Opencast coal mine deep hole blasting control method and related device
By obtaining and matching the geological characteristics and blasting records of open-pit coal mines, and optimizing the blasting plan, the problem of poor blasting effect caused by changes in rock structure is solved, achieving the purpose of more efficient and safer blasting effect and reducing costs.
Patent Information
- Application Number
- CN202411591153.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-08
- Publication Date
- 2024-12-31
AI Technical Summary
During the peeling process of open-pit coal mines, due to changes in rock structure, the original blasting plan cannot meet the on-site requirements, resulting in more large blocks after explosion, larger rear surges, high explosive unit consumption, large secondary crushing volume, and reduced efficiency of mining and installation equipment. The problem of high overall production costs.
By obtaining the first geological characteristics of the area to be blasted and the second geological characteristics and blasting scheme of the blasted area, matching and evaluating candidate blasting schemes, optimizing explosive single consumption, and generating suitable blasting schemes to improve blasting effect.
It effectively improves the blasting effect of deep hole blasting, meets production and safety requirements, reduces production costs, and improves the efficiency of procurement and installation equipment.
Smart Images

Figure CN119223115A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of software technology, and in particular to a method and related device for controlling deep hole blasting in an open-pit coal mine. Background Art
[0002] In the rock stripping and ore recovery projects of large open-pit mines, deep hole loosening blasting is often used. The blasting effect has a direct impact on the subsequent production links, such as the efficiency of mining and transportation equipment, the safety and cost of mining, transportation and drainage production.
[0003] At present, with the development of mining projects, the rock structure of the stripping steps of open-pit coal mines has changed, forming different rock structures, such as soft on top and hard on bottom, hard on top and soft on bottom, soft on top and bottom and hard in the middle. The original blasting plan can no longer meet the on-site requirements. There are problems such as a large number of large pieces after blasting, large backwash (back flip), high unit consumption of explosives, large amount of secondary crushing, reduced efficiency of mining and loading equipment, and high comprehensive production costs. Summary of the invention
[0004] In view of the above problems, this application provides a method and related device for controlling deep hole blasting in open-pit coal mines to achieve the purpose of optimizing the blasting scheme. The specific scheme is as follows:
[0005] The first aspect of the present application provides a method for controlling deep hole blasting in an open-pit coal mine, the method comprising:
[0006] Acquire the first geological characteristics of the area to be blasted;
[0007] Retrieving a blasting record, wherein the blasting record includes a second geological feature of the blasted area and a blasting plan;
[0008] Matching the first geological feature with the second geological feature to determine whether there is a target blasting area in the blasted area with the same geological type as the area to be blasted;
[0009] If the target blasting area exists, the blasting scheme of the target blasting area is used as a candidate blasting scheme of the area to be blasted, and the effect of the candidate blasting scheme is evaluated to generate a blasting scheme for the area to be blasted.
[0010] In a possible implementation, the open-pit coal mine deep hole blasting control method further includes:
[0011] If the target blasting area does not exist, a blasting plan for the area to be blasted is generated by performing simulation analysis based on the first geological feature.
[0012] In a possible implementation, the step of evaluating the effects of the candidate blasting schemes to generate a blasting scheme for the area to be blasted includes:
[0013] Obtain blasting effect evaluation indicators;
[0014] Determining the blasting cost of the candidate blasting scheme based on the blasting effect evaluation index;
[0015] The blasting plan with the lowest blasting cost among the candidate blasting plans is used as the blasting plan for the area to be blasted.
[0016] In a possible implementation, the step of evaluating the effects of the candidate blasting schemes to generate a blasting scheme for the area to be blasted further includes:
[0017] Based on the rock mass blastability classification and explosive matching, the explosive consumption per unit in the blasting scheme of the area to be blasted is optimized.
[0018] In a possible implementation, the open-pit coal mine deep hole blasting control method further includes:
[0019] The blasting design and simulation are carried out based on the blasting plan of the area to be blasted.
