Efficient scrap iron recovery treatment equipment
By designing a combination of ironmaking zone, electric conveyor belt and drilling mechanism, the problem of low efficiency in processing large scrap iron was solved, and high efficiency and stability in scrap iron recycling and processing and improved smelting efficiency were achieved.
Patent Information
- Application Number
- CN202411405800.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2044-10-10
AI Technical Summary
In existing technologies, large pieces of scrap iron are difficult to process efficiently, which affects the overall efficiency of scrap iron recycling and processing.
The equipment design includes an ironmaking zone, electric trolley, furnace body, electric conveyor belt, and drilling mechanism. The electric conveyor belt transports scrap iron, and the drilling mechanism forms a honeycomb porous structure on large scrap iron pieces. Combined with a circular track design, continuous smelting is achieved. The loading amount of scrap iron is controlled by a weighing sensor, which improves processing efficiency.
It improves the efficiency and stability of scrap iron recycling and processing, ensures uniform melting of scrap iron in the furnace, extends the service life of the blades, reduces the risk of equipment blockage, and improves the overall smelting efficiency.
Smart Images

Figure CN119287102A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of scrap iron recovery and smelting, and in particular to a scrap iron efficient recovery and processing device. Background Art
[0002] With the development and progress of society, the replacement of old structures with new ones, and the oxidation of iron materials, a large amount of scrap iron is generated in society every year. In order to avoid the waste of scrap iron resources, it is necessary to recycle and process the scrap iron. In the existing technology, the recycled scrap iron is usually reduced and smelted into molten iron, and then reprocessed to complete the recycling and reuse of the scrap iron.
[0003] When recycling and smelting scrap iron, in order to improve the smelting efficiency of scrap iron in the electric furnace, the scrap iron is usually crushed in advance. The scrap iron is cut into small pieces by the rotation of the crushing roller, which is convenient for rapid smelting of the scrap iron in the electric furnace. However, the recycled scrap iron is usually mixed with some larger scrap iron. These large pieces of scrap iron have a firm structure and are relatively tightly connected as a whole. If they are not processed in advance and are directly put into the electric furnace, the smelting efficiency of the large pieces of scrap iron in the electric furnace will be low. If they are processed by crushing rollers, the thickness and size of the large pieces of scrap iron will affect their efficiency in being crushed by the crushing rollers, and they are easily blocked at the crushing rollers, which in turn reduces the efficiency of conveying the scrap iron to the electric furnace, affecting the overall efficiency of scrap iron recycling.
[0004] Therefore, a kind of scrap iron efficient recycling and processing equipment is proposed to solve some problems existing in the above-mentioned prior art. Summary of the invention
[0005] The purpose of the present invention is to solve the shortcomings of the prior art that large pieces of scrap iron are difficult to process efficiently, resulting in the overall efficiency of scrap iron recycling being affected, and to propose a scrap iron efficient recycling and processing equipment.
[0006] In order to solve the problems existing in the prior art, the present invention adopts the following technical solutions:
[0007] A scrap iron efficient recycling and processing device comprises an ironmaking area, a track extending to the outside is installed at the bottom of the ironmaking area, an electric trolley is slidably installed on the track, a furnace body is stacked on the electric trolley, an ironmaking mechanism corresponding to the furnace body is installed in the ironmaking area, a material discharge rack is arranged on the outside of the ironmaking area, a material discharge hopper located above the track is installed on the material discharge rack, a first bracket is fixedly installed on the outside of the material discharge rack, a first electric conveyor belt extending to the top of the material discharge hopper is installed on the first bracket, a second electric conveyor belt arranged in parallel with the first electric conveyor belt is installed behind the first bracket, the second electric conveyor belt is located above the first electric conveyor belt, and the end of the second electric conveyor belt is connected to the first electric conveyor belt. A drilling mechanism is installed between the conveyor belts, and the drilling mechanism includes a second bracket fixedly connected to the first bracket, a shell fixedly installed in the second bracket is arranged on the right side of the front side of the second electric conveyor belt, and the shell is located directly above the first electric conveyor belt, and a support plate flush with the top of the second electric conveyor belt is rotatably installed in the shell, a second electric push rod is rotatably installed on the second bracket, and the telescopic end of the second electric push rod is hinged to the support plate, a vertically arranged third electric push rod is fixedly installed on the top of the second bracket, and a bearing platform is fixedly installed on the telescopic end below the third electric push rod, and a plurality of evenly distributed clamping heads are rotatably installed on the bottom of the bearing platform, and each clamping head firmly clamps a milling cutter pointing vertically downward.
