Geotechnical engineering pile foundation construction hanging bracket
By designing a geotechnical engineering pile foundation construction hanger with stable components, lifting mechanisms and integrated control systems, the problem of insufficient flexibility and adaptability of traditional lifting methods is solved, and efficient and safe pile foundations are achieved under different ground conditions. Lifting.
Patent Information
- Application Number
- CN202411431654.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-14
- Publication Date
- 2025-01-03
AI Technical Summary
The traditional geotechnical engineering pile foundation construction lifting methods lack flexibility and adaptability, and it is difficult to meet the installation needs of pile foundations of different lengths and weights, resulting in low construction efficiency and safety hazards.
A geotechnical engineering pile foundation construction hanger including turntables, stabilization components, lifting mechanisms, beams, mobile components and hoisting components is designed. It provides stable support, height adjustment, and transverse direction through hydraulic cylinders, electric power components and integrated control systems. Move and automated control to improve lifting flexibility and safety.
It realizes stable support on uneven or soft ground, improves the flexibility and safety of lifting, enhances construction efficiency, reduces human errors, and is suitable for a variety of construction environments.
Smart Images

Figure CN119240537A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of geological exploration, in particular to a geotechnical engineering pile foundation construction hanger. Background Art
[0002] Geotechnical engineering refers to engineering involving rock, soil, underground and water. In the modern construction industry, pile foundation construction refers to the construction process of the building foundation, among which the foundation and pile are one of the most important parts of the building. Concrete piles are piles made of concrete, which have the advantages of saving wood and steel, durability and low cost. They have been widely used in hydraulic construction, industrial construction, civil construction and bridge foundation engineering. When the foundation of a building is dug and concrete piles are built, the pile hole is usually drilled first, and then the steel cage processed in the factory is lifted by a truck crane and aligned with the center of the pile hole. Finally, it is accurately placed in the pile hole and concrete is poured. After it solidifies, it forms a concrete pile.
[0003] In traditional geotechnical engineering pile foundation construction, the lifting and positioning of pile foundations usually rely on ground lifting machinery, which cannot provide sufficient stability on uneven or soft ground. Traditional lifting methods often lack flexibility and adaptability, and it is difficult to meet the installation requirements of pile foundations of different lengths and weights, resulting in low construction efficiency, safety hazards and low adaptability. Summary of the invention
[0004] In view of the problems existing in the prior art, the present invention proposes a geotechnical engineering pile foundation construction hanger, which solves the problems that the traditional lifting method lacks flexibility and adaptability, is difficult to meet the installation requirements of pile foundations of different lengths and weights, and leads to low construction efficiency, safety hazards and low adaptability.
[0005] In view of this, a geotechnical engineering pile foundation construction hanger of the present invention comprises a turntable, a stabilizing assembly fixed to the lower end surface of the turntable, a lifting mechanism installed on the upper end surface of the turntable, a crossbeam installed on the upper end of the lifting mechanism, a moving assembly fixed in the crossbeam, and a lifting assembly;
[0006] A sleeve is provided in the middle of the rotating disk, and the rotating disk is rotatably connected to the sleeve;
[0007] The stabilizing assembly includes a plurality of stabilizing members, and the stabilizing members include a laterally arranged supporting leg, a first hydraulic cylinder, and a supporting foot; one end of the supporting leg is fixed to the lower end of the turntable through a sleeve, and the lower end surface of the other end of the supporting leg is connected to the input end of the first hydraulic cylinder, and the output end of the first hydraulic cylinder is fixed with a supporting foot;
[0008] One end of the lifting mechanism is fixed on the sleeve, and the other end is connected to the crossbeam;
[0009] A counterweight block is provided at the tail end of the crossbeam; the hoisting assembly is connected with the moving assembly and moves laterally along the crossbeam.
[0010] Preferably, it further comprises a first power assembly, wherein the first power assembly is arranged on the turntable and connected to the lifting assembly.
[0011] Preferably, the lifting assembly includes a winding wheel and a hook, and both ends of the winding wheel are fixed on the turntable through a rotating shaft; a pull wire is wound around the winding wheel, one end of the pull wire is wound around the winding wheel, and the other end of the pull wire is passed around the hook arranged under the beam and vertically extends to the ground.
