Building concrete permeability testing device
By designing automated transfer and testing mechanisms, the problem of low efficiency of traditional permeability testing is solved, efficient automatic detection of building concrete samples is achieved, and inspection efficiency and quality are improved.
Patent Information
- Application Number
- CN202411550610.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-01
- Publication Date
- 2025-01-10
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The permeability testing efficiency of traditional building concrete is low and manual operation is cumbersome, which affects the testing efficiency.
A building concrete permeability testing device including a transfer mechanism, a gas permeability testing mechanism, a liquid permeability testing mechanism and a transportation mechanism was designed to realize automatic placement, position conversion and permeability detection of columnar samples, and realize multiple loading mechanisms. Automatic feeding of samples.
It effectively improves the detection efficiency and quality of building concrete samples, realizes automatic gas seepage detection and liquid seepage detection, and simplifies the operation process.
Smart Images

Figure CN119290707A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of concrete testing, in particular to a building concrete permeability testing device. Background Art
[0002] Architectural concrete is a kind of building material widely used in construction projects. It is mainly made of water, cement, aggregate and various admixtures mixed in a certain proportion. It is widely used in various building components such as foundations, floor slabs, walls, bridges, etc. In order to detect the impermeability of architectural concrete, it is necessary to conduct permeability tests on architectural concrete samples to help determine whether the concrete will be invaded by water or other liquids during actual use, thereby affecting its strength and durability.
[0003] Traditional building concrete permeability tests are mostly done by manually placing samples in a protective cylinder, applying a certain water pressure, observing the water seepage of the concrete specimen within a specific time, and taking out the samples after the test. This is rather troublesome and affects the overall permeability test efficiency of building concrete. To this end, we propose a building concrete permeability test device to solve the above problem. Summary of the invention
[0004] The purpose of the present invention is to provide a building concrete permeability testing device to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a building concrete permeability testing device, comprising a base, a material transfer mechanism is fixedly installed in the middle of the top of the base, an air permeability testing mechanism and a liquid permeability testing mechanism are arranged on the side of the top of the base close to the material transfer mechanism, the air permeability testing mechanism and the liquid permeability testing mechanism are symmetrically distributed about the material transfer mechanism, a transportation mechanism is arranged on the side of the top of the base away from the liquid permeability testing mechanism, the transportation mechanism is provided with two symmetrically distributed about the material transfer mechanism, and a loading mechanism is arranged between the transportation mechanism and the material transfer mechanism.
[0006] Preferably, the material transfer mechanism includes a first frame, the first frame is fixedly installed on the top middle part of the base, a first rotating frame is fixedly installed on the top of the first frame, a first shaft column is rotatably installed on the top middle part of the first rotating frame, a material transfer frame is fixedly installed on the top of the first shaft column, four material placing parts distributed in a circular array are fixedly installed on the end of the material transfer frame, a first worm wheel is fixedly installed on the bottom of the first shaft column, a first worm is meshingly connected to the outer side of the first worm wheel, the first worm is rotatably installed in the first rotating frame, a first motor is fixedly installed on the side of the first rotating frame close to the first worm, and a driving end of the first motor and one end of the first worm are fixedly installed.
[0007] Preferably, the material placement part includes a sealing ring frame, which is fixedly mounted on the end of the rotating material frame, a connecting clamp ring is integrally formed in the middle of the sealing ring frame, a first sealing rubber ring is provided on the lower surface of the sealing ring frame, the first sealing rubber ring is movably sleeved on the outer side of the connecting clamp ring, a second sealing rubber ring is provided on the upper surface of the sealing ring frame, the second sealing rubber ring is movably sleeved on the outer side of the connecting clamp ring, a third sealing rubber ring is fixedly sleeved on the top of the connecting clamp ring, and a positioning ring is fixedly mounted on the top of the third sealing rubber ring.