[0008] Preferably, a plurality of ironmaking mechanisms are provided, and the plurality of ironmaking mechanisms are installed in sequence in the ironmaking area along the track, the ironmaking mechanism includes a frame vertically erected on the outside of the track, and a first lifting unit is slidably installed on the frame, a furnace cover matching the top opening of the furnace body is fixedly connected to the first lifting unit, a second lifting unit arranged above the first lifting unit is slidably installed on the frame, and an electrode vertically arranged above the furnace cover is fixedly installed on the second lifting unit.
[0009] Preferably, the track is arranged as an annular structure, and the track surrounds and is interspersed between the unloading rack and the plurality of iron-making mechanisms in the iron-making area.
[0010] Preferably, the bottom of the lower hopper is arranged as an inverted trapezoidal structure, and two symmetrically arranged bottom plates are rotatably mounted on the bottom of the lower hopper, and two symmetrically arranged first electric push rods are rotatably mounted on the outer end wall of the lower hopper, and the telescopic ends of the first electric push rods are hinged to the corresponding bottom plates.
[0011] Preferably, the lower hopper is vertically slidably mounted on the lower rack, a spring for elastically supporting the lower hopper is installed at the connection between the lower rack and the lower hopper, and a weighing sensor acting on the lower hopper is installed on the lower rack.
[0012] Preferably, leakage holes corresponding to the plurality of milling cutters are formed through the support plate, and the inner diameter of the leakage hole is set to be 1.5 times the outer diameter of the milling cutter.
[0013] Preferably, the milling cutter includes a connecting rod firmly clamped in the clamping head, and a plurality of coaxially arranged discs are fixedly installed on the bottom end of the connecting rod from top to bottom, the outer diameters of the plurality of discs decrease layer by layer from top to bottom, the outer diameter of the upper disc is set to be twice the outer diameter of the next disc, a cutting blade is fixedly installed on the bottom of each disc, and a chip removal hole is opened through each disc.
[0014] Preferably, the plurality of blades are distributed on the bottom of the plurality of disks in a spiral structure from top to bottom.
[0015] Preferably, a first guard plate arranged on the front and rear sides of the first electric conveyor belt is fixedly installed on the first bracket, a second guard plate arranged on the front and rear sides of the second electric conveyor belt is fixedly installed on the first bracket, a side plate fixedly connected to the rear second guard plate is arranged at the right end of the second electric conveyor belt, and a fourth electric push rod arranged longitudinally is fixedly installed at the rear of the side plate, a push plate fixedly connected to the telescopic end of the fourth electric push rod is arranged on the inner side of the side plate, and the size of the push plate is adapted to the internal size of the outer shell.
[0016] Preferably, a longitudinally arranged baffle is slidably installed at the connection between the rear second guard plate and the side plate, and the front end of the baffle is fixedly connected to the left end of the push plate, and the push plate cooperates with the baffle to form an L-shaped structure.
[0017] Compared with the prior art, the present invention has the following beneficial effects:
[0018] 1. In the present invention, the first electric conveyor belt and the second electric conveyor belt are provided to convey the scrap iron and the large scrap iron respectively, and the drilling mechanism is provided between the second electric conveyor belt and the first electric conveyor belt, so that the processing of the large scrap iron will not interfere with the conveying of the scrap iron, and the stability of the conveying of the scrap iron into the furnace body is ensured. At the same time, the large scrap iron is cut and drilled by multiple milling cutters in the drilling mechanism, so that the processed large scrap iron forms a honeycomb porous structure, which can be efficiently smelted in the furnace body, and the cutting and drilling are easier to implement. Under the cooperation with each other, the efficiency of scrap iron recycling can be effectively improved;
[0019] 2. In the present invention, by setting the track as a ring structure, the electric trolley can drive the furnace body to circulate between the ironmaking area and the unloading rack, and multiple ironmaking mechanisms are set in the ironmaking area, so that the scrap iron in multiple furnace bodies can be reduced and smelted at the same time, and when the scrap iron is smelted, the furnace body left outside is loaded with scrap iron, so that the ironmaking mechanism can continue to operate uninterruptedly, avoiding the scrap iron loading occupying the ironmaking time, which is conducive to further improving the efficiency of the device for scrap iron recovery and smelting;
[0020] 3. In the present invention, by installing a weighing sensor between the lower hopper and the lower rack, and controlling the bottom plate to open and close with the help of the first electric push rod, the weight of the scrap iron lowered into the furnace body can be controlled, which is conducive to more accurately controlling the amount of scrap iron filled in the furnace body, so that the amount of scrap iron filled in the furnace body is adapted to the operating power of the electrode, which is convenient for controlling the device to smelt scrap iron in the optimal state, thereby facilitating the improvement of the efficiency and effect of the device for scrap iron recovery and processing;
