Deep and large foundation pit inter-pile plate construction device and inter-pile plate construction method

By using alternating casting technology of longitudinal formwork and bottom plates in the construction of pile plates, combined with the design of frame and steel mesh, the problems of uneven distribution of concrete and low construction efficiency are solved, and the construction quality and safety are improved.

CN119195155APending Publication Date: 2024-12-27CHINA RAILWAY NO 5 ENG GRP BUILDING ENG +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411330213.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-24
Publication Date
2024-12-27

AI Technical Summary

Technical Problem

The existing pile plate construction technology has problems such as uneven distribution of concrete, low construction efficiency and high safety risks, especially when the foundation pit is deep, the construction efficiency and quality are difficult to ensure.

Method used

Using a pile plate construction device including longitudinal formwork and bottom plate, concrete is poured alternately through the first and second casting ports, and the uniformity and stability of the concrete are improved by using the frame and steel mesh. The modular construction method simplifies installation and disassembly. process.

Benefits of technology

The uniform distribution of concrete and the improvement of construction efficiency have been achieved, construction risks have been reduced, and construction quality and safety have been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119195155A_ABST
    Figure CN119195155A_ABST
Patent Text Reader

Abstract

The invention discloses a deep and large foundation pit inter-pile plate construction device and method, and belongs to the technical field of inter-pile plate construction.The inter-pile plate construction device comprises a formwork assembly, the formwork assembly comprises a longitudinally-arranged inter-pile plate and a horizontally-arranged bottom plate, and a pouring space M is formed among the inter-pile plate, the bottom plate and two adjacent anti-slide piles A; the pouring space M is used for accommodating concrete; m first pouring openings are formed in the front view face of the inter-pile plate, m is larger than or equal to 2, the n first pouring openings are used for pouring concrete, vibrating rods extend into the remaining first pouring openings, and m is larger than n; and a second pouring opening is further formed in the top of the inter-pile plate, and when the height of concrete in the pouring space M reaches the first pouring opening, the first pouring opening is blocked, and pouring is conducted through the second pouring opening. And pouring is conducted through the first pouring openings, and pouring and vibrating are conducted alternately among the multiple first pouring openings, so that concrete is evenly distributed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pile-slab construction, in particular to a deep and large foundation pit pile-slab construction device and a pile-slab construction method. Background Art

[0002] Anti-slip piles are a common form of deep foundation pit support. When the lateral pressure of the foundation pit soil is large, cast-in-place reinforced concrete pile slabs are often required between the anti-slip piles after the soil is excavated in layers. The most common pile slab construction technology is to excavate the foundation pit in layers after the anti-slip pile construction is completed and meets the strength requirements, drill holes and plant steel bars between the anti-slip piles, tie the steel bars, install the single-sided wooden formwork, and then reinforce it with wooden squares, steel pipes, etc., and then pour concrete. It is troublesome to reinforce the single-sided wooden formwork with steel pipes on the soil in the foundation pit. Reinforcement by inserting steel bars, steel pipes, etc. and anchoring them in the soil is prone to deformation and shaking, and is prone to accidents such as leakage and mold explosion. The pile slab construction efficiency is low, the construction quality is poor, and the safety risk is high.

[0003] The existing concrete pouring is basically poured from the top, which is not conducive to the full mixing of concrete, resulting in uneven distribution of concrete, and the concrete at the bottom of each layer of pile slabs adheres to the soil, resulting in poor concrete quality. In addition, when the foundation pit is deep, the pile slabs need to be manually disassembled, transported and installed continuously, which has low construction efficiency. Summary of the invention

[0004] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.

[0005] In view of the above problems and / or the problems existing in the prior art, the present invention is proposed.

[0006] Therefore, the first object of the present invention is to provide a pile-slab construction device that can replace the existing method of directly pouring concrete from the top to make the concrete evenly distributed; and use a bottom plate to prevent the concrete at the bottom of the pile-slab from sticking to the soil.

[0007] In order to solve the above technical problems, the present invention provides the following technical solutions: a pile-to-slab construction device, comprising a formwork assembly, including a longitudinal formwork arranged longitudinally and a base plate arranged horizontally, a casting space M is formed between the longitudinal formwork, the base plate and two adjacent anti-slip piles A, and the casting space M is used to accommodate concrete; a first casting port is provided on the front surface of the longitudinal formwork, and the first casting port is provided with m numbers, m≥2, wherein n of the first casting ports are used for casting concrete and the remaining first casting ports are used for inserting vibrating rods, m>n; a second casting port is also provided on the top of the longitudinal formwork, and when the height of the concrete in the casting space M reaches the first casting port, the first casting port is blocked and casting is performed through the second casting port instead.