[0020] A second aspect of the present application provides an open-pit coal mine deep hole blasting control device, the open-pit coal mine deep hole blasting control device comprising:
[0021] A feature acquisition module, used to acquire a first geological feature of the area to be blasted;
[0022] The feature matching and scheme generation module is used to retrieve blasting records, wherein the blasting records contain the second geological feature and blasting scheme of the blasted area; match the first geological feature with the second geological feature to determine whether there is a target blasting area with the same geological type as the area to be blasted in the blasted area; if the target blasting area exists, the blasting scheme of the target blasting area is used as a candidate blasting scheme for the area to be blasted, and the effect of the candidate blasting scheme is evaluated to generate a blasting scheme for the area to be blasted.
[0023] In a possible implementation, the feature matching and solution generation module is further used to:
[0024] If the target blasting area does not exist, a blasting plan for the area to be blasted is generated by performing simulation analysis based on the first geological feature.
[0025] The third aspect of the present application provides a computer program product, including computer-readable instructions. When the computer-readable instructions are executed on an electronic device, the electronic device implements the open-pit coal mine deep hole blasting control method of the first aspect or any implementation method of the first aspect.
[0026] A fourth aspect of the present application provides an electronic device, comprising at least one processor and a memory connected to the processor, wherein:
[0027] The memory is used to store computer programs;
[0028] The processor is used to execute the computer program so that the electronic device can implement the open-pit coal mine deep hole blasting control method of the first aspect or any implementation method of the first aspect.
[0029] The fifth aspect of the present application provides a computer storage medium, which carries one or more computer programs. When the one or more computer programs are executed by an electronic device, the electronic device can implement the open-pit coal mine deep hole blasting control method of the above-mentioned first aspect or any implementation method of the first aspect.
[0030] By means of the above technical scheme, the present application provides a method and related devices for controlling deep hole blasting in an open-pit coal mine, which obtains the first geological feature of the area to be blasted; retrieves the blasting record, which contains the second geological feature and blasting scheme of the blasted area; matches the first geological feature with the second geological feature to determine whether there is a target blasting area with the same geological type as the area to be blasted in the blasted area; if there is a target blasting area, the blasting scheme of the target blasting area is used as a candidate blasting scheme for the area to be blasted, and the candidate blasting scheme is evaluated for effect to generate a blasting scheme for the area to be blasted. The present application can optimize the existing blasting schemes with the same geological type, and generate a blasting scheme suitable for this blasting through effect evaluation, which can effectively improve the blasting effect of deep hole blasting, meet production and safety requirements, and achieve the purpose of reducing costs and increasing efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The above and other features, advantages and aspects of the embodiments of the present disclosure will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. Throughout the accompanying drawings, the same or similar reference numerals represent the same or similar elements. It should be understood that the drawings are schematic and the originals and elements are not necessarily drawn to scale.
[0032] Figure 1 A schematic diagram of a process flow of a deep hole blasting control method for an open-pit coal mine provided in an embodiment of the present application;
[0033] Figure 2 A partial flow chart of a method for controlling deep hole blasting in an open-pit coal mine provided in an embodiment of the present application;
[0034] Figure 3 Another schematic diagram of a process flow of a deep hole blasting control method for an open-pit coal mine provided in an embodiment of the present application;
[0035] Figure 4A schematic diagram of the structure of a deep hole blasting control device for an open-pit coal mine provided in an embodiment of the present application;
[0036] Figure 5 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0037] The following describes the embodiments of the present application in conjunction with the drawings in the embodiments of the present application. The terms used in the implementation method section of the present application are only used to explain the specific embodiments of the present application, and are not intended to limit the present application.
[0038] The embodiments of the present application are described below in conjunction with the accompanying drawings. Those skilled in the art will appreciate that, with the development of technology and the emergence of new scenarios, the technical solutions provided in the embodiments of the present application are also applicable to similar technical problems.
