A system and method for engineering building construction based on 3D modeling
By introducing multiple modules into the engineering construction system, the three-dimensional model is constructed and optimized in real time, the deviation problem caused by the actual construction process and the pre-designed model is solved, and the construction quality and efficiency are improved.
Patent Information
- Application Number
- CN202411678272.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-22
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2044-11-22
AI Technical Summary
The prior art fails to effectively consider the deviations generated by the pre-designed three-dimensional model during the actual construction process, resulting in a decline in the construction quality of engineering construction.
By introducing three-dimensional design model generation modules, three-dimensional real-time model construction modules, construction data analysis modules, model optimization modules and construction prediction data generation modules in the engineering construction system, the three-dimensional model is constructed and optimized in real time to reduce construction deviations.
It improves the construction quality of engineering buildings, reduces resource waste caused by deviations, and improves construction efficiency and subsequent construction quality.
Smart Images

Figure CN119180087B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building modeling, and in particular to an engineering building construction system and method based on 3D modeling. Background Art
[0002] With the increasing development of urbanization, the scale and number of engineering construction are also increasing. This has led to a large amount of construction data being generated in the process of engineering construction project management, such as construction data before, during and after construction. For the construction industry, accurate data analysis is conducive to the control of the entire construction project. The mechanization and automation level of the traditional construction industry is low, and its development urgently needs transformation and upgrading. With the development and gradual maturity of 3D modeling technology, this technology will bring technological innovation to the labor-intensive construction industry. 3D modeling technology is a process of creating three-dimensional object models using computer software. 3D modeling technology can identify design defects before construction, avoid the additional costs caused by later modifications, and allow architects to simulate the performance of buildings under different environmental conditions and perform energy optimization design, which not only meets the requirements of sustainable development, but also reduces operating costs in long-term use. Through 3D models, the construction team can understand the construction details in advance and achieve precise construction. 3D models can also be combined with construction progress management systems to update the construction progress in real time, ensure that each link is completed within the expected time, and significantly improve construction efficiency. In the design stage, through visualization functions, unreasonable design plans can be discovered and adjusted early, thereby avoiding material waste and increased labor costs. During the construction phase, accurate models make actual construction operations smoother, reduce rework rates, and ultimately achieve high returns on the project. Engineering and construction 3D modeling technology is an important means to achieve transformation and upgrading of the construction industry. It is an effective way to solve the problem of efficient, safe, digital, automated, and intelligent construction of buildings. Its research has become a development trend in the construction industry.
[0003] Chinese patent publication number CN118097065B discloses an intelligent building engineering 3D modeling system and method, including a modeling data optimization unit, a building index adjustment optimization unit, a building index adaptation unit, a modeling comprehensive management unit, and a modeling method processing unit. The automatic adjustment of building index changes, data verification, clustering update, and adaptive adaptation of related data are realized through the range of various historical indicators of the building project and the change threshold of indicators under different environments.
[0004] It can be seen that the above invention has the following problems: it does not take into account that the actual construction process may deviate from the pre-designed three-dimensional model, thereby reducing the construction quality of the engineering building. Summary of the invention
[0005] To this end, the present invention provides an engineering construction system and method based on 3D modeling, so as to overcome the problem in the prior art that the actual construction process is not considered, resulting in deviations between the actual engineering construction and the pre-designed three-dimensional design model of the engineering construction, thereby reducing the construction quality of the engineering construction.
[0006] To achieve the above objectives, on the one hand, the present invention provides an engineering building construction system based on 3D modeling, comprising:
[0007] A database for storing urban data, engineering and architectural design data, and real-time construction data; the urban data includes urban geographic data, urban planning data, and urban climate data; the engineering and architectural design data includes building feature data and building construction data;
[0008] A three-dimensional design model generation module, which is connected to the database and is used to generate a three-dimensional design model of the engineering building according to the city data and the engineering building design data;
[0009] A three-dimensional real-time model building module, which is connected to the database and is used to build a three-dimensional real-time model of the engineering building based on the real-time construction data;
[0010] a construction data analysis module, which is connected to the 3D design model generation module and the 3D real-time model construction module respectively, and is used to determine the overall construction deviation based on the data difference between the 3D design model and the 3D real-time model, determine the construction deviation vector based on the construction variables of the 3D real-time model, and determine the construction freedom trend vector based on the changes of the 3D real-time model obtained in a preset period;
[0011] a model optimization module, which is connected to the database and the construction data analysis module respectively, and is used to calculate the model data adjustment amount of the three-dimensional design model according to the construction deviation vector and the construction free trend vector to optimize the three-dimensional design model, and update the data in the database;
[0012] A construction prediction data generation module is respectively connected to the database and the model optimization module, and is used to generate construction prediction data based on the optimized three-dimensional design model and the updated data in the database, and use the construction prediction data as a reference value for subsequent engineering construction.
