Multi-power-source power dispatching strategy optimization method and system and storage medium

By aggregating power grids and dividing power clusters for multi-power power systems, building optimization models and using PSO algorithms to solve the challenges brought by grid operation stability and new energy access, improving the accuracy of power scheduling and clean energy utilization The power organization of multi-power system is realized.

CN119154392AActive Publication Date: 2024-12-17GUO JIA DIAN WANG YOU XIAN GONG SI XI NAN FEN BU

Patent Information

Application Number
CN202411081549.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-12-17
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

Large-scale access to power systems has led to challenges in the operation stability of the power grid, and the existing technology is difficult to effectively optimize multi-power power scheduling, resulting in high complexity and low accuracy of optimization modeling, which affects the preparation and dispatch of power grid power generation plans.

Method used

By performing grid aggregation and power cluster division of multi-power power scheduling systems, an optimization model with the highest source-load matching degree and maximum renewable energy generation as the objective function is built, and the PSO algorithm of the Sigmoid function is used for solving it, and the simulation calculation is performed. Verify the optimization scheduling scheme, adjust the working state constraints and objective functions to achieve the optimal solution.

Benefits of technology

It reduces the complexity and calculation difficulty of the optimization model, improves the accuracy of power scheduling and clean energy utilization, reduces the phenomenon of water, wind and light scattering, and realizes the integration of multi-power system resources and optimizes the power organization strategy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119154392A_ABST
    Figure CN119154392A_ABST
Patent Text Reader

Abstract

The invention relates to a multi-power-supply power dispatching strategy optimization method and system and a storage medium, and the method comprises the following steps: carrying out the power grid aggregation and power supply cluster division processing of a multi-power-supply power dispatching system, and setting a working state constraint condition for each divided power supply; based on constraint conditions set by various power supplies, a power dispatching strategy optimization model with the highest source load matching degree of the various power supplies and the maximization of the renewable energy generating capacity as objective functions is constructed; solving the power dispatching strategy optimization model to obtain a strategy optimization result, a source load matching degree and a renewable energy power generation solving result; and finally, performing simulation checking calculation and index evaluation on a strategy optimization result. According to the strategy optimization method provided by the invention, the model construction complexity and the calculation difficulty are reduced, and the deviation between an actual optimization result and an expected result is effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system optimization and dispatching, and in particular to a multi-power supply power dispatching strategy optimization method and system, and a storage medium. Background Art

[0002] Vigorously developing new energy electricity, mainly wind power and photovoltaics, has become a future trend. From the perspective of the power production process, new energy electricity represented by wind power and photovoltaic power generation has the characteristics of zero carbon dioxide emissions and is a typical low-carbon power source. Therefore, vigorously developing new energy is of great significance to promoting the development of a low-carbon economy and adjusting the energy structure.

[0003] However, due to the randomness, volatility and intermittency of new energy sources such as wind power and photovoltaics, the access of large-scale and high-proportion new energy sources has caused a great impact on the power system, bringing great challenges to the safe and stable operation of the power grid. At the same time, due to the imperfect market mechanism, unclear local consumption responsibilities, insufficient system power supply flexibility and other problems, the contradiction of "three abandonments" of clean energy (abandonment of wind, abandonment of light and abandonment of water) has become increasingly prominent, and the power system is facing serious problems in the consumption of new energy. Therefore, the reasonable layout of the installed capacity of various power sources in the multi-power power system will be an indispensable link in promoting the development and construction of new energy at this stage.

[0004] There are many types of power sources in the multi-energy power dispatching system, with complex structure and large scale. There are also technical difficulties in large-scale system optimization algorithms, modeling and computing efficiency. If a single power source and a single power station are used as the basis for management and unified optimization is performed across the entire domain, the complexity of the power production dispatching strategy modeling and the efficiency of the optimization algorithm will be greatly increased, affecting the accuracy of the optimization results and bringing great uncertainty to the grid power generation plan formulation and dispatching operation. Summary of the invention

[0005] The present invention provides a multi-power source power dispatching strategy optimization method and system, and a storage medium, which aggregate and group multiple types of power sources involved in power dispatching, construct an optimization model, and solve the objective function of maximizing the source-load matching degree of the multi-source power system and maximizing the power generation of hydro, wind, and solar renewable energy to obtain an optimized dispatching plan. Finally, the matching degree of the optimized dispatching plan is verified through simulation calculation, which solves the problems of high complexity and low accuracy in establishing large-scale system optimization modeling.

[0006] The present invention solves the above technical problems in the following way: A method for optimizing a multi-power supply power dispatching strategy comprises the following steps:

[0007] Aggregate multiple sub-grids in a multi-power dispatching system to form a power cluster, divide the power clusters based on the power generation type, and set working state constraints for each type of power after division;

[0008] Based on the working state constraints set by various power sources, a power dispatch strategy optimization model is constructed with the highest source-load matching of various power sources and the maximum power generation of renewable energy as the objective function;

[0009] Solve the power dispatch strategy optimization model to obtain the strategy optimization results, source-load matching and renewable energy power generation results;

[0010] Based on the actual power distribution and grid topology of the multi-power power dispatching system, the strategy optimization results are simulated and calculated to obtain the simulation results of source-load matching and renewable energy power generation;

[0011] The solution results of source-load matching and renewable energy power generation are compared with the simulation results of source-load matching and renewable energy power generation. If the solution results of source-load matching and renewable energy power generation are not optimal solutions, the working state constraints and / or objective functions of various power sources are changed to solve the power dispatch strategy optimization model again until the solution results of source-load matching and renewable energy power generation are optimal solutions. The optimal solution is that the solution result of source-load matching is greater than or equal to the simulation result of source-load matching, and at the same time, the solution result of renewable energy power generation is greater than or equal to the simulation result of renewable energy power generation.

[0012] In order to reduce the modeling complexity and calculation difficulty of the optimization model, the multi-power source power dispatching system is generalized, including grid aggregation and power source cluster division processing; based on the constraints set up by various power sources, a power dispatching strategy optimization model is established. By solving the power dispatching strategy optimization model, the optimized power organization strategy of the multi-power source power dispatching system can be obtained, that is, the power generation plan of each power source is obtained, and the optimization strategy is simulated and verified to further improve the accuracy of the results.

[0013] Preferably, the multi-power source power dispatch strategy optimization method further includes: calculating comprehensive indicators of various optimization results in the strategy optimization results through simulation, wherein the indicators include power generation characteristic indicators, efficiency indicators, reliability indicators, flexibility indicators, and environmental benefit indicators. The indicator calculation is adopted to support the dispatcher's comprehensive evaluation of the organization strategy.

[0014] Preferably, the setting of working state constraints for various types of power supplies specifically includes:

[0015] 1) Based on the operating power of each thermal power unit, the thermal power units are classified and the following constraints are set:

[0016] X g (t)P g,min ≤P g (t)≤X g (t)P g,max

[0017] Where: P g (t) is the output of the thermal power unit; P g,min and P g,max is the minimum and maximum unit output; X g (t) represents the operating status of the unit, which is a binary variable. 0 means the unit is shut down, and 1 means the unit is running.