[0008] Preferably, the air permeation testing mechanism includes two symmetrically distributed second frames, the second frames are fixedly mounted on one side of the top of the base close to the material transfer mechanism, a longitudinal sliding frame is fixedly mounted between the two second frames, a first longitudinal rack is slidably clamped on the top of the inner wall of the longitudinal sliding frame close to the material transfer mechanism, a second longitudinal rack is slidably clamped on the bottom of the inner wall of the longitudinal sliding frame away from the material transfer mechanism, a first mounting seat is fixedly mounted on the top of the side of the first longitudinal rack away from the second longitudinal rack, the first mounting seat is slidably clamped on the side of the longitudinal sliding frame close to the material transfer mechanism, and a second longitudinal rack is fixedly mounted on the bottom of the side of the second longitudinal rack close to the first longitudinal rack The mounting seat, the second mounting seat is slidably clamped on a side of the longitudinal sliding frame close to the material transfer mechanism, a storage barrel is fixedly installed on the side of the first mounting seat away from the first longitudinal rack, and a bottom sealing cylinder is fixedly installed on the side of the second mounting seat away from the second longitudinal rack, the positions of the storage barrel, the bottom sealing cylinder and one of the material placing parts correspond vertically, the material placing part is located between the storage barrel and the bottom sealing cylinder, the connecting clamp ring is movably clamped on the bottom of the storage barrel, the bottom of the connecting clamp ring is movably clamped on the top of the bottom sealing cylinder, the bottom end of the storage barrel contacts the upper surface of the second sealing rubber ring, and the top end of the bottom sealing cylinder contacts the lower surface of the first sealing rubber ring.
[0009] Preferably, a first tube is integrally formed at the middle part of the top end of the material storage barrel, a first connecting tube is fixedly installed at the top end of the first tube, a second tube is integrally formed at the middle part of the bottom end of the bottom sealing barrel, a boosting pump is fixedly installed at the bottom end of the second tube, a flow control valve is fixedly installed at the bottom end of the boosting pump, a second connecting tube is fixedly installed at the bottom end of the flow control valve, two symmetrically distributed U-shaped frames are fixedly installed on the inner upper wall of the material storage barrel, a ring frame is movably provided at the bottom of the two U-shaped frames, a sliding seat is fixedly installed on the outer top of the ring frame, the sliding seat is slidably connected in the U-shaped frame, a tension spring is provided at the top end of the ring frame, and a fourth sealing rubber ring is fixedly installed at the bottom end of the ring frame.
[0010] Preferably, a driving gear is provided between the first longitudinal rack and the second longitudinal rack, and the driving gear is meshed and connected with the first longitudinal rack and the second longitudinal rack respectively; a driving shaft is fixedly installed on the middle part of the driving gear, and the driving shaft is rotatably installed on the longitudinal sliding frame; a second worm gear is fixedly installed on one end of the driving shaft, and a second worm is meshed and connected with the outer side of the second worm gear, and the second worm is rotatably installed on the outer side of the longitudinal sliding frame; a second motor is fixedly installed on the side of the outer wall of the longitudinal sliding frame close to the second worm, and the second motor and the driving end and one end of the second worm are fixedly installed.
[0011] Preferably, the structure of the liquid permeation testing mechanism is the same as the structure of the gas permeation testing mechanism.
[0012] Preferably, the feeding mechanism includes a third frame, the third frame is fixedly mounted on the top of the base, a second rotating frame is fixedly mounted on the top of the third frame, a second shaft column is rotatably mounted on the middle of the top of the second rotating frame, a rotating frame is fixedly mounted on the top of the second shaft column, U-shaped frames are fixedly mounted on both ends of the rotating frame, two symmetrically distributed positioning frames are provided on the inner bottom of the U-shaped frame, a telescopic cylinder is fixedly mounted on the bottom of the U-shaped frame, and a driving end of the telescopic cylinder and a corresponding positioning frame are fixedly mounted.
[0013] Preferably, a third worm wheel is fixedly installed on the bottom of the second shaft column, a third worm is meshingly connected to the outer side of the third worm wheel, the third worm is rotatably installed in the second rotating frame, a third motor is fixedly installed on the side of the second rotating frame close to the third worm, and the driving end of the third motor and one end of the third worm are fixedly installed.
[0014] Preferably, the transport mechanism includes two groups of symmetrically distributed transport side frames, the transport side frames are fixedly mounted on the side of the top of the base away from the liquid penetration testing mechanism, transport rollers are rotatably mounted on the top of the transport side frames, and outer movable sleeves of the two transport rollers are provided with transport belts, a fourth motor is fixedly mounted on the top of one of the transport side frames, and the driving end of the fourth motor and the end of one of the transport rollers are fixedly mounted.
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] 1. By setting up a material transfer mechanism and using an air permeability testing mechanism and a liquid permeability testing mechanism in conjunction, the columnar building concrete samples can be placed, positioned and converted, and automatic air permeability testing and automatic liquid permeability testing can be performed on the building concrete samples at the same time, effectively improving the detection efficiency of the building concrete samples.
[0017] 2. By setting up a feeding mechanism and using a transportation mechanism, multiple building concrete samples can be automatically fed to improve the inspection quality of the building concrete samples. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 It is a schematic diagram of the structure of the present invention.