[0013] Furthermore, the three-dimensional design model generation module includes:
[0014] A city data analysis submodule, which is connected to the database and is used to analyze the city data and determine the regional characteristic data of the engineering building;
[0015] A building data matching submodule, which is connected to the database and the city data analysis submodule, and is used to match the engineering building design data with the regional feature data to determine the building design data;
[0016] The three-dimensional design model generating submodule is connected to the building data matching submodule and is used to generate a three-dimensional design model of the engineering building according to the building design data.
[0017] Furthermore, the construction data analysis module includes:
[0018] A construction deviation determination submodule, which is connected to the three-dimensional design model generation module and the three-dimensional real-time model construction module respectively, and is used to determine the data difference corresponding to each engineering building feature based on the three-dimensional design model and the three-dimensional real-time model, and determine the overall construction deviation based on each of the data differences;
[0019] A construction deviation vector determination submodule, which is connected to the three-dimensional real-time model construction module and is used to determine the construction deviation vector based on the construction variables of the three-dimensional real-time model;
[0020] A construction freedom trend vector determination submodule is connected to the database and the three-dimensional real-time model construction module respectively, and is used to determine the construction freedom trend vector based on the changes of the three-dimensional real-time model obtained in a preset period and based on the engineering and architectural design data.
[0021] Furthermore, the model optimization module includes:
[0022] a model data adjustment amount determination submodule, which is connected to the construction data analysis module and is used to calculate the model data adjustment amount of the three-dimensional design model according to the construction deviation vector and the construction free trend vector;
[0023] A model data optimization submodule, which is connected to the model data adjustment amount determination submodule and is used to optimize the three-dimensional design model according to the model data adjustment amount;
[0024] The data updating submodule is respectively connected to the database and the model data optimizing submodule, and is used to update the data in the database based on the optimized three-dimensional design model.
[0025] Furthermore, the data updating submodule includes:
[0026] An update data determination unit, which is connected to the database and the model data optimization submodule respectively, and is used to determine the data to be updated according to the optimized three-dimensional design model and the engineering and architectural design data;
[0027] A data updating unit is connected to the database and the update data determining unit respectively, and is used to update the data in the database according to the data to be updated.
[0028] Furthermore, the three-dimensional real-time model building module includes:
[0029] A construction data acquisition submodule, for acquiring the construction image of the engineering building and the corresponding acquisition time in real time, and determining the real-time construction data according to the construction image of the engineering building;
[0030] The three-dimensional real-time model building submodule is connected to the database and the construction data acquisition submodule respectively, and is used to build a three-dimensional real-time model of the engineering building based on the real-time construction data, and store the three-dimensional real-time model in the database.
[0031] Furthermore, the building data matching submodule determines a matching feature vector based on the engineering building design data and the regional feature data, and inputs the matching feature vector into the target neural network model to obtain the building design data output by the target neural network model.
[0032] Furthermore, the construction prediction data generation module integrates the optimized three-dimensional design model with the preset BIM model and generates construction prediction data, and uses the construction prediction data as a reference value for subsequent engineering building construction.
[0033] Furthermore, the preset period is determined according to the engineering building design data.
[0034] In another aspect, the present invention further provides a method for constructing an engineering building, comprising:
[0035] Step S1, acquiring city data, engineering and architectural design data and real-time construction data; the city data includes city geographic data, city planning data and city climate data; the engineering and architectural design data includes building feature data and building construction data;
[0036] Step S2, generating a three-dimensional design model of the engineering building according to the city data and the engineering building design data, and constructing a three-dimensional real-time model of the engineering building based on the real-time construction data;
[0037] Step S3, determining the overall construction deviation based on the data difference between the three-dimensional design model and the three-dimensional real-time model, determining the construction deviation vector based on the construction variables of the three-dimensional real-time model, and determining the construction freedom trend vector based on the change of the three-dimensional real-time model obtained in a preset period;
[0038] Step S4, calculating the model data adjustment amount of the three-dimensional design model according to the construction deviation vector and the construction free trend vector to optimize the three-dimensional design model, and updating the data in the database;
[0039] Step S5, generating construction prediction data according to the optimized three-dimensional design model and the updated data in the database, and using the construction prediction data as a reference value for subsequent engineering building construction.