[0012] Preferably, the first power assembly includes a first motor and a first belt, the first motor is mounted on a turntable, and the first motor is connected to the shaft of the winding wheel through the first belt to drive the winding wheel to rotate.
[0013] Preferably, the lifting mechanism includes a second hydraulic cylinder and a telescopic rod, the input end of the second hydraulic rod is fixedly connected to the sleeve of the turntable, and the output end of the second hydraulic cylinder is fixed to the lower end of the crossbeam through a connecting piece; the lower end of the telescopic rod is fixed to one side of the lower end of the second hydraulic rod through a connecting ear, and is located above the winding wheel; the telescopic rod is a telescopic rod with a through groove in the middle, and the high-strength pull wire on the winding wheel passes through the through groove at one end of the telescopic rod.
[0014] Preferably, the crossbeam is provided with an installation groove, and the installation groove includes a first groove body, a second groove body and a third groove body; the first groove body is arranged at the lower end of the crossbeam; the second groove body is arranged at the upper end of the crossbeam and is connected with the first groove body; the third groove body is opened at one end of the first groove body and the second groove body, and the third groove body is smaller than the first groove body and the third groove body is smaller than the second groove body.
[0015] Preferably, the moving component includes a long belt, a first pulley, a second pulley and a second power component; the long belts are divided into two groups, and the two ends of each group of the long belts are respectively meshed with a first pulley, and the middle of each group of the long belts is meshed with a second pulley; the two groups of long belts are connected by a rotating shaft, and the rotating shaft is respectively arranged at the center of the first pulley and the center of the second pulley; the two ends of the rotating shaft arranged at the center of the first pulley are rotatably connected to the second groove body, and the middle of the rotating shaft arranged at the center of the second pulley is rotatably connected to a limiting block, and the lower end of the limiting block is connected to the lifting component.
[0016] Preferably, a second power assembly is installed in the third trough body, and the second power assembly includes a second motor and a second belt. One end of the second motor is fixedly installed in the third trough body, and the second motor is connected to the rotating shaft of the first pulley arranged at one end of the long belt through a second belt.
[0017] Preferably, it also includes an integrated control system, which includes an operating system, a control system, and a ground detection module that are electrically connected in sequence; the operating system includes load sensors, which are respectively installed on key supporting points and hooks on the crossbeam; the control system includes a central processing unit (CPU), an input / output interface, a display, and a user operation interface that are electrically connected in sequence; the ground monitoring module includes a number of ground sensors, which are respectively installed at the bottom of the supporting feet or around the supporting feet. .
[0018] The beneficial effects of the present invention are:
[0019] 1. The present invention provides stable support for the construction hanger on uneven or soft ground through the design of a stabilizing component, including a supporting leg, a first hydraulic cylinder and a supporting foot, thereby ensuring the balance and stability of the construction hanger.
[0020] 2. The present invention adjusts the height of the construction hanger according to the length of the pile foundation through the lifting mechanism, thereby improving the adaptability and flexibility of the construction hanger.
[0021] 3. The present invention uses a combination of a hoisting assembly, a crossbeam and a moving assembly to enable the pile foundation to achieve lateral movement during the hoisting process, thereby expanding the lateral movement range of the pipe pile during hoisting and increasing the flexibility of the construction hanger operation.
[0022] 4. The present invention provides power to the hoisting assembly through the first power assembly, making the hoisting operation more efficient and labor-saving. The counterweight block is adjusted according to the weight of the pile foundation to maintain the balance of the construction hanger and improve the safety of the hoisting.
[0023] 5. The present invention includes an operating system, a control system, and a ground detection module; the operating system includes load sensors, which are respectively installed on key supporting points and hooks on the beam; the control system includes a central processing unit (CPU), an input / output interface, a display, and a user operation interface which are electrically connected in sequence; the ground monitoring module includes a plurality of ground sensors, which are respectively installed at the bottom of the supporting feet or around the supporting feet, thereby improving the automation and intelligence level of the operation and reducing the possibility of human error.
