Construction wastewater treatment device and use method
By designing the construction wastewater treatment device, using a comprehensive spraying device and a mixed discharge device to achieve full mixing of flocculant and construction wastewater, and the classification discharge of sewage and sediment is achieved through the design of the step-by-step drainage port of the drainage device, solving the existing solution The problems of insufficient mixing and waste of silt in the technology improve the processing efficiency and effect.
Patent Information
- Application Number
- CN202411664232.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-20
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2044-11-20
AI Technical Summary
In the existing construction wastewater treatment technology, the method of spraying flocculant is single, which leads to insufficient mixing of construction wastewater and flocculant, and the layering time is long and the effect is poor. At the same time, sewage and building sediment are easily layered after layering. Silt waste and lack of effective classification and discharge equipment.
A construction wastewater treatment device is designed, including a base plate, a treatment water tank, a comprehensive spraying device, a drainage device and a mixing and discharge device. The spraying equipment of the comprehensive spraying device sprays the flocculant along the oblique motion trajectory, and the full mixing of the flocculant and construction wastewater is achieved through the wavy trajectory movement of the mixing discharge device. The drainage device realizes the layered discharge of sewage by opening the drain outlet step by step to prevent the sewage from being discharged together.
The mixing sufficientness of construction wastewater and flocculant is improved, the time to stand and layer the layering is shortened, and the layering effect is improved. At the same time, the classification discharge of sewage and building sediment is realized, avoiding the waste of sediment.
Smart Images

Figure CN119143268B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction wastewater treatment equipment, and in particular to a construction wastewater treatment device and a use method thereof. Background Art
[0002] Construction sites often generate a lot of construction wastewater, which contains a large amount of mud, sand and gravel, and direct discharge will cause pollution. In the prior art, the construction wastewater needs to be pumped into a water tank or pool through a water pump, and then the construction wastewater in the pool will be layered after being sprayed with flocculants and left to stand for a period of time. The upper layer is the separated sewage, and the lower layer is the separated construction mud and sand. The separated sewage and mud can be recycled for secondary utilization after treatment. However, there are the following problems: first, the method of spraying flocculants is too single and not comprehensive enough, resulting in insufficient mixing of construction wastewater and flocculants. The static stratification time is long and the stratification effect is poor; secondly, when the sewage and the construction mud are stratified, the sewage in the pool needs to be discharged to the outside first, and then the construction mud in the pool needs to be taken out for subsequent recycling treatment. However, it is easy to discharge the construction mud in the pool at the same time as the sewage is discharged, resulting in a waste of construction mud; there is a lack of a device that can ensure that the flocculant is put in more comprehensively and the flocculant and the construction wastewater are mixed more fully, thereby improving the efficiency of static stratification of construction wastewater, and classify and discharge the construction wastewater and construction mud separately after stratification, and minimize the degree of mixing between the two during the discharge process. Summary of the invention
[0003] The object of the present invention is to provide a construction wastewater treatment device and a method of use, so as to solve the problems raised in the above-mentioned background technology. In order to achieve the above-mentioned object, the present invention provides the following technical solutions: comprising a base plate, the base plate is arranged on the ground, a treatment water tank is arranged on the top of the base plate, the top of the treatment water tank is arranged in an open manner, a driving assembly is arranged on one side end of the treatment water tank, a full-spraying device is arranged directly above the treatment water tank, a spraying device is arranged at the bottom of the full-spraying device, a plurality of drain outlets are arranged at equal distances from top to bottom on one side of the treatment water tank, and the drain outlet at the bottom is a certain distance from the bottom of the treatment water tank, a drainage device is arranged at the drain outlet, and the treatment water A mixing and discharging device is provided at the bottom end of the inner side of the box and is connected to the driving assembly; a discharge port is provided at the bottom end of the side of the treatment water tank opposite to the driving assembly; a closing assembly for closing the discharge port is provided at the discharge port; a water storage tank is provided at the top of the base plate, and the water storage tank is located directly below the drain outlet at the bottom; a storage box is provided at the top of the base plate, and the storage box is located directly below the bottom of the discharge port; the tops of the storage box and the water tank are both open, and one side of the storage box and the water tank are respectively in contact with two sides of the treatment water tank.
[0004] Preferably, the driving assembly includes a mounting plate, a driving motor, a pulley, a transmission belt, a first screw rod and a second screw rod, the mounting plate being horizontally arranged on the top of the base plate and the mounting plate being located directly above the treatment water tank, the first screw rod horizontally passes through one end of the bottom of the mounting plate and is rotatably connected thereto, the second screw rod horizontally passes through the side end of the lower part of the treatment water tank, and the second screw rod is rotatably connected to the side ends of the treatment water tank, the first screw rod is located directly above the second screw rod, two pulleys are provided, and the two pulleys are respectively arranged on the same end of the first screw rod and the second screw rod, the transmission belt is sleeved on the two pulleys, the driving motor is arranged on the top of the base plate and the output end of the driving motor is connected to one end of the second screw rod.
[0005] Preferably, the comprehensive spraying device includes a moving component and a linkage component, the moving component is arranged at the bottom of the mounting plate, the linkage component is arranged on the moving component, the moving component includes a third screw rod, a slide groove rod, a sliding rod and a driving block, the two ends of the third screw rod are rotatably connected to one side of the bottom of the mounting plate, the first screw rod and the third screw rod are arranged at a right angle, one end of the slide groove rod is threadedly connected to the first screw rod, and the top of the slide groove rod is linearly slidably connected to the bottom of the mounting plate along a direction parallel to the first screw rod, one end of the sliding rod is threadedly connected to the third screw rod, the top of the sliding rod is linearly slidably connected to the bottom of the mounting plate along a direction parallel to the third screw rod, the sliding rod and the slide groove rod are cross-arranged and the sliding rod is located directly below the slide groove rod, the driving block is arranged below the mounting plate, the top of the driving block is slidably connected to the slide groove end of the slide groove rod, the sliding rod passes through the side end of the driving block and is slidably connected to it, and the spraying equipment is arranged at the bottom of the driving block.
