Device for monitoring karst geological environment
The motor-driven transmission system of the anchoring, pushing, and loading/unloading mechanism solves the problems of cumbersome fixing and inconvenient maintenance of karst geological environment monitoring devices, realizing automatic anchoring, rapid installation and convenient maintenance, thus improving the convenience and practicality of the device.
Patent Information
- Application Number
- CN202411446620.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-16
- Publication Date
- 2025-01-07
AI Technical Summary
The existing karst geological environment monitoring devices are cumbersome to operate, take a long time to install and adjust, and are inconvenient to maintain and replace, which affects work efficiency and practicality.
The system employs an anchoring mechanism, a pushing mechanism, and a loading and unloading mechanism, and uses a motor-driven transmission system to automatically anchor, push, and load and unload the ground radar, simplifying the fixing operation and improving convenience and practicality.
It enables automatic anchoring, rapid installation, and convenient maintenance of karst geological environment monitoring devices, saving installation, commissioning, and maintenance time, and improving work efficiency and practicality.
Smart Images

Figure CN119267753A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of environmental monitoring, in particular to a device for monitoring karst geological environment. Background Art
[0002] Karst geology is a geological landscape formed by karstification. According to the location of karstification, it can be divided into surface karst landscape and underground karst landscape. The surface karst landscape is a series of phenomena formed by surface water along the surface of soluble carbonate rocks. The underground karst landscape is composed of underground cavities formed by groundwater dissolving along the cracks of soluble carbonate rocks.
[0003] With the increasing role of human activities such as the development of land resources, water resources and mineral resources in karst areas and engineering construction, the resulting karst collapse disasters occur frequently, causing increasing losses. It has become the main geological disaster in karst cities, seriously hindering urban economic construction and development. Therefore, monitoring devices are needed to monitor the geological environment in real time.
[0004] The existing device mainly fixes the geological radar in the karst geological environment for real-time monitoring through a fixing component. The structure with patent number CN109188539A includes a geological radar, the bottom end of the geological radar is screwed to a supporting component, the left and right sides of the supporting component are clamped with one side of the tightening mechanism, and the other side of the tightening mechanism is welded with a cross plate, and the top of the cross plate is plugged with a conical column. This invention can ensure that the geological radar can remain horizontal even if it is installed on an uneven ground or the ground becomes uneven after settlement. The supporting components supporting the geological radar can be tightened as the ground in the karst area settles to avoid the deviation of the geological radar. The overall stability is good and the use is flexible, which improves the stability and safety during monitoring. However, there are still areas that can be optimized in the device.
[0005] The existing devices mainly anchor the geological radar through multiple groups of anchor rods, chains and other structures, so that some devices need to manually anchor multiple groups of fixing components in sequence to fix the geological radar, which makes the fixing operation of some devices more cumbersome. Secondly, some devices are restricted by multiple groups of fixing components, so that some devices adjust the bottom of the geological radar to fit on the ground, resulting in a waste of a lot of installation and deployment time. Finally, some devices mainly fix the geological radar inside the placement box, making it difficult for some devices to quickly load and unload the geological radar for maintenance and replacement, resulting in a waste of a lot of maintenance time and reducing the work efficiency and practicality of the device. Therefore, in order to solve the above problems, a device for karst geological environment monitoring is proposed. Summary of the invention
[0006] The purpose of the present invention is to provide a device for karst geological environment monitoring, so as to solve the problem that the existing devices in the prior art mentioned in the above background technology mainly anchor the geological radar through multiple groups of anchor rods, chains and other structures, so that some devices need to manually anchor multiple groups of fixing components in sequence to fix the geological radar, which makes the fixing operation of some devices more cumbersome. Secondly, some devices are restricted by multiple groups of fixing components, so that some devices make the bottom of the geological radar fit to the ground through adjustment, which leads to a waste of a lot of installation and deployment time. Finally, some devices mainly fix the geological radar inside the placement box, which makes it difficult for some devices to quickly load and unload the geological radar for maintenance and replacement, thus wasting a lot of maintenance time.