[0021] 4. In the present invention, by arranging multiple discs into a stepped structure stacked layer by layer, the range of each blade acting on the scrap iron can be reduced. Compared with using large-sized blades on the same plane to directly perform large-scale cutting operations, the stability and efficiency during drilling and cutting can be effectively improved, and the service life of the blade in the milling cutter can be extended, and the probability of blade fracture and breakage can be effectively reduced;
[0022] 5. In the present invention, by setting the side plate at the right end position of the second electric conveyor belt and pushing the push plate with the help of the fourth electric push rod, the large pieces of scrap iron within the coverage range of the side plate are pushed into the drilling mechanism for processing, which can avoid the impact of the continuous transportation of large pieces of scrap iron by the second electric conveyor belt on the drilling mechanism. The process of large pieces of scrap iron entering the drilling mechanism is compressed into an instantaneous push of the push plate, which can greatly reduce the feeding time of the drilling mechanism and improve the efficiency of the device during processing to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0024] Figure 1 A perspective view of the present invention;
[0025] Figure 2 A top view of the present invention;
[0026] Figure 3 It is a three-dimensional diagram of the ironmaking mechanism of the present invention;
[0027] Figure 4 It is a stereoscopic view of the unloading rack, the first electric conveyor belt, the second electric conveyor belt and the drilling mechanism from the front perspective of the present invention;
[0028] Figure 5 For the present invention Figure 4 A three-dimensional image from the back view of the middle structure;
[0029] Figure 6 For the present invention Figure 4 A top view of the structure in the middle;
[0030] Figure 7 For the present invention Figure 6 Sectional view at AA in the middle;
[0031] Figure 8 For the present invention Figure 6 Cross-section at the middle BB;
[0032] Fig. 9 A three-dimensional diagram of the carrier platform, the clamping head and the milling cutter of the present invention;
[0033] Fig.10 For the present invention Fig. 9 Enlarged view of point C in the middle.
[0034] Serial number in the picture:
[0035] 1. Ironmaking area; 101. Track; 102. Electric trolley; 103. Furnace body;
[0036] 2. Ironmaking mechanism; 201. Frame; 202. First lifting unit; 203. Furnace cover; 204. Second lifting unit; 205. Electrode;
[0037] 3. Unloading rack; 301. Unloading hopper; 302. Bottom plate; 303. First electric push rod;
[0038] 4. First bracket; 401. First electric conveyor belt; 402. First guard plate; 403. Second electric conveyor belt; 404. Second guard plate;
[0039] 5. Second bracket; 501. Housing; 502. Support plate; 503. Second electric push rod; 504. Third electric push rod; 505. Carrying platform; 506. Clamping head; 507. Milling cutter; 5071. Connecting rod; 5072. Disc; 5073. Blade; 5074. Chip removal hole; 508. Leakage hole;
[0040] 6. Side panel; 601. Fourth electric push rod; 602. Push plate; 603. Baffle. DETAILED DESCRIPTION
[0041] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0042] Embodiment: This embodiment provides a scrap iron efficient recycling and processing equipment, see Figure 1 - Fig.10Specifically, it includes an ironmaking area 1, a track 101 extending to the outside is installed at the bottom of the ironmaking area 1, and an electric trolley 102 is slidably installed on the track 101, a furnace body 103 is stacked on the electric trolley 102, an ironmaking mechanism 2 corresponding to the furnace body 103 is installed in the ironmaking area 1, a material unloading rack 3 is arranged on the outside of the ironmaking area 1, and a material unloading hopper 301 located above the track 101 is installed on the material unloading rack 3, a first bracket 4 is fixedly installed on the outside of the material unloading rack 3, and a first electric conveyor belt 401 extending to the top of the material unloading hopper 301 is installed on the first bracket 4, a second electric conveyor belt 403 arranged parallel to the first electric conveyor belt 401 is installed behind the first bracket 4, and the second electric conveyor belt 403 is located above the first electric conveyor belt 401, and the end of the second electric conveyor belt 403 is aligned with the first electric conveyor belt 40 1, a drilling mechanism is installed between the two ends of the second bracket 5, and the drilling mechanism includes a second bracket 5 fixedly connected to the first bracket 4, a shell 501 fixedly installed in the second bracket 5 is arranged on the right side of the front of the second electric conveyor belt 403, and the shell 501 is located directly above the first electric conveyor belt 401, a support plate 502 flush with the top of the second electric conveyor belt 403 is rotatably installed in the shell 501, a second electric push rod 503 is rotatably installed on the second bracket 5, and the telescopic end of the second electric push rod 503 is hinged to the support plate 502, a third electric push rod 504 is fixedly installed vertically on the top of the second bracket 5, and a bearing platform 505 is fixedly installed on the telescopic end below the third electric push rod 504, and a plurality of evenly distributed clamping heads 506 are rotatably installed on the bottom of the bearing platform 505, and each clamping head 506 firmly clamps a milling cutter 507 pointing vertically downward.