[0006] Preferably, the linkage assembly includes a first bevel gear and a second bevel gear, the first bevel gear is arranged at one end of the first screw rod, the second bevel gear is arranged at one end of the third screw rod, the first bevel gear and the second bevel gear are arranged vertically and the first bevel gear and the second bevel gear are meshed with each other.
[0007] Preferably, the drainage device includes a first electric push rod, a first toothed rod, a second toothed rod, a third toothed rod, a fourth toothed rod, a first gear, a second gear, a third gear and a drainage opening, the first electric push rod is horizontally arranged on a side of the treatment water tank where a drainage outlet is provided, the first electric push rod is located on a side of the top of the drainage outlet at the top, the first toothed rod is horizontally arranged at the side end of the treatment water tank and is slidably connected thereto laterally, and the first toothed rod closes the drainage outlet at the top, the second toothed rod is horizontally arranged directly below the first toothed rod and is slidably connected to the side end of the treatment water tank laterally, and the second toothed rod closes the second drainage outlet arranged from top to bottom, the third toothed rod is horizontally arranged directly below the second toothed rod and is slidably connected to the side end of the treatment water tank laterally, the third toothed rod closes the third drainage outlet arranged from top to bottom, the fourth toothed rod is horizontally arranged directly below the third toothed rod and is slidably connected to the side end of the treatment water tank laterally, and the fourth toothed rod closes the drainage outlet at the bottom, A gear is rotatably arranged at the side end of the treatment water tank, the first gear is a distance away from the end of the first toothed rod away from the electric push rod and is pre-engaged with it, the first gear is meshed with the top of one end of the second toothed rod, the second gear is rotatably arranged at the side end of the treatment water tank, the second gear is arranged at a distance from the end of the second toothed rod away from the first gear and is pre-engaged with it, the second gear is meshed with one end of the top of the third toothed rod, the third gear is rotatably arranged at the side end of the treatment water tank and is located directly below the first gear, the third gear is a distance away from the end adjacent to the third toothed rod and is pre-engaged with it, the third gear is meshed with the top of the fourth toothed rod, the second toothed rod, the third toothed rod and the fourth toothed rod are all provided with a drainage opening slightly larger than the drainage outlet, the drainage opening on the second toothed rod is located at one end of the second toothed rod close to the first gear, the drainage opening on the third toothed rod is located at one end of the third toothed rod close to the second gear, and the drainage opening on the fourth toothed rod is located at one end of the fourth toothed rod close to the third gear.
[0008] Preferably, the mixing and discharging device includes a moving frame, a driving groove, a sliding frame, a sliding block, a fifth toothed rod, a fourth gear and a mixing plate, the moving frame is horizontally arranged on one side of the bottom end of the treatment water tank, the side end of the moving frame is penetrated by a driving groove, the upper part of the driving groove is arranged in a wave shape and the lower part of the driving groove is arranged in a straight line, the sliding frame is arranged on the inner side of the moving frame and is connected to the horizontal sliding connection with it, the side end of the sliding frame is connected to the inner side wall of the treatment water tank for horizontal sliding, the top of the sliding frame is threadedly connected to the second screw rod, the sliding block is arranged on the side end of the sliding frame and is connected to the upper and lower sliding connection, the mixing plate is arranged at the lower end inside the treatment water tank and one end of the mixing plate passes through the driving groove and is rotatably connected to the side end of the sliding block, and the side end of the mixing plate is slidably connected to the driving groove, the fourth gear is arranged at the rotation connection between the mixing plate and the sliding block, the fifth toothed rod is vertically arranged in the middle of one side of the sliding frame and the fourth gear is meshed with the fifth toothed rod.
[0009] Preferably, the closing assembly includes a second electric push rod and a closing plate, wherein the closing plate is arranged on the outside of the treatment water tank and closes the discharge port, and the closing plate is slidably connected to the side end of the treatment water tank up and down, and the second electric push rod is vertically arranged on the side end of the treatment water tank and the output end of the second electric push rod is connected to the top of the closing plate.
[0010] Preferably, the method for using the construction wastewater treatment device comprises the following steps:
[0011] S1: When the device is in use, the construction wastewater on the construction site is first pumped into the treatment water tank through a water pump. In the initial state, the drainage port and the discharge port at the side end of the treatment water tank are sealed and closed by the drainage device and the closing component respectively. The full spraying device is driven to work by controlling the driving component. The spraying device is driven to move from the diagonal position on one side of the top surface of the treatment water tank to the diagonal position on the other side of the treatment water tank through the driving of the full spraying device, and the movement of the spraying device is an oblique motion trajectory. During the movement of the spraying device, the flocculant is sprayed on the inside of the treatment water tank, thereby spraying the flocculant on the inside of the treatment water tank in all directions;
[0012] S2: When the spraying equipment moves obliquely to deliver the flocculant into the treatment water tank, the driving component synchronously drives the output end of the mixing and discharging device to move from one end of the treatment water tank to the other end, and the moving trajectory is wavy and the device itself moves in a circular motion, thereby fully mixing the flocculant delivered into the treatment water tank with the construction wastewater, and the moving speed of the output end of the mixing and discharging device is consistent with the moving speed of the spraying equipment;
[0013] S3: After the flocculant is added and mixed with the construction wastewater, it is left to stand for a period of time so that the construction wastewater inside the treatment tank is layered, with the upper layer being sewage and the lower layer being construction mud. At this time, the drainage device is controlled to work, and the drainage port at the top is first opened to discharge the sewage at the uppermost layer inside the treatment tank. When the sewage is almost discharged, the drainage port at the bottom is opened, and so on, all the drainage ports are gradually opened. When the sewage is discharged and approaches the construction mud at the lower layer, the drainage port is closed, and the construction sewage flows into the water storage tank to wait for subsequent treatment;
[0014] S4: When all the construction sewage inside the treatment water tank is discharged, the control drive component drives the spraying equipment to reset to the initial position. During the resetting process, the output end of the mixing and discharging device is driven to reset and move toward the discharge port, and the discharge port is opened by the closing component. At this time, the output end of the mixing and discharging device moves in a straight line and pushes the construction mud and sand at the bottom of the treatment water tank from the discharge port to the outside of the treatment water tank and falls into the storage box to complete the collection.