[0039] The terms "first", "second" etc. in the specification of the application and the above-mentioned drawings are used to distinguish similar objects, and need not be used to describe a specific order or sequential order. It should be understood that the terms used in this way can be interchangeable in appropriate circumstances, and this is only to describe the distinction mode adopted by the objects of the same attributes when describing in the embodiments of the application. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, so that the process, method, system, product or equipment comprising a series of units need not be limited to those units, but may include other units that are not clearly listed or inherent to these processes, methods, products or equipment.
[0040] Deep hole loosening blasting is often used in rock stripping and ore recovery projects in large open-pit mines. Deep hole loosening blasting has a high degree of mechanization, fast construction speed, high engineering quality, and relatively concentrated blast piles, which has little damage to bedrock and slopes; it can reduce the amount of explosives used and reduce engineering costs; at the same time, loosening blasting can meet the requirements of high-step mining of large equipment in open-pit mines.
[0041] However, the blasting effect has a direct impact on the subsequent production links, such as the efficiency of mining and transportation equipment, the safety and cost of mining, transportation and drainage production. After the ore and rock are crushed, the unqualified large pieces need to be crushed again, which not only increases the blasting cost, but also affects the loading efficiency. Excessive crushing of useful minerals will affect product quality and reduce economic benefits. The geometric size and shape of the blast pile also have a huge impact on the production links such as mining and transportation.
[0042] At present, with the development of mining engineering, the rock structure of the stripping steps of open-pit coal mines has changed, forming different rock structures, such as soft on top and hard on bottom, hard on top and soft on bottom, soft on top and hard in the middle, etc. The original blasting plan can no longer meet the requirements of the site. There are many large pieces after blasting, large backwash (back flip), high unit consumption of explosives, large secondary crushing, reduced efficiency of mining and loading equipment, and high comprehensive production costs. Therefore, in the mining blasting link, it is particularly important to deeply optimize the blasting parameters and methods such as hole network parameters, hole layout, charging structure, and detonation sequence in combination with the physical and mechanical properties of the step rock mass, rock structure, and the requirements of the subsequent links of mining production.
[0043] See also Figure 1 , Figure 1 The following is a flow chart of a method for controlling deep hole blasting in an open-pit coal mine provided in an embodiment of the present application. Figure 1 As shown, an open-pit coal mine deep hole blasting control method provided in an embodiment of the present application includes steps S10 to S40, and these steps are described in detail below.
[0044] S10, obtaining a first geological feature of the area to be blasted.
[0045] In the embodiment of the present application, the geological characteristics of the open-pit coal mine include, on the one hand, the composition of the rock mass, the type of the rock mass, and the physical and mechanical parameters related to the explosiveness of the rock mass (such as the rock mass bulk density, the rock mass compressive strength, the wave impedance, etc.), and on the other hand, the internal layered structure of the rock mass (such as bedding, foliation, joints), fracture structure (such as weak interlayers, faults, weathering fissures), etc. A corresponding mine geological model can be established according to the engineering geological conditions of the open-pit coal mine.
[0046] The area to be blasted is the location to be blasted in the open-pit coal mine. The geological characteristics of the area to be blasted, that is, the first geological characteristics, are obtained.
[0047] S20, retrieving a blasting record, wherein the blasting record includes a second geological feature of the blasted area and a blasting plan.
[0048] In the embodiment of the present application, before the initial blasting of the open-pit coal mine, it is necessary to investigate and count the current status of mine blasting design, and propose a blasting plan based on the main problems existing in mine blasting, such as root sills, umbrella eaves, and consumption of blasting equipment, in combination with the mine blasting conditions, to improve the blasting effect, reduce the unit consumption of explosives, and improve the economic benefits of the mine.
