A method and system for optimizing waterway routine maintenance plan based on multi-source data

Through the collection and multi-dimensional analysis of multi-source data, the routine maintenance plan of the waterway is optimized, and the subjective and general problems of the formulation of existing plans are solved, achieving more accurate and scientific waterway maintenance management.

CN119294617BActive Publication Date: 2025-03-11CHINA WATERBORNE TRANSPORT RES INST
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411824180.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-12
Publication Date
2025-03-11
Estimated Expiration
2044-12-12

AI Technical Summary

Technical Problem

In the existing waterway maintenance management, data collection is not comprehensive, in-depth analysis is insufficient, and plan display is not intuitive, which leads to relatively subjective and general formulation of routine waterway maintenance plans, which is difficult to meet high-quality maintenance needs.

Method used

By obtaining multi-source waterway management data, collecting, processing, fusion and multi-dimensional analysis, the existing waterway routine maintenance plan is optimized, and multi-dimensional display is provided to improve the intuitiveness and scientificity of the plan.

Benefits of technology

It has achieved more accurate and scientific formulation of routine waterway maintenance plans, improved the intuitiveness and visualization of the plan, and enhanced the scientificity and efficiency of waterway maintenance management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119294617B_ABST
    Figure CN119294617B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of waterway maintenance technology, and specifically discloses a method and system for optimizing a waterway routine maintenance plan based on multi-source data, including obtaining multi-source data; formulating a waterway routine maintenance plan based on waterway maintenance plan formulation requirements; optimizing the waterway routine maintenance plan based on multi-source data; and multi-dimensionally displaying the optimized waterway routine maintenance plan. The method analyzes the existing waterway routine maintenance plan and gives optimization suggestions through the collection, processing, fusion and multi-dimensional analysis of multi-source waterway management data, and displays the waterway routine maintenance plan in a multi-dimensional manner, effectively solving the problem that the current waterway routine maintenance plan is relatively subjective in formulation based on experience and relatively general in presentation in text, and makes the formulation of the waterway routine maintenance plan more accurate and scientific, and the presentation more intuitive and clear through data empowerment and multi-dimensional presentation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of waterway maintenance, and in particular to a method and system for optimizing a waterway routine maintenance plan based on multi-source data. Background Art

[0002] As an important channel for water transportation, waterways play a key role in regional economic development and regional connectivity. However, some waterways have problems such as siltation, narrowness, shallowness, and curvature, which affect navigation capacity and navigation safety. Therefore, waterway maintenance is of great significance to improving waterway navigation conditions and promoting the development of water transportation.

[0003] In recent years, with the rapid development of digital technology and data analysis technology, the requirements for scientificity and efficiency of waterway maintenance have been continuously improved; however, the contradiction between the traditional management methods currently used by waterway management departments in actual work and the growing demand for high-quality maintenance has become increasingly prominent; therefore, it is necessary to start from the source, formulate accurate waterway maintenance plans, and promote efficient and scientific maintenance work.

[0004] The data types of waterway maintenance management are rich, and the amount of data continues to increase. However, it is difficult to collect and fully apply the existing large amount of historical data. At the same time, the traditional routine maintenance plan formulation often follows the historical plan, lacks the scientific nature of customization, and has a certain impact on the effect of specific maintenance implementation. Specifically:

[0005] (1) Incomplete data collection: Waterway maintenance management involves various data including policies and regulations, process systems, waterway evolution, maintenance implementation, hydrological and meteorological data. The data types are rich and the data volume is large, but the current management department cannot effectively collect and manage these data;

[0006] (2) Insufficient in-depth analysis: Waterway maintenance management involves a lot of complex data, including time, cost, quality, safety, resources and other dimensions; however, traditional management methods do not fully integrate and deeply analyze these data to support the scientific formulation of waterway maintenance plans;

[0007] (3) The plan presentation is not intuitive: The waterway maintenance plan involves many aspects. Traditionally, it is presented in text form, which makes it impossible to intuitively understand the geographical characteristics of the maintained waterway and the overall characteristics of the maintenance plan, and it is also impossible to effectively identify and compare the differences between different maintenance plans. Summary of the invention

[0008] In response to the above problems, an object of the present invention is to provide a method for optimizing routine waterway maintenance plans based on multi-source data. The method analyzes the existing routine waterway maintenance plans and gives optimization suggestions through the collection, processing, integration and multi-dimensional analysis of multi-source waterway management data, and presents the routine waterway maintenance plans in a multi-dimensional manner, thereby effectively solving the problem that the current routine waterway maintenance plans are relatively subjective based on experience and relatively general in text presentation. Data empowerment and multi-dimensional presentation make the formulation of routine waterway maintenance plans more accurate and scientific, and the presentation more intuitive and clear.

[0009] The second object of the present invention is to provide a waterway routine maintenance plan optimization system based on multi-source data.

[0010] The first technical solution adopted by the present invention is: a method for optimizing a waterway routine maintenance plan based on multi-source data, comprising the following steps:

[0011] S100: Acquire multi-source data related to waterway maintenance;

[0012] S200: Formulate a routine waterway maintenance plan based on the waterway maintenance plan formulation requirements; the routine waterway maintenance plan includes a navigation mark maintenance and waterway inspection work plan, a waterway maintenance dredging work plan, and a waterway maintenance observation work plan;

[0013] S300: Optimizing the navigation mark maintenance and waterway inspection work plan, the waterway maintenance dredging work plan, and the waterway maintenance observation work plan based on the multi-source data;

[0014] S400: Multi-dimensional display of the optimized navigation mark maintenance and waterway inspection work plan, waterway maintenance dredging work plan and waterway maintenance observation work plan.

[0015] Preferably, the multi-source data in step S100 includes standards and specifications related to routine waterway maintenance, basic waterway data, historical routine waterway maintenance implementation data, and water level and flow data of waterways over the years.

