Method and device for preventing disordered serial connection of electricity meters and electronic equipment

By obtaining and analyzing the success rate information of the concentrator, building a serial network, solving the problem of disorderly connection of electricity meters, improving the success rate and communication effect of meter reading, and optimizing the meter reading system of the meter.

CN119325046APending Publication Date: 2025-01-17HANGZHOU HAIXINGZEKE INFORMATION TECHNOLOGY CO LTD +6
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411152166.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2025-01-17

AI Technical Summary

Technical Problem

In power meter reading applications, the meter is disorderly connected due to crosstalk in the station area, which reduces the communication effect and reduces the success rate of meter reading, especially in the multi-transformer power supply design of high-rise communities.

Method used

By obtaining the success rate information of the concentrator, building a network of serialization stations, determining whether the meter is allowed to serialization, and sending the meter files to the new concentrator if allowed, optimizing the success rate of meter reading.

Benefits of technology

Avoid long-term disorderly connection of the meter, improve communication effect, improve meter reading success rate, and regularly adjust the concentrator to optimize the meter success rate of the entire meter reading system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119325046A_ABST
    Figure CN119325046A_ABST
Patent Text Reader

Abstract

The embodiment of the invention discloses a method and device for preventing disordered inter-channel connection of electricity meters, and the method comprises the steps: S101, obtaining one-time meter reading success rate information reported by a current concentrator at a collection moment, and comparing the success times with the meter reading times to obtain one-time meter reading success rate of the current concentrator; s102, acquiring registration information sent by the electricity meter, if the electricity meter number of the registration information is consistent with the preset electricity meter number, performing no processing, and if the electricity meter number of the registration information is not consistent with the preset electricity meter number, executing S103; and S103, constructing a channel crossing network, inputting the current one-time meter reading success rate of the concentrator into the channel crossing network to obtain a channel crossing value, judging whether the electricity meter is allowed to be crossed according to the channel crossing value, and executing a first measure when the electricity meter is allowed to be crossed. According to the method and device provided by the embodiment of the invention, the electricity meters are prevented from being in a disordered serial connection state for a long time, the communication effect is improved, and the meter reading success rate is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electric power technology, and in particular to a method, a device, an electronic device and a storage medium for preventing electric meters from being connected in disorder. Background Art

[0002] In the electric power sector, with the continuous development of electric power technology, an integrated solution for the intelligent meter communication network (electricity AMI) for collecting meter data has been proposed and applied to meter data collection. In the electric power AMI integrated solution, the meter needs to actively initiate a registration request to the concentrator in the area to which it belongs, and then the concentrator confirms that the registration request information of the meter has passed, and then the concentrator allows the meter to access the network. Once the meter is connected to the network, the concentrator can collect the meter data of the meter.

[0003] However, in the actual implementation of the solution, the crosstalk problem between the substations is one of the problems that cannot be ignored in the application of power meter reading. There are two main reasons for the crosstalk between multiple substations: one is the common zero line, and the other is spatial coupling. In actual applications, especially in some newly built high-rise residential areas, with the increase in the number of households and the power consumption of each household, multiple transformers are generally used in the same distribution room for power supply. This design exacerbates the crosstalk between substations. The user's smart meter frequently switches between different concentrators, and the meter is in a disordered series state, resulting in a decrease in communication effect, which in turn reduces the success rate of meter reading. Summary of the invention

[0004] To solve the problems existing in the prior art, one or more embodiments of this specification describe a method, device, electronic device and storage medium for preventing disorderly connection of electric meters.

[0005] According to a first aspect, a method for preventing disorderly connection of electric meters is provided, the method comprising: S101, obtaining a preset meter number of a meter under the current concentrator, and sending a meter file of the meter under the current concentrator to the current concentrator; obtaining a meter reading success rate information reported by the current concentrator at the time of collection, wherein the reported meter reading success rate information includes the number of meter readings and the number of successes, and the number of successes is compared with the number of meter readings to obtain the meter reading success rate under the current concentrator; S102, obtaining registration information sent by the electric meter, wherein the registration information includes the electric meter number. If the electric meter number in the registration information is consistent with the preset electric meter number, no processing is performed. If the electric meter number in the registration information is inconsistent with the preset electric meter number, S103 is executed; S103, construct a serial station network, input the success rate of meter reading under the current concentrator into the serial station network, obtain the serial station value, determine whether the meter allows serial stations according to the serial station value, and execute the first measure when the meter allows serial stations, the first measure includes sending the meter file under the current concentrator to the new concentrator.