[0007] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a device for karst geological environment monitoring, comprising a frame, the top four corners of the frame are fixedly connected with support columns, the top of the support columns are fixedly connected with a transmission box, the bottom middle of the transmission box is fixedly connected with an adjustment box, a lifting plate is provided below the adjustment box, a placement box is provided below the lifting plate, the bottom end of the placement box passes through the middle of the bottom plate of the frame, a limiting square hole corresponding to the placement box is provided in the middle of the bottom plate of the frame, a movable box is fixedly connected to the top middle of the placement box, a geological radar is placed below the inside of the placement box, a plug-in sliding seam corresponding to the geological radar is provided at the bottom of the placement box, and a control console is fixedly connected to the middle of the left side of the transmission box;
[0008] An anchoring mechanism is provided inside the transmission box, and the anchoring mechanism includes a first motor, and the bottom of the first motor is fixedly connected to the middle of the top of the transmission box. A pushing mechanism is provided inside the adjustment box, and the pushing mechanism includes a transmission worm, and both ends of the transmission worm are movably connected to the inner wall of the adjustment box. A loading and unloading mechanism is provided inside the movable box, and the loading and unloading mechanism includes a symmetrical screw, and both ends of the symmetrical screw are movably connected to the inner wall of the movable box.
[0009] Preferably, a transmission shaft is fixedly connected to the middle of the bottom of the first motor, the bottom end of the transmission shaft passes through a transmission box and is fixedly connected to a main gear, and the outer wall of the main gear is located inside the transmission box and meshed with sub gears at four corners.
[0010] Preferably, the inner wall of the sub-gear is fixedly connected with a movable screw, the top of the movable screw is movably connected to the four corners of the top inner wall of the transmission box, the bottom end of the movable screw passes through the bottom of the transmission box and is sleeved with a screw barrel, the outer wall of the screw barrel is fixedly connected with a sliding sleeve, and the inner wall of the sliding sleeve is sleeved on the outer wall of the adjacent support column.
[0011] Preferably, a drill bit is fixedly connected to the bottom end of the screw barrel, and a through hole corresponding to the drill bit and the screw barrel is opened on the bottom plate of the frame.
[0012] Preferably, a linkage shaft is fixedly connected to the middle of the bottom of the main gear, the bottom end of the linkage shaft passes through the transmission box and is fixedly connected to the first bevel gear, the lower part of the first bevel gear is meshed with the second bevel gear, and the inner wall of the second bevel gear is fixedly connected to the middle of the outer wall of the transmission worm.
[0013] Preferably, the front sides of both ends of the outer wall of the transmission worm are meshedly connected with a transmission worm wheel, the inner wall of the transmission worm wheel is fixedly connected with a push screw, the top of the push screw is movably connected to the top two sides of the inner wall of the adjusting box, the bottom end of the push screw passes through the bottom of the adjusting box and is movably connected to the top two sides of the frame, the middle part of the outer wall of the push screw is threadedly connected with a push screw sleeve, and the outer wall of the push screw sleeve is fixedly connected to the left and right side walls of the lifting plate.
[0014] Preferably, limit rods are inserted into the four inner corners of the lifting plate, the bottom ends of the limit rods pass through the lifting plate and are fixedly connected to the two sides of the top of the placement box, the top of the placement box is located at the outer ring of the limit rod and is fixedly connected to a spring, and the top end of the spring is fixedly connected to the four bottom corners of the lifting plate.
[0015] Preferably, a fourth bevel gear is fixedly connected to the middle portion of the outer wall of the symmetrical screw, and a third bevel gear is meshingly connected to the front side of the fourth bevel gear.
[0016] Preferably, a rotating shaft is fixedly connected to the middle portion of the front side of the third bevel gear, and a front end of the rotating shaft passes through the movable box and is fixedly connected to a twist cover.