[0008] As a preferred solution of the pile-to-slab construction device of the present invention, it also includes transverse main reinforcement and longitudinal main reinforcement; the two ends of the transverse main reinforcement are respectively fixedly connected to two adjacent anti-slip piles; one end of the longitudinal main reinforcement is fixedly connected to the crown beam, and the other end passes through the base plate.

[0009] As a preferred solution of the pile-to-slab construction device of the present invention, it further comprises a steel mesh, wherein the steel mesh and the longitudinal formwork are arranged parallel to each other, and the steel mesh is fixedly connected to the crown beam.

[0010] As a preferred solution of the pile-to-slab construction device of the present invention, it further comprises a frame, the frame comprising a transverse frame and a longitudinal frame, the bottom of the transverse frame is provided with rollers, the top of the crown beam is provided with a slide groove, the rollers cooperate with the slide groove, and the transverse frame can move along the length direction of the crown beam; the longitudinal frame is slidably connected to the transverse frame, and the longitudinal frame can move vertically; and an operating platform is also provided on the longitudinal frame.

[0011] As a preferred solution of the pile-to-board construction device of the present invention, wherein: a back rib is provided on the front surface of the longitudinal formwork, and the back rib is used for fixed connection with the anti-slip piles; a limb rod is also provided on the back rib, and the limb rod is in conflict with the front surface of the longitudinal formwork.

[0012] As a preferred solution of the pile-to-slab construction device of the present invention, wherein: a hook is provided at the bottom of the operating table; when the pouring space is poured, the hook can interfere with the back rib, and the hook drives the longitudinal formwork to be demoulded; when the longitudinal formwork is demoulded, the hook continues to drive the longitudinal formwork to move along the horizontal or longitudinal direction of the foundation pit to the area to be poured.

[0013] The second object of the present invention is to provide a method for constructing anti-slip piles and inter-pile slabs in a foundation pit, which can be constructed in a modular manner, simplify the steps of installation and disassembly, and improve construction efficiency.

[0014] In order to solve the above technical problems, the present invention provides the following technical solutions: a method for constructing anti-slip piles and pile slabs in a foundation pit, comprising the above-mentioned pile slab construction device, and gradually excavating a plurality of trenches at equal intervals longitudinally in the foundation pit, and arranging a plurality of anti-slip piles at equal intervals laterally; arranging an area to be poured between two adjacent anti-slip piles, and the plurality of areas to be poured are arranged in p rows and q columns; the longitudinal formwork is moved to the area to be poured along the vertical direction or the horizontal direction of the foundation pit; a trench flush with the p-th layer of the area to be poured, and a pad for supporting the longitudinal formwork is installed in the trench, and then the p-th layer of the area to be poured is poured; after the pouring of the p-th layer of the area to be poured is completed, the longitudinal formwork is demolded and moved to p+1 or q+1 for pouring.

[0015] As a preferred solution of the construction method of anti-sliding piles and pile slabs for foundation pits of the present invention, when pouring in the area to be poured, concrete is poured in from the first pouring port, and each layer is filled with 30 to 50 cm, and concrete is poured from one of the first pouring ports, and a vibrating rod is inserted into the other first pouring port and vibrated, and the operations are performed alternately; when the height of the concrete in the pouring space reaches the first pouring port, the first pouring port is blocked; and pouring is continued from the second pouring port until the concrete overflows from the second pouring port.

[0016] As a preferred solution of the construction method of anti-slip piles and pile slabs for foundation pits of the present invention, an air bag is arranged at the joint between the longitudinal formwork and the anti-slip piles; during pouring, the air bag is used to seal the joint between the longitudinal formwork and the anti-slip piles.

[0017] As a preferred solution of the method for constructing anti-sliding piles and inter-pile slabs in foundation pits of the present invention, wherein: when the anti-sliding piles are constructed, embedded joints are reserved on the anti-sliding piles; when the crown beams are constructed, vertical main reinforcement joints are reserved on the crown beams; before pouring, the transverse main reinforcements are fixedly connected to the embedded joints of the anti-sliding piles, and the longitudinal main reinforcements are fixedly connected to the vertical main reinforcement joints of the crown beams.