[0024] 6. The modular design of the present invention makes maintenance and adjustment more convenient, improves the reliability and durability of the hanger during the construction process, is suitable for a variety of construction environments, and enables it to operate stably under changing working conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a structural schematic diagram of the present invention;
[0026] Figure 2It is a structural schematic diagram of another perspective of the present invention;
[0027] Figure 3 It is a schematic diagram of the structure of the stabilizing assembly of the present invention;
[0028] Figure 4 It is a structural schematic diagram of the first power assembly of the present invention;
[0029] Figure 5 It is a schematic diagram of the cross-sectional structure of the crossbeam of the present invention;
[0030] Figure 6 It is a structural schematic diagram of the mobile assembly of the present invention;
[0031] Figure 7 It is an enlarged structural schematic diagram of the hook of the present invention.
[0032] In the figure: 1. turntable; 11. first power assembly; 12. first motor; 13. first belt; 14. winding wheel; 3. telescopic rod; 4. second hydraulic cylinder; 41. sleeve; 42. connecting piece; 5. crossbeam; 51. guide groove; 52. first trough body; 53. second trough body; 54. third trough body; 55. slide rail; 6. counterweight; 7. hook; 8. long belt; 81. second pulley; 82. first pulley; 83. second power assembly; 84. limit block; 85. slider; 9. support leg; 91. first hydraulic cylinder; 92. support foot. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the system design scheme in the embodiments of the present invention. It is worth noting that the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0034] Embodiment 1
[0035] like Figure 1-7 As shown, a geotechnical engineering pile foundation construction hanger of the present invention includes a turntable 1, a stabilizing component fixed to the lower end surface of the turntable 1, a lifting mechanism installed on the upper end surface of the turntable 1, a crossbeam 5 installed at the upper end of the lifting mechanism, a moving component fixed in the crossbeam 5, and a lifting component.
[0036] The turntable 1 is a horizontally arranged circular disc structure. It is used to carry the construction hanger and connect the stable components. Figure 3 As shown, a sleeve 41 is provided in the middle of the turntable 1, and the turntable 1 is rotatably connected to the sleeve 41. The turntable 1 drives the stabilizing assembly, the lifting mechanism, the crossbeam 5, the moving assembly and the hoisting assembly to rotate, and adapts to hoisting work in various directions without moving the construction hanger.
[0037] like Figure 3 As shown, the stabilizing assembly includes several groups of stabilizing parts, each group of stabilizing parts includes a laterally arranged support leg 9, a first hydraulic cylinder 91 and a support foot 92. One end of the support leg 9 is fixed to the lower end of the turntable 1 through a sleeve 41. Preferably, the number of the support legs 9 is 3, which are evenly arranged and connected to the sleeve 41. The lower end surface of the other end of the support leg 9 is connected to the input end of the first hydraulic cylinder 91, and the output end of the first hydraulic cylinder 91 is fixed with a support foot 92. Preferably, the number of the support feet 92 is at least four, and the multi-foot support feet 92 make the support force more stable and will not fall. The stabilizing assembly provides stable support for the construction hanger on uneven or soft ground to ensure the balance and stability of the construction hanger. Preferably, the support leg 9 is stretched outward in the horizontal direction to make the bottom support more stable and balanced. The first hydraulic cylinder 91 of each group of stabilizing parts independently controls the extension and contraction, and then adjusts the height of each group of stabilizing parts according to the situation of the use site to adapt to the site with different ground heights to keep the construction hanger in a horizontal position and ensure stability.
[0038] like Figure 1 and Figure 5 As shown, one end of the lifting mechanism is fixed on the sleeve 41 in the center of the turntable 1, and the other end is connected to the crossbeam 5 through a connector 42. Preferably, the distance between the connection and the tail end of the crossbeam 5 is one-third of the length of the crossbeam 5. The lifting mechanism is used to adjust the height of the construction hanger to meet the installation and operation requirements of pile foundations of different lengths. The crossbeam 5 is a rod-shaped structure with a groove. A moving component is arranged in the crossbeam 5. The moving component is used to support and move the hoisting component, so that the pile foundation can be moved horizontally during the hoisting process. The length of the crossbeam 5 is greater than the length of the support leg 9. One end of the crossbeam 5 extends to the upper and outer sides of the support leg 9, so that the range of lateral movement adjustment of the pipe pile is expanded during hoisting. A counterweight block 6 is arranged at the tail end of the crossbeam 5 to balance the construction hanger. Preferably, one end of the crossbeam 5 is equipped with a plurality of sets of counterweight blocks 6 through a bracket and a hanging rod, and the counterweight blocks 6 are detachable. Different weights of counterweights are matched according to different weights of pipe piles to ensure balance. The mobile assembly is equipped with a lifting assembly for providing control force to the pile foundation to be lifted and performing lifting operation. The turntable 1 is also provided with a first power assembly 11, which is connected to the lifting assembly and provides power for the lifting assembly to complete the retracting and releasing work.