[0018] Unit climbing rate constraint:

[0019] P g (t+1)-P g (t)≤ΔP g,up ΔT

[0020] P g (t)-P g (t+1)≤ΔP g,d ΔT

[0021] Where: ΔP g,up , ΔP g,d They are the ramp-up rate and ramp-down rate of the unit respectively.

[0022] Thermal power start-up and shutdown constraints:

[0023]

[0024] Where: Y(t) and Z(t) are the start-up and shutdown instructions of the system in period t. Considering the actual scheduling situation, the start-up and shutdown instructions are only issued to the units in the network once a week.

[0025] 2) Based on the working power of each hydropower unit, the hydropower units are classified and the following constraints are set:

[0026] P h,min ≤P h (t)≤P h,max

[0027] Where: P h (t) is the output of the hydropower unit; P h,min and P h,max Provide the minimum and maximum technical output for the unit.

[0028]

[0029] Where: Z j,end is the end-of-day water level of the jth reservoir; Z j,begin is the initial water level of the jth reservoir, Z j,allow is the daily water level variation allowed for the jth reservoir.

[0030] Downflow flow restriction:

[0031]

[0032] Where: Q j,t is the discharge flow of the j-th hydropower station in the t-th period; is the maximum discharge flow of the jth hydropower station in the tth period; is the minimum discharge flow of the j-th hydropower station in the t-th period.

[0033] Power generation flow constraints:

[0034]

[0035] Where: is the maximum power generation flow of the jth hydropower station in the tth period; is the minimum power generation flow of the jth hydropower station in the tth period; other parameters have the same meanings as above.

[0036] Unit daily power generation constraints:

[0037]

[0038] Where: P h (t) is the output of the hydropower unit at time t, ΔT is the step length t, Q h The daily power generation of the unit.

[0039] 3) Set the following constraints on the energy storage units in the aggregated grid:

[0040] Charge and discharge state constraints:

[0041] a(t)+b(t)≤1

[0042] Where: a(t) is the charging state variable, 1 indicates energy storage charging, and 0 indicates non-charging; b(t) is the discharging state variable, 1 indicates discharging, and 0 indicates non-discharging.

[0043] Energy storage capacity limitations:

[0044] E es,min ≤E es (t-1)-P es (t)ΔT≤E es,max

[0045] Where: E es,min and E es,max are the minimum and maximum energy storage values ​​of the energy storage power station, which are calculated by multiplying the energy storage SOC limit and the rated capacity; P es (t) and E es (t) is the output and energy storage value in period t. Each energy storage power station is given an initial SOC at the beginning of the calculation.

[0046] Energy storage output constraints:

[0047]

[0048] Where: and are the minimum and maximum charging power of the energy storage power station respectively; and are the minimum and maximum discharge power of the energy storage power station respectively.

[0049] 4) Set the following constraints on the pumped storage units in the aggregated grid:

[0050] Constraints on pumping and releasing water:

[0051] a(t)+b(t)≤1

[0052] Where: a(t) is the pumping state variable, 1 indicates that the pumped storage unit is pumping, and 0 indicates that it is not pumping; b(t) is the discharge state variable, 1 indicates discharge, and 0 indicates that it is not discharge.

[0053] Reservoir capacity limits:

[0054] E ph,min ≤E ph (t-1)-P ph (t)ΔT≤E ph,max

[0055] Where: E ph,min and E ph,max are the minimum and maximum energy storage values ​​of the pumped storage power station respectively; P ph (t) and E ph (t) is the output and energy storage value of period t. Each pumped storage power station is given an initial energy storage value at the beginning of the calculation.

[0056] Unit output constraints:

[0057] Power generation conditions:

[0058] Pumping conditions:

[0059] Where: and They are the pumping power and discharging power of the pumped-storage unit respectively. The power generation power can be adjusted between 0.5 and 1 times of the maximum power generation power, and the pumping power is a constant value.

[0060] 5) Set the following constraints on wind power in the aggregated grid:

[0061]

[0062] Where: It is the theoretical wind power output of the aggregated grid n when the installed capacity is constant during period t.

[0063] 6) Set the following constraints on photovoltaic power in the aggregated grid:

[0064]

[0065] Where: It is the theoretical photovoltaic output of the aggregated grid n when the installed capacity is certain during period t.

[0066] 7) Establish constraints on the total load, line transmission capacity and reserve capacity within the aggregated grid, as follows:

[0067] Inter-regional line transmission capacity constraints:

[0068] -P ι,max ≤P l (t)≤P l,max

[0069] Where: P l (t) is the transmission power of the transmission line, and the reference direction of the current is set as the positive direction for the inflow area and the negative direction for the outflow area; and P l,max and -P l,max are the upper and lower limits of the transmission capacity of the transmission line respectively.

[0070] Overall load balancing constraint:

[0071]

[0072] Where: P ld,n (t) is the total load of zone n.

[0073] System spinning reserve capacity constraints:

[0074]

[0075] Where: P j,max (t, n)·S j (t, n) is the sum of the total power of all conventional units in the grid n in the tth period.

[0076] P re and N re are the minimum requirements for positive spinning reserve and negative spinning reserve respectively; P j,max (t, n) and P j,min (t, n) are the upper and lower output limits of the j-th unit in the aggregated grid n, respectively.

[0077] Preferably, the power dispatch strategy optimization model with the highest source-load matching degree of various power sources and the maximization of renewable energy power generation as the objective function utilizes the regulation capacity of thermal power, pumped storage, energy storage, and hydropower to minimize the intermittency, randomness, and volatility of wind power and photovoltaic power generation, so that the total output power is closer to the grid load level and has the least impact on grid operation. Define the load tracking coefficient ρ to quantitatively evaluate the characteristics of multiple power sources tracking the load. The closer the load tracking coefficient is to 1, the more consistent the change characteristics of the complementary power generation power of multiple energy sources and the load power within the time scale of the investigation, and the better the output power of the power generation system tracks the load, as follows:

[0078]

[0079] Where: ρ is the load tracking coefficient, t is the time period variable, T is the total number of time periods, N r,t is the total power generation output of hydropower, wind power and solar power in period t, L t is the power load in the tth period, is the average load level, l, k, j are the numbers of wind, solar and hydropower stations respectively; L, K, J are the total number of wind, solar and hydropower stations respectively; wN l,t is the output of the lth wind power station in the tth period; sN k,t hN is the output of the k-th photovoltaic power station in the t-th period; j,t is the output of the jth hydropower station in the tth period; N n,t is the total power generation output of thermal power, pumped storage and energy storage in period t; m, o, c are the numbers of thermal power, pumped storage and energy storage power stations respectively; M, O, C are the total number of thermal power, pumped storage and energy storage power stations respectively; gN m,t is the output of the mth thermal power station in the tth period; pN o,t is the output of the oth pumped storage power station in the tth period; eN c,t is the output of the cth energy storage power station in the tth period; E is the total renewable energy power generation; m t is the number of hours in period t.