[0017] Preferably, both ends of the outer wall of the symmetrical screw are threadedly connected with clamping screw sleeves, the bottom of the outer wall of the clamping screw sleeve passes through the placement box and is movably connected with a traction rod, the top of the placement box is provided with a limiting sliding gap corresponding to the clamping screw sleeve, the bottom end of the traction rod is movably connected with a pressure plate, and the bottom of the pressure plate is evenly fixedly connected with a rubber strip.
[0018] Compared with the prior art, the present invention has the following beneficial effects:
[0019] 1. The present invention uses the first motor, transmission shaft, main gear, sub-gear, movable screw, screw barrel, sliding sleeve, drill bit and through hole structures in the anchoring mechanism, and starts the first motor through the console, the first motor drives the transmission shaft to rotate clockwise, the transmission shaft drives the main gear to rotate synchronously, the main gear meshes and drives the sub-gear to rotate synchronously, the sub-gear drives the movable screw to limit rotation, the movable screw drives the screw barrel to slide downward, the screw barrel drives the sliding sleeve to limit and slide on the outer wall of the support column, so that the screw barrel drives the drill bit to pass through the through hole and be inserted into the ground, thereby realizing the anchoring of the frame, so that some devices can automatically insert the fixing components into the ground, simplifying the fixing operation of some devices and improving the convenience and practicality of the devices.
[0020] 2. The present invention uses the linkage shaft, the first bevel gear, the second bevel gear, the transmission worm, the transmission worm wheel, the push screw, the push screw sleeve, the limit rod and the spring and other structures in the pushing mechanism. The main gear drives the linkage shaft to rotate synchronously, the linkage shaft drives the first bevel gear to rotate synchronously, the first bevel gear meshes to drive the second bevel gear to rotate, the second bevel gear drives the transmission worm to limit rotation, the transmission worm meshes to drive the transmission worm wheel to rotate synchronously, the transmission worm wheel drives the push screw to limit rotation, the push screw drives the push screw sleeve to slide downward, the push screw sleeve drives the lifting plate to slide synchronously, and the lifting plate elastically pushes the placement box and the geological radar through the limit rod and the spring, thereby realizing the pushing of the geological radar, so that part of the device can automatically push the geological radar to fit on the ground, saving a lot of installation and deployment time, and improving the efficiency and practicality of the device.
[0021] 3. The present invention uses the symmetrical screw, the fourth bevel gear, the third bevel gear, the rotating shaft, the twist cover, the clamping screw sleeve, the traction rod, the pressure plate and the rubber strip and other structures in the loading and unloading mechanism. The rotating shaft and the third bevel gear are driven to rotate synchronously by rotating the twist cover, the third bevel gear is engaged to drive the fourth bevel gear to rotate, the fourth bevel gear drives the symmetrical screw to limit rotation, the symmetrical screw drives the clamping screw sleeve to slide symmetrically, the clamping screw sleeve drives the top end of the traction rod to slide synchronously, the bottom end of the traction rod drives the pressure plate to slide up and down, and the pressure plate drives the rubber strip to slide synchronously, so that the pressure plate and the rubber strip cooperate with the placement box to clamp or release the geological radar, thereby realizing the loading and unloading of the geological radar, so that some devices can quickly load and unload the geological radar for maintenance and replacement, saving a lot of maintenance time and improving the convenience and practicality of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a front top perspective view of the structure of the present invention;
[0023] Figure 2 It is a front cross-sectional perspective view of the structure of the present invention;
[0024] Figure 3 It is a top-view cross-sectional perspective view of a local structure of a transmission box and an anchoring mechanism of the present invention;
[0025] Figure 4 It is a front view cross-sectional stereoscopic diagram of the local structure of the support column and the anchoring mechanism of the present invention.
[0026] Figure 5 It is a bottom-view cross-sectional stereoscopic view of the local structure of the regulating box and the pushing mechanism of the present invention.
[0027] Figure 6 It is a front view cross-sectional stereoscopic diagram of the local structure of the regulating box and the pushing mechanism of the present invention.