[0049] During the on-site blasting test, the rock blastability test can be carried out in typical areas of different levels in the open-pit coal mine, that is, the blasting test can be carried out in a suitable location and range within the current blasting operation working surface of the open-pit coal mine. The comparative test is mainly carried out under the same geological conditions by changing parameters such as hole spacing, row spacing, chassis resistance line, over-depth, filling length, delay time, charge structure, and detonation point location. Based on this, blasting plans can be designed for different rock structures and on-site blasting tests can be carried out.
[0050] Based on this, a blasting database management system can be established, which stores blasting records of open-pit coal mines. The blasting records specifically record the geological characteristics (i.e., the second geological characteristics) and blasting plans of the blasted areas. The standard design database can be continuously supplemented and improved, and each design can intelligently match the rock structure of the mining area to accurately determine the blasting plan.
[0051] S30, matching the first geological feature with the second geological feature to determine whether there is a target blasting area in the blasted area with the same geological type as the area to be blasted.
[0052] In an embodiment of the present application, for the second geological feature and blasting plan of the blasted area recorded in the blasting record, the first geological feature is matched with the second geological feature to determine whether there is an area in the blasted area with the same geological type as the area to be blasted (i.e., the target blasting area).
[0053] S40, if there is a target blasting area, taking the blasting plan of the target blasting area as a candidate blasting plan of the area to be blasted, and performing effect evaluation on the candidate blasting plan to generate a blasting plan for the area to be blasted.
[0054] In an embodiment of the present application, if there is a target blasting area with the same geological type as the area to be blasted in the blasted area, the blasting plan of the target blasting area can be used as a candidate blasting plan, and a mine blasting effect evaluation system can be established to evaluate the effects of the candidate blasting plans, and the candidate blasting plan with the best effect can be used as the blasting plan for the area to be blasted.
[0055] See also Figure 2 , Figure 2 A partial flow chart of a method for controlling deep hole blasting in an open-pit coal mine provided in an embodiment of the present application. Figure 2 As shown, an open-pit coal mine deep hole blasting control method provided in an embodiment of the present application, wherein "evaluating the effectiveness of candidate blasting schemes to generate a blasting scheme for the area to be blasted" in step S40 may include steps S401 to S403, and these steps are described in detail below.
[0056] S401, obtaining blasting effect evaluation indicators.
[0057] In the embodiment of the present application, blasting effect evaluation indicators such as large block rate, root sill, umbrella eaves, flying rocks, and unit consumption of explosives can be obtained.
[0058] S402, determining the blasting cost of the candidate blasting scheme based on the blasting effect evaluation index.
[0059] In the embodiment of the present application, the candidate blasting scheme may be quantified under the blasting effect evaluation index to calculate the blasting cost of the candidate blasting scheme.
[0060] S403: The blasting plan with the lowest blasting cost among the candidate blasting plans is used as the blasting plan for the area to be blasted.
[0061] In the embodiment of the present application, after the blasting costs of the candidate blasting plans are obtained, the plan with the lowest blasting cost can be used as the blasting plan for the area to be blasted.
[0062] It should be noted that the blasting plan includes blasting parameters such as explosive consumption, hole network parameters, charging structure, delay interval between holes and rows, detonation point selection and detonation sequence, all of which have different degrees of influence on the blasting quality.
[0063] One of the important indicators for measuring the economic benefits of blasting is the unit consumption of explosives used for blasting. The phenomenon of high actual unit consumption of explosives in mines has affected the economic benefits of mines to a certain extent. In order to achieve cost reduction and efficiency improvement in the blasting process, on the basis of ensuring the quality of open-pit mine blasting, the embodiment of the present application can adopt relevant measures to further reduce the unit consumption of explosives for open-pit blasting. In this regard, in a method for controlling deep hole blasting in an open-pit coal mine provided in an embodiment of the present application, step S40 "evaluating the effects of candidate blasting schemes to generate a blasting scheme for the area to be blasted" also includes the following steps:
[0064] Based on the rock mass blastability classification and explosive matching, the explosive consumption in the blasting plan of the blasting area is optimized.