[0020] Figure 2 It is a structural schematic diagram of the material transfer mechanism of the present invention.
[0021] Figure 3 It is a schematic diagram of the structure of the material placement part in the present invention.
[0022] Figure 4 It is a structural schematic diagram of the air permeability testing mechanism in the present invention.
[0023] Figure 5 For the present invention Figure 4 Enlarged view of point A in the middle.
[0024] Figure 6 For the present invention Figure 4 Enlarged view of point B in the middle.
[0025] Figure 7 It is a structural schematic diagram of the feeding mechanism in the present invention.
[0026] Figure 8 It is a structural schematic diagram of the transportation mechanism in the present invention.
[0027] Fig. 9 For the present invention Figure 8 Enlarged view of point C in the middle.
[0028] In the figure: 1, base; 2, material transfer mechanism; 3, air permeation test mechanism; 4, liquid permeation test mechanism; 5, transportation mechanism; 6, feeding mechanism; 21, first frame; 22, first rotating frame; 23, first shaft column; 24, material transfer frame; 25, material placement member; 26, first worm gear; 261, first worm; 262, first motor; 251, sealing ring frame; 252, connecting clamp ring; 253, first sealing rubber ring; 254, second sealing rubber ring; 255, third sealing rubber ring; 256, positioning ring; 31, second frame; 32, longitudinal sliding frame; 33, first longitudinal rack; 331, first mounting seat; 34, second longitudinal rack; 341, second mounting seat; 35, storage barrel; 351, first tube; 352, first Connecting pipe; 36, bottom sealing cylinder; 361, second pipe; 362, booster pump; 363, flow control valve; 364, second connecting pipe; 37, U-shaped frame; 371, ring frame; 372, card slide seat; 373, fourth sealing rubber ring; 374, tension spring; 38, driving gear; 381, driving shaft; 39, second worm gear; 391, second worm; 392, second motor; 61, third frame; 62, second rotating frame; 63, second shaft column; 631, rotating frame; 632, U-shaped frame; 64, positioning frame; 641, telescopic cylinder; 65, third worm gear; 651, third worm; 652, third motor; 51, transport side frame; 52, transport roller; 521, transport belt; 53, fourth motor. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] Example: Figure 1-9 As shown, the present invention provides a building concrete permeability testing device, including a base 1, a material transfer mechanism 2 is fixedly installed in the middle of the top of the base 1, an air permeability testing mechanism 3 and a liquid permeability testing mechanism 4 are provided on the side of the top of the base 1 close to the material transfer mechanism 2, the air permeability testing mechanism 3 and the liquid permeability testing mechanism 4 are symmetrically distributed about the material transfer mechanism 2, a transportation mechanism 5 is provided on the side of the top of the base 1 away from the liquid permeability testing mechanism 4, the transportation mechanism 5 has two symmetrically distributed about the material transfer mechanism 2, and a loading mechanism 6 is provided between the transportation mechanism 5 and the material transfer mechanism 2.
[0031] The material transfer mechanism 2 includes a first frame 21, which is fixedly mounted on the middle of the top of the base 1, a first rotating frame 22 is fixedly mounted on the top of the first frame 21, a first shaft column 23 is rotatably mounted on the middle of the top of the first rotating frame 22, a material transfer frame 24 is fixedly mounted on the top of the first shaft column 23, four material placement members 25 distributed in a circular array are fixedly mounted on the end of the material transfer frame 24, a first worm gear 26 is fixedly mounted on the bottom of the first shaft column 23, and a first worm 261 is meshedly connected to the outer side of the first worm gear 26, and the first The worm 261 is rotatably mounted in the first rotating frame 22. A first motor 262 is fixedly mounted on one side of the first rotating frame 22 close to the first worm 261. The driving end of the first motor 262 and one end of the first worm 261 are fixedly mounted. When in use, the first motor 262 is controlled to start driving the first worm 261 to drive the first worm wheel 26 to rotate, thereby controlling the first shaft column 23 to rotate, and then driving the rotating rack 24 and the four material placing parts 25 to rotate, thereby flexibly adjusting the positions of the four material placing parts 25.