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] In the present invention, the driving motor is controlled to drive the second screw to rotate clockwise, and the first screw is driven to rotate synchronously under the transmission of the pulley and the transmission belt. The rotation of the first screw drives the slide rod to move along the first screw, and the second bevel gear is driven to rotate under the action of the first bevel gear, thereby driving the sliding rod to slide along the third screw, so that the spraying equipment arranged at the bottom of the driving block moves from the diagonal position on one side of the top surface of the treatment water tank to the diagonal position on the other side of the treatment water tank, and the movement of the spraying equipment presents an oblique motion trajectory. During the movement of the spraying equipment, flocculant is sprayed on the inside of the treatment water tank, thereby achieving an effect of all-round flocculant spraying on the inside of the treatment water tank.
[0017] In the present invention, when the construction wastewater inside the treated water tank is stratified and the sewage in the upper layer of the construction wastewater needs to be discharged, the first electric push rod is first controlled to drive the first toothed rod to slide in the direction of the first gear, and the drainage outlet at the top is exposed after sliding for a distance. As the drainage outlet is gradually exposed, the construction sewage in the upper layer of the treated water tank is gradually discharged at a moderate speed. When the drainage outlet at the top no longer discharges sewage, the first toothed rod is controlled to continue to slide in the direction of the first gear to drive the first gear to rotate, thereby driving the second toothed rod to move in the direction opposite to the moving direction of the first toothed rod, thereby making the drainage opening on the second toothed rod gradually correspond to the position of the drainage outlet adjacent to it. After complete correspondence, the movement of the second toothed rod is stopped, and the sewage inside the treated water tank continues to be discharged. When this drainage outlet no longer discharges sewage, the second toothed rod is moved to the left by the first electric push rod. When the cam is in contact with the second gear, the third toothed rod is driven to move in the opposite direction to the second toothed rod, so that the drainage opening on the third toothed rod and the drainage opening adjacent to it gradually correspond to each other. After they are completely matched, the movement of the third toothed rod is stopped, and the sewage inside the treatment water tank is continued to be discharged. While discharging, it is observed whether the sewage inside the treatment water tank is discharged cleanly or close to the boundary between sewage and mud. If the drainage port is no longer draining and the internal sewage has not been discharged cleanly, the third toothed rod is continuously controlled to move by the first electric push rod to contact the third gear and drive the fourth toothed rod to move in the opposite direction to the third toothed rod, so that the drainage opening on the fourth toothed rod and the drainage opening adjacent to it gradually correspond to each other, and the sewage is continued to be discharged. When all the sewage is discharged, the movement of the fourth toothed rod is stopped, thereby realizing the complete drainage of the sewage inside the treatment water tank and avoiding the problem of discharging construction mud and sand together.
[0018] In the present invention, when the spraying equipment moves from one end of the treatment water tank to the other end, the second screw is driven to rotate synchronously under the transmission of the first screw, the pulley and the transmission belt, thereby driving the sliding frame to move from one end of the moving frame to the other end, so that the sliding frame drives the sliding block to move along the wave shape of the upper part of the driving groove while sliding up and down on the sliding frame during the movement, thereby driving the mixing plate to move in a wave-shaped trajectory from one end to the other end inside the treatment water tank, and as the sliding block slides up and down, the fourth gear is driven to rotate under the action of the fifth toothed rod, so that the mixing plate generates a reciprocating circular motion while moving in a wave-shaped trajectory, thereby achieving full mixing of the flocculant and the construction wastewater put into the treatment water tank, and the mixing and flocculant are mixed. The addition is synchronous and carried out on the same trajectory, so that the flocculant and construction wastewater are mixed more fully, thereby shortening the static stratification time of construction wastewater; when the sewage inside the treatment water tank is discharged, the spraying equipment is controlled to reset to the initial position, and the sliding frame is driven to slide toward the discharge port on the moving frame during the reset process. At this time, according to the lower end trajectory of the driving groove, the mixing plate is controlled to descend a certain distance in a vertical state and the bottom is in contact with the bottom of the treatment water tank, and slides in a straight line toward the discharge port. At this time, the second electric push rod is controlled to work to drive the closing plate to rise to expose the discharge port, and then the mud and sand at the lower end of the treatment water tank and the mud and sand adhering to the bottom are all pushed out to the outside of the discharge port through the movement of the mixing plate and fall into the storage box to complete collection, waiting for subsequent recycling and processing. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention;
[0020] Figure 2 It is a schematic diagram of the three-dimensional structure of the driving assembly and the full-spraying device in the present invention;
[0021] Figure 3 It is a three-dimensional structural schematic diagram of the comprehensive spraying device and the spraying equipment in the present invention;
[0022] Figure 4 It is a schematic diagram of the three-dimensional structure of the comprehensive spraying device in the present invention;
[0023] Figure 5 It is a front view of the treatment water tank and the drainage device in the present invention;
[0024] Figure 6 It is a schematic diagram of the three-dimensional structure of the water treatment tank and the first electric push rod in the present invention;
[0025] Figure 7 It is a partial structural schematic diagram of the mixing and discharging device and the driving assembly in the present invention;
[0026] Figure 8It is a schematic diagram of the three-dimensional structure of the mixing and discharging device in the present invention;
[0027] Fig. 9 It is a three-dimensional structural schematic diagram of the treatment water tank and the closing component in the present invention;
[0028] Fig.10 It is a schematic diagram of the three-dimensional structure of the water treatment tank in the present invention.