[0016] Preferably, the step S300 optimizes the navigation mark maintenance and waterway inspection work plan based on the multi-source data, including:

[0017] S311: Acquire a flight segment inspection cycle and a standard inspection frequency value based on the multi-source data;

[0018] S312: obtaining an actual patrol cycle and a median patrol frequency based on the multi-source data; and obtaining a patrol weight value for each flight segment based on the standard patrol cycle and patrol frequency of the flight segment and the median patrol cycle and patrol frequency;

[0019] S313: adjusting the inspection weight value of each route segment based on the waterway inspection record in the multi-source data to obtain a final inspection weight value of each route segment;

[0020] S314: Based on the final inspection weight value of each flight segment, the inspection cycle and inspection frequency of each flight segment are calculated to obtain the inspection cycle and inspection frequency calculation value of each flight segment; determine whether the inspection cycle and inspection frequency calculation value of each flight segment are consistent with the planned value, and if not, give optimization suggestions according to the inspection cycle and inspection frequency calculation value of each flight segment;

[0021] S315: Modify the navigation mark maintenance and waterway inspection work plan based on the optimization suggestion to form an optimized navigation mark maintenance and waterway inspection work plan.

[0022] Preferably, the step S300 of optimizing the waterway maintenance dredging work plan based on the multi-source data includes:

[0023] S321: Calculate the matching degree between the section to be dredged and the planned dredging section in the waterway maintenance dredging work plan;

[0024] S322: Calculate the deviation between the planned dredging workload per unit time and the historical dredging workload per unit time;

[0025] S323: based on the multi-source data, obtaining a time period when the water level and water flow change rate are greater than a set threshold, determining whether the planned construction time is within the time period when the water level and water flow change rate are greater than the set threshold; if within the time period, providing construction time optimization suggestions;

[0026] S324: Obtaining a comprehensive optimization suggestion based on the matching degree, deviation degree, and construction time optimization suggestion;

[0027] S325: Modify the waterway maintenance and dredging work plan based on the comprehensive optimization suggestion to form an optimized waterway maintenance and dredging work plan.

[0028] Preferably, the step S321 includes:

[0029] Mark the waterway maintenance and dredging work plan on the electronic map by section;

[0030] Based on the waterway inspection records in multi-source data, the sections to be dredged are marked on the electronic map;

[0031] And calculate the overlap between the planned dredging section and the section to be dredged in the waterway maintenance and dredging work plan, that is, obtain the matching degree.

[0032] Preferably, the step S300 of optimizing the waterway maintenance observation work plan based on the multi-source data includes:

[0033] S331: Obtaining a standard value of the maintenance observation frequency of the waterway to be maintained based on the multi-source data;

[0034] S332: Based on the multi-source data, obtain the time period and average number of observations each year when the observation frequency is higher or lower than the standard value;

[0035] S333: Determine whether the planned observation frequency is less than the standard value of the observation frequency for the waterway to be maintained. If so, give suggestions for optimizing the observation frequency. Determine whether the planned observation times in the time period when the observation frequency is higher or lower than the standard value each year are the same as the planned observation times in the normal time period. If so, give suggestions for optimizing the observation times according to the average number of observation times in the time period when the observation frequency is higher or lower than the standard value each year.

[0036] S334: Modify the waterway maintenance observation work plan based on the observation frequency optimization suggestion and the observation number optimization suggestion to form an optimized waterway maintenance observation work plan.

[0037] Preferably, the step S400 includes:

[0038] The overall information of the optimized navigation mark maintenance and waterway inspection and maintenance plan is presented in a table form;

[0039] Display the coverage of the optimized navigation mark maintenance and waterway inspection and maintenance plan in the form of a map;

[0040] Mark the flight segments with abnormal patrol frequency. Abnormal patrol frequency means that the patrol frequency exceeds the maximum value of the historical patrol frequency or is lower than the minimum value of the historical patrol frequency.

[0041] The relationship between the coverage of the optimized navigation mark maintenance and waterway inspection and maintenance plan and the high-incidence areas is displayed in map form.

[0042] Preferably, the step S400 includes:

[0043] The overall information of the optimized waterway maintenance and dredging work plan is presented in a table form;

[0044] The map clearly marks the dredging sections of the waterway involved in the optimized waterway maintenance and dredging work plan, identifies the areas to be dredged for waterway inspection, and intuitively displays the coverage and accuracy of the planned dredging sections;

[0045] A timeline diagram is used to show the construction schedule of the optimized channel maintenance and dredging work plan.

[0046] Preferably, the step S400 includes:

[0047] The overall information of the optimized waterway maintenance observation work plan is presented in a table form;

[0048] Mark the waterway area involved in the optimized waterway maintenance observation plan on the map;

[0049] The observation frequency of a certain flight segment is displayed in a time series graph.

[0050] The second technical solution adopted by the present invention is: a waterway routine maintenance plan optimization system based on multi-source data, including a data acquisition module, a plan formulation module, an optimization module and a display module;

[0051] The data acquisition module is used to acquire multi-source data related to waterway maintenance;

[0052] The plan making module is used to make a routine waterway maintenance plan based on the waterway maintenance plan making requirements; the routine waterway maintenance plan includes a navigation mark maintenance and waterway inspection work plan, a waterway maintenance dredging work plan and a waterway maintenance observation work plan;

[0053] The optimization module is used to optimize the navigation mark maintenance and waterway inspection work plan, the waterway maintenance dredging work plan and the waterway maintenance observation work plan based on the multi-source data;

[0054] The display module is used to display the optimized navigation mark maintenance and waterway inspection work plan, waterway maintenance dredging work plan and waterway maintenance observation work plan in multiple dimensions.