[0039] Embodiment 2
[0040] like Figure 1 and Figure 4As shown, the difference between this embodiment and the first embodiment is that the hoisting assembly includes a winding wheel 14 and a hook 7. The two ends of the winding wheel 14 are fixed on the mounting seat through a rotating shaft, and the lower end of the mounting seat is fixedly mounted on the turntable 1. The winding wheel 14 controls the lifting and lowering of the pipe pile. A pull wire is wound around the winding wheel 14, specifically a high-strength pull wire. One end of the pull wire is wound around the winding wheel 14, and the other end is passed around the hook 7 set under the crossbeam 5 and vertically extended to the ground for hoisting the pile foundation. Preferably, the other end of the pull wire uses a variety of workpieces to fix the pile foundation, and the workpieces include but are not limited to clamps and buckles, and the pipe pile is hoisted and transported to the location where the pile needs to be driven.
[0041] like Figure 4 As shown, the first power assembly 11 includes a first motor 12 and a first belt 13. The first motor 12 is installed on the turntable 1, and is preferably a forward and reverse motor. The first motor 12 is rotatably connected to the axis of the winding wheel 14 through the first belt 13, thereby driving the winding wheel 14 to rotate.
[0042] Embodiment 3
[0043] like Figure 1-2 As shown, the difference between this embodiment and the second embodiment is that the lifting mechanism includes a second hydraulic cylinder 4 and a telescopic rod 3. The input end of the second hydraulic cylinder 4 is fixedly connected to the sleeve 41 of the turntable 1, and the output end of the second hydraulic cylinder 4 is fixed to the lower end of the crossbeam 5 through a connecting piece 42. The lower end of the telescopic rod 3 is fixed to one side of the lower end of the second hydraulic cylinder 4 through a connecting ear and is located above the winding wheel 14. A through groove is provided in the middle of the telescopic rod 3. The telescopic rod 3 is composed of at least three telescopic components, and the high-strength cable on the winding wheel 14 passes through the through groove at one end of the telescopic rod 3, which is used to expand the lateral movement range and stabilize the high-strength cable.
[0044] The use height of the crossbeam 5 is controlled by the second hydraulic cylinder 4, thereby adjusting the lifting height of the pipe pile. In cooperation with the lifting assembly, the lifting height of the pipe pile can be adjusted in a larger range to meet the operational requirements of the pipe pile rising and falling. The telescopic rod 3 is naturally extended when the moving assembly moves horizontally with the hook 7, so that the middle part of the pull wire is assisted and fixed so that it will not shake during the operation, thereby ensuring the stability of the pipe pile lifting process.
[0045] Embodiment 4
[0046] like Figure 5As shown, the difference between this embodiment and the first embodiment is that a mounting groove is provided on the crossbeam 5 for installing a moving assembly. According to the movement requirements of the pipe pile, the moving assembly cooperates with the hoisting assembly to move the pipe pile laterally to a suitable position. The mounting groove includes a first groove body 52, a second groove body 53 and a third groove body 54. The first groove body 52 is arranged at the lower end of the crossbeam 5, and the second groove body 53 is arranged at the upper end of the crossbeam 5, and is connected to the first groove body 52. The third groove body 54 is opened at one end of the first groove body 52 and the second groove body 53, and the third groove body 54 is smaller than the first groove body 52 and the third groove body 54 is smaller than the second groove body 53. The mounting groove is used to install the moving assembly, so that the moving assembly drives the pipe pile hoisted on the hoisting assembly to stably move laterally and adjust the position, providing a relatively large and stable supporting force.
