Smart power grid management system, method, equipment and medium

Through the requirements planning module and system building module, user requirements and business scenario data are obtained, preset functions are extracted to implement program components, and a connection interface with power grid equipment is set in the central processor, which solves the problem that the existing smart grid management system cannot be based on different Requirements and regional settings issues realize efficient data processing and management.

CN119209882APending Publication Date: 2024-12-27STATE GRID JIBEI ELECTRIC POWER COMPANY LIMITED CHENGDE POWER SUPPLY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411145586.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-12-27

AI Technical Summary

Technical Problem

The existing smart grid management system cannot achieve smart grid management that meets needs based on different needs and regional settings.

Method used

The requirements planning module obtains user demand data and business scenario data, extracts preset functions to realize program components, and sets up a connection interface with the power grid equipment in the central processor to establish a data transmission relationship, and realizes the construction of functional components and data encryption processing.

Benefits of technology

The smart grid management system setting is realized according to different needs and regions, improving the system fit and data processing efficiency, and solving the needs that cannot be achieved by existing solutions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119209882A_ABST
    Figure CN119209882A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent power grid management system, method and device and a medium, mainly relates to the technical field of intelligent power grids, and is used for solving the problem that the existing scheme cannot set an intelligent power grid management system meeting requirements according to power grids of different areas with different requirements. Comprising the following steps: extracting a corresponding preset function implementation program component from user demand data; determining all power grid equipment corresponding to the current service scene data; determining equipment required by calculation and determining a preset relationship between the equipment required by calculation and the preset function implementation program component; the preset function implementation program component is arranged in a preset central processing unit, and when output data of the preset function implementation program component meet preset qualified requirements, it is determined that building of the preset function implementation program component is completed; and when the connection interface obtains the calculation-required data uploaded by the calculation-required equipment, transmitting the calculation-required data to the corresponding preset function implementation program component.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field, and in particular to a smart grid management system, method, device and medium. Background Art

[0002] Smart grid management uses technologies such as the Internet of Things, cloud computing, big data, and artificial intelligence to fully perceive, monitor, and intelligently control the power grid, thereby achieving refined management of all aspects of the power system. Smart grid management includes real-time monitoring and control, automation and intelligence, distributed energy management, and big data analysis and application. Smart grid management has a wide range of application scenarios, including power supply reliability management, energy management, load forecasting and optimization, and safety management. For example, it can achieve remote monitoring and fault location of power grid equipment, timely detect and eliminate faults, and improve the reliability and stability of the power grid.

[0003] The existing smart grid management solution is: an intelligent energy storage grid management system, which belongs to the field of intelligent energy storage technology. The intelligent energy storage grid management system includes a two-way connected energy storage management system, a power management system and an information management system. The energy storage management system includes an energy storage battery module, a battery management system, a microcontroller module, a balancing management module, and a charging module; the energy storage battery module includes a lithium titanate battery module and a supercapacitor module arranged in parallel; the power management system includes a load module and a remote monitoring module connected to the load module, a safety warning module, and an equipment intelligent management module.

[0004] However, the above existing solutions are fixed-mode management systems, which cannot realize a smart grid management system that can be set up to meet the needs of power grids in different regions according to different needs. Summary of the invention

[0005] In view of the above-mentioned deficiencies in the prior art, the present application provides a smart grid management system, method and medium to solve the problem that the existing solutions cannot realize a smart grid management system that meets the needs of power grids in different areas according to different needs.

[0006] In a first aspect, the present application provides a smart grid management system, the system comprising: a demand planning module, used to obtain user demand data and business scenario data; extract the corresponding preset function implementation program component from the user demand data; determine all power grid devices corresponding to the current business scenario data; based on the parameter type involved in the preset function implementation program component, determine the device required for calculation and the preset relationship between the device required for calculation and the preset function implementation program component from all power grid devices; wherein there is a corresponding relationship between the power grid equipment and the parameter type; a system construction module, used to set the preset function implementation program component in a preset central processor, and when the output data of the preset function implementation program component meets the preset qualification requirements, determine to complete the construction of the preset function implementation program component, otherwise generate an alarm instruction to a preset maintenance terminal; set a connection interface between the device required for calculation in the central processor; establish a preset corresponding relationship between the data required for calculation and the preset function implementation program component, and then when the connection interface obtains the data required for calculation uploaded by the device required for calculation, transmit the data required for calculation to the corresponding preset function implementation program component; a transmission encryption module, connected to the central processor, used to automatically call the encryption program when it is detected that the central processor triggers a data output instruction, and encrypt the output data corresponding to the data output instruction.