[0055] Beneficial effects of the above technical solution:

[0056] (1) The present invention provides a method for optimizing routine waterway maintenance plans based on multi-source data. The method analyzes the existing routine waterway maintenance plans and gives optimization suggestions by collecting, processing, integrating and multi-dimensionally analyzing multi-source waterway management data. The method also displays the routine waterway maintenance plans in multiple dimensions, which effectively solves the problem that the current routine waterway maintenance plans are relatively subjective when formulated based on experience and relatively general when presented in text. The method uses data empowerment and multi-dimensional presentation to make the routine waterway maintenance plans more accurate and scientific, and the presentation more intuitive and clear.

[0057] (2) The present invention uses standards and specifications as strong constraints, which solves the problems of possible omissions and errors in the routine maintenance plan of the waterway based on experience, and effectively improves the efficiency of the routine maintenance plan formulation of the waterway.

[0058] (3) The present invention makes full use of multi-source data and optimizes the routine waterway maintenance plan through classification analysis, time series analysis, median analysis, rate of change analysis and other methods, ensuring that the waterway maintenance plan is accurate, scientific and systematic, which is of great significance for ensuring shipping safety.

[0059] (4) The present invention presents the waterway maintenance plan in an intuitive and multi-dimensional form, which increases visualization and improves understanding, making the discussion and communication of the waterway maintenance plan smoother, and is an important breakthrough in waterway maintenance management.

[0060] (5) The present invention selectively acquires data related to routine waterway maintenance, optimizes and displays the existing routine waterway maintenance plan, provides accurate planning suggestions for waterway maintenance managers, and makes the formulation of waterway maintenance plans more scientific. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] Figure 1 A schematic flow chart of a method for optimizing a waterway routine maintenance plan based on multi-source data provided by an embodiment of the present invention;

[0062] Figure 2 A schematic diagram of a process for optimizing a navigation mark maintenance and waterway inspection work plan provided by an embodiment of the present invention;

[0063] Figure 3 A schematic diagram of a process for optimizing a waterway maintenance and dredging work plan provided by an embodiment of the present invention;

[0064] Figure 4 A schematic diagram of a process for optimizing a waterway maintenance observation work plan provided by an embodiment of the present invention;

[0065] Figure 5 A schematic diagram of a waterway routine maintenance plan optimization system based on multi-source data provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0066] The following detailed description of the embodiments of the present invention is further described in detail in conjunction with the accompanying drawings and examples. The detailed description of the following embodiments and the accompanying drawings are used to exemplarily illustrate the principles of the present invention, but cannot be used to limit the scope of the present invention, that is, the present invention is not limited to the preferred embodiments described, and the scope of the present invention is defined by the claims.

[0067] In the description of the present invention, it should be noted that, unless otherwise specified, “plurality” means two or more than two; the terms “first”, “second”, etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance; for ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.

[0068] Embodiment 1

[0069] like Figure 1 As shown, an embodiment of the present invention provides a method for optimizing a waterway routine maintenance plan based on multi-source data, comprising the following steps:

[0070] S100: Acquire multi-source data related to waterway maintenance;

[0071] The present invention obtains multi-source data through interface docking, document recognition, Internet of Things perception and other means; the multi-source data includes standards and specifications related to routine waterway maintenance, basic waterway data, historical waterway routine maintenance implementation data, and water level and flow data of waterways over the years.

[0072] (1) Standards and specifications related to routine waterway maintenance;

[0073] Obtain the texts of waterway management regulations, waterway maintenance technical specifications, and waterway technical inspection guidelines, identify the text content, and extract structured data on technical requirements related to routine waterway maintenance, that is, obtain standards and specifications related to routine waterway maintenance.

[0074] The quality of structured data is tested from the perspectives of "standardization, completeness, accuracy, consistency, timeliness and accessibility". After cleaning the data, a database of technical requirements for routine waterway maintenance is constructed based on relevant standards and specifications for routine waterway maintenance. The database of technical requirements for routine waterway maintenance includes parameters such as routine maintenance project types, maintenance requirements, maintenance indicators, maintenance channel grades, and maintenance levels.

[0075] (2) Basic waterway data;

[0076] Obtain basic waterway data of the jurisdiction through surveying and mapping and electronic documents. Basic waterway data includes geographic data and attribute data such as the starting and ending points of the waterway section, navigation aids around the waterway, waterway stations, and waterway regulation buildings;

[0077] The quality of the waterway basic data is examined from the perspectives of "standardization, completeness, accuracy, consistency, timeliness and accessibility". After cleaning the waterway basic data, it is marked and displayed on the map according to the waterway grade, building category, etc., to construct a spatial geographic database and attribute database of the waterway basic data.

[0078] (3) Historical waterway routine maintenance implementation data;

[0079] The historical waterway routine maintenance implementation data includes one or more of historical navigation mark maintenance, waterway inspection implementation data, historical waterway maintenance dredging implementation data, and historical waterway maintenance observation implementation data;

[0080] Among them, the waterway routine maintenance implementation system is connected to obtain historical navigation mark maintenance and waterway patrol implementation data; historical navigation mark maintenance and waterway patrol implementation data specifically include navigation mark maintenance, waterway patrol records, waterway patrol problems, work organization plans, technical plans, patrol problems, abnormal solution records, etc.;

[0081] Connect to the waterway routine maintenance implementation system to obtain historical waterway maintenance dredging implementation data; historical waterway maintenance dredging implementation data specifically includes dredging commencement application data, work organization plan data, dredging commencement date, dredging completion date, dredging construction implementation record data, dredging workload, dredging acceptance data, etc.;

[0082] Connect to the waterway routine maintenance implementation system to obtain historical waterway maintenance observation implementation data; historical waterway maintenance observation implementation data specifically includes commencement application data, work organization plan data, observation start date, observation completion date, observation implementation records and other data.

[0083] The text contents of the above-mentioned historical navigation mark maintenance, waterway inspection implementation data, historical waterway maintenance dredging implementation data, and historical waterway maintenance observation implementation data were structured, and the data quality was tested from the perspectives of "standardization, completeness, accuracy, consistency, timeliness and accessibility". The data was cleaned and the navigation mark maintenance and waterway inspection implementation database, the waterway maintenance dredging implementation database, and the waterway maintenance observation implementation database were constructed respectively.