[0029] In the figure: 1, base plate; 2, treatment water tank; 3, drive assembly; 31, mounting plate; 32, drive motor; 33, pulley; 34, transmission belt; 35, first screw rod; 36, second screw rod; 4, full spray device; 41, moving assembly; 411, third screw rod; 412, slide rod; 413, sliding rod; 414, drive block; 42, linkage assembly; 421, first bevel gear; 422, second bevel gear; 5, spray equipment; 6, drain outlet; 7, drain device; 71, first electric push rod ; 72. first toothed rod; 73. second toothed rod; 74. third toothed rod; 75. fourth toothed rod; 76. first gear; 77. second gear; 78. third gear; 79. drainage opening; 8. mixing and discharging device; 81. moving frame; 82. driving groove; 83. sliding frame; 84. sliding block; 85. fifth toothed rod; 86. fourth gear; 87. mixing plate; 9. discharge port; 10. closing assembly; 101. second electric push rod; 102. closing plate; 11. water tank; 12. storage box. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technical personnel in this field without creative work are within the scope of protection of the present invention.
[0031] See also Figures 1 to 10The present invention provides a technical solution: comprising a base plate 1, the base plate 1 is set on the ground, a treatment water tank 2 is arranged on the top of the base plate 1, the top of the treatment water tank 2 is open, a driving assembly 3 is arranged on one side of the treatment water tank 2, a full spraying device 4 is arranged just above the treatment water tank 2, a spraying device 5 is arranged at the bottom of the full spraying device 4, a plurality of drain ports 6 are arranged equidistantly from top to bottom on one side of the treatment water tank 2, and the drain port 6 at the bottom is a distance from the bottom of the treatment water tank 2, a drainage device 7 is arranged at the drain port 6, and a mixing device is arranged at the bottom of the inner side of the treatment water tank 2 The discharging device 8 and the mixed discharging device 8 are connected to the driving component 3, and a discharge port 9 is provided at the bottom end of the treated water tank 2 on the side opposite to the driving component 3, and a closing component 10 for closing the discharge port 9 is provided at the discharge port 9. A water storage tank 11 is provided on the top of the base plate 1, and the water storage tank 11 is located directly below the drain outlet 6 at the bottom. A storage box 12 is provided on the top of the base plate 1, and the storage box 12 is located directly below the bottom of the discharge port 9. The tops of the storage box 12 and the water storage tank 11 are both open, and the storage box 12 and one side of the water storage tank 11 are respectively attached to the two sides of the treated water tank 2.
[0032] In this embodiment, Figures 2 to 4 As shown, the driving assembly 3 includes a mounting plate 31, a driving motor 32, a pulley 33, a transmission belt 34, a first screw rod 35 and a second screw rod 36. The mounting plate 31 is horizontally arranged on the top of the base plate 1 and the mounting plate 31 is located directly above the treatment water tank 2. The first screw rod 35 horizontally passes through one end of the bottom of the mounting plate 31 and is rotatably connected thereto. The second screw rod 36 horizontally passes through the side end of the lower part of the treatment water tank 2, and the second screw rod 36 is rotatably connected to the side ends of the treatment water tank 2. The first screw rod 35 is located directly above the second screw rod 36. Two pulleys 33 are provided, and the two pulleys 33 are respectively arranged on the same end of the first screw rod 35 and the second screw rod 36. The transmission belt 34 is sleeved on the two pulleys 33. The driving motor 32 is arranged on the top of the base plate 1 and the output end of the driving motor 32 is connected to one end of the second screw rod 36.
[0033] The comprehensive spraying device 4 includes a moving component 41 and a linkage component 42, wherein the moving component 41 is arranged at the bottom of the mounting plate 31, and the linkage component 42 is arranged on the moving component 41, and the moving component 41 includes a third screw rod 411, a slide slot rod 412, a sliding rod 413 and a driving block 414, and both ends of the third screw rod 411 are rotatably connected to one side of the bottom of the mounting plate 31, and the first screw rod 35 is arranged at a right angle to the third screw rod 411, and one end of the slide slot rod 412 is threadedly connected to the first screw rod 35, and the top of the slide slot rod 412 is connected to the bottom of the mounting plate 31 along a line parallel to the first screw rod 35. The sliding rod 413 is connected to the third screw rod 411 in a linear sliding manner, one end of the sliding rod 413 is threadedly connected to the third screw rod 411, the top of the sliding rod 413 is connected to the bottom of the mounting plate 31 in a linear sliding manner in a direction parallel to the third screw rod 411, the sliding rod 413 and the slide slot rod 412 are cross-arranged and the sliding rod 413 is located directly below the slide slot rod 412, the driving block 414 is arranged below the mounting plate 31, the top of the driving block 414 is connected to the slide slot end of the slide slot rod 412 in a sliding manner, the sliding rod 413 passes through the side end of the driving block 414 and is connected to the driving block 414 in a sliding manner, and the spraying device 5 is arranged at the bottom of the driving block 414;
[0034] The linkage assembly 42 includes a first bevel gear 421 and a second bevel gear 422, wherein the first bevel gear 421 is disposed at one end of the first screw rod 35, and the second bevel gear 422 is disposed at one end of the third screw rod 411, and the first bevel gear 421 and the second bevel gear 422 are disposed vertically and mesh with each other;
[0035] By controlling the driving motor 32 to work, the second screw rod 36 is driven to rotate clockwise, and the first screw rod 35 is driven to rotate synchronously under the transmission of the pulley 33 and the transmission belt 34. The rotation of the first screw rod 35 drives the slide rod 412 to move along the first screw rod 35, and under the action of the first bevel gear 421, the second bevel gear 422 is driven to rotate, and then the sliding rod 413 is driven to slide along the third screw rod 411, so that the spraying device 5 set at the bottom of the driving block 414 moves from the diagonal position on one side of the top surface of the treatment water tank 2 to the diagonal position on the other side of the treatment water tank 2, and the movement of the spraying device 5 is an oblique motion trajectory. During the movement of the spraying device 5, the flocculant is sprayed on the inside of the treatment water tank 2, thereby achieving the effect of all-round flocculant spraying on the inside of the treatment water tank 2.