[0028] Figure 7 It is a side sectional stereoscopic view of the local structure of the placement rack and the loading and unloading mechanism of the present invention.
[0029] In the figure: 101, frame; 102, support column; 103, transmission box; 104, adjustment box; 105, lifting plate; 106, placement box; 107, movable box; 108, geological radar; 109, control console; 2, anchoring mechanism; 201, first motor; 202, transmission shaft; 203, main gear; 204, sub-gear; 205, movable screw; 206, screw barrel; 207, sliding sleeve; 208, drill bit; 209, through hole; 3, pushing mechanism; 301 , linkage shaft; 302, first bevel gear; 303, second bevel gear; 304, transmission worm; 305, transmission worm wheel; 306, push screw; 307, push screw sleeve; 308, limit rod; 309, spring; 4, loading and unloading mechanism; 401, symmetrical screw; 402, fourth bevel gear; 403, third bevel gear; 404, rotating shaft; 405, twist cover; 406, clamping screw sleeve; 407, traction rod; 408, pressure plate; 409, rubber strip. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] See also Figure 1-7 , an embodiment provided by the present invention:
[0032] A device for karst geological environment monitoring, comprising a frame 101, the top four corners of the frame 101 are fixedly connected with support columns 102, the top of the support column 102 is fixedly connected with a transmission box 103, the bottom middle of the transmission box 103 is fixedly connected with an adjustment box 104, a lifting plate 105 is provided below the adjustment box 104, a placement box 106 is provided below the lifting plate 105, the bottom end of the placement box 106 passes through the middle of the bottom plate of the frame 101, a limiting square hole corresponding to the placement box 106 is provided in the middle of the bottom plate of the frame 101, a movable box 107 is fixedly connected to the top middle of the placement box 106, a geological radar 108 is placed below the placement box 106, a plug-in sliding seam corresponding to the geological radar 108 is provided at the bottom of the placement box 106, and a console 109 is fixedly connected to the middle of the left side of the transmission box 103;
[0033] An anchoring mechanism 2 is provided inside the transmission box 103, and the anchoring mechanism 2 includes a first motor 201, the bottom of the first motor 201 is fixedly connected to the top middle of the transmission box 103, a transmission shaft 202 is fixedly connected to the bottom middle of the first motor 201, the bottom end of the transmission shaft 202 passes through the transmission box 103 and is fixedly connected to a main gear 203, and the outer wall of the main gear 203 is located at the inner four corners of the transmission box 103 and is meshed and connected to a sub gear 204. Through this design, the first motor 201 drives the sub gear 204 to rotate synchronously through the main gear 203, and the inner wall of the sub gear 204 is fixedly connected to a movable screw 205, and the movable screw 205 The top end is movably connected to the four corners of the top inner wall of the transmission box 103, the bottom end of the movable screw 205 passes through the bottom of the transmission box 103 and is sleeved with a screw barrel 206, the outer wall of the screw barrel 206 is fixedly connected with a sliding sleeve 207, the inner wall of the sliding sleeve 207 is sleeved on the outer wall of the adjacent support column 102, through this design, the movable screw 205 drives the screw barrel 206 to slide up and down stably, the bottom end of the screw barrel 206 is fixedly connected with a drill bit 208, and the bottom plate of the frame 101 is provided with a through hole 209 corresponding to the drill bit 208 and the screw barrel 206, through this design, the drill bit 208 drives the screw barrel 206 to be inserted into the ground, which is convenient for the anchoring operation of the monitoring device.