[0084] (4) Historical waterway water level and current data;

[0085] The water level and flow data of the waterway over the years are obtained from external departments through the public interfaces of the water conservancy department and the meteorological department respectively; and the water level and flow data of the waterway over the years are obtained from the hydrological telemetry devices of the waterway management department.

[0086] Data quality is inspected from the perspectives of "standardization, completeness, accuracy, consistency, timeliness and accessibility", and quality inspections are carried out on data from multiple departments and the data is cleaned. The cleaned historical waterway water level and flow data obtained from external departments are merged with the historical waterway level and flow data obtained from the hydrological telemetry device of the waterway management department according to time, location and other identifiers to obtain historical waterway water level and flow data. A historical waterway water level and flow database is constructed based on historical waterway water level and flow data.

[0087] The present invention obtains historical maintenance implementation data, waterway basic data and historical waterway maintenance plan data respectively through interface docking, document recognition, Internet of Things perception and other means according to the maintenance plan categories and corresponding data requirements, so as to provide a data source for rationality analysis; structurally processes technical documents through text recognition technology; establishes a waterway spatial geographic information database through automatic recognition of geographic information; implements data quality inspection through predefined rules, primary key and foreign key query, and construction of data dictionary; and realizes multi-source data fusion through comparison of different data sources.

[0088] S200: Develop routine waterway maintenance plans based on the waterway maintenance plan development requirements;

[0089] According to the requirements for formulating the waterway maintenance plan, the content of the requirements is logically extracted, refined and structured to form a routine waterway maintenance plan; the routine waterway maintenance plan includes various routine maintenance plan contents such as navigation mark maintenance and waterway inspection work plan, waterway maintenance dredging work plan, and waterway maintenance observation work plan.

[0090] Furthermore, in one embodiment, it also includes judging the integrity of the contents of the routine waterway maintenance plan according to the contents of the routine waterway maintenance plan, according to the categories of the routine waterway maintenance plan and the sections involved in the management area, so as to ensure the integrity of the contents of the routine waterway maintenance plan.

[0091] The integrity assessment of the contents of the routine waterway maintenance plan includes:

[0092] For the navigation mark maintenance and waterway inspection work plan, determine whether the number of maintenance marks and the number of maintenance project days are complete;

[0093] For the waterway maintenance dredging work plan, determine whether the dredging location, engineering quantity, and implementation schedule are complete;

[0094] For the waterway maintenance observation work plan, determine whether the observation content, number of observations, and time schedule are complete.

[0095] The present invention analyzes the actual needs of waterway maintenance according to the waterway maintenance management regulations of the waterway maintenance management department, sorts out the contents of the waterway routine maintenance plan, determines the data type, scope and relationship, and plans the data storage strategy at the same time, constructs various types of waterway routine maintenance plan databases, and confirms the integrity of the formulated waterway routine maintenance plan, thereby ensuring the integrity of the formulated waterway routine maintenance plan and making it more convenient to optimize and manage the waterway routine maintenance plan.

[0096] S300: Optimizing the waterway routine maintenance plan based on the multi-source data;

[0097] The formulated routine waterway maintenance plan is comprehensively analyzed and evaluated based on multi-source data, and optimization suggestions are provided from the target dimension and execution dimension. The plan preparation personnel modify the plan according to the modification suggestions and reasons and complete the plan formulation; based on the pre-processed multi-source data, the routine waterway maintenance plan is optimized, including the optimization of navigation mark maintenance and waterway inspection work plans, the optimization of waterway maintenance dredging work plans, and the optimization of waterway maintenance observation work plans.

[0098] (1) Optimize the navigation mark maintenance and waterway inspection work plan;

[0099] like Figure 2As shown, in combination with the relevant standards and specifications for routine waterway maintenance and historical navigation mark maintenance and waterway inspection records, the navigation mark maintenance and waterway inspection work plan is optimized and analyzed, including the following sub-steps:

[0100] S311: Obtaining the standard value of the inspection cycle and inspection frequency of the flight segment based on multi-source data;

[0101] Based on parameters such as the maintenance channel grade and maintenance level in the relevant standards and specifications for routine channel maintenance, the standard values ​​of the section inspection cycle and inspection frequency are obtained. Local standards and specifications and management regulations will have obvious standard values ​​of the section inspection cycle and inspection frequency, which are different in different places.

[0102] S312: obtaining an actual patrol cycle and a median patrol frequency based on multi-source data; and obtaining a patrol weight value for each flight segment based on the standard patrol cycle and patrol frequency of the flight segment and the median patrol cycle and patrol frequency;

[0103] Based on the historical navigation mark maintenance and waterway inspection records in the multi-source data, the actual inspection cycle and the median inspection frequency are analyzed, including: according to the actual inspection cycle and frequency data, the actual inspection cycle and frequency data are arranged from small to large. If the number of actual inspection cycle and frequency data is an odd number, the middle number is the median of the actual inspection cycle and inspection frequency; if the number of actual inspection cycle and frequency data is an even number, the average of the two middle values ​​is taken as the median of the actual inspection cycle and inspection frequency.

[0104] The actual inspection period and the median of the inspection frequency are compared with the standard inspection period and inspection frequency, and the inspection weight of each flight segment is assigned to obtain the inspection weight value of each flight segment. That is, the inspection weight value of each flight segment is expressed by the following formula:

[0105] The weight value of the flight segment inspection = the median of the actual inspection period and inspection frequency / the standard value of the flight segment inspection period and inspection frequency.