[0043] During the use of the device, the scrap iron collected by the recycling will be screened in advance, and the large pieces of scrap iron, iron bars and small iron blocks in the scrap iron will be separated. During the recycling production, the furnace body 103 is stacked on the electric trolley 102. The electric trolley 102 is provided with a driving unit, which can drive the electric trolley 102 to move along the track 101. Driven by the electric trolley 102, the furnace body 103 stacked on the electric trolley 102 moves to the inner side of the unloading rack 3, so that the furnace body 103 is directly below the unloading hopper 301, and then the scrap iron fragments such as iron bars and small iron blocks are directly transported to the unloading hopper 301 through the first electric conveyor belt 401, and fall into the furnace body 103 below with the guidance of the unloading hopper 301, and the large pieces of scrap iron are transported through the second electric conveyor belt 403.
[0044] When the large piece of scrap iron is transported to the end position of the second electric conveyor belt 403, it will be transferred to the shell 501, and the large piece of scrap iron will be laid flat on the top of the support plate 502. Then, the third electric push rod 504 installed on the top of the second bracket 5 is powered on and started, driving the support platform 505 to move downward. A power unit for driving each clamping head 506 to rotate is installed in the support platform 505. During the downward movement of the support platform 505, the clamping head 506 drives the milling cutter 507 to rotate at high speed, acting on the large piece of scrap iron. The milling cutter 507 rotates at high speed to cut the large piece of scrap iron, forming evenly distributed through holes in the large piece of scrap iron, and cutting The generated metal chips are accumulated on the support plate 502. When the through hole on the large piece of scrap iron is opened, the third electric push rod 504 is started in the reverse direction, driving the support platform 505 to move upward and reset, and synchronously, the milling cutter 507 is moved away from the large piece of scrap iron on the support plate 502. Then the second electric push rod 503 is powered on and started, pulling the support plate 502 to deflect, so that one end of the support plate 502, which was originally in a horizontal state, tilts downward, and the large pieces of scrap iron and metal chips on the support plate 502 are dumped onto the first electric conveyor belt 401, and are sent into the lower hopper 301 under the transportation of the first electric conveyor belt 401, and finally put into the furnace body 103 below.
[0045] When the scrap iron in the furnace body 103 is added, the electric trolley 102 moves along the track 101, sends the furnace body 103 into the ironmaking area 1, and docks with the ironmaking mechanism 2. Through the cooperation of the ironmaking mechanism 2 and the furnace body 103, the scrap iron is reduced and smelted into molten iron. After the scrap iron is smelted, the electric trolley 102 continues to move along the track 101 to move the furnace body 103 out of the other end of the ironmaking area 1. At this time, the staff can lift the furnace body 103 through the lifting device in the factory to collect the molten iron and dump the slag. During the use of the device, the collected scrap iron is screened in advance. The scrap iron fragments are transported by the first electric conveyor belt 401, and the large pieces of scrap iron are transported by the first guard plate 402. The large pieces of scrap iron are pre-processed with the help of a drilling mechanism arranged between the first guard plate 402 and the first electric conveyor belt 401. With the help of a large number of evenly distributed milling cutters 507 rotating at high speed, dense through holes are formed on the large pieces of scrap iron. Through the opening of the holes, the overall tightness of the large pieces of scrap iron is destroyed, making it easier to be smelted and reduced to molten iron, thereby improving the efficiency of reduction smelting in the furnace body 103 after the scrap iron is recovered to a certain extent.
[0046] In the specific implementation process, Figure 1 - Figure 3As shown, there are a plurality of ironmaking mechanisms 2, which are sequentially installed in the ironmaking area 1 along the track 101. The ironmaking mechanism 2 includes a frame 201 vertically erected on the outside of the track 101, and a first lifting unit 202 is slidably installed on the frame 201, a furnace cover 203 matched with the top opening of the furnace body 103 is fixedly connected to the first lifting unit 202, a second lifting unit 204 arranged above the first lifting unit 202 is slidably installed on the frame 201, and an electrode 205 vertically arranged above the furnace cover 203 is fixedly installed on the second lifting unit 204, and the track 101 is arranged as a ring structure, and the track 101 surrounds and intersperses between the unloading rack 3 and the plurality of ironmaking mechanisms 2 in the ironmaking area 1.