[0007] Furthermore, the demand planning module includes: a function uploading unit, a function corresponding unit and a function deleting unit; the function uploading unit is used to obtain a preset function implementation program component, a preset function implementation program component name and a function keyword corresponding to the component; store the correspondence between the preset function implementation program component name and the function keyword, and upload the preset function implementation program component to the cloud; the function corresponding unit is used to extract the function keyword from the user demand data, and then obtain the preset function implementation program component name corresponding to the function keyword; download the corresponding preset function implementation program component from the cloud; the function deleting unit is used to delete the preset function implementation program component inside the system when the output data of the preset function implementation program component meets the preset qualification requirements.

[0008] Furthermore, the demand planning module includes: an equipment uploading unit and an equipment corresponding unit; the equipment uploading unit is used to obtain the correspondence between the location data and all the power grid equipment through a preset interface; the equipment corresponding unit is used to determine a number of location data corresponding to the current business scenario data through a trained semantic recognition algorithm; and then based on the correspondence between the location data and all the power grid equipment, determine all the power grid equipment corresponding to the current business scenario data.

[0009] Furthermore, the system building module includes: a qualification verification unit, used to obtain sample data corresponding to the preset function implementation program component; automatically use the sample data as input of the preset function implementation program component to obtain output data, and when the output data falls within a preset qualified range, determine that the output data of the preset function implementation program component meets the preset qualified requirements.

[0010] Furthermore, the system also includes: an operation monitoring module, which is connected to the central processing unit and is used to obtain the operation data of the central processing unit and upload the operation data to a preset operation and maintenance monitoring terminal.

[0011] In a second aspect, the present application provides a smart grid management method, the method comprising: obtaining user demand data and business scenario data; extracting the corresponding preset function implementation program component from the user demand data; determining all power grid devices corresponding to the current business scenario data; based on the parameter type involved in the preset function implementation program component, determining the device required for calculation and the preset relationship between the device required for calculation and the preset function implementation program component from all power grid devices; wherein there is a corresponding relationship between the power grid equipment and the parameter type; setting the preset function implementation program component in a preset central processor, and when the output data of the preset function implementation program component meets the preset qualification requirements, determining that the construction of the preset function implementation program component is completed, otherwise generating an alarm instruction to a preset maintenance terminal; setting a connection interface between the device required for calculation and the central processor; establishing a preset corresponding relationship between the data required for calculation and the preset function implementation program component, and then when the connection interface obtains the data required for calculation uploaded by the device required for calculation, the data required for calculation is transmitted to the corresponding preset function implementation program component; when it is detected that the central processor triggers a data output instruction, the encryption program is automatically called to encrypt the output data corresponding to the data output instruction.

[0012] Furthermore, extracting the corresponding preset function implementation program component from the user demand data specifically includes: extracting function keywords from the user demand data, and then obtaining the preset function implementation program component name corresponding to the function keyword; downloading the corresponding preset function implementation program component from the cloud; before extracting the corresponding preset function implementation program component from the user demand data, the method also includes: obtaining the preset function implementation program component, the preset function implementation program component name and the function keyword corresponding to the component; storing the correspondence between the preset function implementation program component name and the function keyword, and uploading the preset function implementation program component to the cloud.

[0013] Furthermore, the method also includes: obtaining operation data of the central processing unit, and uploading the operation data to a preset operation and maintenance monitoring terminal.

[0014] In a third aspect, the present application provides a smart grid management device, the device comprising: a processor; and a memory having executable code stored thereon, wherein when the executable code is executed, the processor executes a smart grid management method such as any one of the above items.

[0015] In a fourth aspect, the present application provides a non-volatile computer storage medium having computer instructions stored thereon, which when executed implement a smart grid management method as described above.

[0016] Those skilled in the art can understand that the present application has at least the following beneficial effects: The present application discloses a smart grid management system, method, device and medium, which extracts corresponding preset function implementation program components from user demand data through a demand planning module to achieve demand matching, and achieves regional matching by determining all power grid equipment corresponding to current business scenario data; and then through a system building module, it achieves docking of preset function implementation program components and regional equipment on a preset central processor, and then runs and processes data, solving the problem that existing solutions cannot achieve smart grid management systems that meet the needs of power grids in different regions according to different needs. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Some embodiments of the present disclosure are described below with reference to the accompanying drawings, in which: Figure 1 It is a schematic diagram of the internal structure of a smart grid management system provided in an embodiment of the present application.