[0106] S313: adjusting the inspection weight value of each route segment based on the waterway inspection record to obtain a final inspection weight value of each route segment;

[0107] Problems existing in the waterway inspection records are classified and analyzed by flight segments to clarify the type, severity, and cause (natural cause, man-made damage) of the problems; the inspection weight of the flight segment whose frequency of man-made damage exceeds the set threshold (the set threshold is set by the management personnel, and the threshold is different for different flight segments) in the flight segment inspection weight value obtained in step S312 is increased (the weight increase value is set by the management personnel, and the increase ratio is different for different flight segments) to obtain the final inspection weight value of each flight segment; that is, the inspection weight of the flight segment whose frequency of man-made damage exceeds the set threshold in the flight segment inspection weight value is increased to obtain the final inspection weight value of each flight segment.

[0108] S314: Based on the final inspection weight value of each flight segment, the inspection cycle and inspection frequency of each flight segment are calculated to obtain the inspection cycle and inspection frequency calculation value of each flight segment; determine whether the inspection cycle and inspection frequency calculation value of each flight segment are consistent with the planned value, and if not, give optimization suggestions according to the inspection cycle and inspection frequency calculation value of each flight segment;

[0109] Based on the final inspection weight value of each segment, the inspection cycle and inspection frequency of each segment are calculated in combination with the actual inspection cycle and the median of the inspection frequency, and the calculated value of the inspection cycle and inspection frequency of each segment is obtained; it is determined whether the calculated value of the inspection cycle and inspection frequency of each segment is consistent with the planned value of the inspection cycle and inspection frequency of each segment in the navigation mark maintenance and waterway inspection work plan. If not, optimization suggestions are given according to the calculated value of the inspection cycle and inspection frequency of each segment, that is, the recommended inspection cycle and inspection frequency are proposed, and the reasons are explained; if consistent, there is no need to modify the inspection cycle and inspection frequency of each segment in the navigation mark maintenance and waterway inspection work plan.

[0110] S315: Modify the navigation mark maintenance and waterway inspection work plan based on the optimization suggestion to form an optimized navigation mark maintenance and waterway inspection work plan.

[0111] The planners completed the optimization and modification of the navigation mark maintenance and waterway inspection work plan according to the optimization suggestions, and formed an optimized navigation mark maintenance and waterway inspection work plan.

[0112] (2) Optimize the waterway maintenance and dredging work plan;

[0113] like Figure 3 As shown, combined with historical navigation mark maintenance, channel inspection records, historical channel maintenance and dredging implementation data, channel water level and water flow data over the years, the channel maintenance and dredging work plan is optimized and analyzed, including:

[0114] S321: Calculate the matching degree between the section to be dredged and the planned dredging section in the waterway maintenance dredging work plan;

[0115] The waterway maintenance and dredging work plan is marked on the electronic map according to the sections; and the waterway inspection records are extracted to mark the area to be dredged on the electronic map, and it is determined whether the planned dredging section in the waterway maintenance and dredging work plan covers the section to be dredged (i.e. the problem section), that is, the matching degree between the section to be dredged and the planned dredging section in the waterway maintenance and dredging work plan is calculated. The higher the overlap between the planned dredging section in the waterway maintenance and dredging work plan and the section to be dredged (i.e. the problem section) on the map, the higher the matching degree.

[0116] S322: Calculate the deviation between the planned dredging workload per unit time and the historical dredging workload per unit time;

[0117] Extract historical waterway maintenance dredging implementation data, calculate the dredging volume generated per unit time according to each dredging work, and fit to form a historical dredging volume change curve generated per unit time, which includes the maximum and minimum values ​​of the historical dredging workload per unit time; judge whether the planned dredging workload per unit time in the current waterway maintenance dredging work plan is greater than the maximum value of the historical dredging workload per unit time. If it is greater than the maximum value of the historical dredging workload per unit time, it means that there is a significant deviation between the planned dredging workload per unit time and the historical dredging workload per unit time, calculate the difference between the planned dredging workload per unit time and the maximum value of the historical dredging workload per unit time, and obtain the deviation degree between the planned dredging workload per unit time and the historical dredging workload per unit time;

[0118] Alternatively, it is determined whether the planned dredging workload per unit time in the current waterway maintenance and dredging work plan is less than the minimum value of the historical dredging workload per unit time. If it is less than the minimum value of the historical dredging workload per unit time, it means that there is a significant deviation between the planned dredging workload per unit time and the historical dredging workload per unit time. The difference between the planned dredging workload per unit time and the minimum value of the historical dredging workload per unit time is calculated to obtain the degree of deviation between the planned dredging workload per unit time and the historical dredging workload per unit time.

[0119] S323: Based on the multi-source data, a time period when the water level and water flow change rate are greater than a set threshold is obtained, and whether the planned construction time is within the time period when the water level and water flow change rate are greater than the set threshold is determined; if it is within the time period, a construction time optimization suggestion is given;

[0120] Extract the water level and flow data of the waterway over the years and draw a water level-flow time series diagram; and analyze the water level and flow change rate based on the water level-flow time series diagram to identify the time period when the water level and flow change rate exceeds the set threshold (the set threshold is set by business personnel according to the conditions of the specific section, and the value is different for different waterways), that is, the time period with a large water level and flow change rate;

[0121] Determine whether the planned construction time in the waterway maintenance and dredging work plan is within the time period with large water level and water flow change rates mentioned above; if the planned construction time is within the time period with large water level and water flow change rates mentioned above, give suggestions for optimizing the construction time.

[0122] S324: Obtaining a comprehensive optimization suggestion based on the matching degree, deviation degree, and construction time optimization suggestion;

[0123] Based on the matching degree between the sections to be dredged and the planned dredging sections in the waterway maintenance dredging work plan (i.e. the planned dredging section coverage rate), specific suggestions on changes in dredging section coverage are put forward; based on the deviation between the planned dredging workload per unit time and the historical dredging workload per unit time, suggestions on deviation in dredging workload (too much or too little) and suggestions on construction time optimization (i.e. suggestions on the need to adjust the dredging plan construction time) are put forward to obtain comprehensive optimization suggestions.