[0047] When the device is used, the track 101 is set as a ring structure, so that the electric trolley 102 can drive the furnace body 103 to circulate between the ironmaking area 1 and the unloading rack 3. Sufficient space is reserved between the entrance of the ironmaking area 1 and the unloading rack 3, and between the exit of the ironmaking area 1 and the unloading rack 3. Multiple electric trolleys 102 can be parked on the track 101 in this area. The electric trolley 102 carries the furnace body 103 to the bottom of the unloading rack 3 for loading of scrap iron. After completion, the electric trolley 102 carries the furnace body 103 to the entrance of the ironmaking area 1, waiting for the smelting of scrap iron. A plurality of ironmaking mechanisms 2 are arranged in the ironmaking area 1, which can simultaneously carry out reduction smelting on the scrap iron in a plurality of furnace bodies 103. When smelting scrap iron, the remaining idle furnace bodies 103 are loaded with scrap iron, so that the ironmaking mechanism 2 can operate continuously and uninterruptedly, avoiding the scrap iron loading occupying the ironmaking time, and improving the efficiency of the device for scrap iron recovery and smelting to a certain extent.
[0048] The furnace body 103 loaded with scrap iron is moved into the frame 201 by the electric trolley 102. In this state, the furnace body 103 is aligned directly below the furnace cover 203. Then the first lifting unit 202 is powered on and started, driving the furnace cover 203 to move downward, covering the top of the furnace body 103, and blocking the opening on the top of the furnace body 103. An opening adapted to the electrode 205 is opened in the middle of the furnace cover 203. The second lifting unit 204 drives the electrode 205 to move downward through the opening on the furnace cover 203. After that, it is vertically inserted into the furnace body 103, and then the electrode 205 is powered on to start, releasing a high-temperature electric arc in the furnace body 103, and using the high temperature when the electric arc is released to directly reduce the scrap iron in the furnace body 103. During the scrap iron reduction smelting process, the thinner and finer scrap iron fragments will be reduced to molten iron first. These high-temperature molten irons flow in the through holes opened in the large pieces of scrap iron, which can effectively improve the heating uniformity and heating efficiency of the large pieces of scrap iron during subsequent smelting, and is beneficial to improving the efficiency of the reduction and melting of the large pieces of scrap iron.
[0049] When the scrap iron smelting is completed, the second lifting unit 204 drives the electrode 205 to lift up, and the first lifting unit 202 drives the furnace cover 203 to lift up, and the furnace body 103 loaded with high-temperature molten iron is moved out along the track 101 under the transportation of the electric trolley 102. Subsequent staff will lift out the furnace body 103 loaded with high-temperature molten iron, and lift the empty furnace body 103 onto the electric trolley 102. In the process of the electric trolley 102 moving around along the track 101, a new round of scrap iron smelting is carried out.
[0050] In the specific implementation process, Figure 4 and Figure 5 As shown, the bottom of the lower hopper 301 is set to an inverted trapezoidal structure, and two symmetrically arranged bottom plates 302 are rotatably installed at the bottom of the lower hopper 301. Two symmetrically arranged first electric push rods 303 are rotatably installed on the outer end wall of the lower hopper 301, and the telescopic ends of the first electric push rods 303 are hinged to the corresponding bottom plates 302. The lower hopper 301 is vertically slidably installed on the lower material rack 3, and a spring for elastically supporting the lower hopper 301 is installed at the connection between the lower material rack 3 and the lower hopper 301. A weighing sensor acting on the lower hopper 301 is installed on the lower material rack 3. During the use of the device, by setting the bottom of the lower hopper 301 to an inverted trapezoidal structure, Gathering the scrap iron during the scrap iron lowering process is beneficial to ensuring the stability of the scrap iron being guided into the furnace body 103 through the lower hopper 301. At the same time, by installing a weighing sensor between the lower hopper 301 and the lower rack 3, and controlling the opening and closing of the bottom plate 302 with the help of the first electric push rod 303, the weight of the scrap iron lowered into the furnace body 103 can be controlled, which is beneficial to more accurately control the amount of scrap iron loaded in the furnace body 103, so that the amount of scrap iron loaded in the furnace body 103 is adapted to the operating power of the electrode 205, which is convenient for controlling the device to smelt scrap iron in the optimal state, thereby effectively improving the efficiency of the device for scrap iron recycling and processing.
[0051] In the specific implementation process, Figure 7 and Figure 8As shown, leakage holes 508 corresponding to a plurality of milling cutters 507 are provided on the support plate 502, and the inner diameter of the leakage hole 508 is set to 1.5 times the outer diameter of the milling cutter 507. During the use of the device, leakage holes 508 corresponding to the milling cutters 507 are provided on the support plate 502, and the inner diameter of the leakage hole 508 is set to 1.5 times the outer diameter of the milling cutter 507, so that when the milling cutter 507 rotates at high speed to drill through a large piece of scrap iron, the milling cutter 507 can enter the corresponding leakage hole 508 below, and the cutting of the milling cutter 507 will not act on the support plate 502. At the same time, due to the existence of the leakage hole 508, the metal chips or metal wire strips produced by the cutting can directly fall through the leakage hole 508 to the first electric conveyor belt 401 below the shell 501, so as to avoid the accumulation of metal chips affecting the upward reset of the milling cutter 507, which is beneficial to ensure the stability of the drilling mechanism during actual operation.