[0080] Preferably, the power dispatch strategy optimization model is solved to obtain the strategy optimization result, the source-load matching degree and the renewable energy power generation solution result. Specifically, the power dispatch strategy optimization model is solved by the PSO algorithm of the Sigmoid function to obtain the strategy optimization result, the source-load matching degree and the renewable energy power generation solution result. The PSO algorithm of the Sigmoid function is used to generate the initial population, which can greatly improve the convergence speed of the algorithm and save calculation time, and includes the following steps:

[0081] The load demand of the power grid and the output forecast curves of each power source obtained from various power source stations are input into the PSO algorithm of the Sigmoid function;

[0082] Based on the Sigmoid function, the reservoir storage curve is initialized in the variable domain, and the water level is obtained as the initial state of the particle swarm;

[0083] Calculate the initial fitness of particles and determine the initial global extreme value and initial individual extreme value;

[0084] The position and velocity of the particles are updated based on the particle swarm update formula until all types of power sources meet the working state constraints;

[0085] Calculate the fitness value of the particle position and speed after updating, compare with the historical individual extreme value and the global extreme value, determine the current individual optimal position and the current global optimal position, output the obtained results and put them into the result cluster; repeatedly update the particle position and speed until the maximum number of cycles is reached;

[0086] After the cycle is completed, the best result is selected from the result cluster to obtain the strategy optimization result, source-load matching and renewable energy power generation solution results.

[0087] Preferably, the strategy optimization results are simulated and calculated based on the actual power distribution and grid topology of the system to obtain the simulation results of source-load matching and renewable energy power generation, specifically including:

[0088] Based on the actual power distribution and grid topology of the system, the power grid power balance theory and the constraints of various power supply working states, the optimization results of the strategy optimization results are synchronously input for simulation calculation to obtain the simulation results of the first source-load matching degree and renewable energy power generation;

[0089] Based on the actual power distribution and grid topology of the system, based on the power grid power balance theory and various power supply working state constraints, the optimization results of the strategy optimization results are input one by one for simulation calculation, and multiple second source-load matching and renewable energy power generation simulation results are obtained (specifically, under the premise of keeping other conditions unchanged, a single optimization result of the strategy optimization result is input for simulation to obtain the first simulation result; then, keeping other conditions unchanged, another single optimization result of the strategy optimization result is input for simulation to obtain the second simulation result, and this is repeated until all single results of the strategy optimization results are simulated and calculated to obtain the nth simulation result);

[0090] The strategy optimization results include the water level utilization mode of pumped storage reservoirs and hydropower reservoirs, water level control range, charging and discharging plan of energy storage power station, start and stop plan and startup mode of thermal power units, power generation output plan of pumped storage hydropower and conventional hydropower units, and system wind power and photovoltaic output plan.

[0091] Preferably, the solution results of the source-load matching and renewable energy power generation are compared with the simulation results of the source-load matching and renewable energy power generation. If the solution results of the source-load matching and renewable energy power generation are not the optimal solution, the power dispatch strategy optimization model is re-adjusted or the parameters are changed to solve again until the solution results of the source-load matching and renewable energy power generation are the optimal solution. The optimal solution is that the solution result of the source-load matching is greater than or equal to the simulation result of the source-load matching, and at the same time, the solution result of the renewable energy power generation is greater than or equal to the simulation result of the renewable energy power generation, specifically including:

[0092] Compare the first source-load matching degree and renewable energy power generation simulation result with the source-load matching degree and renewable energy power generation solution result. If the source-load matching degree and renewable energy power generation solution result are not the optimal solution, adjust the working state constraints or objective functions of various power sources to reconstruct the power dispatch strategy optimization model. The optimal solution is that the source-load matching degree solution result is greater than or equal to the first source-load matching degree simulation result, and at the same time, the renewable energy power generation solution result is greater than or equal to the first renewable energy power generation simulation result;

[0093] Compare multiple second source-load matching and renewable energy power generation simulation results with the source-load matching and renewable energy power generation solution results. If the source-load matching and renewable energy power generation solution results are not the optimal solution, adjust the power cluster division method, grid load demand or each power output forecast curve to re-solve the power dispatch strategy optimization model until the source-load matching and renewable energy power generation solution results are the optimal solution, and the optimal solution is that the source-load matching solution result is greater than or equal to any second source-load matching simulation result, and at the same time, the renewable energy power generation solution result is greater than or equal to any second renewable energy power generation simulation result.

[0094] The optimization results are verified through simulation calculations, which effectively reduces the deviation between the actual optimization results and the expected ones, so that the trend can be kept consistent when applied to the optimization of actual power operation organization.

[0095] The present invention also provides a multi-power supply power dispatch strategy optimization system, comprising:

[0096] The system generalization constraint module is used to aggregate multiple sub-grids in the multi-power power dispatching system to form a power cluster, divide the power cluster based on the power generation type, and set working state constraints for each type of power after division;

[0097] The strategy optimization model building module is used to build a power dispatch strategy optimization model with the highest source-load matching degree of various power sources and the maximum power generation of renewable energy as the objective function based on the working state constraints set by various power sources;

[0098] The strategy optimization model solving module is used to solve the power dispatch strategy optimization model to obtain the strategy optimization results, source-load matching and renewable energy power generation results;

[0099] The simulation calculation module is used to simulate and calculate the strategy optimization results based on the actual power distribution and grid topology of the system, and obtain the simulation results of source-load matching and renewable energy power generation;

[0100] The strategy optimization result verification module is used to compare the solution results of source-load matching and renewable energy power generation with the simulation results of source-load matching and renewable energy power generation. If the solution results of source-load matching and renewable energy power generation are not optimal solutions, the working state constraints and / or objective functions of various power sources are changed to solve the power dispatch strategy optimization model again until the solution results of source-load matching and renewable energy power generation are optimal solutions. The optimal solution is that the solution result of source-load matching is greater than or equal to the simulation result of source-load matching, and at the same time, the solution result of renewable energy power generation is greater than or equal to the simulation result of renewable energy power generation.

[0101] The present invention also provides a computer storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the multi-power supply power dispatch strategy optimization method as described above are implemented.

[0102] The present invention also provides an electronic device, comprising a memory and a processor: the memory is used to store computer executable instructions, the processor is used to execute the computer executable instructions, and when the computer executable instructions are executed by the processor, the steps of the multi-power supply power scheduling strategy optimization method as described above are implemented.