[0047] Embodiment 5
[0048] like Figure 6 and 7 As shown, the difference between this embodiment and the fourth embodiment is that the moving assembly includes a long belt 8, a first pulley 82, a second pulley 81 and a second power assembly 83, and the long belt 8, the first pulley 82 and the second pulley 81 are all structural members with teeth. There are two groups of long belts 8, each group of long belts 8 is ring-shaped, and a first pulley 82 is meshed in each of the two ends of each group of long belts 8, and a second pulley 81 is meshed in the middle of each group of long belts 8. The two groups of long belts 8 are connected by a rotating shaft, and the rotating shaft is respectively arranged at the center of the two first pulleys 82 and the center of the two second pulleys 81. The two ends of the rotating shaft arranged at the center of the first pulley 82 are rotatably connected to the second groove body 53. The middle of the rotating shaft arranged at the center of the second pulley 81 is rotatably connected to the limit block 84, and the limit block 84 is composed of two upper and lower cubes of different volumes, and the volume of the cube at the upper end of the limit block 84 is smaller than the volume of the cube at the lower end of the limit block 84. As shown Figure 5 and Figure 7 As shown, the lower end of the limit block 84 is connected to the upper end of the hook 7 through the slider 85. The lower end of the beam 5 is also connected to the slide rail 55, which is provided with a guide groove 51, the lower end of the slider 85 is slidably connected to the guide groove 51, and the limit block 84 is slidably connected to the first slot body 52.
[0049] like Figure 5 and Figure 6As shown, a second power assembly 83 is installed in the third trough 54, which is used to provide power for the first pulley 82. The second power assembly 83 includes a second motor and a second belt that rotate forward and reversely. One end of the second motor is fixedly installed in the third trough 54. The second motor is connected to the rotating shaft of the first pulley 82 provided at one end of the long belt 8 through the second belt, so that the second motor drives the long belt 8 to rotate through the first pulley 82, thereby rotating and moving the second pulley 81, and also moving the hook 7 connected to the lower end of the second pulley 81, that is, the pipe pile hoisted at the lower end of the hook 7 is moved horizontally to adjust the position.
[0050] Embodiment 6
[0051] The only difference between this embodiment and the second embodiment is that the geotechnical engineering pile foundation construction hanger of the present invention further includes an integrated control system, which includes an operating system, a control system and a ground detection module that are electrically connected in sequence.
[0052] The operating system includes a load sensor, which is composed of at least one pressure sensor, and detects the load weight of the construction hanger through the pressure sensor. The load sensors are respectively installed on the key supporting points on the beam 5 and the hook 7, and the load sensors send data to the control system through cables or wireless signal transmission systems.
[0053] The control system includes a central processing unit (CPU), an input / output interface, a display and a user operation interface which are electrically connected in sequence. There is one central processing unit, which is connected to the input / output interface through an internal bus, receives data from the load sensor and the ground monitoring module, and controls the hydraulic or electric drive system of the boom. The display is set on the turntable 1, and is used to display information, and its information includes but is not limited to starting, stopping, adjusting the height of the first hydraulic cylinder 91, and displaying the position of the central processing unit and the connection with the user operation interface. The display is preferably a mobile terminal or mobile phone application software. The user operation interface is used for the operator to input instructions and monitor the status of this construction hanger.
[0054] The ground monitoring module includes a plurality of ground sensors, which are preferably pressure sensors, tilt sensors or displacement sensors. The ground sensors are installed at the bottom of the support leg 92 or around the support leg 92 to detect the stability and changes of the ground. The ground sensors send data to the control system via a cable or a wireless signal transmission system. The first hydraulic cylinder 91 is electrically connected to the upper and lower parts of the support leg 9 and the support leg 92, and is used to adjust the length of the support leg 9 and the support leg 92.