[0040] Compared with the prior art, the beneficial effect of the present invention is that the present invention generates a three-dimensional design model of an engineering building according to urban data and engineering building design data by setting a three-dimensional design model generation module, comprehensively considering urban geography, planning, climate, architectural features and architectural design data, and can automatically generate a three-dimensional design model of an engineering building. By setting a three-dimensional real-time model construction module to construct a three-dimensional real-time model of an engineering building based on real-time construction data, it is convenient to compare with the three-dimensional design model before construction, and the real-time and accuracy of the comparison can be improved. By setting a construction data analysis module to determine the overall construction deviation between the three-dimensional design model and the three-dimensional real-time model, it is convenient to timely discover the deviation generated in the actual construction process. By setting a model optimization module to determine the model data adjustment amount to optimize the three-dimensional design model, the construction quality of the engineering building can be improved, and the waste of resources caused by the unqualified engineering building due to deviation can be avoided. By setting a construction prediction data generation module to generate construction prediction data, the construction efficiency can be improved and the subsequent construction quality can be improved.
[0041] Furthermore, the three-dimensional design model generation module of the present invention includes a city data analysis submodule, a building data matching submodule and a three-dimensional design model generation submodule. The building design data is determined by matching the regional characteristic data of the engineering building with the engineering building design data, thereby determining the three-dimensional design model, which can improve the model accuracy of the constructed three-dimensional design model.
[0042] Furthermore, the construction data analysis module of the present invention includes a construction deviation determination submodule, a construction deviation vector determination submodule and a construction free trend vector determination submodule. By determining the overall construction deviation, the construction deviation vector and the construction free trend vector, data support is provided for subsequent model optimization to improve the construction quality of engineering buildings.
[0043] Furthermore, the model optimization module of the present invention includes a model data adjustment amount determination submodule, a model data optimization submodule and a data update submodule. By calculating the model data adjustment amount to optimize the three-dimensional design model and updating the data in the database, the construction quality of the engineering building can be improved.
[0044] Furthermore, the data updating submodule of the present invention includes an updated data determining unit and a data updating unit, and by updating the data in the database, the real-time and validity of the data in the database can be guaranteed.
[0045] Furthermore, the three-dimensional real-time model building module of the present invention includes a construction data acquisition submodule and a three-dimensional real-time model building submodule. By collecting construction images of the engineering building to determine real-time construction data to build a three-dimensional real-time model of the engineering building, the real-time and accuracy of the three-dimensional real-time model can be improved, thereby improving the accuracy of subsequent model optimization. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 It is a structural block diagram of the engineering building construction system based on 3D modeling of the present invention;
[0047] Figure 2 A structural block diagram of a three-dimensional design model generation module according to an embodiment of the present invention;
[0048] Figure 3 A structural block diagram of a data analysis module is constructed for an embodiment of the present invention;
[0049] Figure 4 It is a structural block diagram of a model optimization module according to an embodiment of the present invention;
[0050] Figure 5 This is a structural block diagram of a data updating submodule according to an embodiment of the present invention;
[0051] Figure 6 A structural block diagram of a three-dimensional real-time model building module according to an embodiment of the present invention;
[0052] Figure 7 The present invention is a flowchart of the engineering building construction method based on 3D modeling. DETAILED DESCRIPTION
[0053] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0054] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.
[0055] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.
[0056] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0057] See also Figure 1 As shown, it is a structural block diagram of an engineering building construction system based on 3D modeling of the present invention; the present invention provides an engineering building construction system based on 3D modeling, including:
[0058] A database for storing urban data, engineering and architectural design data, and real-time construction data; the urban data includes urban geographic data, urban planning data, and urban climate data; the engineering and architectural design data includes building feature data and building construction data;
[0059] In practice, urban geographic data include terrain, roads, water systems, vegetation and other data; urban planning data include land use planning, transportation planning, public facilities planning, urban landscape planning, urban development strategy planning and other data; urban climate data include the daytime temperature, nighttime temperature, relative humidity data, wind direction and speed data, air pressure, precipitation data, etc. of the city for the current day / next week / history. Building characteristic data are the demand characteristics of engineering buildings, including the architectural style, building structure, building purpose, building area, building structure, physical properties and other data of engineering buildings; construction data include construction specifications and standards, construction progress, construction technology, construction cost, material utilization, construction personnel management and other data.
