between the feeding area (4) and the feeding mechanism (5).

8. A method for using the explosive binding device according to any one of claims 1 to 7, Features: The following steps are included: a. placing a plurality of explosives on a feeding mechanism (5), and conveying the explosives to a forward conveyor (1) at a uniform speed through the feeding mechanism (5); b. Place the long rod in the loading area (4). c. After the explosives are tied to the long poles by the tying mechanism (3), the adhesive tape between the adjacent long poles is cut off.

Citation Information

Patent Citations

  • Semi-automatic explosive cartridge binding production line and process

    CN113587758A

  • Automatic winding device for manufacturing explosive package

    CN115096149A

  • Binding type explosive cartridge smooth blasting structure

    CN220524789U

  • Flexible emulsion explosive binding wire

    CN221484367U

  • Tying machine

    EP2189376A1