[0018] The beneficial effects of the present invention are as follows: firstly, pouring is performed through the first pouring opening, and alternate pouring and vibrating are performed between multiple first pouring openings to make the concrete evenly distributed; and construction efficiency is improved by moving the inter-pile plates layer by layer. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:

[0020] Figure 1This is a structural diagram of the anti-slip piles of the pile-slab construction device.

[0021] Figure 2 This is a structural diagram of the embedded joint of the anti-sliding pile of the pile-slab construction device.

[0022] Figure 3 This is a structural diagram of the anti-slip piles and pouring space during construction.

[0023] Figure 4 This is the coordination diagram of the frame and crown beam of the pile-slab construction device.

[0024] Figure 5 It is a cross-sectional view of the pile-slab construction device.

[0025] Figure 6 It is a front view of the pile plate of the pile plate construction device.

[0026] Figure 7 This is the structural diagram of the transverse main reinforcement and longitudinal main reinforcement of the pile-to-slab construction device.

[0027] Figure 8 This is a structural diagram of the steel mesh used in the pile slab construction device.

[0028] Fig. 9 This is the construction status diagram of the pile-to-slab construction device.

[0029] Fig.10 This is the status diagram of the demoulding and movement of the pile-to-pile slab construction device. DETAILED DESCRIPTION

[0030] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0031] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0032] Secondly, the present invention is described in detail with reference to schematic diagrams. When describing the embodiments of the present invention in detail, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.

[0033] Furthermore, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0034] Example 1

[0035] Reference Figure 1 to Figure 5 , which is the first embodiment of the present invention, provides a pile-slab construction device, including a template assembly 100, the template assembly 100 includes a longitudinal template 101 and a bottom plate 102, the longitudinal template 101 is longitudinally arranged, and the bottom plate 101 is horizontally arranged, and a casting space M is formed between the longitudinal template 101, the bottom plate 102 and two adjacent anti-slip piles A, and the casting space M is used to accommodate concrete. After the concrete is formed in the casting space M, a pile-slab is formed.

[0036] A first pouring port 101a is provided on the front surface of the longitudinal formwork 101. In the present embodiment, two first pouring ports 101a are provided. The two first pouring ports 101a are located on the horizontal central axis plane of the longitudinal formwork 101, and the two first pouring ports 101a are symmetrical with respect to the vertical central axis plane of the longitudinal formwork 101. One of the first pouring ports 101a is used for pouring concrete and the remaining first pouring port 101a is used for inserting a vibrating rod, and the operations are performed alternately. A second pouring port 101b is also provided on the top of the longitudinal formwork 101. When the height of the concrete in the pouring space M reaches the first pouring port 101a, the first pouring port 101a is blocked and the second pouring port 101b is used for pouring instead.

[0037] With this inter-pile slab construction device, concrete is first poured through the first pouring opening 101a, and then poured and vibrated alternately between the two first pouring openings 101a, and then poured through the second pouring opening 101b to make the concrete evenly distributed.

[0038] Example 2

[0039] See also Figure 1 to Figure 5, is the second embodiment of the present invention, which is basically the same as the embodiment 1, except that the first pouring openings 101a of this embodiment are provided with four, two of which form a group, wherein the first pouring openings 101a of the first group are in the same position as the first pouring openings 101a in the embodiment 1, the first pouring openings 101a of the second group are in a higher position than the first pouring openings 101a of the first group, and the two first pouring openings 101a of the second group are also symmetrical with respect to the vertical central axis of the longitudinal formwork 101; during construction, pouring is first performed from the first pouring openings 101a of the first group, and when the height of the concrete in the pouring space M reaches the first pouring openings 101a of the first group, the first pouring openings 101a of the first group are blocked; and pouring is performed from the first pouring openings 101a of the second group instead. Compared with the traditional method of pouring directly from the top, the concrete is evenly distributed.

[0040] Example 3

[0041] See also Figures 1 to 10 , which is the third embodiment of the present invention, and is based on embodiment 1 or embodiment 2.