[0032] The material placing part 25 comprises a sealing ring frame 251, which is fixedly mounted on the end of the rotating material frame 24; a connecting clamp ring 252 is integrally formed in the middle of the sealing ring frame 251; a first sealing rubber ring 253 is arranged on the lower surface of the sealing ring frame 251, and the first sealing rubber ring 253 is movably sleeved on the outer side of the connecting clamp ring 252; a second sealing rubber ring 254 is arranged on the upper surface of the sealing ring frame 251, and the second sealing rubber ring 254 is movably sleeved on the outer side of the connecting clamp ring 252; a third sealing rubber ring 255 is fixedly sleeved on the top of the connecting clamp ring 252; a positioning ring 256 is fixedly mounted on the top of the third sealing rubber ring 255; when in use, a columnar building concrete sample is inserted into the positioning ring 256 and contacts the third sealing rubber ring 255.
[0033] The air permeation testing mechanism 3 includes two symmetrically distributed second frames 31, the second frames 31 are fixedly installed on one side of the top of the base 1 close to the material transfer mechanism 2, a longitudinal sliding frame 32 is fixedly installed between the two second frames 31, a first longitudinal rack 33 is slidably clamped on the top of the inner wall of the longitudinal sliding frame 32 close to the material transfer mechanism 2, a second longitudinal rack 34 is slidably clamped on the bottom of the inner wall of the longitudinal sliding frame 32 away from the material transfer mechanism 2, a first mounting seat 331 is fixedly installed on the top of the side of the first longitudinal rack 33 away from the second longitudinal rack 34, the first mounting seat 331 is slidably clamped on the side of the longitudinal sliding frame 32 close to the material transfer mechanism 2, a second mounting seat 341 is fixedly installed on the bottom of the side of the second longitudinal rack 34 close to the first longitudinal rack 33, the second mounting seat 341 is slidably clamped on the side of the longitudinal sliding frame 32 close to the material transfer mechanism 2, a storage cylinder 35 is fixedly installed on the side of the first mounting seat 331 away from the first longitudinal rack 33, and a bottom sealing cylinder 36 is fixedly installed on the side of the second mounting seat 341 away from the second longitudinal rack 34;
[0034] A driving gear 38 is provided between the first longitudinal rack 33 and the second longitudinal rack 34. The driving gear 38 is meshed with the first longitudinal rack 33 and the second longitudinal rack 34 respectively. A driving shaft 381 is fixedly installed in the middle of the driving gear 38. The driving shaft 381 is rotatably installed on the longitudinal sliding frame 32. A second worm gear 39 is fixedly installed on one end of the driving shaft 381. A second worm 391 is meshed with the outer side of the second worm gear 39. The second worm 391 is rotatably installed on the outer side of the longitudinal sliding frame 32. The outer wall of the longitudinal sliding frame 32 is close to the second worm gear. A second motor 392 is fixedly installed on one side of 391. The second motor 392 and the driving end and one end of the second worm 391 are fixedly installed. By controlling the second motor 392 to start, the second worm 391 drives the second worm gear 39 to rotate, thereby controlling the driving shaft 381 and the driving gear 38 to rotate, thereby driving the first longitudinal rack 33 and the second longitudinal rack 34 to move toward each other, thereby controlling the first mounting seat 331 and the second mounting seat 341 to move toward each other, thereby controlling the storage cylinder 35 and the bottom sealing cylinder 36 to move toward each other;
[0035] The positions of the material storage barrel 35, the bottom sealing barrel 36 and one of the material placement pieces 25 correspond vertically, and the material placement piece 25 is located between the material storage barrel 35 and the bottom sealing barrel 36. The connecting clamp 252 is movably clamped at the bottom of the material storage barrel 35, and the bottom of the connecting clamp 252 is movably clamped at the top of the bottom sealing barrel 36. The bottom end of the material storage barrel 35 contacts the upper surface of the second sealing rubber ring 254, and the top end of the bottom sealing barrel 36 contacts the lower surface of the first sealing rubber ring 253, so that the material storage barrel 35, the bottom sealing barrel 36 and one of the material placement pieces 25 are sealed and clamped. Therefore, the building concrete sample placed on the material placement piece 25 is sealed by the material storage barrel 35 and the bottom sealing barrel 36, so as to facilitate the subsequent permeability detection of the building concrete sample.