[0052] In the specific implementation process, Fig. 9 and Fig.10 As shown, the milling cutter 507 includes a connecting rod 5071 firmly clamped in the clamping head 506, and a plurality of coaxially arranged discs 5072 are fixedly installed on the bottom end of the connecting rod 5071 from top to bottom, and the outer diameters of the plurality of discs 5072 decrease layer by layer from top to bottom, and the outer diameter of the upper disc 5072 is set to be twice the outer diameter of the lower disc 5072, and a blade 5073 is fixedly installed on the bottom of each disc 5072, and a chip removal hole 5074 is opened through each disc 5072, and the plurality of blades 5073 are distributed in a spiral structure from top to bottom at the bottom of the plurality of discs 5072.
[0053] During the use of the device, the clamping head 506 drives the connecting rod 5071 to rotate at high speed, and then drives the multiple disks 5072 fixed at the lower end to rotate synchronously at high speed. During the high-speed rotation of each disk 5072, the blade 5073 fixed at the bottom acts on the scrap iron to cut the scrap iron. As the milling cutter 507 moves downward, a through hole is finally formed in the large piece of scrap iron. By arranging the multiple disks 5072 into a stepped structure stacked layer by layer, the range of action of the blade 5073 at the bottom of each disk 5072 can be reduced during cutting. Compared with using the blade 5073 on the same plane to directly perform a large-scale cutting operation, the milling cutter 507 in the present application can effectively improve the stability and efficiency during drilling and cutting, and is beneficial to prolonging the service life of the blade 5073 in the milling cutter 507 and reducing the probability of the blade 5073 breaking and breaking.
[0054] During use of the device, when the milling cutter 507 rotates at high speed for cutting processing, the chip discharge holes 5074 formed on the disc 5072 can assist in discharging metal chips generated by cutting to the outside, thereby preventing metal chips generated by cutting from accumulating in the hole. At the same time, by distributing the blades 5073 at the bottom of multiple discs 5072 in a spiral shape, the positions at which the blades 5073 at the bottom of each disc 5072 act on the scrap iron can be dispersed, thereby preventing metal chips generated by cutting from accumulating in the same position in the hole. The above structures cooperate with each other to ensure the efficient and stable discharge of metal debris, thereby improving the stability of the device when cutting and drilling on large pieces of scrap iron to a certain extent.
[0055] In the specific implementation process, Figure 6 As shown, a first guard plate 402 arranged on the front and rear sides of the first electric conveyor belt 401 is fixedly installed on the first bracket 4, a second guard plate 404 arranged on the front and rear sides of the second electric conveyor belt 403 is fixedly installed on the first bracket 4, a side plate 6 fixedly connected to the rear second guard plate 404 is arranged at the right end of the second electric conveyor belt 403, and a fourth electric push rod 601 arranged longitudinally is fixedly installed at the rear of the side plate 6, a push plate 602 fixedly connected to the telescopic end of the fourth electric push rod 601 is arranged on the inner side of the side plate 6, and the size of the push plate 602 is adapted to the internal size of the outer shell 501, and a longitudinal baffle 603 is slidably installed at the connection between the rear second guard plate 404 and the side plate 6, and the front end of the baffle 603 is fixedly connected to the left end of the push plate 602, and the push plate 602 cooperates with the baffle 603 to form an L-shaped structure.
[0056] During the use of the device, when large pieces of scrap iron are conveyed to the right end of the second electric conveyor belt 403, the large pieces of scrap iron enter the range corresponding to the side plate 6. The range covered by the side plate 6 on the second electric conveyor belt 403 is adapted to the space for processing large pieces of scrap iron in the shell 501. The fourth electric push rod 601 installed on the back of the side plate 6 is powered on and started, and its telescopic end pushes the push plate 602 to move into the shell 501, pushing the large pieces of scrap iron on the second electric conveyor belt 403 that enter the range covered by the side plate 6 onto the support plate 502 in the shell 501, and then drilling is performed by the milling cutter 507. The large pieces of scrap iron are pushed by the push plate 602 When it reaches the support plate 502, it will drive the baffle plate 603 to move forward synchronously, forming a shield on the left side of the push plate 602, and blocking the left end of the coverage range of the side plate 6 on the second electric conveyor belt 403, to prevent scrap iron from entering between the fourth electric push rod 601 and the push plate 602, which is beneficial to ensuring the stability of the device during actual use. When the drilling mechanism processes large pieces of scrap iron, the telescopic end of the fourth electric push rod 601 retracts, driving the push plate 602 to move backward and reset. At this time, the large pieces of scrap iron transported on the second electric conveyor belt 403 can continue to enter the coverage range of the side plate 6, preparing for the planing and drilling processing of the next batch of large pieces of scrap iron.