[0065] In the embodiment of the present application, a geological information management system with blasting auxiliary function and a rock blastability classification model can be established. Through field tests and laboratory measurements, the rock wave impedance is calculated and matched with the explosive wave impedance, the type of explosive and unit consumption are reasonably selected, and the explosive energy is efficiently used. Specifically, a rock blastability classification model is established considering the blastability of the rock mass of the stripping step of the open-pit coal mine, and then, considering the influence of the rock structure surface of the stripping step in the area to be blasted and the physical and mechanical properties of the rock strata on the blasting effect, the blastability classification corresponding to the first geological feature is determined based on the rock blastability classification model, so as to determine the corresponding rock wave impedance, and the explosive unit consumption is selected by matching it with the explosive wave impedance of different explosives.
[0066] The geological information management system can realize the functions of importing, editing, viewing and outputting data such as the rock types and their physical and mechanical properties, topographic and geomorphic characteristics, and rock structure characteristics of the mining area.
[0067] It should be noted that according to the relevant literature on blasting theory, when the wave impedance of the rock mass matches the wave impedance of the explosive, the energy transmitted to the rock mass by the explosive is the largest, the strain value caused in the rock mass is the largest, and a better blasting effect can be obtained. According to the rock mass conditions of the quarry, a group of rock mass samples are taken for rock mass wave velocity testing. In rock mass classification, the elastic wave method has become an indispensable means. The main parameters for rock mass classification using elastic waves are: wave velocity, integrity coefficient, weathering coefficient, and crack coefficient. Generally speaking, a fast wave propagation speed in a rock mass indicates that the rock mass is dense, hard, complete, and lightly weathered. On the contrary, a low wave velocity indicates that the rock mass is loose, weak, broken, structurally developed, and severely weathered.
[0068] In one possible implementation, a blasting plan can be simulated for a blasting area where the geological type is first realized. Figure 3 , Figure 3 Another schematic diagram of a process flow of a deep hole blasting control method for an open-pit coal mine provided in an embodiment of the present application. Figure 3 As shown, an open-pit coal mine deep hole blasting control method provided in an embodiment of the present application also includes the following steps:
[0069] S50: If there is no target blasting area, a blasting plan for the area to be blasted is generated by performing simulation analysis based on the first geological feature.
[0070] In the embodiment of the present application, if the target blasting area does not exist in the blasting record, ANSYS / LS-DYNA software can be used to perform numerical calculations on the step blasting under different blasting schemes to reveal its mechanism of action on the blasting effect; at the same time, a comparative analysis of the blasting effects of different blasting schemes is performed to provide a theoretical basis for on-site blasting optimization plans.
[0071] In a possible implementation, in order to realize the visualized operation of blasting, a method for controlling deep hole blasting in an open-pit coal mine provided in an embodiment of the present application further includes the following steps:
[0072] Blasting design and simulation are carried out based on the blasting plan of the area to be blasted.
[0073] The embodiment of the present application can establish an intelligent blasting optimization design system, realize template management of blasting design, establish a design parameter database, and provide basic data for blasting effect prediction.
[0074] In long-term production practice and scientific experiments, using the latest testing methods, through a large number of blasting simulation tests, the stress, strain, rupture and flying phenomena inside and outside the rock mass during the blasting process were observed and measured, and further research results on the rock mass crushing mechanism under blasting were obtained. Various hypotheses and calculation formulas were proposed. They all reflect certain objective laws and have certain guiding significance and application value for actual engineering blasting. All these have enabled us to understand the nature of rock mass medium crushing, and consciously use its crushing laws to guide engineering practice, so as to achieve the purpose of improving blasting effect.