[0060] A three-dimensional design model generation module, which is connected to the database and is used to generate a three-dimensional design model of the engineering building according to the city data and the engineering building design data;
[0061] A three-dimensional real-time model building module, which is connected to the database and is used to build a three-dimensional real-time model of the engineering building based on the real-time construction data;
[0062] a construction data analysis module, which is connected to the 3D design model generation module and the 3D real-time model construction module respectively, and is used to determine the overall construction deviation based on the data difference between the 3D design model and the 3D real-time model, determine the construction deviation vector based on the construction variables of the 3D real-time model, and determine the construction freedom trend vector based on the changes of the 3D real-time model obtained in a preset period;
[0063] Specifically, the preset period is determined according to the engineering building design data.
[0064] In implementation, the overall construction time is determined based on the building characteristic data and the building construction data, and the preset period is determined based on the overall construction time. Preferably, the preset period is 1 / 10 to 1 / 30 of the overall construction time.
[0065] a model optimization module, which is connected to the database and the construction data analysis module respectively, and is used to calculate the model data adjustment amount of the three-dimensional design model according to the construction deviation vector and the construction free trend vector to optimize the three-dimensional design model, and update the data in the database;
[0066] A construction prediction data generation module is respectively connected to the database and the model optimization module, and is used to generate construction prediction data based on the optimized three-dimensional design model and the updated data in the database, and use the construction prediction data as a reference value for subsequent engineering construction.
[0067] Specifically, the construction prediction data generation module integrates the optimized three-dimensional design model with the preset BIM model, generates construction prediction data, and uses the construction prediction data as a reference value for subsequent engineering building construction.
[0068] In practical applications, the actual implementers can build a preset BIM model based on the engineering and construction design data and the three-dimensional design model according to the actual situation. The optimized three-dimensional design model can update the preset BIM model. The updated BIM model can generate construction prediction data, including the construction content, construction tasks, working conditions and required resources in subsequent stages. Using the construction prediction data as a reference value for subsequent engineering and construction construction can improve the construction efficiency of subsequent engineering and construction construction.
[0069] The present invention generates a three-dimensional design model of an engineering building according to urban data and engineering building design data by setting a three-dimensional design model generation module, comprehensively considering urban geography, planning, climate, architectural features and architectural design data, and can automatically generate a three-dimensional design model of an engineering building. By setting a three-dimensional real-time model construction module to construct a three-dimensional real-time model of an engineering building based on real-time construction data, it is convenient to compare with the three-dimensional design model before construction, and the real-time and accuracy of the comparison can be improved. By setting a construction data analysis module to determine the overall construction deviation between the three-dimensional design model and the three-dimensional real-time model, it is convenient to timely discover the deviation generated in the actual construction process. By setting a model optimization module to determine the model data adjustment amount to optimize the three-dimensional design model, the construction quality of the engineering building can be improved, and the waste of resources caused by the unqualified engineering building due to the deviation can be avoided. By setting a construction prediction data generation module to generate construction prediction data, the construction efficiency can be improved and the subsequent construction quality can be improved.
[0070] See also Figure 2 As shown, it is a structural block diagram of a three-dimensional design model generation module according to an embodiment of the present invention; specifically, the three-dimensional design model generation module includes:
[0071] A city data analysis submodule, which is connected to the database and is used to analyze the city data and determine the regional characteristic data of the engineering building;
[0072] During implementation, the structural characteristics of engineering buildings are preliminarily planned based on urban data so that the engineering buildings meet the requirements of urban geography and urban planning and adapt to the urban climate, thereby determining the regional characteristic data of the engineering buildings. For example, the climate in southern cities is hot and humid with heavy rain and a harmonious natural environment. The design of engineering buildings in the south focuses on ventilation, shading and drainage. The corresponding regional characteristic data can be rainproof building materials, design sculpture art, building colors that are conducive to reflecting sunlight, water systems with rich vegetation, earthquake-resistant structures, etc.
[0073] Specifically, the city data can be input into a preset deep learning model to obtain regional feature data output by the preset deep learning model.
[0074] It is understandable that the actual implementers can obtain a preset deep learning model through training based on the urban data of each engineering building that has passed the qualification inspection in the historical data and the regional characteristic data of each engineering building.
[0075] A building data matching submodule, which is connected to the database and the city data analysis submodule, and is used to match the engineering building design data with the regional feature data to determine the building design data;
[0076] Specifically, the building data matching submodule determines a matching feature vector based on the engineering building design data and the regional feature data, and inputs the matching feature vector into the target neural network model to obtain the building design data output by the target neural network model.