[0042] It is worth noting that during the construction of the anti-sliding pile A, a pre-embedded joint A1 is reserved on the anti-sliding pile A for connecting the transverse main reinforcement 200; and during the construction of the crown beam, fixing screws for connecting the pile-to-pile plate construction device are pre-embedded on the crown beam, and a main reinforcement joint B1 is reserved for connecting the vertical main reinforcement of the pile-to-pile plate.

[0043] Specifically, it also includes transverse main reinforcement 200 and longitudinal main reinforcement 300; the transverse main reinforcement 200 is arranged horizontally, and the longitudinal main reinforcement 300 is arranged vertically, and the two ends of the transverse main reinforcement 200 are respectively fixedly connected to the two adjacent anti-sliding piles A by spot welding or wire binding; one end of the longitudinal main reinforcement 300 is also fixedly connected to the crown beam B by spot welding or wire binding, and the other end passes through the bottom plate 102; by arranging the transverse main reinforcement 200 and the longitudinal main reinforcement 300, the stability of the concrete after forming is increased.

[0044] Preferably, a steel mesh 400 is further included. The steel mesh 400 and the longitudinal template 101 are arranged parallel to each other. The steel mesh 400 is fixedly connected to the reserved inner steel bars of the crown beam B, thereby increasing the stability of the concrete after forming.

[0045] Preferably, it also includes a frame 500, which includes a transverse frame 501 and a longitudinal frame 502. A roller 501a is provided at the bottom of the transverse frame 501, and a slide groove B2 is provided at the top of the crown beam B. The slide groove B2 is arranged along the length direction of the crown beam B. The roller 501a cooperates with the slide groove B2. The roller 501a can roll in the slide groove B2, so that the transverse frame 501 can move along the length direction of the crown beam B; the longitudinal frame 502 is slidably connected to the transverse frame 501, and the longitudinal frame 502 can move vertically; an operating table 502a is also provided on the longitudinal frame 502.

[0046] Preferably, a back rib 101c is provided on the front surface of the longitudinal formwork 101, and the back rib 101c is used to be fixedly connected to the anti-slip piles A by bolts, and the back rib 101c is used to reinforce the longitudinal formwork 101; a limb rod 101d is also provided on the back rib 101c, and the limb rod 101d is in conflict with the front surface of the longitudinal formwork 101, and the limb rod 101d supports the longitudinal formwork 101.

[0047] Preferably, a hook 503 is provided at the bottom of the operating table 502a; when the pouring space M is completed, the hook 503 can interfere with the back rib 101c, and the operating table 502a drives the hook 503 to move vertically, and the hook 503 drives the longitudinal formwork 101 to be demolded; when the longitudinal formwork 101 is demolded, the hook 503 continues to drive the longitudinal formwork 101 to move horizontally or vertically along the foundation pit to the area to be poured.

[0048] Example 4

[0049] See also Figures 1 to 10 , which is the fourth embodiment of the present invention, and is based on the above embodiment. This embodiment provides a method for constructing anti-sliding piles and pile slabs in a foundation pit.

[0050] S100: gradually excavating a plurality of trenches 600 at equal intervals longitudinally in the foundation pit, and arranging a plurality of anti-slide piles A at equal intervals transversely;

[0051] S101: When the anti-sliding pile A is constructed, a pre-embedded joint A1 is reserved on the anti-sliding pile A; when the crown beam B is constructed, a vertical main reinforcement joint B1 is reserved on the crown beam B; before pouring, the transverse main reinforcement 200 is fixedly connected to the pre-embedded joint A1 of the anti-sliding pile A, and the longitudinal main reinforcement 300 is fixedly connected to the vertical main reinforcement joint B1 of the crown beam B.

[0052] S200: setting a to-be-casted area between two adjacent anti-sliding piles A, wherein the plurality of to-be-casted areas are arranged in p rows and q columns;

[0053] S300: The longitudinal formwork 101 moves along the vertical direction or the horizontal direction of the foundation pit to the area to be poured;

[0054] S400: digging a groove 600 flush with the area to be poured on the p-th layer, and installing a pad 700 for supporting the longitudinal formwork 101 in the groove 600, the pad 700 being fixed in the groove 600 by anchoring steel nails, and then pouring the area to be poured on the p-th layer; in this embodiment, the longitudinal formwork 101 is first moved horizontally, and after all the areas to be poured on the same side are poured, it is moved vertically to the next layer to be poured for pouring;