[0036] A first tube 351 is integrally formed at the middle of the top of the material storage barrel 35, and a first connecting tube 352 is fixedly installed at the top of the first tube 351. A second tube 361 is integrally formed at the middle of the bottom end of the bottom sealing barrel 36, and a booster pump 362 is fixedly installed at the bottom end of the second tube 361, and a flow control valve 363 is fixedly installed at the bottom end of the booster pump 362, and a second connecting tube 364 is fixedly installed at the bottom end of the flow control valve 363. Two symmetrically distributed U-shaped frames 37 are fixedly installed on the inner upper wall of the material storage barrel 35, and a ring frame 371 is movably provided at the bottom of the two U-shaped frames 37, and a card slide 372 is fixedly installed on the outer top of the ring frame 371, and the card slide 372 is slidably connected in the U-shaped frame 37, and a tension spring 374 is provided at the top of the ring frame 371, and a fourth sealing rubber ring 373 is fixedly installed at the bottom of the ring frame 371. When in use, the second connecting tube 364 in the air permeability testing mechanism 3 is fixedly installed. The end is connected to the output port of the gas output system, and the end of the first tube 351 in the gas permeability testing mechanism 3 is connected to the receiving end of the gas receiving system. When the building concrete sample placed on the material placing part 25 is sealed by the storage tube 35 and the bottom sealing tube 36, the fourth sealing rubber ring 373 at the bottom end of the ring frame 371 contacts the upper surface of the building concrete sample and squeezes the tension spring 374, effectively limiting the upper surface of the building concrete sample, thereby achieving effective sealing of the lower surface of the building concrete sample. Subsequently, the gas output system and the flow control valve 363 are controlled to be opened, and the booster pump 362 is turned on to adjust the gas pressure. The gas is introduced into the bottom sealing tube 36 through the second connecting tube 364 and the second tube 361, and then introduced into the building concrete sample through the connecting clamp 252. According to the gas reception of the gas receiving system, the building concrete sample is automatically tested for gas permeability.
[0037] The structure of the liquid permeation test mechanism 4 is the same as that of the gas permeation test mechanism 3. When in use, the end of the second connecting tube 364 in the liquid permeation test mechanism 4 is connected to the output port of the liquid output system, and the end of the first tube 351 in the liquid permeation test mechanism 4 is connected to the receiving end of the liquid receiving system. The liquid output system and the flow control valve 363 are controlled to open, and the booster pump 362 is turned on to adjust the liquid pressure. The liquid is introduced into the bottom sealing cylinder 36 through the second connecting tube 364 and the second tube 361, and then introduced into the building concrete sample through the connecting clamp 252. According to the gas reception of the liquid receiving system, the building concrete sample is automatically tested for liquid permeation.
[0038] The transport mechanism 5 includes two groups of transport side frames 51 distributed symmetrically. The transport side frames 51 are fixedly installed on the top of the base 1 on a side away from the liquid penetration test mechanism 4. The top of the transport side frame 51 is rotatably installed with a transport roller 52. The outer movable sleeves of the two transport rollers 52 are provided with a transport belt 521. The top of one of the transport side frames 51 is fixedly installed with a fourth motor 53. The driving end of the fourth motor 53 and the end of one of the transport rollers 52 are fixedly installed. When in use, the fourth motor 53 is controlled to start and drive one of the transport rollers 52 to rotate, thereby controlling the transport belt 521 to transport, placing the building concrete sample to be tested on the upper surface of the transport belt 521, and controlling the transmission of the building concrete sample through the transport belt 521, and transmitting the building concrete sample to the position of the feeding mechanism 6, so as to automatically transmit the building concrete sample;
[0039] The feeding mechanism 6 includes a third frame 61, which is fixedly mounted on the top of the base 1, a second rotating frame 62 is fixedly mounted on the top of the third frame 61, a second shaft column 63 is rotatably mounted on the middle of the top of the second rotating frame 62, a rotating frame 631 is fixedly mounted on the top of the second shaft column 63, U-shaped frames 632 are fixedly mounted on both ends of the rotating frame 631, two symmetrically distributed positioning frames 64 are provided on the inner bottom of the U-shaped frame 632, a telescopic cylinder 641 is fixedly mounted on the bottom of the U-shaped frame 632, a driving end of the telescopic cylinder 641 and a corresponding positioning frame 64 are fixedly mounted, and the building concrete sample is transmitted to between one group of positioning frames 64 at the position of the feeding mechanism 6, and then the corresponding telescopic cylinder 641 is controlled to open, driving the positioning frames 64 on both sides to move toward each other, so as to clamp and position the building concrete sample;
[0040] A third worm gear 65 is fixedly installed at the bottom of the second shaft column 63, and a third worm 651 is meshedly connected to the outer side of the third worm gear 65. The third worm 651 is rotatably installed in the second rotating frame 62. A third motor 652 is fixedly installed on one side of the second rotating frame 62 close to the third worm 651. The driving end of the third motor 652 and one end of the third worm 651 are fixedly installed. The third motor 652 is controlled to start and drive the third worm 651 to drive the third worm gear 65 to rotate, thereby controlling the second shaft column 63 to drive the U-shaped frames 632 on both sides to rotate, and transporting the clamped building concrete sample to the top of one of the material placing parts 25. Subsequently, the clamping and positioning is released, and the building concrete sample falls into the positioning ring 256 in the corresponding material placing part 25 and contacts the third sealing rubber ring 255, thereby automatically loading the building concrete sample.