Claims
1. A geotechnical engineering pile foundation construction hanger, characterized in that: It includes a turntable, a stabilizing component fixed on the lower end surface of the turntable, a lifting mechanism installed on the upper end surface of the turntable, a crossbeam installed on the upper end of the lifting mechanism, a moving component fixed in the crossbeam, and a lifting component; A sleeve is provided in the middle of the rotating disk, and the rotating disk is rotatably connected to the sleeve; The stabilizing assembly includes a plurality of stabilizing members, and the stabilizing members include a laterally arranged supporting leg, a first hydraulic cylinder, and a supporting foot; one end of the supporting leg is fixed to the lower end of the turntable through a sleeve, and the lower end surface of the other end of the supporting leg is connected to the input end of the first hydraulic cylinder, and the output end of the first hydraulic cylinder is fixed with a supporting foot; One end of the lifting mechanism is fixed on the sleeve, and the other end is connected to the crossbeam; A counterweight block is provided at the tail end of the crossbeam; the hoisting assembly is connected with the moving assembly and moves laterally along the crossbeam.
2. The geotechnical engineering pile foundation construction hanger according to claim 1, characterized in that: It also includes a first power assembly, which is arranged on the turntable and connected to the lifting assembly.
3. The geotechnical engineering pile foundation construction hanger according to claim 2, characterized in that: The hoisting assembly includes a winding wheel and a hook, wherein both ends of the winding wheel are fixed on a turntable through a rotating shaft; a pull wire is wound around the winding wheel, one end of the pull wire is wound around the winding wheel, and the other end of the pull wire is passed around a hook arranged under the crossbeam and vertically extends to the ground.
4. The geotechnical engineering pile foundation construction hanger according to claim 3, characterized in that: The first power assembly includes a first motor and a first belt. The first motor is installed on the turntable. The first motor is connected to the shaft of the winding wheel through the first belt to drive the winding wheel to rotate.
5. The geotechnical engineering pile foundation construction hanger according to claim 1, characterized in that: The lifting mechanism includes a second hydraulic cylinder and a telescopic rod, the input end of the second hydraulic rod is fixedly connected to the sleeve of the turntable, and the output end of the second hydraulic cylinder is fixed to the lower end of the beam through a connecting piece; the lower end of the telescopic rod is fixed to one side of the lower end of the second hydraulic rod through a connecting ear, and is located above the winding wheel; the telescopic rod is a telescopic rod with a through groove in the middle, and the high-strength pull wire on the winding wheel passes through the through groove at one end of the telescopic rod.
6. The geotechnical engineering pile foundation construction hanger according to claim 1, characterized in that: The crossbeam is provided with an installation groove, and the installation groove includes a first groove body, a second groove body and a third groove body; the first groove body is arranged at the lower end of the crossbeam; the second groove body is arranged at the upper end of the crossbeam and is connected with the first groove body; the third groove body is opened at one end of the first groove body and the second groove body, and the third groove body is smaller than the first groove body and the third groove body is smaller than the second groove body.
7. The geotechnical engineering pile foundation construction hanger according to claim 5, characterized in that: The moving assembly includes a long belt, a first pulley, a second pulley and a second power assembly; the long belts are divided into two groups, and the two ends of each group of the long belts are respectively meshed with a first pulley, and the middle of each group of the long belts is meshed with a second pulley; the two groups of long belts are connected by a rotating shaft, and the rotating shaft is respectively arranged at the center of the first pulley and the center of the second pulley; the two ends of the rotating shaft arranged at the center of the first pulley are rotatably connected to the second groove body, and the middle of the rotating shaft arranged at the center of the second pulley is rotatably connected to a limiting block, and the lower end of the limiting block is connected to the lifting assembly.
8. The geotechnical engineering pile foundation construction hanger according to claim 6, characterized in that: A second power assembly is installed in the third slot body, and the second power assembly includes a second motor and a second belt. One end of the second motor is fixedly installed in the third slot body, and the second motor is connected to the rotating shaft of the first pulley arranged at one end of the long belt through a second belt.
9. The geotechnical engineering pile foundation construction hanger according to claim 2, characterized in that: It also includes an integrated control system, which includes an operating system, a control system, and a ground detection module that are electrically connected in sequence; the operating system includes load sensors, which are respectively installed on key supporting points and hooks on the crossbeam; the control system includes a central processing unit (CPU), an input / output interface, a display, and a user operation interface that are electrically connected in sequence; the ground monitoring module includes a number of ground sensors, which are respectively installed at the bottom of the supporting feet or around the supporting feet.