Electric power engineering cable installation method
Through the combination of the lifting platform and the cable conveying device, the problem of manual lifting of thick cables is solved, efficient lifting and laying of cables is achieved, and cable installation efficiency is improved.
Patent Information
- Application Number
- CN202411445564.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-16
- Publication Date
- 2025-01-17
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In power construction, due to the large weight of thick cables, it takes time and effort to lift them to a high place manually, resulting in inefficient cable installation.
Using a lifting platform and a cable conveying device, one end of the cable is lifted to the roller on the lifting platform through a cable conveying device. After clamping with a cable clamping mechanism, the lifting platform is raised through the lifting mechanism to lift the cable to a high place for easy traction. Machine traction laying.
It improves the installation efficiency of cables, reduces the labor intensity and time of manual lifting, and improves the convenience of cable laying.
Smart Images

Figure CN119324404A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of electric power engineering construction, and more specifically to a method for installing electric power engineering cables. Background Art
[0002] The power industry is a basic industry for national economic development and plays a pivotal role in national economic construction. With the rapid development of the economy, the demand for electricity in various countries is increasing, resulting in the annual increase in the rated voltage and rated current levels in the power system. Due to the reduction in the application cost of power cables and the high reliability of power supply, no influence from ground and space buildings, no damage from bad weather, safe, concealed and durable, power cables have been increasingly widely used.
[0003] Existing power cables use a bracket-type operation. During the cable installation process, the cable is generally pulled by a traction machine to lay it on the bracket. When laying the cable at a high place, the operator is required to lift one end of the cable to a high place in advance to facilitate traction and laying. However, some thick cables are heavy and it is difficult to lift them manually. It is not convenient to lift, and the installation is time-consuming and labor-intensive. Summary of the invention
[0004] The object of the present invention is to provide a method for installing a power engineering cable, which is convenient for lifting the cable to a high place for laying and improving the installation efficiency of the cable.
[0005] In order to achieve the above object, the technical solution of the present invention is as follows:
[0006] A method for installing a power engineering cable comprises the following steps:
[0007] S1: lift one end of the cable onto the roller on the lifting platform, and convey the cable through the cable conveying device so that one end of the cable completely passes through the cable conveying channel;
[0008] S2: The cable is clamped and limited by the cable clamping mechanisms on both sides;
[0009] S3: Raise the lifting platform through the lifting mechanism to lift one end of the cable to a high place to facilitate traction and laying by the traction machine.
[0010] Furthermore, in step S1, the lifting platform and the lifting mechanism for driving the lifting platform to lift are arranged on a base, mounting seats are symmetrically arranged on both sides of the top of the lifting platform, multiple groups of rollers are rotatably arranged between the two mounting seats, the cable conveying device is arranged on the mounting seat, the cable conveying channel is formed between the two cable conveying devices, and the two cable clamping mechanisms are respectively arranged at both ends of the cable conveying device.
[0011] Furthermore, two vertical plates are fixedly connected to the base, and lifting slide grooves are formed on opposite sides of the two vertical plates; the lifting mechanism includes a screw rod rotatably arranged in one of the lifting slide grooves, a screw rod motor for driving the screw rod to rotate is installed in the lifting slide groove, and a guide rod is fixedly connected in the other lifting slide groove, one end of the lifting platform is threadedly connected to the screw rod, and the other end of the lifting platform is slidably connected to the guide rod.
[0012] Furthermore, a reinforcing plate is fixedly connected between the vertical plate and the base.
[0013] Furthermore, the cable conveying device includes a driving shaft and a driven shaft rotatably arranged on the top of the mounting seat, and gears are fixedly sleeved on the driving shaft and the driven shaft. The two gears are connected by a rack transmission, and a conveyor belt is fixedly connected to the outer side of the rack.
[0014] Furthermore, a protective cover is provided on the outer side of the conveyor belt, a driving motor is installed on the protective cover, and an output shaft of the driving motor is drivingly connected to the active rotating shaft.
[0015] Furthermore, two limiting slide grooves are provided on the lifting platform; the cable clamping mechanism includes a bidirectional screw arranged in the limiting slide groove and a limiting motor driving the bidirectional screw to rotate, both ends of the bidirectional screw are screwed with a slide seat, and an arc-shaped clamping block is fixedly connected to the slide seat.
[0016] Furthermore, two mounting plates are provided between the limiting slide groove and the mounting seat, the two mounting plates are symmetrically fixedly connected to the lifting platform, and two groups of limiting rollers are rotatably provided between the two mounting plates.
[0017] Furthermore, the base is provided with a plurality of screw holes.