[0055] S401: When pouring in the area to be poured, concrete is poured in from the first pouring port 101a, and each 30-50 cm is poured into a layer. One first pouring port 101a pours concrete, and the other first pouring port 101a inserts a vibrating rod and vibrates, and the operations are performed alternately; until the height of the concrete in the pouring space M reaches the first pouring port 101a, the first pouring port 101a is blocked; pouring continues from the second pouring port 101b until the concrete overflows from the second pouring port 101b;

[0056] S402: An air bag 800 is arranged at the joint between the longitudinal formwork 101 and the anti-sliding pile A; during pouring, the air bag 800 is used to block the joint between the longitudinal formwork 101 and the anti-sliding pile A;

[0057] S500: After the pouring of the p-th layer to be poured is completed, the longitudinal formwork 101 is demoulded and moved to p+1 or q+1 for pouring. In this embodiment, it is first moved to q+1 for pouring, and when the p-th layer is completed, it is moved to the p+1 layer for construction.

[0058] Based on the above, the beneficial effects of the present invention are:

[0059] 1. By setting the longitudinal formwork 101, after the longitudinal formwork 101 is installed, concrete is first poured through the two first pouring openings 101a on the front face of the longitudinal formwork 101, and the two first pouring openings 101a are alternately poured and vibrated to make the concrete evenly distributed; when the concrete reaches the first pouring opening 101a, the first pouring opening 101a is blocked, and then the pouring is continued through the second pouring opening 101b on the top of the first pouring opening 101a until the concrete overflows from the second pouring opening 101b; this pouring method can make the concrete distribution more even compared with the existing pouring method.

[0060] 2. The construction is carried out layer by layer through the pile board construction device. Compared with the traditional single-sided wooden formwork construction, the construction is more convenient and more efficient.

[0061] Importantly, it should be noted that the construction and arrangement of the present application shown in a plurality of different exemplary embodiments are only exemplary. Although only a few embodiments are described in detail in this disclosure, it should be readily understood by those who refer to this disclosure that many modifications are possible (e.g., the size, scale, structure, shape and proportion of various elements, and parameter values ​​(e.g., temperature, pressure, etc.), installation arrangement, use of materials, color, directional changes, etc.) without substantially departing from the novel teachings and advantages of the subject matter described in the application. For example, the element shown as integrally formed can be composed of multiple parts or elements, the position of the element can be inverted or otherwise changed, and the nature or number or position of the discrete element can be changed or changed. Therefore, all such modifications are intended to be included in the scope of the present invention. The order or sequence of any process or method steps can be changed or reordered according to alternative embodiments. In the claims, any "device plus function" clause is intended to cover the structure of performing the function described herein, and is not only structurally equivalent but also equivalent structure. Without departing from the scope of the present invention, other replacements, modifications, changes and omissions can be made in the design, operating conditions and arrangement of the exemplary embodiments. Therefore, the invention is not limited to a specific embodiment, but extends to numerous modifications still falling within the scope of the appended claims.

[0062] Additionally, in order to provide a concise description of exemplary embodiments, all features of an actual embodiment (ie, those features that are not relevant to the best mode presently contemplated for carrying out the invention or those that are not relevant to implementing the invention) may not be described.

[0063] It will be appreciated that in the development of any actual implementation, as in any engineering or design project, numerous implementation-specific decisions may be made. Such a development effort may be complex and time-consuming, but will be a routine task of design, fabrication, and production for those of ordinary skill having the benefit of this disclosure without undue experimentation.

[0064] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A pile-slab construction device, characterized in that: include: A formwork assembly (100) comprises a longitudinal formwork (101) arranged longitudinally and a bottom plate (102) arranged horizontally, wherein a pouring space (M) is formed between the longitudinal formwork (101), the bottom plate (102) and two adjacent anti-slip piles (A), and the pouring space (M) is used to accommodate concrete; A first pouring port (101a) is provided on the front face of the longitudinal formwork (101), and m first pouring ports (101a) are provided, where m≥2, n first pouring ports (101a) are used for pouring concrete and the remaining first pouring ports (101a) are used for inserting vibrating rods, where m>n; A second pouring port (101b) is also provided on the top of the longitudinal formwork (101). When the height of concrete in the pouring space (M) reaches the first pouring port (101a), the first pouring port (101a) is blocked and pouring is performed through the second pouring port (101b).