[0103] The beneficial effects of the present invention are as follows: the present invention utilizes the object generalization technology of the multi-source power system to aggregate multiple sub-grids into an equivalent large power grid, which greatly reduces the number of power grids during modeling, reduces the modeling complexity and calculation difficulty of the optimization model; takes the highest source-load matching degree of the multi-source power system and the maximization of the power generation of water, wind and solar renewable energy as the objective function, and establishes a multi-source power dispatching strategy optimization model based on various power unit constraints, line transmission constraints, load balance constraints, and positive and negative standby constraints. Solving the model can obtain the optimized power organization strategy of the multi-source power system, and can obtain a thermal power-hydropower-pumped storage-energy storage-new energy multi-source power system power generation plan that meets the constraints. Improve the system source-load matching degree, clean energy utilization rate, reduce the abandonment of water, wind and solar, and realize the multi-power system resource integration of clean energy and conventional units and pumped storage and energy storage systems. Through the simulation verification and evaluation of the optimization results, the deviation between the actual optimization results and the expected ones is effectively reduced, so that the trend is kept consistent when applied to the actual power operation organization optimization, and the dispatching personnel are supported to fully evaluate the organization strategy.

[0104] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention in conjunction with the accompanying drawings. The specific implementation of the present invention is given in detail by the following embodiments and their accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0105] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0106] Figure 1 A flow chart of a multi-power supply power dispatch strategy optimization method according to Example 1;

[0107] Figure 2 A module diagram of a multi-power supply power dispatch strategy optimization system in Example 2;

[0108] Figure 3 This is a functional diagram of the power dispatch strategy simulation module in Example 2. DETAILED DESCRIPTION

[0109] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.

[0110] like Figure 1 As shown, the present invention provides a multi-power supply power dispatch strategy optimization method, comprising the following steps:

[0111] S1. Aggregate multiple sub-grids in a multi-power source power dispatching system to form a power source cluster, divide the power source cluster based on the power generation type, and set working state constraints for each type of divided power source, specifically including the following steps:

[0112] S11. When performing grid aggregation processing on a multi-power source power dispatching system to form a power cluster, the following principles shall be followed: 1) The establishment of the grid aggregation model does not affect the power balance analysis of the grid; 2) The detailed grid topology is not considered in the grid aggregation model, and each power source and load is no longer affected by its physical location; 3) The grid aggregation model should accurately describe the power generation limitation situation; 4) The grid aggregation model is the basis for subsequent research, and the calculation target grid can contain one or more aggregated grids; 5) The logical relationship between multiple aggregated grids should be consistent with the actual grid operation; 6) The loads in the aggregated grid should be combined into the total load.

[0113] S12: Power cluster division processing, as follows:

[0114] 1) Thermal power units: Units above 300MW are modeled separately, and small units below 300MW are modeled as one unit.

[0115] 2) Hydropower units: Hydropower units above 100MW are modeled separately, and small units below 100MW are modeled as one unit. The output of small units participates in intraday optimization under the condition of a given daily power generation.

[0116] 3) Energy storage: The energy storage in the aggregated power grid is modeled as an equivalent energy storage system.

[0117] 4) Pumped storage: The units are modeled separately.

[0118] 5) Wind power: The centralized wind power in the aggregated power grid is modeled as one unit; the distributed wind power is modeled as one power station.

[0119] 6) Photovoltaic: The centralized photovoltaic system in the aggregated power grid is modeled as one unit; the distributed photovoltaic system is modeled as one power station.

[0120] S13. Establish constraints on various types of power sources, including:

[0121] 1) Set the following constraints for thermal power units:

[0122] X g (t)P g,min ≤P g (t)≤X g (t)P g,max

[0123] Where: P g (t) is the output of the thermal power unit; P g,min and P g,max is the minimum and maximum unit output; X g (t) represents the operating status of the unit, which is a binary variable. 0 means the unit is shut down, and 1 means the unit is running.

[0124] Unit climbing rate constraint:

[0125] P g (t+1)-P g (t)≤ΔP g,up ΔT

[0126] P g (t)-P g (t+1)≤ΔP g,d ΔT

[0127] Where: ΔP g,up PP g,d They are the ramp-up rate and ramp-down rate of the unit respectively.

[0128] Thermal power start-up and shutdown constraints:

[0129]

[0130] Where: Y(t) and Z(t) are the start-up and shutdown instructions of the system in period t. Considering the actual scheduling situation, the start-up and shutdown instructions are only issued to the units in the network once a week.

[0131] 2) The following constraints are set for the hydropower unit:

[0132] P h,min ≤P h (t)≤P h,max

[0133] Where: P h (t) is the output of the hydropower unit; P h,min and P h,max Provide the minimum and maximum technical output for the unit.

[0134]

[0135] Where: Z j,end is the end-of-day water level of the jth reservoir; Z j,begin is the initial water level of the jth reservoir, Z j,allow is the daily water level variation allowed for the jth reservoir.

[0136] Downflow flow restriction:

[0137]

[0138] Where: Q j,t is the discharge flow of the j-th hydropower station in the t-th period; is the maximum discharge flow of the jth hydropower station in the tth period; is the minimum discharge flow of the j-th hydropower station in the t-th period.

[0139] Power generation flow constraints:

[0140]

[0141] Where: is the maximum power generation flow of the jth hydropower station in the tth period; is the minimum power generation flow of the jth hydropower station in the tth period; other parameters have the same meanings as above.

[0142] Unit daily power generation constraints:

[0143]

[0144] Where: P h(t) is the output of the hydropower unit at time t, ΔT is the step length t, Q h The daily power generation of the unit.

[0145] 3) Set the following constraints on the energy storage units in the aggregated grid:

[0146] Charge and discharge state constraints:

[0147] a(t)+b(t)≤1

[0148] Where: a(t) is the charging state variable, 1 indicates energy storage charging, and 0 indicates non-charging; b(t) is the discharging state variable, 1 indicates discharging, and 0 indicates non-discharging.

[0149] Energy storage capacity limitations:

[0150] E es,min ≤E es (t-1)-P es (t)ΔT≤E es,max

[0151] Where: E es,min and E es,max are the minimum and maximum energy storage values ​​of the energy storage power station, which are calculated by multiplying the energy storage SOC limit and the rated capacity; P es (t) and E es (t) is the output and energy storage value in period t. Each energy storage power station is given an initial SOC at the beginning of the calculation.

[0152] Energy storage output constraints:

[0153]

[0154] Where: and are the minimum and maximum charging power of the energy storage power station respectively; and are the minimum and maximum discharge power of the energy storage power station respectively.

[0155] 4) Set the following constraints on the pumped storage units in the aggregated grid:

[0156] Constraints on pumping and releasing water:

[0157] a(t)+b(t)≤1

[0158] Where: a(t) is the pumping state variable, 1 indicates that the pumped storage unit is pumping, and 0 indicates that it is not pumping; b(t) is the discharge state variable, 1 indicates discharge, and 0 indicates that it is not discharge.

[0159] Reservoir capacity limits:

[0160] Eph,min ≤E ph (t-1)-P ph (t)ΔT≤E ph,max

[0161] Where: E ph,min and E ph,max are the minimum and maximum energy storage values ​​of the pumped storage power station respectively; P ph (t) and E ph (t) is the output and energy storage value of period t. Each pumped storage power station is given an initial energy storage value at the beginning of the calculation.