[0036] In this embodiment, Figures 5 and 6As shown, the drainage device 7 includes a first electric push rod 71, a first toothed rod 72, a second toothed rod 73, a third toothed rod 74, a fourth toothed rod 75, a first gear 76, a second gear 77, a third gear 78 and a drainage opening 79. The first electric push rod 71 is horizontally arranged on the side of the treatment water tank 2 where the drainage port 6 is provided. The first electric push rod 71 is located on the side of the top of the drainage port 6 at the top. The first toothed rod 72 is horizontally arranged at the side end of the treatment water tank 2 and is slidably connected thereto in a transverse direction. The first toothed rod 72 closes the drainage port 6 at the top. The second toothed rod 73 is horizontally arranged The first gear 76 is arranged to rotate to rotate the gear 76, and the second gear 76 rotates to rotate the gear 76. The first gear 76 is arranged at the side end of the treatment water tank 2, the first gear 76 is at a distance from the end of the first toothed rod 72 away from the electric push rod and is pre-engaged therewith, the first gear 76 is meshed with the top of one end of the second toothed rod 73, the second gear 77 is rotatably arranged at the side end of the treatment water tank 2, the second gear 77 is arranged at a distance from one end of the second toothed rod 73 away from the first gear 76 and is pre-engaged therewith, the second gear 77 is meshed with one end of the top of the third toothed rod 74, the third gear 78 is rotatably arranged at the side end of the treatment water tank 2 and is located directly below the first gear 76, and the third gear 78 is at a distance from the third gear 78. The third gear 78 is meshed with the top of the fourth toothed rod 75 at a distance from the adjacent end of the toothed rod 74 and pre-engaged therewith. The second toothed rod 73, the third toothed rod 74 and the fourth toothed rod 75 are all provided with a drainage opening 79 slightly larger than the drainage port 6. The drainage opening 79 on the second toothed rod 73 is located at an end of the second toothed rod 73 close to the first gear 76. The drainage opening 79 on the third toothed rod 74 is located at an end of the third toothed rod 74 close to the second gear 77. The drainage opening 79 on the fourth toothed rod 75 is located at an end of the fourth toothed rod 75 close to the third gear 78.
[0037] After the sewage in the treatment tank 2 is stratified, it is necessary to discharge the sewage in the upper layer of the construction sewage. First, the first electric push rod 71 is controlled to drive the first toothed rod 72 to slide in the direction of the first gear 76. After sliding for a distance, the drainage outlet 6 at the top is exposed. As the drainage outlet 6 is gradually exposed, the construction sewage in the upper layer of the treatment tank 2 is gradually discharged at a moderate speed. When the drainage outlet 6 at the top no longer discharges sewage, the first toothed rod 72 is controlled to continue to slide in the direction of the first gear 76 to drive the first gear 76 to rotate, thereby driving the second toothed rod 73 to move in the direction opposite to the moving direction of the first toothed rod 72, so that the drainage opening 79 on the second toothed rod 73 and the adjacent drainage outlet 6 position gradually correspond. After they are completely corresponding, the movement of the second toothed rod 73 is stopped, and the sewage in the treatment tank 2 continues to be discharged. When this drainage outlet 6 no longer discharges sewage, the second toothed rod 73 is moved to the first electric push rod 71 to correspond to the first toothed rod 73. The second gear 77 contacts, thereby driving the third toothed rod 74 to move in the opposite direction to the second toothed rod 73, so that the drainage opening 79 on the third toothed rod 74 and the adjacent drainage opening 6 gradually correspond to each other. After they are completely corresponding, the movement of the third toothed rod 74 is stopped, and the sewage inside the treatment water tank 2 is continued to be discharged. While discharging, it is observed whether the sewage inside the treatment water tank 2 is discharged cleanly or close to the dividing line between sewage and mud. If the drainage opening 6 no longer drains and the internal sewage has not been discharged cleanly, the third toothed rod 74 is continued to be controlled by the first electric push rod 71 to move so that it contacts the third gear 78 and drives the fourth toothed rod 75 to move in the opposite direction to the third toothed rod 74, so that the drainage opening 79 on the fourth toothed rod 75 and the adjacent drainage opening 79 gradually correspond to each other, and the sewage is continued to be discharged. When the sewage is completely discharged, the movement of the fourth toothed rod 75 is stopped, so that the sewage inside the treatment water tank 2 is completely drained, and the problem of discharging construction mud and sand together is avoided.