[0124] S325: Modify the waterway maintenance and dredging work plan based on the comprehensive optimization suggestion to form an optimized waterway maintenance and dredging work plan.

[0125] The planners completed the optimization and modification of the waterway maintenance and dredging work plan according to the comprehensive optimization suggestions and formed an optimized waterway maintenance and dredging work plan.

[0126] (3) Optimize the waterway maintenance observation work plan;

[0127] like Figure 4 As shown in the figure, combined with the relevant standards and specifications for routine waterway maintenance and historical waterway maintenance observation implementation data, the waterway maintenance observation work plan is optimized and analyzed, including:

[0128] S331: Obtain the standard value of the maintenance observation frequency of the waterway to be maintained;

[0129] Based on parameters such as waterway grade and waterway maintenance level in relevant standards and specifications for routine waterway maintenance, the standard values ​​of maintenance observation frequency for the waterway to be maintained are analyzed.

[0130] S332: Based on the historical waterway maintenance observation implementation data, obtain the time period and average number of observations when the observation frequency is higher than the standard value or lower than the standard value every year;

[0131] Based on the historical waterway maintenance observation implementation data, the time series of the number of observations per year was fitted, and the multi-year time series were superimposed and represented by a scatter plot. The periodicity of the observation frequency changing with the month was analyzed, and the time sections and the average number of observations when the observation frequency was higher than the standard value throughout the year, and the time sections and the average number of observations when the observation frequency was lower than the standard value throughout the year were obtained, that is, the average number of observations in special time periods.

[0132] S333: judging whether the planned observation frequency is less than the standard value of the observation frequency for the waterway to be maintained, and if so, giving suggestions for optimizing the observation frequency; and judging whether the planned observation times in the special time period are the same as the planned observation times in other normal time periods, and if so, giving suggestions for optimizing the observation times according to the average observation times in the special time period;

[0133] Based on the standard value of maintenance observation frequency for waterways to be maintained and the average number of observations in special time periods, an analysis is conducted to determine whether the planned observation frequency in the waterway maintenance observation work plan is greater than or equal to the standard value of maintenance observation frequency for waterways to be maintained. If the planned observation frequency is greater than or equal to the standard value of maintenance observation frequency for waterways to be maintained, it is considered that the planned observation frequency meets the standard value of maintenance observation frequency for waterways to be maintained; if the planned observation frequency is less than the standard value of maintenance observation frequency for waterways to be maintained, it is considered that the planned observation frequency does not meet the standard value of maintenance observation frequency for waterways to be maintained.

[0134] And determine whether the planned number of observations in a special time period in the waterway maintenance observation work plan is the same as the planned number of observations in other normal time periods. If they are the same, optimization suggestions for the number of observations are given based on the average number of observations in the special time period.

[0135] S334: Modify the waterway maintenance observation work plan based on the observation frequency optimization suggestion and the observation number optimization suggestion to form an optimized waterway maintenance observation work plan.

[0136] The planners completed the optimization and modification of the waterway maintenance observation work plan according to the observation frequency optimization suggestions and observation time optimization suggestions, and formed an optimized waterway maintenance observation work plan.

[0137] The present invention combines the maintenance contents of three types of plans, namely, navigation mark maintenance and waterway inspection work, waterway maintenance dredging work, and waterway maintenance observation work, and based on multi-source data statistical analysis, proposes modification suggestions for the plan contents from the target dimension and the execution dimension; based on standards and specifications, historical maintenance records, hydrological and other data, analyzes the optimal waterway routine maintenance goals, including scope, number of times, workload, etc., and proposes plan modification suggestions; based on standards and specifications, historical maintenance records, hydrological and other data, analyzes the optimal waterway routine maintenance schedule, and proposes plan modification suggestions, which effectively solves the problem that the current waterway routine maintenance plan is relatively subjective based on experience and relatively general in text, and solves the possible omissions and errors in the waterway routine maintenance plan based on experience, ensures the accuracy, science and system of the waterway maintenance plan, which is of great significance for ensuring shipping safety.

[0138] S400: Multi-dimensional display of the optimized waterway routine maintenance plan;

[0139] The optimized routine maintenance plan for the waterway is presented in multi-dimensional forms such as charts, allowing managers to understand the plan contents intuitively and clearly.

[0140] (1) Display of optimized navigation mark maintenance and waterway inspection and maintenance plans;

[0141] According to the optimized navigation mark maintenance and waterway inspection and maintenance plan, users are provided with multi-dimensional visual display, including:

[0142] 1) Display the overall information of the optimized navigation mark maintenance and waterway inspection and maintenance plan in a table, including objectives, scope, inspection cycle, etc.;

[0143] 2) Display the coverage of the optimized navigation mark maintenance and waterway inspection and maintenance plan in the form of a map, and clearly mark the sections covered by the submitted plan on the map to intuitively present the coverage of the plan;

[0144] 3) For the flight segments with abnormal inspection frequency, they will be highlighted with flashing marks and attached with explanations to explain the reasons. Abnormal inspection frequency means that the inspection frequency exceeds the maximum value of the historical inspection frequency or is lower than the minimum value of the historical inspection frequency; for example, the area has many problems due to human damage or natural factors;

[0145] 4) The relationship between the coverage of the optimized navigation mark maintenance and waterway inspection and maintenance plan and the high-incidence areas is displayed in the form of a map; navigation marks that have had inspection problems in the past are marked in the form of icons; users can select the corresponding layer to view the description of historical inspection problems, including the time when the problem occurred, the specific situation, and the treatment measures taken.

[0146] (2) Display of optimized waterway maintenance and dredging work plan;

[0147] The optimized waterway maintenance and dredging work plan includes:

[0148] 1) Display the overall information of the optimized waterway maintenance and dredging work plan in a table, including objectives, scope, maintenance scale, time period, dredging workload, etc.;

[0149] 2) Clearly mark the dredging sections of the waterway involved in this plan on the map, identify the areas to be dredged for waterway inspection, and intuitively show the coverage and accuracy of the planned dredging sections;

[0150] 3) Display the planned construction schedule using a timeline diagram.