[0162] Unit output constraints:

[0163] Power generation conditions:

[0164] Pumping conditions:

[0165] Where: and They are the pumping power and discharging power of the pumped-storage unit respectively. The power generation power can be adjusted between 0.5 and 1 times of the maximum power generation power, and the pumping power is a constant value.

[0166] 5) Set the following constraints on wind power in the aggregated grid:

[0167]

[0168] Where: It is the theoretical wind power output of the aggregated grid n when the installed capacity is constant during period t.

[0169] 6) Set the following constraints on photovoltaic power in the aggregated grid:

[0170]

[0171] Where: It is the theoretical photovoltaic output of the aggregated grid n when the installed capacity is certain during period t.

[0172] 7) Establish constraints on the total load, line transmission capacity and reserve capacity within the aggregated grid, as follows:

[0173] Inter-regional line transmission capacity constraints:

[0174] -P l,max ≤P l (t)≤P l,max

[0175] Where: P l (t) is the transmission power of the transmission line, and the reference direction of the current is set as the positive direction for the inflow area and the negative direction for the outflow area; and P l,maxand -P l,max are the upper and lower limits of the transmission capacity of the transmission line respectively.

[0176] Overall load balancing constraint:

[0177]

[0178] Where: P ld,n (t) is the total load of zone n.

[0179] System spinning reserve capacity constraints:

[0180]

[0181] Where: P j,max (t, n)·S j (t, n) is the sum of the total power of all conventional units in the grid n in the tth period.

[0182] P re and N re are the minimum requirements for positive spinning reserve and negative spinning reserve respectively; P j,max (t, n) and P j,min (t, n) are the upper and lower output limits of the j-th unit in the aggregated grid n, respectively.

[0183] S2. Based on the constraints set by various power sources, a power dispatch strategy optimization model is constructed with the highest source-load matching degree of various power sources and the maximization of renewable energy power generation as the objective function (in this embodiment, the goal is to maximize the total power generation of wind power, hydropower, and photovoltaic power to reduce the abandonment rate of wind and photovoltaic power), as follows:

[0184]

[0185] Where: ρ is the load tracking coefficient, t is the time period variable, T is the total number of time periods, N r,t is the total power generation output of hydropower, wind power and solar power in period t, L t is the power load in the tth period, is the average load level, l, k, j are the numbers of wind, solar and hydropower stations respectively; L, K, J are the total number of wind, solar and hydropower stations respectively; wN l,t is the output of the lth wind power station in the tth period; sN k,t hN is the output of the k-th photovoltaic power station in the t-th period; j,t is the output of the jth hydropower station in the tth period; N n,t is the total power generation output of thermal power, pumped storage and energy storage in period t; m, o, c are the numbers of thermal power, pumped storage and energy storage power stations respectively; M, O, C are the total number of thermal power, pumped storage and energy storage power stations respectively; gN m,t is the output of the mth thermal power station in the tth period; pNo,t is the output of the oth pumped storage power station in the tth period; eN c,t is the output of the cth energy storage power station in the tth period; E is the total renewable energy power generation; m t is the number of hours in period t.

[0186] S3. Solve the power dispatch strategy optimization model to obtain the strategy optimization results, source-load matching and renewable energy power generation results, as follows:

[0187] S31, inputting the load demand of the power grid and the output forecast curves of each power source obtained from various power source stations into the PSO algorithm of the Sigmoid function;

[0188] S32, based on the Sigmoid function, the reservoir water storage curve is initialized in the variable domain, and the water level is obtained as the initial state of the particle swarm;

[0189] S33, calculating the initial fitness of the particle, and determining the initial global extreme value and the initial individual extreme value;

[0190] S34, updating the position and speed of the particles based on the particle swarm update formula until all types of power sources meet the working state constraint conditions;

[0191] S35, calculating the fitness value after the particle position and speed are updated, comparing with the historical individual extreme value and the global extreme value, determining the current individual optimal position and the current global optimal position, outputting the obtained results and putting them into the result cluster; repeatedly updating the particle position and speed until the maximum number of cycles is reached;

[0192] S36. After the cycle is completed, the best result is selected from the result cluster to obtain the strategy optimization result, source-load matching and renewable energy power generation solution results.

[0193] S4. Based on the actual power distribution and grid topology of the system, the strategy optimization results are simulated and calculated to obtain the simulation results of source-load matching and renewable energy power generation, which specifically includes the following steps:

[0194] S41. Based on the actual power distribution and grid topology of the system, the power grid power balance theory and the constraints of various power supply working states, the optimization results of the strategy optimization results are synchronously input for simulation calculation to obtain the first source-load matching degree and renewable energy power generation simulation results;

[0195] S42. Based on the actual power distribution and grid topology of the system, the power balance theory of the power grid and the working transition constraints of various power sources, the optimization results of the strategy optimization results are input one by one for simulation calculation to obtain multiple second source-load matching and renewable energy power generation simulation results;

[0196] The optimization results of the strategy optimization results include the water level utilization method of pumped storage reservoirs and hydropower reservoirs, water level control range, charging and discharging plan of energy storage power stations, start and stop plan and startup method of thermal power units, power generation output plan of pumped storage hydropower and conventional hydropower units, and system wind power and photovoltaic output plan.

[0197] S5. Compare the solution results of source-load matching and renewable energy power generation with the simulation results of source-load matching and renewable energy power generation. If the solution results of source-load matching and renewable energy power generation are not optimal solutions, change the working state constraints and / or objective functions of various power sources to solve the power dispatch strategy optimization model again until the solution results of source-load matching and renewable energy power generation are optimal solutions. The optimal solution is that the solution result of source-load matching is greater than or equal to the simulation result of source-load matching, and at the same time, the solution result of renewable energy power generation is greater than or equal to the simulation result of renewable energy power generation, specifically including:

[0198] S51, comparing the first source-load matching degree and renewable energy power generation simulation result with the source-load matching degree and renewable energy power generation solution result, if the source-load matching degree and renewable energy power generation solution result is not the optimal solution, adjusting the working state constraints or objective functions of various power sources to reconstruct the power dispatch strategy optimization model, the optimal solution is that the source-load matching degree solution result is greater than or equal to the first source-load matching degree simulation result, and at the same time, the renewable energy power generation solution result is greater than or equal to the first renewable energy power generation simulation result;

[0199] S52. Compare multiple second source-load matching and renewable energy power generation simulation results with the source-load matching and renewable energy power generation solution results. If the source-load matching and renewable energy power generation solution results are not optimal solutions, adjust the power cluster division method, grid load demand or each power output forecast curve to re-solve the power dispatch strategy optimization model until the source-load matching and renewable energy power generation solution results are the optimal solution. The optimal solution is that the source-load matching solution result is greater than or equal to any second source-load matching simulation result, and at the same time, the renewable energy power generation solution result is greater than or equal to any second renewable energy power generation simulation result.