[0077] Specifically, the data corresponding to each feature in the engineering and architectural design data and the regional feature data are used as elements in a matching feature vector to obtain a matching feature vector.
[0078] It should be noted that those skilled in the art know that any neural network model in the prior art that can obtain architectural design data through training of engineering architectural design data and regional feature data falls within the protection scope of the present invention and will not be described in detail here.
[0079] The three-dimensional design model generating submodule is connected to the building data matching submodule and is used to generate a three-dimensional design model of the engineering building according to the building design data.
[0080] It is understandable that any method in the prior art that can generate a three-dimensional design model of an engineering building based on architectural design data falls within the protection scope of the present invention and will not be described in detail herein.
[0081] The three-dimensional design model generation module of the present invention includes a city data analysis submodule, a building data matching submodule and a three-dimensional design model generation submodule. The building design data is determined by matching the regional characteristic data of the engineering building with the engineering building design data, thereby determining the three-dimensional design model, which can improve the model accuracy of the constructed three-dimensional design model.
[0082] See also Figure 3 As shown, it is a structural block diagram of a construction data analysis module according to an embodiment of the present invention; specifically, the construction data analysis module includes:
[0083] A construction deviation determination submodule, which is connected to the three-dimensional design model generation module and the three-dimensional real-time model construction module respectively, and is used to determine the data difference corresponding to each engineering building feature based on the three-dimensional design model and the three-dimensional real-time model, and determine the overall construction deviation based on each of the data differences;
[0084] During implementation, a number of engineering construction features are determined according to the three-dimensional real-time model, and a three-dimensional comparison model is determined based on the several engineering construction features and the three-dimensional design model, and the three-dimensional comparison model partially overlaps with the three-dimensional design model; the engineering construction features corresponding to the three-dimensional real-time model and the engineering construction features corresponding to the three-dimensional comparison model are compared to determine the data differences corresponding to each engineering construction feature, and the overall fluctuation degree of each data difference is determined as the overall construction deviation.
[0085] For example: The engineering building features Y1, Y2, ..., Y j , …, Y m ; The engineering and construction features E1, E2, ..., E corresponding to the three-dimensional comparison model j ,…,E m ; The corresponding data differences are H1, H2, …, H j , …, H m ; where j = 1, 2, ..., m; m is the number of engineering building features; Y j is the jth engineering building feature of the 3D real-time model; E j is the jth engineering building feature of the 3D comparison model; H j =Y j -E j ; then the overall construction deviation Z is: Z=(∑ m j=1 (H j -((∑ m j=1 H j ) / m)) 2 ) / m.
[0086] A construction deviation vector determination submodule, which is connected to the three-dimensional real-time model construction module and is used to determine the construction deviation vector based on the construction variables of the three-dimensional real-time model;
[0087] In the implementation, the construction variables are determined according to several engineering construction features corresponding to the three-dimensional real-time model, and the data differences of each engineering construction feature corresponding to the three-dimensional real-time model and each engineering construction feature corresponding to the three-dimensional comparison model are compared with a preset difference threshold to determine the deviation feature, and the construction deviation vector is determined according to the construction variables corresponding to the deviation feature; wherein, if H j >C, the j-th engineering building feature is determined as a deviation feature; C is the preset difference threshold.
[0088] It is understandable that the actual implementers can determine the preset difference threshold based on the actual situation or the average of the data differences of multiple tests based on the historical data that have passed the acceptance inspection, or determine the preset difference threshold based on the standard range of building tolerances.
[0089] A construction freedom trend vector determination submodule is connected to the database and the three-dimensional real-time model construction module respectively, and is used to determine the construction freedom trend vector based on the changes of the three-dimensional real-time model obtained in a preset period and based on the engineering and architectural design data.
[0090] During implementation, a number of basic engineering construction features and a number of changed engineering construction features are determined according to changes in the three-dimensional real-time model obtained in a preset period (the basic engineering construction features are engineering construction features that exist in all three-dimensional real-time models obtained in a preset period; the changed engineering construction features are engineering construction features newly introduced in each three-dimensional real-time model obtained in a preset period); a basic characteristic equation is constructed according to changes in the basic engineering construction features in a preset period; a force analysis is performed on each changed engineering construction feature, and a number of engineering construction influencing factors are determined in combination with the engineering construction design data (the influencing factors of each changed engineering construction feature are determined in combination with the force analysis and the engineering construction design data, and the engineering construction influencing factors are determined based on each influencing factor); a new basic characteristic equation is determined based on the basic characteristic equation and the several engineering construction influencing factors, and a construction freedom trend vector is determined based on the new basic characteristic equation.