[0018] Figure 2 It is a flow chart of a smart grid management method provided in an embodiment of the present application.

[0019] Figure 3 It is a schematic diagram of the internal structure of a smart grid management device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0020] It should be understood by those skilled in the art that the embodiments described below are only preferred embodiments of the present disclosure, and do not mean that the present disclosure can only be implemented through the preferred embodiments. The preferred embodiments are only used to explain the technical principles of the present disclosure, and are not used to limit the protection scope of the present disclosure. Based on the preferred embodiments provided by the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work should still fall within the protection scope of the present disclosure.

[0021] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0022] The technical solution proposed in the embodiments of the present application is described in detail below with reference to the accompanying drawings.

[0023] Figure 1 A smart grid management system is provided in the embodiment of the present application. Figure 1 As shown, the system provided in the embodiment of the present application mainly includes: The demand planning module is used to obtain user demand data and business scenario data; extract the corresponding preset function implementation program components from the user demand data; determine all power grid equipment corresponding to the current business scenario data; based on the parameter types involved in the preset function implementation program components, determine the equipment required for calculation from all power grid equipment and determine the preset relationship between the equipment required for calculation and the preset function implementation program components.

[0024] Among them, extracting the corresponding preset function implementation program components from the user demand data can be achieved through the function correspondence unit in the demand planning module. Specifically, the function upload unit is used to obtain the preset function implementation program components, the preset function implementation program component names and the function keywords corresponding to the components; store the correspondence between the preset function implementation program component names and the function keywords, and upload the preset function implementation program components to the cloud.

[0025] In addition, the present application can process the preset function implementation program component through the function corresponding unit in the demand planning module before obtaining the preset function implementation program component, the preset function implementation program component name and the function keyword corresponding to the component. The specific process can be: The function corresponding unit obtains the function keywords from the user demand data, and then obtains the names of the preset function implementation program components corresponding to the function keywords; and downloads the corresponding preset function implementation program components from the cloud.

[0026] In addition, the present application can delete the preset function implementation program component in the current system when the preset function implementation program component is not needed, thereby freeing up space. The specific process can be: When the output data of the preset function realization program component meets the preset qualification requirements, the preset function realization program component inside the system is deleted through the function deletion unit in the demand planning module.

[0027] Among them, determining all power grid equipment corresponding to the current business scenario data can be achieved through the equipment corresponding unit in the demand planning module. Specifically, the equipment corresponding unit in the demand planning module determines several location data corresponding to the current business scenario data through a trained semantic recognition algorithm; and then determines all power grid equipment corresponding to the current business scenario data based on the correspondence between the location data and all power grid equipment.

[0028] In addition, based on the correspondence between the location data and all the power grid equipment, the present application can obtain the correspondence between the location data and all the power grid equipment through the device upload unit in the demand planning module through a preset interface.

[0029] A system construction module is used to set the preset function implementation program component in the preset central processing unit. When the output data of the preset function implementation program component meets the preset qualification requirements, it is determined that the construction of the preset function implementation program component is completed, otherwise an alarm instruction is generated to the preset maintenance terminal; a connection interface between the device required for calculation is set in the central processing unit; a preset corresponding relationship between the data required for calculation and the preset function implementation program component is established, and then when the connection interface obtains the data required for calculation uploaded by the device required for calculation, the data required for calculation is transmitted to the corresponding preset function implementation program component.

[0030] It should be noted that setting the preset function implementation program component in the preset central processing unit can be achieved by the existing technology and this application does not limit this.

[0031] The specific process corresponding to the output data of the preset function realization program component meeting the preset qualification requirements may be: The sample data corresponding to the preset function implementation program component is obtained through the qualified verification unit; the sample data is automatically used as the input of the preset function implementation program component to obtain output data, and when the output data falls into the preset qualified range, it is determined that the output data of the preset function implementation program component meets the preset qualified requirements.

[0032] The transmission encryption module is connected to the central processing unit and is used to automatically call the encryption program when it detects that the central processing unit triggers a data output instruction, and encrypt the output data corresponding to the data output instruction.

[0033] In addition, the present application can also monitor the operation of the central processing unit, and the specific process can be: The operation monitoring module connected to the central processing unit in the system obtains the operation data of the central processing unit and uploads the operation data to the preset operation and maintenance monitoring terminal.