[0200] S6. The comprehensive indicators of various optimization results in the strategy optimization results are calculated by simulation, and the indicators include power generation characteristic indicators, efficiency indicators, reliability indicators, flexibility indicators, and environmental benefit indicators. The indicator calculation is adopted to support the dispatcher's comprehensive evaluation of the organization strategy.

[0201] The power generation characteristic indicators include power extreme difference rate, output extreme difference rate, integrated complementary coefficient, integrated load rate, etc.; efficiency indicators include peak-shaving contribution rate, channel utilization rate, network loss rate, power abandonment rate, clean energy utilization rate, hydropower utilization rate, wind power utilization rate, photovoltaic utilization rate, etc.; reliability indicators include source-load matching degree, failure probability, etc.; flexibility indicators include peak-shaving capacity, peak-shaving depth, etc.; environmental benefit indicators include clean energy contribution rate, etc.

[0202] Example 2

[0203] like Figure 2 As shown, this embodiment provides a multi-power supply power dispatch strategy optimization system, including:

[0204] The system generalization constraint module is used to aggregate multiple sub-grids in the multi-power power dispatching system to form a power cluster, divide the power cluster based on the power generation type, and set working state constraints for each type of power after division;

[0205] The strategy optimization model building module is used to build a power dispatch strategy optimization model with the highest source-load matching degree of various power sources and the maximum power generation of renewable energy as the objective function based on the working state constraints set by various power sources;

[0206] The strategy optimization model solving module is used to solve the power dispatch strategy optimization model to obtain the strategy optimization results, source-load matching and renewable energy power generation results;

[0207] The simulation calculation module is used to simulate and calculate the strategy optimization results based on the actual power distribution and grid topology of the system, and obtain the simulation results of source-load matching and renewable energy power generation;

[0208] The strategy optimization result verification module is used to compare the solution results of source-load matching and renewable energy power generation with the simulation results of source-load matching and renewable energy power generation. If the solution results of source-load matching and renewable energy power generation are not optimal solutions, the power dispatch strategy optimization model is adjusted or the parameters are changed and solved again until the solution results of source-load matching and renewable energy power generation are optimal solutions. The optimal solution is that the solution result of source-load matching is greater than or equal to the simulation result of source-load matching, and at the same time, the solution result of renewable energy power generation is greater than or equal to the simulation result of renewable energy power generation.

[0209] In this embodiment, a result comprehensive index calculation module is also included, which is used to calculate the comprehensive index of each optimization result in the strategy optimization result through simulation calculation.

[0210] like Figure 3As shown, in this embodiment, the simulation calculation module, the strategy optimization result verification module, and the comprehensive index calculation module are integrated into the power dispatching strategy simulation module, and a parameter configuration function is further provided to realize the import of power grid model, power supply model, basic equipment information, power grid and various power station operation data, including historical operation data, real-time operation data and forecast plan data, and support manual modification of imported data; support the input and modification of various constraints of simulation calculation, including various power supply unit constraints, line transmission constraints, load balance constraints and positive and negative standby constraints; support the input and modification of simulation parameters, including simulation object, simulation time, and simulation range; support manual modification and maintenance of power grid model and power supply model data.

[0211] The simulation calculation module includes the functions of result import, simulation calculation and result comparison. The result import can select the optimization results stored in the library, import the weekly water level operation mode of the pumped storage reservoir and hydropower reservoir of the optimization result, the weekly water level control range, the weekly charging and discharging plan of the energy storage power station, the weekly start-stop plan and weekly startup mode of the thermal power unit, the weekly power generation output plan of the pumped storage hydropower and conventional hydropower units, the weekly output plan of the system wind power and photovoltaic power, and the operation data selection optimization calculation The operation data used; the simulation calculation is based on the power grid power and electricity balance theory and various constraints, and the simulation calculation results under the simulation environment are obtained. The simulation calculation results are used to recalculate the objective function, that is, the highest source-load matching and the maximization of the power generation of water, wind and solar renewable energy; the result comparison compares the objective function calculation results of the simulation calculation with the objective function results of the optimization calculation to analyze the differences.

[0212] The strategy optimization result verification module includes result import, result modification and result verification. The result import can select the optimization results stored in the library, as well as the objective function results calculated by the result data; the result modification can select the weekly water level operation mode of pumped storage reservoirs and hydropower reservoirs, weekly water level control range, weekly charging and discharging plan of energy storage power stations, weekly start-stop plan and weekly startup mode of thermal power units, weekly power generation output plan of pumped storage hydropower and conventional hydropower units, weekly output plan of system wind power and photovoltaic power, and modify the selected optimization results in positive and negative directions in turn. After each modification, re-simulate the objective function calculation, and then obtain the two optimization objective functions of the highest source-load matching and the maximum power generation of water, wind and light renewable energy according to the simulation calculation; the result verification compares the trend of the original objective function results with the series of calculation results after the modified data, and verifies whether the original optimization results are the optimal values ​​in the simulation environment through trend comparison analysis.

[0213] The comprehensive index calculation module includes power generation characteristic index, efficiency index, reliability index, flexibility index, and environmental benefit index. It calculates various comprehensive indicators based on the simulation results of the power dispatching strategy to support the dispatching personnel's comprehensive evaluation of the organization strategy. Power generation characteristic indicators include power extreme difference rate, output extreme difference rate, integrated complementary coefficient, integrated load rate, etc.; efficiency indicators include peak load contribution rate, channel utilization rate, network loss rate, power abandonment rate, clean energy utilization rate, hydropower utilization rate, wind power utilization rate, photovoltaic utilization rate, etc.; reliability indicators include source-load matching, non-compliance probability, etc.; flexibility indicators include peak load capacity, peak load depth, etc.; environmental benefit indicators include clean energy contribution rate, etc.

[0214] Example 3

[0215] This embodiment provides a computer storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the multi-power supply power dispatch strategy optimization method as described in Embodiment 1 are implemented.

[0216] Example 4

[0217] This embodiment provides an electronic device, including a memory and a processor: the memory is used to store computer-executable instructions, and the processor is used to execute the computer-executable instructions. When the computer-executable instructions are executed by the processor, the steps of the multi-power supply power scheduling strategy optimization method as described in Example 1 are implemented.

[0218] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any ordinary technician in the industry can smoothly implement the present invention as shown in the drawings and described above. However, any equivalent changes, modifications and evolutions made by technicians familiar with the profession without departing from the scope of the technical solution of the present invention using the technical content disclosed above are all equivalent embodiments of the present invention. At the same time, any equivalent changes, modifications and evolutions made to the above embodiments based on the essential technology of the present invention are still within the protection scope of the technical solution of the present invention.