[0075] In the embodiment of the present application, a computer 3D graphics platform suitable for loose blasting design can be developed, and the functions include drawing, editing, three-dimensional view display, visualization operation of blasting design and simulation, etc. The fast intelligent blasting design and simulation in a 3D environment include blasting area division, hole layout and charge design, connection design, blasting process simulation, blasting design template management, explosives and pyrotechnics template management, etc., creating a complete intelligent optimization solution for safe and efficient blasting in open-pit mines.
[0076] In addition, the application can also perform statistical analysis and report output. Specifically, it can statistically output information such as the volume of blasted rock, the amount of explosives and pyrotechnics used, the unit consumption of explosives, hole network parameters, charging structure, hole layout location, the amount of explosives to be detonated once, and the number of blast holes.
[0077] In practical applications, we can collect and organize data such as the surface morphology, landform distribution, and topographic contour maps of the mining area, as well as survey and statistical analysis of the morphological characteristics and slope size of the micro-topography in the blasting area. Use GPS equipment to accurately measure the location of the blasting area, the location of the drill hole, the hole depth, etc., and connect with the software to achieve accurate hole layout. GPS positioning is 30% more accurate than the level measurement. Improve the loosening blasting effect, reduce the cost of perforating blasting by 0.05 yuan / m3 on the original basis, reduce the large block rate of loosening blasting by an average of 10%, and reduce the root sill.
[0078] In actual scenarios, we can comprehensively use advanced technical methods in object-oriented (OOP) technology, geographic information system (GIS) technology, virtual reality (VR) technology, etc., apply the development model advocated by software engineering in system design, and adopt design methods such as seamless integration of graphics and data, visualization technology, integration of data flow and control flow, and software functional componentization; use controls, ODBC, DirectX and other technologies in software code implementation projects to develop a digital intelligent design system for blasting with advanced concepts and practical technologies.
[0079] Through the above description, the open-pit coal mine deep hole blasting control method provided by the embodiment of the present application serves the daily blasting design operation of the mine, provides accurate data and design for blasting construction, and improves the efficiency of blasting design work. By studying the principle of deep hole blasting on the steps of open-pit mines, analyzing the influence mechanism of geological conditions, blasting design parameters, etc. on the blasting effect, a blasting optimization plan is proposed according to the actual situation of the mine, and the intelligent combination of blasting design and geological information is realized, so that each blasting design can be accurately targeted at the rock formation in the blasting area, making the blasting design more reasonable, scientific, and accurate. It can effectively solve the problems of high rate of large blocks in mine blasting or over-crushing of blasting, the existence of foundation of blasting piles, and the existence of umbrella eaves on the upper part of the steps after blasting.
[0080] A method for controlling deep hole blasting in an open-pit coal mine provided in an embodiment of the present application is introduced above. A device for executing the method for controlling deep hole blasting in an open-pit coal mine is introduced below.
[0081] See also Figure 4 , Figure 4 The schematic diagram of the structure of a deep hole blasting control device for open-pit coal mines provided in the embodiment of the present application. Figure 4 As shown, an open-pit coal mine deep hole blasting control device provided in an embodiment of the present application comprises:
[0082] A feature acquisition module 10 is used to acquire a first geological feature of the area to be blasted;
[0083] The feature matching and scheme generating module 20 is used to retrieve the blasting record, which contains the second geological feature and the blasting scheme of the blasted area; match the first geological feature with the second geological feature to determine whether there is a target blasting area with the same geological type as the area to be blasted in the blasted area; if there is a target blasting area, the blasting scheme of the target blasting area is used as a candidate blasting scheme for the area to be blasted, and the effect of the candidate blasting scheme is evaluated to generate a blasting scheme for the area to be blasted.
[0084] In a possible implementation, the feature matching and solution generating module 20 is further used for:
[0085] If there is no target blasting area, a blasting plan for the area to be blasted is generated by performing simulation analysis through the first geological feature.