[0091] It should be noted that the basic characteristic equation is generally a mathematical equation (generally a size or shape equation) constructed by force analysis and deformation analysis combined with time changes.
[0092] Specifically, the variation equations of the building characteristics of each infrastructure project are J1, J2, …, J i , …, J n ; then the basic characteristic equation JC=J1+J2+…+J i +…+J n ; Change engineering building features B1, B2, ..., B g , …, B h ; Determine the influencing factors b1, b2, ..., b of each engineering building according to the characteristics of each changing engineering building g , …, b h ; Determine the comprehensive impact factor a=b1×b2×…×b based on the impact factors of each engineering building g ×…×b h ; then the new basic characteristic equation is XC=a×JC; based on the new basic characteristic equation, the construction free trend vector can be determined.
[0093] It is understandable that those skilled in the art know that any method in the prior art that can determine a vector according to an equation falls within the protection scope of the present invention and will not be described in detail herein.
[0094] Where i = 1, 2, ..., n; g = 1, 2, ..., h; h < n; J i is the variation equation of the building characteristics of the ith foundation project, B g is the g-th variable engineering building feature, b g is the engineering construction impact factor corresponding to the g-th changed engineering construction feature.
[0095] The construction data analysis module of the present invention includes a construction deviation determination submodule, a construction deviation vector determination submodule and a construction free trend vector determination submodule. By determining the overall construction deviation, the construction deviation vector and the construction free trend vector, data support is provided for subsequent model optimization to improve the construction quality of engineering buildings.
[0096] See also Figure 4 As shown, it is a structural block diagram of the model optimization module of an embodiment of the present invention; specifically, the model optimization module includes:
[0097] a model data adjustment amount determination submodule, which is connected to the construction data analysis module and is used to calculate the model data adjustment amount of the three-dimensional design model according to the construction deviation vector and the construction free trend vector;
[0098] In implementation, the corresponding deviation adjustment amount is determined according to each construction deviation vector and the construction free trend vector; and the model data adjustment amount of the three-dimensional design model is determined according to the minimum value of each deviation adjustment amount.
[0099] Specifically, the deviation adjustment amount corresponding to each construction deviation vector is determined according to the product of the modulus of each construction deviation vector and the modulus of the construction free trend vector.
[0100] A model data optimization submodule, which is connected to the model data adjustment amount determination submodule and is used to optimize the three-dimensional design model according to the model data adjustment amount;
[0101] In implementation, the data corresponding to each architectural variable of the three-dimensional design model is adjusted according to the model data adjustment amount to obtain an optimized three-dimensional design model.
[0102] The data updating submodule is respectively connected to the database and the model data optimizing submodule, and is used to update the data in the database based on the optimized three-dimensional design model.
[0103] The model optimization module of the present invention comprises a model data adjustment amount determination submodule, a model data optimization submodule and a data updating submodule. The three-dimensional design model is optimized by calculating the model data adjustment amount and the data in the database is updated, so that the construction quality of the engineering building can be improved.
[0104] See also Figure 5 As shown, it is a structural block diagram of the data updating submodule of an embodiment of the present invention; specifically, the data updating submodule includes:
[0105] An update data determination unit, which is connected to the database and the model data optimization submodule respectively, and is used to determine the data to be updated according to the optimized three-dimensional design model and the engineering and architectural design data;
[0106] During implementation, the optimized three-dimensional design model is compared with the three-dimensional design model before optimization to determine the optimization adjustment area, and the building feature data and building construction data corresponding to the optimization adjustment area are determined as data to be updated.
[0107] A data updating unit is connected to the database and the update data determining unit respectively, and is used to update the data in the database according to the data to be updated.
[0108] In implementation, the data to be updated is updated according to a preset data updating method, thereby updating the data in the database.
[0109] In actual application scenarios, actual implementers can set preset data update methods based on expert systems or on engineering and construction design data update methods that have passed qualification tests in historical data according to actual conditions. For example: adjusting and updating engineering and construction design data by building a BIM model; adjusting and updating engineering and construction design data by building a digital twin model for simulation.
[0110] The data updating submodule of the present invention comprises an updated data determining unit and a data updating unit, and can ensure the real-time and validity of the data in the database by updating the data in the database.