2. The pile-slab construction device according to claim 1, characterized in that: It also includes transverse main reinforcement (200) and longitudinal main reinforcement (300); The two ends of the transverse main reinforcement (200) are respectively fixedly connected to two adjacent anti-sliding piles (A); One end of the longitudinal main reinforcement (300) is fixedly connected to the crown beam (B), and the other end passes through the bottom plate (102).

3. The pile-slab construction device according to claim 1 or 2, characterized in that: It also includes a steel mesh (400), wherein the steel mesh (400) and the longitudinal template (101) are arranged parallel to each other, and the steel mesh (400) is fixedly connected to the crown beam (B).

4. The pile-slab construction device according to claim 3, characterized in that: The machine also comprises a frame (500), wherein the frame (500) comprises a transverse frame (501) and a longitudinal frame (502), wherein a roller (501a) is provided at the bottom of the transverse frame (501), a slide groove (B2) is provided at the top of the crown beam (B), the roller (501a) cooperates with the slide groove (B2), and the transverse frame (501) can move along the length direction of the crown beam (B); the longitudinal frame (502) is slidably connected to the transverse frame (501), and the longitudinal frame (502) can move vertically; and an operating table (502a) is also provided on the longitudinal frame (502).

5. The pile-slab construction device according to claim 4, characterized in that: A back rib (101c) is provided on the front face of the longitudinal template (101), and the back rib (101c) is used for fixed connection with the anti-slip pile (A); a limb rod (101d) is also provided on the back rib (101c), and the limb rod (101d) is in conflict with the front face of the longitudinal template (101).

6. The pile-slab construction device according to claim 5, characterized in that: A hook (503) is provided at the bottom of the operating table (502a); when the pouring space (M) is poured, the hook (503) can interfere with the back rib (101c), and the hook (503) drives the longitudinal formwork (101) to be demoulded; when the longitudinal formwork (101) is demoulded, the hook (503) continues to drive the longitudinal formwork (101) to move along the horizontal or vertical direction of the foundation pit to the area to be poured.

7. A method for constructing anti-sliding piles and pile slabs in a foundation pit, characterized in that: include: The pile-slab construction device according to any one of claims 1 to 6, and A plurality of trenches (600) are excavated longitudinally and equidistantly in the foundation pit, and a plurality of anti-sliding piles (A) are arranged transversely and equidistantly; An area to be poured is set between two adjacent anti-sliding piles (A), and a plurality of the areas to be poured are arranged in p rows and q columns; The longitudinal formwork (101) is moved along the vertical direction or the horizontal direction of the foundation pit to the area to be poured; Digging a trench (600) flush with the area to be poured for the p-th layer, installing a pad (700) for supporting the longitudinal formwork (101) in the trench (600), and then pouring the area to be poured for the p-th layer; After the pouring of the p-th layer to be poured area is completed, the longitudinal formwork (101) is demoulded and moved to p+1 or q+1 for pouring.

8. The method for constructing anti-sliding piles and inter-pile slabs in foundation pits according to claim 7, characterized in that: When pouring in the area to be poured, concrete is poured in from the first pouring port (101a), and each layer is filled with 30 to 50 cm, and one of the first pouring ports (101a) pours concrete, and a vibrating rod is inserted into the other first pouring port (101a) and vibrates, and the operations are performed alternately; when the height of the concrete in the pouring space (M) reaches the first pouring port (101a), the first pouring port (101a) is blocked; and pouring is continued from the second pouring port (101b) until the concrete overflows from the second pouring port (101b).

9. The method for constructing anti-sliding piles and inter-pile slabs in foundation pits according to claim 7, characterized in that: An air bag (800) is arranged at the joint between the longitudinal formwork (101) and the anti-slip pile (A); during pouring, the air bag (800) is used to seal the joint between the longitudinal formwork (101) and the anti-slip pile (A).

10. The method for constructing anti-sliding piles and inter-pile slabs in foundation pits according to claim 7, characterized in that: When the anti-sliding pile (A) is constructed, a pre-embedded joint (A1) is reserved on the anti-sliding pile (A); when the crown beam (B) is constructed, a vertical main reinforcement joint (B1) is reserved on the crown beam (B); before pouring, the transverse main reinforcement (200) is fixedly connected to the pre-embedded joint (A1) of the anti-sliding pile (A), and the longitudinal main reinforcement (300) is fixedly connected to the vertical main reinforcement joint (B1) of the crown beam (B).