[0038] In this embodiment, Figures 7 to 10As shown, the mixing and discharging device 8 includes a moving frame 81, a driving groove 82, a sliding frame 83, a sliding block 84, a fifth toothed rod 85, a fourth gear 86 and a mixing plate 87. The moving frame 81 is horizontally arranged on one side of the bottom end of the treatment water tank 2. The side end of the moving frame 81 is penetrated by a driving groove 82. The upper part of the driving groove 82 is arranged in a wave shape and the lower part of the driving groove 82 is arranged in a straight line. The sliding frame 83 is arranged on the inner side of the moving frame 81 and is connected to the moving frame 81 in a transverse sliding manner. The side end of the sliding frame 83 is connected to the inner side wall of the treatment water tank 2 in a transverse sliding manner. The top end of the sliding frame 83 is threadedly connected to the second screw rod 36, the sliding block 84 is arranged at the side end of the sliding frame 83 and is slidably connected thereto up and down, the mixing plate 87 is arranged at the lower end inside the treatment water tank 2, and one end of the mixing plate 87 passes through the driving groove 82 and is rotatably connected to the side end of the sliding block 84, and the side end of the mixing plate 87 is slidably connected to the driving groove 82, the fourth gear 86 is arranged at the rotation connection between the mixing plate 87 and the sliding block 84, the fifth toothed groove rod 85 is vertically arranged in the middle of one side of the sliding frame 83, and the fourth gear 86 is meshed with the fifth toothed groove rod 85;
[0039] The closing assembly 10 includes a second electric push rod 101 and a closing plate 102, wherein the closing plate 102 is arranged outside the treatment water tank 2 and closes the discharge port 9, and the closing plate 102 is connected to the side end of the treatment water tank 2 by sliding up and down, and the second electric push rod 101 is vertically arranged at the side end of the treatment water tank 2 and the output end of the second electric push rod 101 is connected to the top of the closing plate 102;
[0040] When the spraying device 5 moves from one end of the treatment water tank 2 to the other end, the second screw 36 is driven to rotate synchronously under the transmission of the first screw 35, the pulley 33 and the transmission belt 34, thereby driving the sliding frame 83 to move from one end of the moving frame 81 to the other end, so that the sliding frame 83 drives the sliding block 84 to move along the wave-shaped movement of the upper part of the driving groove 82 during the movement, while sliding up and down on the sliding frame 83, thereby driving the mixing plate 87 to move in a wave-shaped trajectory from one end to the other end inside the treatment water tank 2, and as the sliding block 84 slides up and down, the fourth gear 86 is driven to rotate under the action of the fifth toothed rod 85, so that the mixing plate 87 generates a reciprocating circular motion while moving in a wave-shaped trajectory, thereby achieving full mixing of the flocculant and the construction wastewater placed in the treatment water tank 2, and the mixing and flocculant mixing is achieved. The coagulant is added synchronously and in the same trajectory, so that the flocculant and construction wastewater are mixed more fully, thereby shortening the static stratification time of the construction wastewater; when the sewage inside the treatment water tank 2 is discharged, the spraying device 5 is controlled to reset to the initial position, and during the resetting process, the sliding frame 83 is driven to slide on the moving frame 81 toward the discharge port 9. At this time, according to the lower end trajectory of the driving groove 82, the mixing plate 87 is controlled to descend a certain distance in a vertical state and the bottom is in contact with the bottom of the treatment water tank 2, and slides in a straight line toward the discharge port 9. At this time, the second electric push rod 101 is controlled to work and drive the closing plate 102 to rise to expose the discharge port 9. Then, through the movement of the mixing plate 87, the mud and sand at the lower end of the treatment water tank 2 and the mud and sand adhering to the bottom are all pushed out to the outside of the discharge port 9 and fall into the storage box 12 to complete collection, waiting for subsequent recycling and processing.
[0041] The use method and advantages of the present invention: The use method of the construction wastewater treatment device, the working process is as follows:
[0042] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8 , Fig. 9 , Fig.10 As shown:
[0043] S1: When the device is in use, the construction wastewater on the construction site is first pumped into the treatment water tank 2 by a water pump. In the initial state, the drainage port 6 and the discharge port 9 at the side end of the treatment water tank 2 are sealed and closed by the drainage device 7 and the closing component 10 respectively. The driving component 3 is controlled to drive the full spraying device 4 to work. The full spraying device 4 is driven to drive the spraying device 5 to move from the diagonal position on one side of the top surface of the treatment water tank 2 to the diagonal position on the other side of the treatment water tank 2, and the movement of the spraying device 5 is an oblique motion trajectory. During the movement of the spraying device 5, the flocculant is sprayed on the inside of the treatment water tank 2, thereby spraying the flocculant on the inside of the treatment water tank 2 in all directions;
[0044] S2: When the spraying device 5 moves obliquely to deliver the flocculant into the treatment water tank 2, the driving component 3 synchronously drives the output end of the mixing and discharging device 8 to move from one end of the treatment water tank 2 to the other end, and the moving trajectory is wavy and the device itself moves in a circular motion, so that the flocculant delivered into the treatment water tank 2 is fully mixed with the construction wastewater, and the moving speed of the output end of the mixing and discharging device 8 is consistent with the moving speed of the spraying device 5;
[0045] S3: After the flocculant is added and mixed with the construction wastewater, it is left to stand for a period of time so that the construction wastewater in the treatment water tank 2 is stratified, with the upper layer being sewage and the lower layer being construction mud. At this time, the drainage device 7 is controlled to work, and the drainage port 6 at the top is first opened to discharge the sewage at the upper layer in the treatment water tank 2. When the sewage is almost discharged, the drainage port 6 at the bottom is opened, and so on, all the drainage ports 6 are gradually opened. When the sewage is discharged and approaches the construction mud at the lower layer, the drainage port 6 is closed, and the construction sewage flows into the water storage tank 11 to wait for subsequent treatment;
[0046] S4: When all the construction sewage inside the treatment water tank 2 is discharged, the control driving component 3 drives the spraying equipment 5 to reset to the initial position. During the resetting process, the output end of the mixing and discharging device 8 is driven to reset and move toward the discharge port 9, and the discharge port 9 is opened through the closing component 10. At this time, the output end of the mixing and discharging device 8 moves in a straight line and pushes the construction mud and sand at the bottom of the treatment water tank 2 from the discharge port 9 to the outside of the treatment water tank 2 and falls into the storage box 12 to complete the collection.