[0034] The push mechanism 3 is provided inside the regulating box 104, and the push mechanism 3 includes a transmission worm 304, and the two ends of the transmission worm 304 are movably connected to the inner wall of the regulating box 104. A linkage shaft 301 is fixedly connected to the middle of the bottom of the main gear 203, and the bottom end of the linkage shaft 301 passes through the transmission box 103 and is fixedly connected to the first bevel gear 302. The lower part of the first bevel gear 302 is meshed with a second bevel gear 303, and the inner wall of the second bevel gear 303 is fixedly connected to the transmission worm 304. 04, through this design, the main gear 203 drives the first bevel gear 302 to rotate synchronously, so that the anchoring mechanism 2 and the pushing mechanism 3 are linked to each other, and at the same time, the second bevel gear 303 drives the transmission worm 304 to rotate in a limited position, and the front sides of the two ends of the outer wall of the transmission worm 304 are meshed and connected with the transmission worm wheel 305, and the inner wall of the transmission worm wheel 305 is fixedly connected with the pushing screw 306, and the top of the pushing screw 306 is movably connected to the top two sides of the inner wall of the adjustment box 104 The bottom end of the push screw 306 passes through the bottom of the adjustment box 104 and is movably connected to the top two sides of the frame 101. The middle part of the outer wall of the push screw 306 is threadedly connected with a push screw sleeve 307. The outer wall of the push screw sleeve 307 is fixedly connected to the left and right side walls of the lifting plate 105. Through this design, the transmission worm gear 305 drives the push screw 306 to rotate synchronously, so that the push screw sleeve 307 drives the lifting plate 105 to slide up and down. The four corners of the lifting plate 105 are inserted with limit screws. The positioning rod 308, the bottom end of the limiting rod 308 passes through the lifting plate 105 and is fixedly connected to the two sides of the top of the placement box 106. The top of the placement box 106 is located at the outer ring of the limiting rod 308 and is fixedly connected with a spring 309. The top of the spring 309 is fixedly connected to the four corners of the bottom of the lifting plate 105. Through this design, the lifting plate 105 can elastically push the placement box 106 and the geological radar 108 through the spring 309, so that the bottom of the geological radar 108 is more flexible and fits the ground.
[0035] The interior of the movable box 107 is provided with a loading and unloading mechanism 4, which includes a symmetrical screw 401, both ends of which are movably connected to the inner wall of the movable box 107, a fourth bevel gear 402 is fixedly connected to the middle of the outer wall of the symmetrical screw 401, and a third bevel gear 403 is meshedly connected to the front side of the fourth bevel gear 402. Through this design, the third bevel gear 403 is meshed to drive the fourth bevel gear 402 and the symmetrical screw 401 to rotate in a limited position, a rotating shaft 404 is fixedly connected to the middle of the front side of the third bevel gear 403, and the front end of the rotating shaft 404 passes through the movable box 107 and is fixedly connected to a twist cover 405. Through this design, The twist cover 405 drives the symmetrical screw 401 to rotate synchronously. The two ends of the outer wall of the symmetrical screw 401 are threadedly connected with clamping screw sleeves 406. The bottom of the outer wall of the clamping screw sleeve 406 passes through the placement box 106 and is movably connected with a traction rod 407. The top of the placement box 106 is provided with a limiting sliding joint corresponding to the clamping screw sleeve 406. The bottom end of the traction rod 407 is movably connected with a pressure plate 408, and the bottom of the pressure plate 408 is evenly fixedly connected with a rubber strip 409. Through this design, the traction rod 407 drives the pressure plate 408 and the rubber strip 409 to slide up and down to limit the position, so that the pressure plate 408 and the rubber strip 409 cooperate with the placement box 106 to quickly load and unload the geological radar 108.
[0036] Working principle: when the vehicle frame 101 needs to be anchored, first start the first motor 201 through the control console 109, the first motor 201 drives the transmission shaft 202 to rotate clockwise, the transmission shaft 202 drives the main gear 203 to rotate synchronously, the main gear 203 engages and drives the sub-gear 204 to rotate synchronously, the sub-gear 204 drives the movable screw 205 to limit rotation, the movable screw 205 drives the screw barrel 206 to slide downward, the screw barrel 206 drives the sliding sleeve 207 to slide on the outer wall of the support column 102 to limit the outer wall, so that the screw barrel 206 drives the drill bit 208 to pass through the through hole 209 and be inserted into the ground, thereby realizing the anchoring operation of the vehicle frame 101.