[0111] See also Figure 6 As shown, it is a structural block diagram of a three-dimensional real-time model construction module according to an embodiment of the present invention; specifically, the three-dimensional real-time model construction module includes:
[0112] A construction data acquisition submodule, for acquiring the construction image of the engineering building and the corresponding acquisition time in real time, and determining the real-time construction data according to the construction image of the engineering building;
[0113] It should be noted that those skilled in the art are aware that any method in the prior art that can collect images of engineering building construction falls within the protection scope of the present invention and will not be described in detail herein.
[0114] The three-dimensional real-time model building submodule is connected to the database and the construction data acquisition submodule respectively, and is used to build a three-dimensional real-time model of the engineering building based on the real-time construction data, and store the three-dimensional real-time model in the database.
[0115] The three-dimensional real-time model building module of the present invention includes a construction data acquisition submodule and a three-dimensional real-time model building submodule. By collecting construction images of the engineering building to determine real-time construction data to build a three-dimensional real-time model of the engineering building, the real-time performance and accuracy of the three-dimensional real-time model can be improved, thereby improving the accuracy of subsequent model optimization.
[0116] See also Figure 7 As shown, it is a flow chart of the engineering building construction method based on 3D modeling of the present invention; the present invention also provides an engineering building construction method, including:
[0117] Step S1, acquiring city data, engineering and architectural design data and real-time construction data; the city data includes city geographic data, city planning data and city climate data; the engineering and architectural design data includes building feature data and building construction data;
[0118] Step S2, generating a three-dimensional design model of the engineering building according to the city data and the engineering building design data, and constructing a three-dimensional real-time model of the engineering building based on the real-time construction data;
[0119] Step S3, determining the overall construction deviation based on the data difference between the three-dimensional design model and the three-dimensional real-time model, determining the construction deviation vector based on the construction variables of the three-dimensional real-time model, and determining the construction freedom trend vector based on the change of the three-dimensional real-time model obtained in a preset period;
[0120] Step S4, calculating the model data adjustment amount of the three-dimensional design model according to the construction deviation vector and the construction free trend vector to optimize the three-dimensional design model, and updating the data in the database;
[0121] Step S5, generating construction prediction data according to the optimized three-dimensional design model and the updated data in the database, and using the construction prediction data as a reference value for subsequent engineering building construction.
[0122] Specifically, the engineering building construction method provided by the present invention can be applied to the above-mentioned engineering building construction system based on 3D modeling to achieve the same technical effect, which will not be repeated here.
[0123] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.
Claims
1. An engineering building construction system based on 3D modeling, characterized in that: include: A database for storing urban data, engineering and architectural design data, and real-time construction data; the urban data includes urban geographic data, urban planning data, and urban climate data; The engineering building design data includes building feature data and building construction data; A three-dimensional design model generation module, which is connected to the database and is used to generate a three-dimensional design model of the engineering building according to the city data and the engineering building design data; A three-dimensional real-time model building module, which is connected to the database and is used to build a three-dimensional real-time model of the engineering building based on the real-time construction data; a construction data analysis module, which is connected to the 3D design model generation module and the 3D real-time model construction module respectively, and is used to determine the overall construction deviation based on the data difference between the 3D design model and the 3D real-time model, determine the construction deviation vector based on the construction variables of the 3D real-time model, and determine the construction freedom trend vector based on the changes of the 3D real-time model obtained in a preset period; The construction data analysis module includes: A construction deviation determination submodule, which is connected to the three-dimensional design model generation module and the three-dimensional real-time model construction module respectively, and is used to determine the data difference corresponding to each engineering building feature based on the three-dimensional design model and the three-dimensional real-time model, and determine the overall construction deviation based on each of the data differences; The construction deviation determination submodule determines a number of engineering construction features according to the three-dimensional real-time model, and determines a three-dimensional comparison model based on the several engineering construction features and the three-dimensional design model, wherein the three-dimensional comparison model partially overlaps with the three-dimensional design model; the engineering construction features corresponding to the three-dimensional real-time model and the engineering construction features corresponding to the three-dimensional comparison model are compared to determine the data differences corresponding to the various engineering construction features, and the overall fluctuation degree of the various data differences is determined as the overall construction deviation; A construction deviation vector determination submodule, which is connected to the three-dimensional real-time model construction module and is used to determine the construction deviation vector based on the construction variables of the three-dimensional real-time model; A construction freedom trend vector determination submodule, which is connected to the database and the three-dimensional real-time model construction module respectively, and is used to determine the construction freedom trend vector based on the changes of the three-dimensional real-time model obtained in a preset period and based on the engineering building design data; a model optimization module, which is connected to the database and the construction data analysis module respectively, and is used to calculate the model data adjustment amount of the three-dimensional design model according to the construction deviation vector and the construction free trend vector to optimize the three-dimensional design model, and update the data in the database; A construction prediction data generation module is respectively connected to the database and the model optimization module, and is used to generate construction prediction data based on the optimized three-dimensional design model and the updated data in the database, and use the construction prediction data as a reference value for subsequent engineering construction.