[0219] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0220] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0221] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0222] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

Claims

1. A multi-power source power dispatch strategy optimization method, It is characterized in that The following steps are involved: Aggregate multiple sub-grids in a multi-power dispatching system to form a power cluster, divide the power clusters based on the power generation type, and set working state constraints for each type of power after division; Based on the working state constraints set by various power sources, a power dispatch strategy optimization model is constructed with the highest source-load matching of various power sources and the maximum power generation of renewable energy as the objective function; Solve the power dispatch strategy optimization model to obtain the strategy optimization results, source-load matching and renewable energy power generation results; Based on the actual power distribution and grid topology of the multi-power power dispatching system, the strategy optimization results are simulated and calculated to obtain the simulation results of source-load matching and renewable energy power generation; The solution results of source-load matching and renewable energy power generation are compared with the simulation results of source-load matching and renewable energy power generation. If the solution results of source-load matching and renewable energy power generation are not optimal solutions, the working state constraints and / or objective functions of various power sources are changed to solve the power dispatch strategy optimization model again until the solution results of source-load matching and renewable energy power generation are optimal solutions. The optimal solution is that the solution result of source-load matching is greater than or equal to the simulation result of source-load matching, and at the same time, the solution result of renewable energy power generation is greater than or equal to the simulation result of renewable energy power generation.

2. According to the multi-power supply power dispatch strategy optimization method described in claim 1, It is characterized in that The method further includes: calculating comprehensive indicators of various optimization results in the strategy optimization results through simulation, wherein the comprehensive indicators include power generation characteristic indicators, efficiency indicators, reliability indicators, flexibility indicators, and environmental benefit indicators.

3. According to the multi-power supply power dispatch strategy optimization method described in claim 1, It is characterized in that The setting of working state constraints for various power sources specifically includes: Based on the working power of each thermal power unit, the thermal power units are classified and the following constraints are set: X g (t)P g,min ≤P g (t)≤X g (t)P g,max Where: P g (t) is the output of the thermal power unit; P g,min and P g,max is the minimum and maximum unit output; X g (t) indicates the operating status of the unit; Thermal power unit ramp rate constraints: P g (t+1)-P g (t)≤AP g,up ΔT P g (t)-P g (t+1)≤ΔP g,d ΔT Where: ΔP g,up , ΔP g,d are the ramp-up rate and ramp-down rate of the unit respectively; Thermal power start-up and shutdown constraints: Where: Y(t) and Z(t) are the start command and shutdown command of the system in period t; Based on the working power of each hydropower unit, the hydropower units are classified and the following constraints are set: P h,min ≤P h (t)≤P h,max Where: P h (t) is the output of the hydropower unit; P h,min and P h,max is the minimum and maximum output of the hydropower unit; Where: Z j,end is the end-of-day water level of the jth reservoir; Z j,begin is the initial water level of the jth reservoir, Z j,allow is the daily water level fluctuation allowed for the jth reservoir; Downflow flow restriction: Where: Q j,t is the discharge flow of the j-th hydropower station in the t-th period; is the maximum discharge flow of the jth hydropower station in the tth period; is the minimum discharge flow of the j-th hydropower station in the t-th period; Hydropower unit power generation flow constraints: Where: is the maximum power generation flow of the jth hydropower station in the tth period; is the minimum power generation flow of the jth hydropower station in the tth period; Constraints on daily power generation of hydropower units: Where: P h (t) is the output of the hydropower unit at time t, ΔT is the step length t, Q h is the daily power generation of the unit; The following constraints are set for energy storage units in the aggregated power grid: Energy storage unit charging and discharging state constraints: a(t)+b(t)≤1 Where: a(t) is the charging state variable, 1 indicates energy storage charging, 0 indicates non-charging; b(t) is the discharging state variable, 1 indicates discharging, 0 indicates non-discharging; Energy storage capacity limitations: E es,min ≤E es (t-1)-P es (t)ΔT≤E es,max Where: E es,min and E es,max are the minimum and maximum energy storage values ​​of the energy storage power station, which are calculated by multiplying the energy storage SOC limit and the rated capacity; P es (t) and E es (t) is the output and energy storage value in period t. Each energy storage power station is given an initial SOC at the beginning of the calculation; Energy storage output constraints: Where: and are the minimum and maximum charging power of the energy storage power station respectively; and are the minimum and maximum discharge power of the energy storage power station respectively; The following constraints are set for the pumped storage units in the aggregated power grid: Constraints on pumping and releasing water: a(t)+b(t)≤1 Where: a(t) is the pumping state variable, 1 indicates that the pumped storage unit is pumping, and 0 indicates that it is not pumping; b(t) is the discharge state variable, 1 indicates discharge, and 0 indicates that it is not discharge; Reservoir capacity limits: E ph,min ≤E ph (t-1)-P ph (t)ΔT≤E ph,max Where: E ph,min and E ph,max are the minimum and maximum energy storage values ​​of the pumped storage power station respectively; P ph (t) and E ph (t) is the output and energy storage value for period t. Each pumped storage power station is given an initial energy storage value at the beginning of the calculation; Unit output constraints: Power generation conditions: Pumping conditions: Where: and are the pumping power and discharging power of the pumped storage unit respectively; The following constraints are set for wind power in the aggregated grid: Where: The theoretical output of wind power for aggregated grid n when the installed capacity is constant during time period t; The following constraints are set for PV in the aggregated grid: Where: The theoretical photovoltaic output of the aggregated grid n when the installed capacity is constant during time period t; Constraints are set on the total load, line transmission capacity and reserve capacity within the aggregated grid, as follows: Inter-regional line transmission capacity constraints: -P l,max ≤P l (t)≤P l,max Where: P l (t) is the transmission power of the transmission line, and the reference direction of the current is set as the positive direction for the inflow area and the negative direction for the outflow area; and P l,max and -P l,max They are the upper and lower limits of the transmission capacity of the transmission line respectively; Overall load balancing constraint: Where: P ld,n (t) is the total load of area n; System spinning reserve capacity constraints: Where: P j,max (t, n)·S j (t, n) is the sum of the total power of all conventional units in the grid nth period t; P re and N re are the minimum requirements for positive spinning reserve and negative spinning reserve respectively; P j,max (t, n) and P j,min (t, n) are the upper and lower output limits of the j-th unit in the aggregated grid n, respectively.

4. According to the multi-power supply power dispatch strategy optimization method described in claim 1, It is characterized in that The power dispatch strategy optimization model with the highest matching degree of various power sources and the maximum power generation of renewable energy as the objective function is as follows: Where: ρ is the load tracking coefficient, t is the time period variable, T is the total number of time periods, N r,t is the total power generation output of hydropower, wind power and solar power in period t, L t is the power load in the tth period, is the average load level, l, k, j are the numbers of wind, solar and hydropower stations respectively; L, K, J are the total number of wind, solar and hydropower stations respectively; wN l,t is the output of the lth wind power station in the tth period; sN k,t hN is the output of the k-th photovoltaic power station in the t-th period; j,t is the output of the jth hydropower station in the tth period; N n,t is the total power generation output of thermal power, pumped storage and energy storage in period t; m, o, c are the numbers of thermal power, pumped storage and energy storage power stations respectively; M, O, C are the total number of thermal power, pumped storage and energy storage power stations respectively; gN m,t is the output of the mth thermal power station in the tth period; pN o,t is the output of the oth pumped storage power station in the tth period; eN c,t is the output of the cth energy storage power station in the tth period; E is the total renewable energy power generation; m t is the number of hours in period t.