[0057] During the use of the device, by setting the side plate 6 at the right end position of the second electric conveyor belt 403, and using the fourth electric push rod 601 to push the push plate 602, the large pieces of scrap iron within the coverage area of the side plate 6 are pushed into the drilling mechanism for processing. Compared with directly connecting the drilling mechanism to the conveying direction of the right end of the second electric conveyor belt 403, the impact of the second electric conveyor belt 403 continuously conveying large pieces of scrap iron on the drilling mechanism when the drilling mechanism is running can be effectively reduced. At the same time, the feeding time of the drilling mechanism can also be greatly reduced. The process of large pieces of scrap iron entering the drilling mechanism is compressed into an instantaneous push of the push plate 602, which to a certain extent improves the efficiency of the device during processing.
[0058] Specifically, the working principle and operation method of the present invention are as follows:
[0059] The staff screens out the large pieces of scrap iron from the scrap iron, and conveys the scrap iron fragments to the lower hopper 301 through the first electric conveyor belt 401, and conveys the large pieces of scrap iron to the coverage range of the side plate 6 through the second electric conveyor belt 403. Then the fourth electric push rod 601 is powered on to drive the push plate 602 to move, and the large pieces of scrap iron in the coverage range of the side plate 6 are pushed onto the support plate 502 in the shell 501. After the third electric push rod 504 is powered on, it drives the support platform 505 to move downward, and the power unit in the support platform 505 drives the milling cutter 507 clamped in the clamping head 506 to rotate at a high speed. During the downward movement, the large pieces of scrap iron are cut and opened, forming a large number of evenly distributed through holes on the large pieces of scrap iron. After the cutting and drilling are completed, the third electric push rod 504 is powered on to drive the support platform 505 to move downward. The rod 504 retracts and drives the milling cutter 507 to move up and reset. The second electric push rod 503 pulls the support plate 502 to tilt downward, and the large pieces of scrap iron and metal chips after the hole is opened are dumped onto the first electric conveyor belt 401, and transported to the lower hopper 301. After weighing, they are quantitatively lowered into the furnace body 103 through the opening and closing of the bottom plate 302. The electric trolley 102 carries the furnace body 103 into the iron-making area 1 and docks with the iron-making mechanism 2. Then the furnace cover 203 covers the furnace body 103, and the electrode 205 is inserted into the furnace body 103. The electrode 205 is started to reduce and smelt the scrap iron in the furnace body 103. After the scrap iron smelting is completed, the iron-making mechanism 2 returns to its initial state, and the electric trolley 102 carries the furnace body 103 out of the iron-making area 1 for subsequent processing.
[0060] The above are only preferred specific implementation modes of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A scrap iron high-efficiency recycling and processing device, comprising an ironmaking area (1), characterized in that: A track (101) extending to the outside is installed at the bottom of the ironmaking area (1), and an electric trolley (102) is slidably installed on the track (101), and a furnace body (103) is stacked on the electric trolley (102). An ironmaking mechanism (2) corresponding to the furnace body (103) is installed in the ironmaking area (1). A material discharge rack (3) is installed on the outside of the ironmaking area (1), and a material discharge hopper (301) located above the track (101) is installed on the material discharge rack (3). A first bracket (4) is fixedly installed on the outer side of (3), and a first electric conveyor belt (401) extending to the top of the lower hopper (301) is installed on the first bracket (4), a second electric conveyor belt (403) arranged in parallel with the first electric conveyor belt (401) is installed behind the first bracket (4), and the second electric conveyor belt (403) is located above the first electric conveyor belt (401), a drilling mechanism is installed between the end of the second electric conveyor belt (403) and the first electric conveyor belt (401), and the drilling mechanism includes a second bracket (5) fixedly connected to the first bracket (4), a shell (501) fixedly installed in the second bracket (5) is arranged on the right side of the front of the second electric conveyor belt (403), and the shell (501) is located directly above the first electric conveyor belt (401), a support plate (502) flush with the top of the second electric conveyor belt (403) is rotatably installed in the shell (501), and a second bracket (5) is rotatably installed on the second bracket (5). Two electric push rods (503), and the telescopic end of the second electric push rod (503) is hinged to the support plate (502), the top of the second bracket (5) is fixedly installed with a vertically arranged third electric push rod (504), and the telescopic end below the third electric push rod (504) is fixedly installed with a support platform (505), and the bottom of the support platform (505) is rotatably installed with a plurality of evenly distributed clamping heads (506), and each of the clamping heads (506) firmly clamps a milling cutter (507) pointing vertically downward.