[0006] Preferably, the said construction of the serial meter network, inputting the success rate of a meter reading under the current concentrator into the serial meter network, and obtaining the serial meter value includes: Setting the network parameters of the serial stations, wherein the network parameters of the serial stations include a one-time meter reading success rate parameter; Perform a difference operation between the one-time meter reading success rate of the current concentrator and the one-time meter reading success rate parameter to obtain the cross-station value.

[0007] Preferably, the network parameter for connecting stations also includes a difference parameter of success rate of meter reading once, and judging whether the meter is allowed to connect stations according to the connection value, and executing the first measure when the meter is allowed to connect stations includes: If the cross-station value is less than 0, execute the first measure; If the string value is greater than 0, the second measure or the first measure is executed according to the relationship between the first meter reading success rate under the current concentrator and the first meter reading success rate difference parameter, and the second measure includes no processing.

[0008] Preferably, the executing the second measure or the first measure according to the relationship between the one-time meter reading success rate under the current concentrator and the one-time meter reading success rate difference parameter comprises: Obtain the success rate of a meter reading of the new concentrator, add the success rate of a meter reading of the current concentrator to the difference parameter of the success rate of a meter reading, and obtain the limit value; If the success rate of meter reading of the new concentrator is greater than the limit value, the first measure is executed; If the meter reading success rate of the new concentrator is less than the limit value, the second measure is executed.

[0009] Preferably, the reported meter reading success rate information also includes a concentrator number and data time.

[0010] Preferably, after obtaining the registration information sent by the electric meter, the electric meter corresponding to the registration information is marked as the first state.

[0011] Preferably, the first state indicates that the electric meter is to be processed.

[0012] According to a second aspect, a device for preventing disorderly connection of electric meters is provided, the device comprising: A registration module, used to obtain a preset meter number of a meter under the current concentrator, and send a meter file of the meter under the current concentrator to the current concentrator; A preprocessing module is used to obtain the preset meter number of the meter under the current concentrator, and send the meter file of the meter under the current concentrator to the current concentrator; obtain the meter reading success rate information reported by the current concentrator at the collection time, the reported meter reading success rate information includes the number of meter readings and the number of successes, and the number of successes is compared with the number of meter readings to obtain the meter reading success rate under the current concentrator; A judgment module is used to obtain registration information sent by the electric meter, wherein the registration information includes an electric meter number. If the electric meter number in the registration information is consistent with the preset electric meter number, no processing is performed. If the electric meter number in the registration information is inconsistent with the preset electric meter number, S103 is executed; An execution module is used to build a serial meter network, input the success rate of a meter reading under the current concentrator into the serial meter network, obtain the serial meter value, judge whether the meter allows serial meter connection based on the serial meter value, and execute the first measure when the meter allows serial meter connection, wherein the first measure includes sending the meter file under the current concentrator to the new concentrator.

[0013] According to a third aspect, there is provided an electronic device, comprising a processor and a memory; The processor is connected to the memory; The memory is used to store executable program code; The processor runs a program corresponding to the executable program code by reading the executable program code stored in the memory, so as to execute the steps of the method provided in the first aspect or any possible implementation manner of the first aspect.

[0014] According to a fourth aspect, a computer-readable storage medium is provided, on which a computer program is stored, and the computer-readable storage medium stores instructions, which, when the instructions are executed on a computer or a processor, cause the computer or the processor to execute the method provided in the first aspect or any possible implementation of the first aspect.