5. According to the multi-power supply power dispatch strategy optimization method described in claim 1, It is characterized in that The power dispatch strategy optimization model is solved to obtain the strategy optimization results, source-load matching degree and renewable energy power generation results, specifically including: The load demand of the power grid and the output forecast curves of each power source obtained from various power source stations are input into the PSO algorithm of the Sigmoid function; Based on the Sigmoid function, the reservoir storage curve is initialized in the variable domain, and the water level is obtained as the initial state of the particle swarm; Calculate the initial fitness of particles and determine the initial global extreme value and initial individual extreme value; The position and velocity of the particles are updated based on the particle swarm update formula until all types of power sources meet the working state constraints; Calculate the fitness value of the particle position and speed after updating, compare with the historical individual extreme value and the global extreme value, determine the current individual optimal position and the current global optimal position, output the obtained results and put them into the result cluster; repeatedly update the particle position and speed until the maximum number of cycles is reached; After the cycle is completed, the best result is selected from the result cluster to obtain the strategy optimization result, source-load matching and renewable energy power generation solution results.

6. According to the multi-power supply power dispatch strategy optimization method of claim 1, It is characterized in that Based on the actual power distribution and grid topology of the system, the strategy optimization results are simulated and calculated to obtain the simulation results of source-load matching and renewable energy power generation, as follows: Based on the actual power distribution and grid topology of the system, the power grid power balance theory and the constraints of various power supply working states, the optimization results of the strategy optimization results are synchronously input for simulation calculation to obtain the simulation results of the first source-load matching degree and renewable energy power generation; Based on the actual power distribution and grid topology of the system, the power balance theory of the power grid and the constraints of the working status of various power sources, the optimization results of the strategy optimization results are input one by one for simulation calculation, and multiple simulation results of the second source-load matching and renewable energy power generation are obtained; The strategy optimization results include the water level utilization mode of pumped storage reservoirs and hydropower reservoirs, water level control range, charging and discharging plan of energy storage power station, start and stop plan and startup mode of thermal power units, power generation output plan of pumped storage hydropower and conventional hydropower units, and system wind power and photovoltaic output plan.

7. According to the multi-power supply power dispatch strategy optimization method of claim 6, It is characterized in that The solution results of the source-load matching and renewable energy power generation are compared with the simulation results of the source-load matching and renewable energy power generation. If the solution results of the source-load matching and renewable energy power generation are not optimal solutions, the working state constraints and / or objective functions of various power sources are changed to solve the power dispatch strategy optimization model again until the solution results of the source-load matching and renewable energy power generation are optimal solutions. The optimal solution is that the solution result of the source-load matching is greater than or equal to the simulation result of the source-load matching, and at the same time, the solution result of the renewable energy power generation is greater than or equal to the simulation result of the renewable energy power generation, specifically including: Compare the first source-load matching degree and renewable energy power generation simulation result with the source-load matching degree and renewable energy power generation solution result. If the source-load matching degree and renewable energy power generation solution result are not the optimal solution, adjust the working state constraints or objective functions of various power sources to reconstruct the power dispatch strategy optimization model. The optimal solution is that the source-load matching degree solution result is greater than or equal to the first source-load matching degree simulation result, and at the same time, the renewable energy power generation solution result is greater than or equal to the first renewable energy power generation simulation result; Compare multiple second source-load matching and renewable energy power generation simulation results with the source-load matching and renewable energy power generation solution results. If the source-load matching and renewable energy power generation solution results are not the optimal solution, adjust the power cluster division method, grid load demand or each power output forecast curve to re-solve the power dispatch strategy optimization model until the source-load matching and renewable energy power generation solution results are the optimal solution, and the optimal solution is that the source-load matching solution result is greater than or equal to any second source-load matching simulation result, and at the same time, the renewable energy power generation solution result is greater than or equal to any second renewable energy power generation simulation result.

8. A multi-power source power dispatch strategy optimization system, It is characterized in that include: The system generalization constraint module is used to aggregate multiple sub-grids in the multi-power power dispatching system to form a power cluster, divide the power cluster based on the power generation type, and set working state constraints for each type of power after division; The strategy optimization model building module is used to build a power dispatch strategy optimization model with the highest source-load matching degree of various power sources and the maximum power generation of renewable energy as the objective function based on the working state constraints set by various power sources; The strategy optimization model solving module is used to solve the power dispatch strategy optimization model to obtain the strategy optimization results, source-load matching and renewable energy power generation results; The simulation calculation module is used to simulate and calculate the strategy optimization results based on the actual power distribution and grid topology of the system, and obtain the simulation results of source-load matching and renewable energy power generation; The strategy optimization result verification module is used to compare the solution results of source-load matching and renewable energy power generation with the simulation results of source-load matching and renewable energy power generation. If the solution results of source-load matching and renewable energy power generation are not optimal solutions, the working state constraints and / or objective functions of various power sources are changed to solve the power dispatch strategy optimization model again until the solution results of source-load matching and renewable energy power generation are optimal solutions. The optimal solution is that the solution result of source-load matching is greater than or equal to the simulation result of source-load matching, and at the same time, the solution result of renewable energy power generation is greater than or equal to the simulation result of renewable energy power generation.

9. A computer storage medium, wherein the computer readable storage medium stores a computer program. It is characterized in that When the computer program is executed by a processor, the steps of the multi-power supply power dispatch strategy optimization method as described in any one of claims 1 to 7 are implemented.

10. An electronic device, It is characterized in that It comprises a memory and a processor: the memory is used to store computer-executable instructions, the processor is used to execute the computer-executable instructions, and the computer-executable instructions, when executed by the processor, implement the steps of the multi-power supply power dispatching strategy optimization method as described in any one of claims 1-7.

Citation Information

Patent Citations

  • Sending end power grid power source structure planning method considering local load peak regulation capacity

    CN109599861A

  • Micro-energy network source load matching method and system

    CN116451501A

  • Water-wind-light multi-energy complementary integrated capacity optimization configuration method

    CN117767423A

  • Multi-microgrid power interaction optimization method and system based on source-load matching degree, and medium

    CN118199178A

Cited By

  • Multi-energy coordinated optimization method and device based on port electricity load characteristics

    CN120262571A

  • Multi-energy coordination optimization method and device based on port power load characteristics

    CN120262571B

  • Hydropower station short-term optimization scheduling method and device coupled with hydraulic transient characteristics

    CN120410283A

  • User side green electricity optimization scheduling method and system

    CN122437167A