2. The high-efficiency scrap iron recycling and processing equipment according to claim 1 is characterized in that: There are a plurality of the ironmaking mechanisms (2), which are sequentially installed in the ironmaking area (1) along the track (101). The ironmaking mechanisms (2) include a frame (201) vertically erected on the outside of the track (101), and a first lifting unit (202) is slidably installed on the frame (201), a furnace cover (203) adapted to the top opening of the furnace body (103) is fixedly connected to the first lifting unit (202), a second lifting unit (204) arranged above the first lifting unit (202) is slidably installed on the frame (201), and an electrode (205) vertically arranged above the furnace cover (203) is fixedly installed on the second lifting unit (204).
3. The high-efficiency scrap iron recycling and processing equipment according to claim 2 is characterized in that: The track (101) is configured as a ring structure, and the track (101) surrounds and penetrates between the unloading rack (3) and a plurality of ironmaking mechanisms (2) in the ironmaking area (1).
4. The high-efficiency scrap iron recycling and processing equipment according to claim 1 is characterized in that: The bottom of the lower hopper (301) is configured as an inverted trapezoidal structure, and two symmetrically arranged bottom plates (302) are rotatably mounted on the bottom of the lower hopper (301). Two symmetrically arranged first electric push rods (303) are rotatably mounted on the outer end wall of the lower hopper (301), and the telescopic ends of the first electric push rods (303) are hinged to the corresponding bottom plates (302).
5. The high-efficiency scrap iron recycling and processing equipment according to claim 4 is characterized in that: The lower hopper (301) is vertically slidably mounted on the lower rack (3); a spring for elastically supporting the lower hopper (301) is mounted at the connection between the lower rack (3) and the lower hopper (301); and a weighing sensor acting on the lower hopper (301) is mounted on the lower rack (3).
6. The high-efficiency scrap iron recycling and processing equipment according to claim 1 is characterized in that: The support plate (502) is provided with leakage holes (508) corresponding to the plurality of milling cutters (507) one by one, and the inner diameter of the leakage hole (508) is set to 1.5 times the outer diameter of the milling cutter (507).
7. The high-efficiency scrap iron recycling and processing equipment according to claim 1 is characterized in that: The milling cutter (507) includes a connecting rod (5071) firmly clamped in a clamping head (506), and a plurality of coaxially arranged discs (5072) are fixedly installed on the bottom end of the connecting rod (5071) from top to bottom, and the outer diameters of the plurality of discs (5072) decrease layer by layer from top to bottom, and the outer diameter of the upper disc (5072) is set to be twice the outer diameter of the lower disc (5072). A blade (5073) is fixedly installed on the bottom of each disc (5072), and a chip removal hole (5074) is opened through each disc (5072).
8. The high-efficiency scrap iron recycling and processing equipment according to claim 7 is characterized in that: The plurality of blades (5073) are distributed at the bottom of the plurality of disks (5072) in a spiral structure from top to bottom.
9. The high-efficiency scrap iron recycling and processing equipment according to claim 1 is characterized in that: A first guard plate (402) arranged on the front and rear sides of the first electric conveyor belt (401) is fixedly installed on the first bracket (4), and a second guard plate (404) arranged on the front and rear sides of the second electric conveyor belt (403) is fixedly installed on the first bracket (4). The right end of the second electric conveyor belt (403) is provided with a side plate (6) fixedly connected to the rear second guard plate (404), and a fourth electric push rod (601) arranged longitudinally is fixedly installed behind the side plate (6). A push plate (602) fixedly connected to the telescopic end of the fourth electric push rod (601) is provided on the inner side of the side plate (6), and the size of the push plate (602) is adapted to the internal size of the outer shell (501).
10. The high-efficiency scrap iron recycling and processing equipment according to claim 9, characterized in that: A longitudinally arranged baffle plate (603) is slidably installed at the connection between the second rear guard plate (404) and the side plate (6), and the front end of the baffle plate (603) is fixedly connected to the left end of the push plate (602), and the push plate (602) cooperates with the baffle plate (603) to form an L-shaped structure.
Citation Information
Patent Citations
Efficient energy-saving waste metal smelting system
CN105087941A
Waste iron efficient recovery treatment equipment
CN108411058A
Continuous feeding device for scrap iron for steelmaking
CN210570000U
Sorting and impurity-removing device for scrap iron for steelmaking
CN210907367U
Iron casting waste cast iron scrap recycling and smelting device
CN214881643U