[0151] (3) Presentation of optimized waterway maintenance observation work plan;

[0152] The optimized waterway maintenance observation work plan is displayed, including:

[0153] 1) The overall information of the optimized waterway maintenance observation work plan is presented in a table, including the target, scope, different sections and time periods, and the corresponding observation frequency, time period, dredging workload, etc.;

[0154] 2) Clearly mark the waterway area involved in this waterway maintenance observation plan on the map, and use lines of specific colors to outline the waterway boundaries;

[0155] 3) The observation frequency of a certain flight segment is displayed in a time series graph, and the observation frequency in a special time period is displayed with special emphasis and color change.

[0156] The present invention uses tools such as maps and tables to intuitively display various aspects of the waterway maintenance plan in the form of a combination of pictures and texts, graphic comparison, timeline, etc.; directly display the maintenance plan objectives, scope, investment, etc. in tables; intuitively display the scope of maintenance sections, key maintenance sections, etc. on maps, and can compare and view maintenance sections in previous years; display the maintenance plan schedule on a timeline; the present invention uses data empowerment and multi-dimensional display to make the formulation of routine waterway maintenance plans more accurate and scientific, and the display more intuitive and clear, and displays waterway maintenance plans in an intuitive and multi-dimensional form, thereby increasing visualization and improving understanding, making the discussion and communication of waterway maintenance plans smoother, which is an important breakthrough in waterway maintenance management.

[0157] Embodiment 2

[0158] like Figure 5 As shown, an embodiment of the present invention provides a waterway routine maintenance plan optimization system based on multi-source data, including a data acquisition module, a plan formulation module, an optimization module and a display module;

[0159] The data acquisition module is used to acquire multi-source data;

[0160] The plan making module is used to make a routine waterway maintenance plan based on the waterway maintenance plan making requirements; the routine waterway maintenance plan includes a navigation mark maintenance and waterway inspection work plan, a waterway maintenance dredging work plan and a waterway maintenance observation work plan;

[0161] The optimization module is used to optimize the navigation mark maintenance and waterway inspection work plan, the waterway maintenance dredging work plan and the waterway maintenance observation work plan based on the multi-source data;

[0162] The display module is used to display the optimized navigation mark maintenance and waterway inspection work plan, waterway maintenance dredging work plan and waterway maintenance observation work plan in multiple dimensions.

[0163] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed in the embodiments of the present invention can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0164] In the embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0165] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0166] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0167] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as USB flash drives, mobile hard disks, ROM, RAM, magnetic disks, or optical disks.

[0168] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A method for optimizing routine waterway maintenance plan based on multi-source data, characterized in that: The following steps are involved: S100: Acquire multi-source data related to waterway maintenance; S200: Develop routine waterway maintenance plans based on the waterway maintenance plan development requirements; The routine waterway maintenance plan includes a navigation mark maintenance and waterway inspection work plan, a waterway maintenance dredging work plan and a waterway maintenance observation work plan; S300: Optimizing the navigation mark maintenance and waterway inspection work plan, the waterway maintenance dredging work plan, and the waterway maintenance observation work plan based on the multi-source data; S400: Multi-dimensional display of the optimized navigation mark maintenance and waterway inspection work plan, waterway maintenance dredging work plan and waterway maintenance observation work plan; The step S300 optimizes the navigation mark maintenance and waterway inspection work plan based on the multi-source data, including: S311: Acquire a flight segment inspection cycle and a standard inspection frequency value based on the multi-source data; S312: obtaining an actual patrol cycle and a median patrol frequency based on the multi-source data; and obtaining a patrol weight value for each flight segment based on the standard patrol cycle and patrol frequency of the flight segment and the median patrol cycle and patrol frequency; S313: adjusting the inspection weight value of each route segment based on the waterway inspection record in the multi-source data to obtain a final inspection weight value of each route segment; S314: Based on the final inspection weight value of each flight segment, the inspection cycle and inspection frequency of each flight segment are calculated to obtain the inspection cycle and inspection frequency calculation value of each flight segment; determine whether the inspection cycle and inspection frequency calculation value of each flight segment are consistent with the planned value, and if not, give optimization suggestions according to the inspection cycle and inspection frequency calculation value of each flight segment; S315: modifying the navigation mark maintenance and waterway inspection work plan based on the optimization suggestion to form an optimized navigation mark maintenance and waterway inspection work plan; Optimizing the waterway maintenance and dredging work plan based on the multi-source data includes: S321: Calculate the matching degree between the section to be dredged and the planned dredging section in the waterway maintenance dredging work plan; S322: Calculate the deviation between the planned dredging workload per unit time and the historical dredging workload per unit time; S323: based on the multi-source data, obtaining a time period when the water level and water flow change rate are greater than a set threshold, determining whether the planned construction time is within the time period when the water level and water flow change rate are greater than the set threshold; if within the time period, providing construction time optimization suggestions; S324: Obtaining a comprehensive optimization suggestion based on the matching degree, deviation degree, and construction time optimization suggestion; S325: modifying the waterway maintenance and dredging work plan based on the comprehensive optimization suggestion to form an optimized waterway maintenance and dredging work plan; Optimizing the waterway maintenance observation work plan based on the multi-source data includes: S331: Obtaining a standard value of the maintenance observation frequency of the waterway to be maintained based on the multi-source data; S332: Based on the multi-source data, obtain the time period and average number of observations each year when the observation frequency is higher or lower than the standard value; S333: Determine whether the planned observation frequency is less than the standard value of the observation frequency for the waterway to be maintained. If so, give suggestions for optimizing the observation frequency. Determine whether the planned observation times in the time period when the observation frequency is higher or lower than the standard value each year are the same as the planned observation times in the normal time period. If so, give suggestions for optimizing the observation times according to the average number of observation times in the time period when the observation frequency is higher or lower than the standard value each year. S334: Modify the waterway maintenance observation work plan based on the observation frequency optimization suggestion and the observation number optimization suggestion to form an optimized waterway maintenance observation work plan.