[0015] The beneficial effects of the present invention are: 1. The method and device provided in the embodiments of this specification determine whether the meter is allowed to be connected to another station according to the meter reading success rate information reported by the concentrator, and connect the connected meter to the new concentrator, so as to avoid the meter being in a disordered connection state for a long time, improve the communication effect, and increase the meter reading success rate; 2. The method and device provided in the embodiments of this specification, the master station obtains the meter reading success rate information reported by the concentrator once at a certain interval for processing, which can not only solve the problem of meter cross-connection in time, but also save the resources of the master station; 3. The method and device provided in the embodiments of this specification set a meter reading success rate difference parameter. If the meter reading success rate of the meter on the new concentrator is higher, the meter is connected to the new concentrator, and the meter reading success rate of the meter under the concentrator is continuously optimized, thereby improving the meter reading success rate of the meters in the entire meter reading system. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 It is a flowchart of a method for preventing disorderly connection of electric meters in the specific implementation of this specification; Figure 2 It is a structural schematic diagram of a device for preventing disorderly connection of electric meters in a specific implementation of this specification; Figure 3 It is a structural schematic diagram of an electronic device in the specific implementation of this specification; DETAILED DESCRIPTION

[0018] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application.

[0019] In the following introduction, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance. The following introduction provides multiple embodiments of the present application, and different embodiments can be replaced or combined, so the present application can also be considered to include all possible combinations of the same and / or different embodiments recorded. Therefore, if one embodiment includes features A, B, and C, and another embodiment includes features B and D, then the present application should also be considered to include embodiments containing one or more of all other possible combinations of A, B, C, and D, although the embodiment may not be clearly recorded in the following text.

[0020] The following description provides examples and does not limit the scope, applicability or examples set forth in the claims. Changes may be made to the functions and arrangements of the elements described without departing from the scope of the present application. Various processes or components may be appropriately omitted, substituted or added to each example. For example, the described method may be performed in an order different from the order described, and various steps may be added, omitted or combined. In addition, features described in some examples may be combined in other examples.

[0021] See also Figure 1 , Figure 1 1 is a flow chart of a method for preventing disorderly connection of electric meters provided in an embodiment of the present application. In an embodiment of the present application, the method includes: S101, obtain the preset meter number of the meter under the current concentrator, and send the meter file of the meter under the current concentrator to the current concentrator; obtain the meter reading success rate information reported by the current concentrator at the collection time, the reported meter reading success rate information includes the number of meter readings and the number of successes, and the number of successes is compared with the number of meter readings to obtain the meter reading success rate under the current concentrator.

[0022] In the embodiment of this specification, before the entire meter reading system is in operation, the meter will send registration information to the current concentrator before reading the meter. After receiving the registration information, the current concentrator will send the registration information to the master station. The registration information includes the preset meter number. The master station will send the corresponding file of the meter to the current concentrator according to the preset meter number of the meter. Only when the current concentrator has the corresponding file of the meter, the current concentrator can read the meter. In addition to reporting the collected business data to the master station normally, the collected business data includes load curves, daily freezes, monthly freezes, events, etc. The concentrator sends the meter reading success rate information of the previous day to the master station at regular intervals every day. The meter reading success rate information includes the number of meter readings and the number of successes. The master station will compare the number of successes received with the number of meter readings to obtain the meter reading success rate of the meter under the current concentrator.

[0023] In order to make the calculated meter reading success rate more accurate, you can set the statistical days, calculate the meter reading success rates of several days according to the statistical days, and take the average of the meter reading success rates of several days. For example, if the statistical days are set to 3, when calculating the meter reading success rate, the meter reading success rates of nearly 3 days will be calculated, and the average of the meter reading success rates of nearly 3 days will be taken as the meter reading success rate.

[0024] It should be noted that the meter reading success rate is the meter reading success rate of a single meter under a single concentrator, and the meter reading success rates are all historical data. If a meter has not been read under a certain concentrator, the meter reading success rate of the meter under the concentrator is 0. The number of meter readings is the total number of times the concentrator reads a certain meter on the same day, and the number of successes is the number of times the concentrator successfully returns business data for the meter reading on the same day.

[0025] The execution entity of this application may be the main station.