[0047] The above shows and describes the basic principles, main features and advantages of the present invention. Technical personnel in this industry should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not used to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A construction wastewater treatment device, characterized in that: The invention comprises a base plate (1), wherein the base plate (1) is arranged on the ground, a treatment water tank (2) is arranged on the top of the base plate (1), the top of the treatment water tank (2) is arranged to be open, a driving assembly (3) is arranged on one side end of the treatment water tank (2), a full-scale spraying device (4) is arranged directly above the treatment water tank (2), a spraying device (5) is arranged at the bottom of the full-scale spraying device (4), a plurality of drainage ports (6) are arranged at equal distances from top to bottom on one side of the treatment water tank (2), and the drainage port (6) is located at a distance from the bottom of the treatment water tank (2), a drainage device (7) is arranged at the drainage port (6), a mixing discharge device (8) is arranged at the bottom end of the inner side of the treatment water tank (2), and a mixing discharge device (8) is arranged at the bottom end of the inner side of the treatment water tank (2). The material device (8) is connected to the driving component (3); a discharge port (9) is provided at the bottom end of the treated water tank (2) on the side opposite to the driving component (3); a closing component (10) for closing the discharge port (9) is provided at the discharge port (9); a water storage tank (11) is provided at the top of the base plate (1); the water storage tank (11) is located directly below the drainage port (6) at the bottom; a material storage box (12) is provided at the top of the base plate (1); the material storage box (12) is located directly below the bottom of the discharge port (9); the tops of the material storage box (12) and the water storage tank (11) are both open, and one side of the material storage box (12) and the water storage tank (11) are respectively in contact with two sides of the treated water tank (2); The drainage device (7) comprises a first electric push rod (71), a first toothed rod (72), a second toothed rod (73), a third toothed rod (74), a fourth toothed rod (75), a first gear (76), a second gear (77), a third gear (78) and a drainage opening (79), wherein the first electric push rod (71) is horizontally arranged on a side of the treatment water tank (2) provided with a drainage opening (6), the first electric push rod (71) is located on a side of the top of the drainage opening (6) at the top, the first toothed rod (72) is horizontally arranged on a side end of the treatment water tank (2) and is laterally slidably connected thereto, and the first toothed rod (72) closes the drainage opening (6) at the top, and the second toothed rod (73) The first gear (76) is rotatably arranged at the bottom of the first toothed rod (72) and is connected to the side end of the treatment water tank (2) in a horizontal manner. The second toothed rod (73) closes the second drainage outlet (6) arranged from top to bottom. The third toothed rod (74) is horizontally arranged directly below the second toothed rod (73) and is connected to the side end of the treatment water tank (2) in a horizontal manner. The third toothed rod (74) closes the third drainage outlet (6) arranged from top to bottom. The fourth toothed rod (75) is horizontally arranged directly below the third toothed rod (74) and is connected to the side end of the treatment water tank (2) in a horizontal manner. The fourth toothed rod (75) closes the drainage outlet (6) at the bottom. The first gear (76) is rotatably arranged at the bottom of the first gear (76). The first gear (76) is disposed at a distance from an end of the first toothed rod (72) away from the electric push rod and is pre-engaged therewith. The first gear (76) is meshed with the top of one end of the second toothed rod (73). The second gear (77) is rotatably disposed at the side end of the water tank (2). The second gear (77) is disposed at a distance from one end of the second toothed rod (73) away from the first gear (76) and is pre-engaged therewith. The second gear (77) is meshed with one end of the top of the third toothed rod (74). The third gear (78) is rotatably disposed at the side end of the water tank (2) and is located directly below the first gear (76). The third gear (78) is rotatably disposed at the side end of the water tank (2) and is located directly below the first gear (76). The third gear (78) is rotatably disposed at a distance from the third toothed rod (74). 4) a distance from an adjacent end and pre-engaged therewith, the third gear (78) is engaged with the top of the fourth toothed rod (75), the second toothed rod (73), the third toothed rod (74) and the fourth toothed rod (75) are all provided with a drainage opening (79) slightly larger than the drainage opening (6), the drainage opening (79) on the second toothed rod (73) is located at an end of the second toothed rod (73) close to the first gear (76), the drainage opening (79) on the third toothed rod (74) is located at an end of the third toothed rod (74) close to the second gear (77), and the drainage opening (79) on the fourth toothed rod (75) is located at an end of the fourth toothed rod (75) close to the third gear (78); The driving assembly (3) comprises a mounting plate (31), a driving motor (32), a pulley (33), a transmission belt (34), a first screw rod (35) and a second screw rod (36); the mounting plate (31) is horizontally arranged on the top of the base plate (1) and the mounting plate (31) is located directly above the treatment water tank (2); the first screw rod (35) horizontally passes through one end of the bottom of the mounting plate (31) and is rotatably connected thereto; the second screw rod (36) horizontally passes through the side end of the lower part of the treatment water tank (2); and the second screw rod (35) is horizontally arranged on the top of the base plate (1) and is located directly above the treatment water tank (2). The rod (36) is rotatably connected to the side ends of the treatment water tank (2), the first screw rod (35) is located directly above the second screw rod (36), two pulleys (33) are provided, and the two pulleys (33) are respectively arranged on the same end of the first screw rod (35) and the second screw rod (36), the transmission belt (34) is sleeved on the two pulleys (33), the drive motor (32) is arranged on the top of the base plate (1), and the output end of the drive motor (32) is connected to one end of the second screw rod (36); The mixing and discharging device (8) comprises a moving frame (81), a driving groove (82), a sliding frame (83), a sliding block (84), a fifth toothed rod (85), a fourth gear (86) and a mixing plate (87); the moving frame (81) is horizontally arranged on one side of the bottom end of the treated water tank (2); a driving groove (82) is provided through the side end of the moving frame (81); the upper part of the driving groove (82) is arranged in a wave shape and the lower part of the driving groove (82) is arranged in a straight line; the sliding frame (83) is arranged on the inner side of the moving frame (81) and is slidably connected thereto in a transverse direction; the side end of the sliding frame (83) is slidably connected to the inner side wall of the treated water tank (2); The top end of the sliding frame (83) is threadedly connected to the second screw rod (36), the sliding block (84) is arranged at the side end of the sliding frame (83) and is slidably connected thereto up and down, the mixing plate (87) is arranged at the lower end inside the treatment water tank (2), and one end of the mixing plate (87) passes through the driving groove (82) and is rotatably connected to the side end of the sliding block (84), and the side end of the mixing plate (87) is slidably connected to the driving groove (82), the fourth gear (86) is arranged at the rotation connection between the mixing plate (87) and the sliding block (84), and the fifth toothed groove rod (85) is vertically arranged in the middle of one side of the sliding frame (83), and the fourth gear (86) is meshed with the fifth toothed groove rod (85); According to the trajectory of the lower end of the driving groove (82), the mixing plate (87) can be controlled to descend a certain distance in a vertical state, and the bottom thereof is in contact with the bottom of the treatment water tank (2), and slides in a straight line toward the discharge port (9).