2. The method for optimizing waterway routine maintenance plan according to claim 1, characterized in that: The multi-source data in step S100 include standards and specifications related to routine waterway maintenance, basic waterway data, historical waterway routine maintenance implementation data, and water level and flow data of waterways over the years.

3. The method for optimizing waterway routine maintenance plan according to claim 1, characterized in that: The step S321 includes: Mark the waterway maintenance and dredging work plan on the electronic map by section; Based on the waterway inspection records in multi-source data, the sections to be dredged are marked on the electronic map; And calculate the overlap between the planned dredging section and the section to be dredged in the waterway maintenance and dredging work plan, that is, obtain the matching degree.

4. The method for optimizing routine waterway maintenance plan according to claim 1, characterized in that: The step S400 includes: The overall information of the optimized navigation mark maintenance and waterway inspection and maintenance plan is presented in a table form; Display the coverage of the optimized navigation mark maintenance and waterway inspection and maintenance plan in the form of a map; Mark the flight segments with abnormal patrol frequency. Abnormal patrol frequency means that the patrol frequency exceeds the maximum value of the historical patrol frequency or is lower than the minimum value of the historical patrol frequency. The relationship between the coverage of the optimized navigation mark maintenance and waterway inspection and maintenance plan and the high-incidence areas is displayed in map form.

5. The method for optimizing waterway routine maintenance plan according to claim 1, characterized in that: The step S400 includes: The overall information of the optimized waterway maintenance and dredging work plan is presented in a table form; The map clearly marks the dredging sections of the waterway involved in the optimized waterway maintenance and dredging work plan, identifies the areas to be dredged for waterway inspection, and intuitively displays the coverage and accuracy of the planned dredging sections; A timeline diagram is used to show the construction schedule of the optimized channel maintenance and dredging work plan.

6. The method for optimizing waterway routine maintenance plan according to claim 1, characterized in that: The step S400 includes: The overall information of the optimized waterway maintenance observation work plan is presented in a table form; Mark the waterway area involved in the optimized waterway maintenance observation plan on the map; The observation frequency of a certain flight segment is displayed in a time series graph.

7. A waterway routine maintenance plan optimization system based on multi-source data, characterized in that: It includes data acquisition module, planning module, optimization module and display module; The data acquisition module is used to acquire multi-source data related to waterway maintenance; The plan making module is used to make a routine waterway maintenance plan based on the waterway maintenance plan making requirements; the routine waterway maintenance plan includes a navigation mark maintenance and waterway inspection work plan, a waterway maintenance dredging work plan and a waterway maintenance observation work plan; The optimization module is used to optimize the navigation mark maintenance and waterway inspection work plan, the waterway maintenance dredging work plan and the waterway maintenance observation work plan based on the multi-source data; The display module is used to display the optimized navigation mark maintenance and waterway inspection work plan, waterway maintenance dredging work plan and waterway maintenance observation work plan in multiple dimensions; The optimization module performs the following operations: Optimizing the navigation mark maintenance and waterway inspection work plan based on the multi-source data, including: S311: Acquire a flight segment inspection cycle and a standard inspection frequency value based on the multi-source data; S312: obtaining an actual patrol cycle and a median patrol frequency based on the multi-source data; and obtaining a patrol weight value for each flight segment based on the standard patrol cycle and patrol frequency of the flight segment and the median patrol cycle and patrol frequency; S313: adjusting the inspection weight value of each route segment based on the waterway inspection record in the multi-source data to obtain a final inspection weight value of each route segment; S314: Based on the final inspection weight value of each flight segment, the inspection cycle and inspection frequency of each flight segment are calculated to obtain the inspection cycle and inspection frequency calculation value of each flight segment; determine whether the inspection cycle and inspection frequency calculation value of each flight segment are consistent with the planned value, and if not, give optimization suggestions according to the inspection cycle and inspection frequency calculation value of each flight segment; S315: modifying the navigation mark maintenance and waterway inspection work plan based on the optimization suggestion to form an optimized navigation mark maintenance and waterway inspection work plan; Optimizing the waterway maintenance and dredging work plan based on the multi-source data includes: S321: Calculate the matching degree between the section to be dredged and the planned dredging section in the waterway maintenance dredging work plan; S322: Calculate the deviation between the planned dredging workload per unit time and the historical dredging workload per unit time; S323: based on the multi-source data, obtaining a time period when the water level and water flow change rate are greater than a set threshold, determining whether the planned construction time is within the time period when the water level and water flow change rate are greater than the set threshold; if within the time period, providing construction time optimization suggestions; S324: Obtaining a comprehensive optimization suggestion based on the matching degree, deviation degree, and construction time optimization suggestion; S325: modifying the waterway maintenance and dredging work plan based on the comprehensive optimization suggestion to form an optimized waterway maintenance and dredging work plan; Optimizing the waterway maintenance observation work plan based on the multi-source data includes: S331: Obtaining a standard value of the maintenance observation frequency of the waterway to be maintained based on the multi-source data; S332: Based on the multi-source data, obtain the time period and average number of observations each year when the observation frequency is higher or lower than the standard value; S333: Determine whether the planned observation frequency is less than the standard value of the observation frequency for the waterway to be maintained. If so, give suggestions for optimizing the observation frequency. Determine whether the planned observation times in the time period when the observation frequency is higher or lower than the standard value each year are the same as the planned observation times in the normal time period. If so, give suggestions for optimizing the observation times according to the average number of observation times in the time period when the observation frequency is higher or lower than the standard value each year. S334: Modify the waterway maintenance observation work plan based on the observation frequency optimization suggestion and the observation number optimization suggestion to form an optimized waterway maintenance observation work plan.