[0034] In addition, the present application also provides a smart grid management method, such as Figure 2 As shown, the method provided in the embodiment of the present application mainly includes the following steps: Step 210, obtain user demand data and business scenario data; extract the corresponding preset function implementation program component from the user demand data; determine all power grid equipment corresponding to the current business scenario data; based on the parameter types involved in the preset function implementation program component, determine the equipment required for calculation from all power grid equipment and determine the preset relationship between the equipment required for calculation and the preset function implementation program component.

[0035] It should be noted that there is a corresponding relationship between power grid equipment and parameter types.

[0036] Among them, extracting the corresponding preset function implementation program component from the user demand data specifically includes: extracting function keywords from the user demand data, and then obtaining the name of the preset function implementation program component corresponding to the function keyword; downloading the corresponding preset function implementation program component from the cloud.

[0037] In addition, before extracting the corresponding preset function implementation program component from the user demand data, the method also includes: obtaining the preset function implementation program component, the preset function implementation program component name and the function keyword corresponding to the component; storing the correspondence between the preset function implementation program component name and the function keyword, and uploading the preset function implementation program component to the cloud.

[0038] Step 220, setting the preset function implementation program component in the preset central processing unit, and when the output data of the preset function implementation program component meets the preset qualification requirements, determining that the construction of the preset function implementation program component is completed, otherwise generating an alarm instruction to the preset maintenance terminal; setting a connection interface between the device required for calculation and the central processing unit; establishing a preset corresponding relationship between the data required for calculation and the preset function implementation program component, and then when the connection interface obtains the data required for calculation uploaded by the device required for calculation, the data required for calculation is transmitted to the corresponding preset function implementation program component.

[0039] Step 230: When it is detected that the central processing unit triggers a data output instruction, the encryption program is automatically called to encrypt the output data corresponding to the data output instruction.

[0040] The method also includes: obtaining operation data of the central processing unit, and uploading the operation data to a preset operation and maintenance monitoring terminal.

[0041] The above is a method embodiment of the present application. Based on the same inventive concept, the present application embodiment also provides a smart grid management device. Figure 3As shown, the device includes: a processor; and a memory on which executable codes are stored. When the executable codes are executed, the processor executes a smart grid management method as described in the above-mentioned embodiment.

[0042] Specifically, the server side obtains user demand data and business scenario data; extracts the corresponding preset function implementation program component from the user demand data; determines all power grid devices corresponding to the current business scenario data; based on the parameter type involved in the preset function implementation program component, determines the equipment required for calculation and the preset relationship between the equipment required for calculation and the preset function implementation program component from all power grid devices; wherein there is a corresponding relationship between the power grid equipment and the parameter type; sets the preset function implementation program component in a preset central processor, and when the output data of the preset function implementation program component meets the preset qualification requirements, determines that the construction of the preset function implementation program component is completed, otherwise generates an alarm instruction to the preset maintenance terminal; sets a connection interface between the equipment required for calculation in the central processor; establishes a preset corresponding relationship between the data required for calculation and the preset function implementation program component, and then when the connection interface obtains the data required for calculation uploaded by the equipment required for calculation, transmits the data required for calculation to the corresponding preset function implementation program component; when it is detected that the central processor triggers a data output instruction, the encryption program is automatically called to encrypt the output data corresponding to the data output instruction.

[0043] In addition, an embodiment of the present application further provides a non-volatile computer storage medium on which executable instructions are stored. When the executable instructions are executed, a smart grid management method as described above is implemented.

[0044] So far, the technical solutions of the present disclosure have been described in combination with the above multiple embodiments, but it is easy for those skilled in the art to understand that the protection scope of the present disclosure is not limited to these specific embodiments. Without departing from the technical principles of the present disclosure, those skilled in the art can split and combine the technical solutions in the above-mentioned various embodiments, and can also make equivalent changes or replacements to the relevant technical features. Any changes, equivalent replacements, improvements, etc. made within the technical concept and / or technical principle of the present disclosure will fall within the protection scope of the present disclosure.

Claims

1. A smart grid management system, characterized in that: The system comprises: The demand planning module is used to obtain user demand data and business scenario data; extract the corresponding preset function implementation program components from the user demand data; determine all power grid devices corresponding to the current business scenario data; based on the parameter types involved in the preset function implementation program components, determine the devices required for calculation from all power grid devices and determine the preset relationship between the devices required for calculation and the preset function implementation program components; wherein there is a corresponding relationship between the power grid devices and the parameter types; A system construction module is used to set the preset function realization program component in the preset central processing unit, and when the output data of the preset function realization program component meets the preset qualification requirements, it is determined that the construction of the preset function realization program component is completed, otherwise an alarm instruction is generated to the preset maintenance terminal; a connection interface between the device required for calculation is set in the central processing unit; a preset corresponding relationship between the data required for calculation and the preset function realization program component is established, and then when the connection interface obtains the data required for calculation uploaded by the device required for calculation, the data required for calculation is transmitted to the corresponding preset function realization program component; The transmission encryption module is connected to the central processing unit and is used to automatically call the encryption program when it detects that the central processing unit triggers a data output instruction, and encrypt the output data corresponding to the data output instruction.