[0018] Compared with the prior art, the present invention has the following beneficial effects:
[0019] When laying cables at a height, the operator lifts one end of the cable onto the roller, and conveys the cable through the cable conveying devices on both sides, so that one end of the cable completely passes through the cable conveying channel. At this time, the cable is clamped and limited by the cable clamping mechanisms on both sides, and then the lifting platform is raised by the lifting mechanism to lift one end of the cable to a high place, which is convenient for the traction machine to pull and lay. The present invention makes it easy to lift the cable to a high place for laying, thereby improving the installation efficiency of the cable. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 The structure of the present invention is schematically shown Figure 1 ;
[0021] Figure 2 The structure of the present invention is schematically shown Figure 2 ;
[0022] Figure 3 It is a cross-sectional view of the present invention.
[0023] 1. Base; 101. Screw hole; 2. Lifting platform; 201. Limiting slide; 3. Mounting seat; 4. Roller; 5. Vertical plate; 501. Lifting slide; 6. Screw; 7. Screw motor; 8. Guide rod; 9. Reinforcement plate; 10. Active shaft; 11. Driven shaft; 12. Gear; 13. Rack; 14. Conveyor belt; 15. Protective cover; 16. Driving motor; 17. Bidirectional screw; 18. Limiting motor; 19. Slide; 20. Arc clamp; 21. Mounting plate; 22. Limiting roller. DETAILED DESCRIPTION
[0024] like Figures 1 to 3 As shown, a method for installing a power engineering cable comprises the following steps:
[0025] S1: lifting one end of the cable onto the roller 4 located on the lifting platform 2, conveying the cable through the cable conveying device, so that one end of the cable completely passes through the cable conveying channel;
[0026] S2: The cable is clamped and limited by the cable clamping mechanisms on both sides;
[0027] S3: Raise the lifting platform 2 through the lifting mechanism to lift one end of the cable to a high place to facilitate traction and laying by the traction machine.
[0028] In step S1, the lifting platform 2 and the lifting mechanism that drives the lifting platform 2 to lift are arranged on the base 1, the mounting seats 3 are symmetrically arranged on both sides of the top of the lifting platform 2, and multiple groups of rollers 4 are rotatably arranged between the two mounting seats 3. The cable conveying device is arranged on the mounting seats 3, and the cable conveying channel is formed between the two cable conveying devices. The two cable clamping mechanisms are respectively arranged at both ends of the cable conveying device.
[0029] Two vertical plates 5 are fixedly connected to the base 1, and lifting grooves 501 are formed on opposite sides of the two vertical plates 5; the lifting mechanism includes a screw rod 6 rotatably arranged in one of the lifting grooves 501, a screw motor 7 for driving the screw rod 6 to rotate is installed in the lifting groove 501, and a guide rod 8 is fixedly connected in the other lifting groove 501, one end of the lifting platform 2 is screwed to the screw rod 6, and the other end of the lifting platform 2 is slidably connected to the guide rod 8.
[0030] A reinforcing plate 9 is fixedly connected between the vertical plate 5 and the base 1 ; the reinforcing plate 9 is provided to improve the stability of the connection between the vertical plate 5 and the base 1 .
[0031] The cable conveying device includes a driving shaft 10 and a driven shaft 11 rotatably arranged at the top of the mounting seat 3, and a gear 12 is fixedly sleeved on the driving shaft 10 and the driven shaft 11. The two gears 12 are connected by a rack 13, and a conveyor belt 14 is fixedly connected to the outer side of the rack 13.
[0032] A protective cover 15 is disposed on the outer side of the conveyor belt 14 . A driving motor 16 is mounted on the protective cover 15 . The output shaft of the driving motor 16 is drivingly connected to the driving shaft 10 .
[0033] Two limiting slide grooves 201 are provided on the lifting platform 2; the cable clamping mechanism includes a bidirectional screw 17 arranged in the limiting slide groove 201 and a limiting motor 18 driving the bidirectional screw 17 to rotate, and both ends of the bidirectional screw 17 are screwed with a slide seat 19, and an arc-shaped clamping block 20 is fixedly connected to the slide seat 19.
[0034] Two mounting plates 21 are provided between the limiting slide groove 201 and the mounting seat 3. The two mounting plates 21 are symmetrically fixedly connected to the lifting platform 2. Two groups of limiting rollers 22 are rotatably provided between the two mounting plates 21. The cable passes through the two groups of limiting rollers 22. The limiting rollers 22 are provided to prevent the cable from tilting and sliding due to the influence of gravity during transmission.
[0035] The base 1 is provided with a plurality of screw holes 101 ; the screw holes 101 are provided to facilitate fixing the base 1 on the ground, thereby improving the stability of the device.