[0041] Working principle: When in use, connect the end of the second connecting tube 364 in the gas permeability test mechanism 3 to the output port of the gas output system, and connect the end of the first tube 351 in the gas permeability test mechanism 3 to the receiving end of the gas receiving system;
[0042] Connect the end of the second connecting tube 364 in the liquid penetration test mechanism 4 to the output port of the liquid output system, and connect the end of the first tube 351 in the liquid penetration test mechanism 4 to the receiving end of the liquid receiving system;
[0043] The fourth motor 53 is controlled to start and drive one of the transport rollers 52 to rotate, thereby controlling the transport belt 521 to transport, placing the building concrete sample to be tested on the upper surface of the transport belt 521, and controlling the transport of the building concrete sample through the transport belt 521, and transporting the building concrete sample to between one group of positioning frames 64 at the position of the feeding mechanism 6, and then controlling the corresponding telescopic cylinder 641 to start and drive the positioning frames 64 on both sides to move toward each other, so as to clamp and position the building concrete sample;
[0044] The third motor 652 is controlled to start driving the third worm 651 to drive the third worm wheel 65 to rotate, thereby controlling the second shaft column 63 to drive the U-shaped frames 632 on both sides to rotate, and the clamped building concrete sample is transported to the top of one of the material placement pieces 25. Then, the clamping and positioning is released, and the building concrete sample falls into the positioning ring 256 in the corresponding material placement piece 25 and contacts the third sealing rubber ring 255, so as to automatically load the building concrete sample;
[0045] In this way, the building concrete samples on both sides are transported to the corresponding positioning rings 256 on the material placement parts 25 through the transport mechanisms 5 and the loading mechanisms 6 on both sides and contacted with the third sealing rubber ring 255;
[0046] Subsequently, the first motor 262 is controlled to start driving the first worm 261 to drive the first worm wheel 26 to rotate, thereby controlling the first shaft column 23 to rotate, and then driving the material transfer rack 24 and the four material placement members 25 to rotate, so as to flexibly adjust the positions of the four material placement members 25, and transfer the building concrete samples on both sides to between the material storage cylinder 35 and the bottom sealing cylinder 36 in the air permeability test mechanism 3 and the liquid permeability test mechanism 4 respectively;
[0047] Subsequently, the second motor 392 in the gas permeation test mechanism 3 and the liquid permeation test mechanism 4 is controlled to be turned on, and the second worm 391 is driven to drive the second worm gear 39 to rotate, thereby controlling the driving shaft 381 and the driving gear 38 to rotate, thereby driving the first longitudinal rack 33 and the second longitudinal rack 34 to move toward each other, thereby controlling the first mounting seat 331 and the second mounting seat 341 to move toward each other, thereby controlling the storage barrel 35 and the bottom sealing barrel 36 to move toward each other, and the connecting clamp ring 252 is movably clamped at the bottom of the storage barrel 35, and the bottom of the connecting clamp ring 252 is connected. The movably clamped part is connected to the top of the bottom sealing cylinder 36, the bottom end of the material storage cylinder 35 contacts the upper surface of the second sealing rubber ring 254, and the top end of the bottom sealing cylinder 36 contacts the lower surface of the first sealing rubber ring 253, so as to seal and clamp the material storage cylinder 35, the bottom sealing cylinder 36 and one of the material placing parts 25, and the fourth sealing rubber ring 373 at the bottom end of the ring frame 371 contacts the upper surface of the building concrete sample and squeezes the tension spring 374, so as to effectively limit the upper surface of the building concrete sample, thereby realizing effective sealing of the lower surface of the building concrete sample;
[0048] Subsequently, the gas output system and the flow control valve 363 are controlled to be turned on, and the booster pump 362 is turned on to adjust the gas pressure. The gas is introduced into the bottom sealing cylinder 36 through the second connecting pipe 364 and the second pipe 361, and then introduced into the building concrete sample through the connecting clamp ring 252. According to the gas reception of the gas receiving system, the building concrete sample is automatically tested for gas permeability.