2. The smart grid management system according to claim 1, characterized in that: The demand planning module includes: function uploading unit, function corresponding unit and function deleting unit; A function uploading unit, used to obtain a preset function implementation program component, a preset function implementation program component name, and a function keyword corresponding to the component; store the correspondence between the preset function implementation program component name and the function keyword, and upload the preset function implementation program component to the cloud; The function corresponding unit is used to extract the function keywords from the user demand data, and then obtain the names of the preset function realization program components corresponding to the function keywords; and download the corresponding preset function realization program components from the cloud; The function deletion unit is used to delete the preset function implementation program component inside the system when the output data of the preset function implementation program component meets the preset qualification requirements.

3. The smart grid management system according to claim 1, characterized in that: The demand planning module includes: equipment uploading unit and equipment corresponding unit; The device uploading unit is used to obtain the corresponding relationship between the location data and all the power grid devices through a preset interface; The device corresponding unit is used to determine a number of location data corresponding to the current business scenario data through a trained semantic recognition algorithm; and then determine all power grid devices corresponding to the current business scenario data based on the correspondence between the location data and all power grid devices.

4. The smart grid management system according to claim 1, characterized in that: The system building modules include: qualified verification unit, Used to obtain sample data corresponding to a preset function implementation program component; automatically use the sample data as input to the preset function implementation program component to obtain output data, and when the output data falls within a preset qualified range, determine that the output data of the preset function implementation program component meets the preset qualified requirements.

5. The smart grid management system according to claim 1, characterized in that: The system further comprises: The operation monitoring module is connected to the central processing unit and is used to obtain the operation data of the central processing unit and upload the operation data to the preset operation and maintenance monitoring terminal.

6. A smart grid management method, characterized in that: The method comprises: Obtain user demand data and business scenario data; extract corresponding preset function implementation program components from the user demand data; determine all power grid devices corresponding to the current business scenario data; based on the parameter types involved in the preset function implementation program components, determine the devices required for calculation from all power grid devices and determine the preset relationship between the devices required for calculation and the preset function implementation program components; wherein there is a corresponding relationship between the power grid devices and the parameter types; The preset function realization program component is set in the preset central processing unit. When the output data of the preset function realization program component meets the preset qualification requirements, it is determined that the construction of the preset function realization program component is completed, otherwise an alarm instruction is generated to the preset maintenance terminal; a connection interface between the device required for calculation is set in the central processing unit; a preset corresponding relationship between the data required for calculation and the preset function realization program component is established, and then when the connection interface obtains the data required for calculation uploaded by the device required for calculation, the data required for calculation is transmitted to the corresponding preset function realization program component; When it is detected that the central processing unit triggers a data output instruction, the encryption program is automatically called to encrypt the output data corresponding to the data output instruction.

7. The smart grid management method according to claim 6, characterized in that: Extracting the corresponding preset function implementation program component from the user demand data specifically includes: extracting the function keyword from the user demand data, and then obtaining the name of the preset function implementation program component corresponding to the function keyword; downloading the corresponding preset function implementation program component from the cloud; Before extracting the corresponding preset function implementation program component from the user demand data, the method also includes: obtaining the preset function implementation program component, the preset function implementation program component name and the function keyword corresponding to the component; storing the correspondence between the preset function implementation program component name and the function keyword, and uploading the preset function implementation program component to the cloud.

8. The smart grid management method according to claim 6, characterized in that: The method further comprises: Obtain the operating data of the central processing unit and upload the operating data to the preset operation and maintenance monitoring terminal.

9. A smart grid management device, characterized in that: The device comprises: processor; and a memory having executable codes stored thereon, which, when the executable codes are executed, enable the processor to execute a smart grid management method as described in any one of claims 6 to 8.

10. A non-volatile computer storage medium, characterized in that: Computer instructions are stored thereon, and when the computer instructions are executed, a smart grid management method as described in any one of claims 6-8 is implemented.