[0037] When it is necessary to push the geological radar 108, first, the main gear 203 drives the linkage shaft 301 to rotate synchronously, the linkage shaft 301 drives the first bevel gear 302 to rotate synchronously, the first bevel gear 302 engages to drive the second bevel gear 303 to rotate, the second bevel gear 303 drives the transmission worm 304 to limit the rotation, the transmission worm 304 engages to drive the transmission worm wheel 305 to rotate synchronously, the transmission worm wheel 305 drives the pushing screw 306 to limit the rotation, the pushing screw 306 drives the pushing screw sleeve 307 to slide downward, the pushing screw sleeve 307 drives the lifting plate 105 to slide synchronously, the lifting plate 105 is through the limiting rod 308 and the spring 309, so that the lifting plate 105 elastically pushes the placement box 106 and the geological radar 108, thereby realizing the pushing operation of the geological radar 108.
[0038] When the geological radar 108 needs to be loaded and unloaded, first, the twist cover 405 is rotated, and the twist cover 405 drives the rotating shaft 404 to rotate, and the rotating shaft 404 drives the third bevel gear 403 to rotate synchronously, and the third bevel gear 403 engages to drive the fourth bevel gear 402 to rotate, and the fourth bevel gear 402 drives the symmetrical screw 401 to rotate in a limited position, and the symmetrical screw 401 drives the clamping screw sleeve 406 to slide symmetrically, and the clamping screw sleeve 406 drives the top end of the traction rod 407 to slide synchronously, and the bottom end of the traction rod 407 drives the pressure plate 408 to slide up and down, and the pressure plate 408 drives the rubber strip 409 to slide synchronously, so that the pressure plate 408 and the rubber strip 409 cooperate with the placement box 106 to clamp or release the geological radar 108, thereby realizing the loading and unloading operation of the geological radar 108.
[0039] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any ordinary technician in the industry can smoothly implement the present invention as shown in the drawings and described above. However, any equivalent changes, modifications and evolutions made by technicians familiar with the profession without departing from the scope of the technical solution of the present invention using the technical content disclosed above are all equivalent embodiments of the present invention. At the same time, any equivalent changes, modifications and evolutions made to the above embodiments based on the essential technology of the present invention are still within the protection scope of the technical solution of the present invention.
Claims
1. A device for monitoring karst geological environment, comprising a frame (101), characterized in that: The four corners of the top of the frame (101) are fixedly connected to support columns (102), the top of the support columns (102) is fixedly connected to a transmission box (103), the middle of the bottom of the transmission box (103) is fixedly connected to an adjustment box (104), a lifting plate (105) is provided below the adjustment box (104), a placement box (106) is provided below the lifting plate (105), and the bottom end of the placement box (106) passes through the bottom plate of the frame (101). In the middle, a limiting square hole corresponding to the placement box (106) is provided in the middle of the bottom plate of the frame (101), a movable box (107) is fixedly connected to the middle of the top of the placement box (106), a geological radar (108) is placed at the bottom of the placement box (106), a plug-in sliding slot corresponding to the geological radar (108) is provided at the bottom of the placement box (106), and a control console (109) is fixedly connected to the middle of the left side of the transmission box (103); An anchoring mechanism (2) is provided inside the transmission box (103), and the anchoring mechanism (2) comprises a first motor (201), and the bottom of the first motor (201) is fixedly connected to the middle of the top of the transmission box (103); a pushing mechanism (3) is provided inside the adjustment box (104), and the pushing mechanism (3) comprises a transmission worm (304), and the two ends of the transmission worm (304) are movably connected to the inner wall of the adjustment box (104); a loading and unloading mechanism (4) is provided inside the movable box (107), and the loading and unloading mechanism (4) comprises a symmetrical screw (401), and the two ends of the symmetrical screw (401) are movably connected to the inner wall of the movable box (107).