2. A construction wastewater treatment device according to claim 1, characterized in that: The full-scale spraying device (4) comprises a moving assembly (41) and a linkage assembly (42), wherein the moving assembly (41) is arranged at the bottom of the mounting plate (31), and the linkage assembly (42) is arranged on the moving assembly (41), and the moving assembly (41) comprises a third screw rod (411), a slide groove rod (412), a sliding rod (413) and a driving block (414), wherein both ends of the third screw rod (411) are rotatably connected to one side of the bottom of the mounting plate (31), the first screw rod (35) and the third screw rod (411) are arranged at a right angle, one end of the slide groove rod (412) is threadedly connected to the first screw rod (35), and the top of the slide groove rod (412) and the bottom of the mounting plate (31) are connected along the first screw rod (35). ), one end of the sliding rod (413) is threadedly connected to the third screw rod (411), the top of the sliding rod (413) is linearly slidably connected to the bottom of the mounting plate (31) along a direction parallel to the third screw rod (411), the sliding rod (413) and the slide groove rod (412) are cross-arranged and the sliding rod (413) is located directly below the slide groove rod (412), the driving block (414) is arranged below the mounting plate (31), the top of the driving block (414) is slidably connected to the slide groove end of the slide groove rod (412), the sliding rod (413) passes through the side end of the driving block (414) and is slidably connected thereto, and the spraying device (5) is arranged at the bottom of the driving block (414).
3. A construction wastewater treatment device according to claim 2, characterized in that: The linkage assembly (42) comprises a first bevel gear (421) and a second bevel gear (422); the first bevel gear (421) is arranged at one end of the first screw rod (35); the second bevel gear (422) is arranged at one end of the third screw rod (411); the first bevel gear (421) and the second bevel gear (422) are arranged vertically and the first bevel gear (421) and the second bevel gear (422) are meshed with each other.
4. A construction wastewater treatment device according to claim 1, characterized in that: The sealing component (10) comprises a second electric push rod (101) and a sealing plate (102); the sealing plate (102) is arranged outside the treatment water tank (2) and seals the discharge port (9); the sealing plate (102) is slidably connected to the side end of the treatment water tank (2) in an up-and-down manner; the second electric push rod (101) is vertically arranged at the side end of the treatment water tank (2) and the output end of the second electric push rod (101) is connected to the top of the sealing plate (102).
5. The method for using the construction wastewater treatment device according to claim 1 comprises the following steps: S1: When the device is in use, the construction wastewater on the construction site is first pumped into the treatment water tank (2) by a water pump. In the initial state, the drainage port (6) and the discharge port (9) at the side end of the treatment water tank (2) are sealed and closed by the drainage device (7) and the sealing component (10) respectively. The driving component (3) is controlled to drive the full-scale spraying device (4) to work. The full-scale spraying device (4) drives the spraying device (5) to move from the diagonal position on one side of the top surface of the treatment water tank (2) to the diagonal position on the other side of the treatment water tank (2), and the movement of the spraying device (5) is in an oblique motion trajectory. During the movement of the spraying device (5), the flocculant is sprayed on the inside of the treatment water tank (2), thereby spraying the flocculant on the inside of the treatment water tank (2) in all directions; S2: When the spraying device (5) moves obliquely to deliver the flocculant into the treatment water tank (2), the driving component (3) simultaneously drives the output end of the mixing and discharging device (8) to move from one end of the treatment water tank (2) to the other end, and the moving trajectory is wavy and the device itself moves in a circular motion, thereby fully mixing the flocculant delivered into the treatment water tank (2) with the construction wastewater, and the moving speed of the output end of the mixing and discharging device (8) is consistent with the moving speed of the spraying device (5); S3: After the flocculant is added and mixed with the construction wastewater, it is left to stand for a period of time so that the construction wastewater in the treatment tank (2) is stratified, with the upper layer being sewage and the lower layer being construction mud. At this time, the drainage device (7) is controlled to work, and the drainage port (6) at the top is first opened to discharge the sewage in the upper layer of the treatment tank (2). When the sewage is almost discharged, the drainage port (6) at the bottom is opened, and so on, all the drainage ports (6) are gradually opened. When the sewage is discharged and approaches the construction mud in the lower layer, the drainage port (6) is closed, and the construction sewage flows into the storage tank (11) to wait for subsequent treatment; S4: After all the construction wastewater in the treatment water tank (2) is discharged, the control drive component (3) drives the spraying device (5) to reset to the initial position. During the reset process, the output end of the mixing and discharging device (8) is driven to reset and move toward the discharge port (9), and the discharge port (9) is opened by the closing component (10). At this time, the output end of the mixing and discharging device (8) moves in a straight line and pushes the construction mud and sand at the bottom of the treatment water tank (2) out of the discharge port (9) to the outside of the treatment water tank (2) and into the storage box (12) to complete the collection.
Citation Information
Patent Citations
Anti-clogging sewage treatment device convenient for purifying domestic wastewater
CN113200638A
Pretreatment system and treatment method for leachate in solid waste treatment plant before entering regulating reservoir
CN115028251A
Permeable membrane separation device for shale oil fracturing flow-back fluid wastewater treatment
CN118851341A
Wastewater treatment device for urban construction
CN218371784U
Cited By
Sewage drainage device for building construction and drainage method thereof
CN122919085A