[0049] The liquid output system and the flow control valve 363 are controlled to be opened, and the booster pump 362 is turned on to adjust the liquid pressure. The liquid is introduced into the bottom sealing cylinder 36 through the second connecting pipe 364 and the second pipe 361, and then introduced into the building concrete sample through the connecting clamp ring 252. According to the gas reception of the liquid receiving system, the building concrete sample is automatically tested for liquid seepage;
[0050] In this way, automatic air seepage detection and automatic liquid seepage detection of building concrete samples can be realized, effectively improving the detection efficiency of building concrete samples.
[0051] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A building concrete permeability testing device, comprising a base (1), characterized in that: A material transfer mechanism (2) is fixedly installed at the middle of the top of the base (1); an air permeation test mechanism (3) and a liquid permeation test mechanism (4) are arranged on the side of the top of the base (1) close to the material transfer mechanism (2); the air permeation test mechanism (3) and the liquid permeation test mechanism (4) are symmetrically distributed with respect to the material transfer mechanism (2); a transport mechanism (5) is arranged on the side of the top of the base (1) away from the liquid permeation test mechanism (4); two transport mechanisms (5) are arranged symmetrically with respect to the material transfer mechanism (2); and a loading mechanism (6) is arranged between the transport mechanism (5) and the material transfer mechanism (2).
2. A building concrete permeability testing device according to claim 1, characterized in that: The material transfer mechanism (2) comprises a first frame (21), the first frame (21) is fixedly mounted at the middle of the top end of the base (1), a first rotating frame (22) is fixedly mounted at the top end of the first frame (21), a first shaft column (23) is rotatably mounted at the middle of the top end of the first rotating frame (22), a material transfer frame (24) is fixedly mounted at the top end of the first shaft column (23), four material placement members (25) distributed in a circular array are fixedly mounted at the end of the material transfer frame (24), a first worm wheel (26) is fixedly mounted at the bottom of the first shaft column (23), a first worm (261) is meshingly connected to the outer side of the first worm wheel (26), the first worm (261) is rotatably mounted in the first rotating frame (22), a first motor (262) is fixedly mounted on one side of the first rotating frame (22) close to the first worm (261), and a driving end of the first motor (262) and one end of the first worm (261) are fixedly mounted.
3. A building concrete permeability testing device according to claim 2, characterized in that: The material placement member (25) comprises a sealing ring frame (251), the sealing ring frame (251) is fixedly mounted on the end of the rotating material frame (24), a connecting snap ring (252) is integrally formed in the middle of the sealing ring frame (251), a first sealing rubber ring (253) is arranged on the lower surface of the sealing ring frame (251), the first sealing rubber ring (253) is movably sleeved on the outer side of the connecting snap ring (252), a second sealing rubber ring (254) is arranged on the upper surface of the sealing ring frame (251), the second sealing rubber ring (254) is movably sleeved on the outer side of the connecting snap ring (252), a third sealing rubber ring (255) is fixedly sleeved on the top of the connecting snap ring (252), and a positioning ring (256) is fixedly mounted on the top of the third sealing rubber ring (255).
4. A building concrete permeability testing device according to claim 3, characterized in that: The air permeation testing mechanism (3) comprises two symmetrically distributed second frames (31), wherein the second frames (31) are fixedly mounted on one side of the top of the base (1) close to the material transfer mechanism (2), and a longitudinal sliding frame (32) is fixedly mounted between the two second frames (31). A first longitudinal rack (33) is slidably mounted on the top of the inner wall of the longitudinal sliding frame (32) close to the material transfer mechanism (2), and a second longitudinal rack (34) is slidably mounted on the bottom of the inner wall of the longitudinal sliding frame (32) away from the material transfer mechanism (2). A first mounting seat (331) is fixedly mounted on the top of the side of the first longitudinal rack (33) away from the second longitudinal rack (34), and the first mounting seat (331) is slidably mounted on the side of the longitudinal sliding frame (32) close to the material transfer mechanism (2), and a second mounting seat (341) is fixedly mounted on the bottom of the side of the second longitudinal rack (34) close to the first longitudinal rack (33). The mounting seat (341) is slidably engaged with a side of the longitudinal sliding frame (32) close to the material transfer mechanism (2); a storage barrel (35) is fixedly mounted on a side of the first mounting seat (331) away from the first longitudinal rack (33); a bottom sealing cylinder (36) is fixedly mounted on a side of the second mounting seat (341) away from the second longitudinal rack (34); the positions of the storage barrel (35), the bottom sealing cylinder (36) and one of the material placing members (25) correspond vertically; the material placing member (25) is located between the storage barrel (35) and the bottom sealing cylinder (36); the connecting clamp ring (252) is movably engaged with the bottom of the storage barrel (35); the bottom of the connecting clamp ring (252) is movably engaged with the top of the bottom sealing cylinder (36); the bottom end of the storage barrel (35) contacts the upper surface of the second sealing rubber ring (254); and the top end of the bottom sealing cylinder (36) contacts the lower surface of the first sealing rubber ring (253).