2. The engineering building construction system based on 3D modeling according to claim 1 is characterized in that: The three-dimensional design model generation module includes: A city data analysis submodule, which is connected to the database and is used to analyze the city data and determine the regional characteristic data of the engineering building; A building data matching submodule, which is connected to the database and the city data analysis submodule, and is used to match the engineering building design data with the regional feature data to determine the building design data; The three-dimensional design model generating submodule is connected to the building data matching submodule and is used to generate a three-dimensional design model of the engineering building according to the building design data.
3. The engineering building construction system based on 3D modeling according to claim 2 is characterized in that: The model optimization module includes: a model data adjustment amount determination submodule, which is connected to the construction data analysis module and is used to calculate the model data adjustment amount of the three-dimensional design model according to the construction deviation vector and the construction free trend vector; A model data optimization submodule, which is connected to the model data adjustment amount determination submodule and is used to optimize the three-dimensional design model according to the model data adjustment amount; The data updating submodule is respectively connected to the database and the model data optimizing submodule, and is used to update the data in the database based on the optimized three-dimensional design model.
4. The engineering building construction system based on 3D modeling according to claim 3 is characterized in that: The data updating submodule comprises: An update data determination unit, which is connected to the database and the model data optimization submodule respectively, and is used to determine the data to be updated according to the optimized three-dimensional design model and the engineering and architectural design data; A data updating unit is connected to the database and the update data determining unit respectively, and is used to update the data in the database according to the data to be updated.
5. The engineering building construction system based on 3D modeling according to claim 4 is characterized in that: The three-dimensional real-time model building module includes: A construction data acquisition submodule, for acquiring the construction image of the engineering building and the corresponding acquisition time in real time, and determining the real-time construction data according to the construction image of the engineering building; The three-dimensional real-time model building submodule is connected to the database and the construction data acquisition submodule respectively, and is used to build a three-dimensional real-time model of the engineering building based on the real-time construction data, and store the three-dimensional real-time model in the database.
6. The engineering building construction system based on 3D modeling according to claim 5 is characterized in that: The building data matching submodule determines a matching feature vector based on the engineering building design data and the regional feature data, and inputs the matching feature vector into a target neural network model to obtain the building design data output by the target neural network model.
7. The engineering building construction system based on 3D modeling according to claim 6, characterized in that: The construction prediction data generation module integrates the optimized three-dimensional design model with the preset BIM model, generates construction prediction data, and uses the construction prediction data as a reference value for subsequent engineering building construction.
8. The engineering building construction system based on 3D modeling according to claim 7 is characterized in that: The preset period is determined according to the engineering building design data.
9. An engineering building construction method applied to the engineering building construction system based on 3D modeling as described in any one of claims 1 to 8, characterized in that: include: Step S1, obtaining city data, engineering and architectural design data, and real-time construction data; The urban data includes urban geographic data, urban planning data and urban climate data; The engineering building design data includes building feature data and building construction data; Step S2, generating a three-dimensional design model of the engineering building according to the city data and the engineering building design data, and constructing a three-dimensional real-time model of the engineering building based on the real-time construction data; Step S3, determining the overall construction deviation based on the data difference between the three-dimensional design model and the three-dimensional real-time model, determining the construction deviation vector based on the construction variables of the three-dimensional real-time model, and determining the construction freedom trend vector based on the change of the three-dimensional real-time model obtained in a preset period; Step S4, calculating the model data adjustment amount of the three-dimensional design model according to the construction deviation vector and the construction free trend vector to optimize the three-dimensional design model, and updating the data in the database; Step S5, generating construction prediction data according to the optimized three-dimensional design model and the updated data in the database, and using the construction prediction data as a reference value for subsequent engineering building construction.
Citation Information
Patent Citations
An intelligent building engineering three-dimensional modeling system and method
CN118097065B
Automatic measurement system for constructional engineering
CN111797522A
Engineering budget management method and system based on BIM technology
CN116720695A