[0086] In a possible implementation, the feature matching and scheme generation module 20 for evaluating the effects of candidate blasting schemes and generating blasting schemes for the area to be blasted is specifically used to:
[0087] Acquire blasting effect evaluation indicators; determine blasting costs of candidate blasting schemes based on the blasting effect evaluation indicators; and use the scheme with the lowest blasting cost among the candidate blasting schemes as the blasting scheme for the area to be blasted.
[0088] In a possible implementation, the feature matching and solution generating module 20 is further used for:
[0089] Based on the rock mass blastability classification and explosive matching, the explosive consumption in the blasting plan of the blasting area is optimized.
[0090] In a possible implementation, the feature matching and solution generating module 20 is further used for:
[0091] Blasting design and simulation are carried out based on the blasting plan of the area to be blasted.
[0092] It should be noted that the detailed functions of each module in the open-pit coal mine deep hole blasting control device provided in the embodiment of the present application can be found in the corresponding public part of the above-mentioned open-pit coal mine deep hole blasting control method embodiment, which will not be repeated here.
[0093] The present application also provides an electronic device. Figure 5 , Figure 5 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. The electronic device in the embodiment of the present application may include but is not limited to fixed terminals such as mobile phones, laptops, PDAs (personal digital assistants), PADs (tablet computers), desktop computers, etc. Figure 5 The electronic device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.
[0094] like Figure 5 As shown, the electronic device may include a processing device (e.g., a central processing unit, a graphics processing unit, etc.) 501, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 502 or a program loaded from a storage device 508 to a random access memory (RAM) 503. When the electronic device is powered on, various programs and data required for the operation of the electronic device are also stored in the RAM 503. The processing device 501, the ROM 502, and the RAM 503 are connected to each other via a bus 504. An input / output (I / O) interface 505 is also connected to the bus 504.
[0095] Typically, the following devices may be connected to the I / O interface 505: an input device 506 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; an output device 507 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; a storage device 508 including, for example, a memory card, a hard disk, etc.; and a communication device 509. The communication device 509 may allow the electronic device to communicate with other devices wirelessly or by wire to exchange data. Although Figure 5An electronic device having various devices is shown, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead.
[0096] Also provided in an embodiment of the present application is a computer program product, including computer-readable instructions. When the computer-readable instructions are executed on an electronic device, the electronic device implements any open-pit coal mine deep hole blasting control method provided in the embodiment of the present application.
[0097] A computer-readable storage medium is also provided in an embodiment of the present application. The storage medium carries one or more computer programs. When one or more computer programs are executed by an electronic device, the electronic device can implement any open-pit coal mine deep hole blasting control method provided in the embodiment of the present application.
[0098] It should also be noted that the device embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed over multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, in the drawings of the device embodiments provided by the present application, the connection relationship between the modules indicates that there is a communication connection between them, which may be specifically implemented as one or more communication buses or signal lines.
[0099] Through the description of the above implementation mode, the technicians in the field can clearly understand that the present application can be implemented by means of software plus necessary general hardware, and of course, it can also be implemented by special hardware including special integrated circuits, special CPUs, special memories, special components, etc. In general, all functions completed by computer programs can be easily implemented by corresponding hardware, and the specific hardware structure used to implement the same function can also be various, such as analog circuits, digital circuits or special circuits. However, for the present application, software program implementation is a better implementation mode in more cases. Based on such an understanding, the technical solution of the present application is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a readable storage medium, such as a computer floppy disk, a U disk, a mobile hard disk, a ROM, a RAM, a disk or an optical disk, etc., including a number of instructions to enable a computer device (which can be a personal computer, a training device, or a network device, etc.) to execute the methods described in each embodiment of the present application.
[0100] In the above embodiments, all or part of the embodiments may be implemented by software, hardware, firmware or any combination thereof. When implemented by software, all or part of the embodiments may be implemented in the form of a computer program product.
[0101] The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable devices. The computer instructions may be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions may be transmitted from a website site, a computer, a training device, or a data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) mode to another website site, computer, training device, or data center. The computer-readable storage medium may be any available medium that a computer can store or a data storage device such as a training device, a data center, etc. that includes one or more available media integrations. The available medium may be a magnetic medium, (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid-state drive (SSD)), etc.