5. A building concrete permeability testing device according to claim 4, characterized in that: A first tube (351) is integrally formed at the middle of the top end of the material storage cylinder (35), a first connecting tube (352) is fixedly installed at the top end of the first tube (351), a second tube (361) is integrally formed at the middle of the bottom end of the bottom sealing cylinder (36), a booster pump (362) is fixedly installed at the bottom end of the second tube (361), a flow control valve (363) is fixedly installed at the bottom end of the booster pump (362), and a second connecting tube (364) is fixedly installed at the bottom end of the flow control valve (363). Two symmetrically distributed U-shaped frames (37) are fixedly mounted on the inner upper wall of the storage barrel (35); a ring frame (371) is movably mounted at the bottom of the two U-shaped frames (37); a sliding seat (372) is fixedly mounted on the outer top of the ring frame (371); the sliding seat (372) is slidably mounted in the U-shaped frame (37); a tension spring (374) is disposed at the top of the ring frame (371); and a fourth sealing rubber ring (373) is fixedly mounted at the bottom of the ring frame (371).
6. A building concrete permeability testing device according to claim 5, characterized in that: A driving gear (38) is provided between the first longitudinal rack (33) and the second longitudinal rack (34), and the driving gear (38) is meshedly connected with the first longitudinal rack (33) and the second longitudinal rack (34) respectively. A driving shaft (381) is fixedly installed in the middle of the driving gear (38), and the driving shaft (381) is rotatably installed on the longitudinal sliding frame (32). A second worm gear (39) is fixedly installed at one end of the driving shaft (381), and a second worm (391) is meshedly connected to the outer side of the second worm gear (39), and the second worm (391) is rotatably installed on the outer side of the longitudinal sliding frame (32). A second motor (392) is fixedly installed on the side of the outer wall of the longitudinal sliding frame (32) close to the second worm (391), and the second motor (392) and the driving end and one end of the second worm (391) are fixedly installed.
7. A building concrete permeability testing device according to claim 6, characterized in that: The structure of the liquid permeation testing mechanism (4) is the same as the structure of the gas permeation testing mechanism (3).
8. A building concrete permeability testing device according to claim 1, characterized in that: The feeding mechanism (6) comprises a third frame (61), the third frame (61) is fixedly mounted on the top of the base (1), a second rotating frame (62) is fixedly mounted on the top of the third frame (61), a second shaft column (63) is rotatably mounted in the middle of the top of the second rotating frame (62), a rotating frame (631) is fixedly mounted on the top of the second shaft column (63), U-shaped frames (632) are fixedly mounted on both ends of the rotating frame (631), two symmetrically distributed positioning frames (64) are provided at the inner bottom of the U-shaped frame (632), a telescopic cylinder (641) is fixedly mounted at the bottom of the U-shaped frame (632), and a driving end of the telescopic cylinder (641) and a corresponding positioning frame (64) are fixedly mounted.
9. A building concrete permeability testing device according to claim 8, characterized in that: A third worm gear (65) is fixedly mounted on the bottom of the second shaft column (63); a third worm gear (651) is meshingly connected to the outer side of the third worm gear (65); the third worm gear (651) is rotatably mounted in the second rotating frame (62); a third motor (652) is fixedly mounted on one side of the second rotating frame (62) close to the third worm gear (651); a driving end of the third motor (652) and one end of the third worm gear (651) are fixedly mounted.
10. A building concrete permeability testing device according to claim 1, characterized in that: The transport mechanism (5) comprises two groups of transport side frames (51) which are symmetrically distributed. The transport side frames (51) are fixedly mounted on the top of the base (1) on a side away from the liquid penetration testing mechanism (4). A transport roller (52) is rotatably mounted on the top of the transport side frame (51). The outer movable sleeves of the two transport rollers (52) are provided with a transport belt (521). A fourth motor (53) is fixedly mounted on the top of one of the transport side frames (51). The driving end of the fourth motor (53) and the end of one of the transport rollers (52) are fixedly mounted.