[0036] Working principle:
[0037] When laying a high-altitude cable, the operator passes one end of the cable through the two groups of limit rollers 22 and lifts it onto the roller 4. The driving motor 16 drives the active shaft 10 to rotate, drives the gear 12 and the rack 13 to rotate, thereby driving the conveyor belt 14 to rotate, and the conveyor belt 14 drives the cable to move along the cable conveying channel. When one end of the cable completely passes through the cable conveying channel and between the two groups of limit rollers 22 at the other end, the limit motor 18 drives the bidirectional screw 17 to rotate, drives the two slides 19 to approach each other, and clamps and limits the cable through the two arc-shaped clamping blocks 20. Then the screw motor 7 drives the screw 6 to rotate, drives the lifting platform 2 to rise along the guide rod 8, and lifts one end of the cable to a high place, which is convenient for the traction machine to pull and lay; when one end of the cable is connected to the traction machine, the limit motor 18 drives the two arc-shaped clamping blocks 20 to move away from each other, drives the conveyor belt 14 to rotate through the driving motor 16, and cooperates with the traction machine to convey the cable for laying; the present invention facilitates the lifting of the cable to a high place for laying, thereby improving the installation efficiency of the cable.
[0038] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A method for installing a power engineering cable, characterized in that: It includes the following steps: S1: lifting one end of the cable onto a roller (4) located on a lifting platform (2), and conveying the cable through a cable conveying device so that one end of the cable completely passes through the cable conveying channel; S2: The cable is clamped and limited by the cable clamping mechanisms on both sides; S3: The lifting platform (2) is raised by the lifting mechanism to lift one end of the cable to a high position, so as to facilitate the traction machine to pull and lay the cable.
2. A method for installing a power engineering cable according to claim 1, characterized in that: In step S1, the lifting platform (2) and the lifting mechanism for driving the lifting platform (2) to lift are arranged on the base (1), mounting seats (3) are symmetrically arranged on both sides of the top of the lifting platform (2), a plurality of groups of rollers (4) are rotatably arranged between the two mounting seats (3), the cable conveying device is arranged on the mounting seat (3), the cable conveying channel is formed between the two cable conveying devices, and the two cable clamping mechanisms are respectively arranged at the two ends of the cable conveying device.
3. The method for installing a power engineering cable according to claim 2, characterized in that: Two vertical plates (5) are fixedly connected to the base (1), and lifting grooves (501) are formed on opposite sides of the two vertical plates (5); the lifting mechanism comprises a screw rod (6) rotatably arranged in one of the lifting grooves (501), a screw rod motor (7) for driving the screw rod (6) to rotate is installed in the lifting groove (501), and a guide rod (8) is fixedly connected in the other lifting groove (501); one end of the lifting platform (2) is screwed to the screw rod (6), and the other end of the lifting platform (2) is slidably connected to the guide rod (8).
4. The method for installing a power engineering cable according to claim 3, characterized in that: A reinforcing plate (9) is fixedly connected between the vertical plate (5) and the base (1).
5. The method for installing a power engineering cable according to claim 2, characterized in that: The cable conveying device comprises a driving shaft (10) and a driven shaft (11) rotatably arranged at the top of the mounting seat (3); a gear (12) is fixedly sleeved on the driving shaft (10) and the driven shaft (11); the two gears (12) are connected by a rack (13); and a conveyor belt (14) is fixedly connected to the outer side of the rack (13).
6. The method for installing a power engineering cable according to claim 5, characterized in that: A protective cover (15) is provided on the outer side of the conveyor belt (14), a driving motor (16) is installed on the protective cover (15), and an output shaft of the driving motor (16) is drivingly connected to the driving shaft (10).
7. The method for installing a power engineering cable according to claim 2, characterized in that: The lifting platform (2) is provided with two limiting slide grooves (201); the cable clamping mechanism comprises a bidirectional screw (17) arranged in the limiting slide groove (201) and a limiting motor (18) driving the bidirectional screw (17) to rotate, and both ends of the bidirectional screw (17) are screwed with a slide seat (19), and an arc-shaped clamping block (20) is fixedly connected to the slide seat (19).
8. The method for installing a power engineering cable according to claim 7, characterized in that: Two mounting plates (21) are provided between the limiting slide groove (201) and the mounting seat (3); the two mounting plates (21) are symmetrically fixedly connected to the lifting platform (2); and two groups of limiting rollers (22) are rotatably provided between the two mounting plates (21).
9. The method for installing a power engineering cable according to claim 2, characterized in that: The base (1) is provided with a plurality of screw holes (101).