Claims
1. A method for controlling deep hole blasting in an open-pit coal mine, characterized in that: The open-pit coal mine deep hole blasting control method comprises: Acquire the first geological characteristics of the area to be blasted; Retrieving a blasting record, wherein the blasting record includes a second geological feature of the blasted area and a blasting plan; Matching the first geological feature with the second geological feature to determine whether there is a target blasting area in the blasted area with the same geological type as the area to be blasted; If the target blasting area exists, the blasting scheme of the target blasting area is used as a candidate blasting scheme of the area to be blasted, and the effect of the candidate blasting scheme is evaluated to generate a blasting scheme for the area to be blasted.
2. The open-pit coal mine deep hole blasting control method according to claim 1, characterized in that: The open-pit coal mine deep hole blasting control method also includes: If the target blasting area does not exist, a blasting plan for the area to be blasted is generated by performing simulation analysis based on the first geological feature.
3. The open-pit coal mine deep hole blasting control method according to claim 1, characterized in that: The step of evaluating the effects of the candidate blasting schemes to generate a blasting scheme for the area to be blasted includes: Obtain blasting effect evaluation indicators; Determining the blasting cost of the candidate blasting scheme based on the blasting effect evaluation index; The blasting plan with the lowest blasting cost among the candidate blasting plans is used as the blasting plan for the area to be blasted.
4. The open-pit coal mine deep hole blasting control method according to claim 3, characterized in that: The step of evaluating the effects of the candidate blasting schemes to generate the blasting scheme for the area to be blasted also includes: Based on the rock mass blastability classification and explosive matching, the explosive consumption per unit in the blasting scheme of the area to be blasted is optimized.
5. The open-pit coal mine deep hole blasting control method according to claim 1, characterized in that: The open-pit coal mine deep hole blasting control method also includes: The blasting design and simulation are carried out based on the blasting plan of the area to be blasted.
6. A deep hole blasting control device for open-pit coal mines, characterized in that: The open-pit coal mine deep hole blasting control device comprises: A feature acquisition module, used to acquire a first geological feature of the area to be blasted; The feature matching and scheme generation module is used to retrieve blasting records, wherein the blasting records contain the second geological feature and blasting scheme of the blasted area; match the first geological feature with the second geological feature to determine whether there is a target blasting area with the same geological type as the area to be blasted in the blasted area; if the target blasting area exists, the blasting scheme of the target blasting area is used as a candidate blasting scheme for the area to be blasted, and the effect of the candidate blasting scheme is evaluated to generate a blasting scheme for the area to be blasted.
7. The open-pit coal mine deep hole blasting control device according to claim 6, characterized in that: The feature matching and solution generation module is also used for: If the target blasting area does not exist, a blasting plan for the area to be blasted is generated by performing simulation analysis based on the first geological feature.
8. A computer program product, characterized in that It comprises computer-readable instructions, and when the computer-readable instructions are executed on an electronic device, the electronic device implements the open-pit coal mine deep hole blasting control method as claimed in any one of claims 1 to 5.
9. An electronic device, characterized in that: The method comprises at least one processor and a memory connected to the processor, wherein: The memory is used to store computer programs; The processor is used to execute the computer program so that the electronic device can implement the open-pit coal mine deep hole blasting control method as described in any one of claims 1 to 5.
10. A computer storage medium, characterized in that: The storage medium carries one or more computer programs, and when the one or more computer programs are executed by an electronic device, the electronic device can implement the open-pit coal mine deep hole blasting control method as described in any one of claims 1 to 5.
Citation Information
Cited By
Hole site parameter optimization analysis method based on open-air deep hole blasting
CN120970412A
A hole site parameter optimization analysis method based on open deep hole blasting
CN120970412B