2. The device for karst geological environment monitoring according to claim 1, characterized in that: A transmission shaft (202) is fixedly connected to the middle of the bottom of the first motor (201); the bottom end of the transmission shaft (202) passes through the transmission box (103) and is fixedly connected to a main gear (203); the outer wall of the main gear (203) is located at the inner four corners of the transmission box (103) and is meshedly connected to sub gears (204).
3. The device for karst geological environment monitoring according to claim 2, characterized in that: The inner wall of the sub-gear (204) is fixedly connected with a movable screw rod (205), the top end of the movable screw rod (205) is movably connected to the top four corners of the inner wall of the transmission box (103), the bottom end of the movable screw rod (205) passes through the bottom of the transmission box (103) and is sleeved with a screw barrel (206), the outer wall of the screw barrel (206) is fixedly connected with a sliding sleeve (207), and the inner wall of the sliding sleeve (207) is sleeved on the outer wall of the adjacent support column (102).
4. The device for karst geological environment monitoring according to claim 3, characterized in that: The bottom end of the screw barrel (206) is fixedly connected to a drill bit (208), and the bottom plate of the vehicle frame (101) is provided with a through hole (209) corresponding to the drill bit (208) and the screw barrel (206).
5. The device for karst geological environment monitoring according to claim 2, characterized in that: A linkage shaft (301) is fixedly connected to the middle of the bottom of the main gear (203); the bottom end of the linkage shaft (301) passes through the transmission box (103) and is fixedly connected to a first bevel gear (302); a second bevel gear (303) is meshedly connected below the first bevel gear (302); and the inner wall of the second bevel gear (303) is fixedly connected to the middle of the outer wall of the transmission worm (304).
6. The device for karst geological environment monitoring according to claim 5, characterized in that: The front sides of both ends of the outer wall of the transmission worm (304) are meshedly connected with a transmission worm wheel (305), the inner wall of the transmission worm wheel (305) is fixedly connected with a push screw (306), the top end of the push screw (306) is movably connected to the top two sides of the inner wall of the adjustment box (104), the bottom end of the push screw (306) passes through the bottom of the adjustment box (104) and is movably connected to the top two sides of the frame (101), the middle part of the outer wall of the push screw (306) is threadedly connected with a push screw sleeve (307), and the outer wall of the push screw sleeve (307) is fixedly connected to the left and right side walls of the lifting plate (105).
7. The device for monitoring karst geological environment according to claim 6, characterized in that: Limit rods (308) are inserted into the four inner corners of the lifting plate (105), the bottom ends of the limit rods (308) pass through the lifting plate (105) and are fixedly connected to the top two sides of the placement box (106), the top of the placement box (106) is located at the outer ring of the limit rod (308) and is fixedly connected to a spring (309), and the top end of the spring (309) is fixedly connected to the four bottom corners of the lifting plate (105).
8. The device for karst geological environment monitoring according to claim 1, characterized in that: A fourth bevel gear (402) is fixedly connected to the middle of the outer wall of the symmetrical screw rod (401), and a third bevel gear (403) is meshedly connected to the front side of the fourth bevel gear (402).
9. The device for karst geological environment monitoring according to claim 8, characterized in that: A rotating shaft (404) is fixedly connected to the middle portion of the front side of the third bevel gear (403), and the front end of the rotating shaft (404) passes through the movable box (107) and is fixedly connected to a twist cover (405).
10. The device for karst geological environment monitoring according to claim 9, characterized in that: The two ends of the outer wall of the symmetrical screw rod (401) are threadedly connected with clamping screw sleeves (406), the bottom of the outer wall of the clamping screw sleeve (406) passes through the placement box (106) and is movably connected with a traction rod (407), the top of the placement box (106) is provided with a limiting sliding joint corresponding to the clamping screw sleeve (406), the bottom end of the traction rod (407) is movably connected with a pressure plate (408), and the bottom of the pressure plate (408) is evenly fixedly connected with a rubber strip (409).
Citation Information
Patent Citations
Device for monitoring karst geological environment
CN109188539A