[0026] It should be noted that the master station is responsible for tasks such as file management, equipment parameter configuration, remote opening and closing of switches, issuance of collection tasks, and display of collection data reports. The master station includes monitoring equipment, control equipment, data processing equipment, and communication equipment, etc. It collects, transmits and stores the meter data of the electricity meters in the substation through the concentrator.

[0027] In one possible implementation, the meter reading success rate information also includes the concentrator number and data time, so as to more accurately represent the relationship between the concentrator and the meter. It should be noted that the concentrator number is a serial number assigned to each concentrator in the meter reading system to distinguish the concentrators, and the data time is the time when the meter sends the current meter data to the concentrator.

[0028] S102, obtaining registration information sent by the electric meter, wherein the registration information includes the electric meter number. If the electric meter number in the registration information is consistent with the preset electric meter number, no processing is performed; if the electric meter number in the registration information is inconsistent with the preset electric meter number, executing S103.

[0029] In the embodiments of the present specification, as the meter is connected to the concentrator and time passes, the meter may not be connected to the current concentrator. Specifically, the meter sends registration information to the concentrator that does not have the meter file to request meter reading, resulting in a problem of serial connection. Serial connection will cause the meter to be in a disordered serial connection state. The concentrator may not be able to complete the meter reading of the meter because it does not have the corresponding meter file. Before requesting a meter reading, the meter will send registration information to the concentrator. The registration information includes the meter number. The concentrator forwards the received registration information to the master station. After the master station obtains the registration information, it marks the meter corresponding to the registration information as the first state. The first state indicates that the meter is to be processed. If the meter number of the registration information obtained by the master station is consistent with the preset meter number, it means that the master station has already processed the meter. In order to avoid repeated processing of the meter and save the resources of the master station, the master station does not process the meter whose reported meter number is consistent with the preset meter number, and marks the meter corresponding to the registration information as the second state. If the meter number of the registration information obtained by the master station is inconsistent with the preset meter number, it means that the meter has not been processed, and the master station executes S103.

[0030] It should be noted that the second state indicates that the electric meter has been processed.

[0031] S103, construct a serial meter network, input the success rate of a meter reading into the serial meter network, obtain the serial meter value, determine whether the meter allows serial meter connection based on the serial meter value, and execute the first measure when the meter allows serial meter connection, wherein the first measure includes sending the meter file under the current concentrator to the new concentrator.

[0032] In the embodiment of the present specification, the master station will build a serial station network before the meter reading work is carried out. The master station will input the success rate of a meter reading into the serial station network, and then calculate it in the serial station network to obtain the serial station value. The master station will judge whether the meter allows serial stations according to the size of the serial station value according to the pre-set rules, and execute the first measure when the meter allows serial stations. Among them, the first measure is to delete the file from the current concentrator (issue a delete file command), terminate the relationship with the current concentrator, add and replace it to a new concentrator, and issue the file to the new concentrator, and mark the meter corresponding to the registration information as the third state.

[0033] It should be noted that the third state indicates that the electric meter has undergone a change in the concentrator.

[0034] In one possible implementation, a station-to-station network is constructed, and a single meter reading success rate is input into the station-to-station network. The process of obtaining a station-to-station value includes: the master station first sets the station-to-station network parameters, the station-to-station network parameters include a single meter reading success rate parameter, and the master station performs a difference operation between the single meter reading success rate and the single meter reading success rate parameter to obtain the station-to-station value. The master station determines whether the meter is allowed to be connected to stations through the single meter reading success rate, and then executes corresponding measures.

[0035] Furthermore, the string-to-string network parameters also include a single meter reading success rate difference parameter. If the string-to-string value calculated by the master station is greater than 0, it means that the single meter reading success rate is greater than the single meter reading success rate parameter. The master station will execute the second measure or the first measure based on the relationship between the string-to-string value and the single meter reading success rate difference parameter. If the string-to-string value calculated by the master station is less than 0, it means that the single meter reading success rate is less than the single meter reading success rate parameter. The master station will execute the first measure. Among them, the second measure is not to do any processing on the electric meter and the concentrator.

[0036] Specifically, the master station will obtain the meter reading success rate of the new concentrator, and add the meter reading success rate to the meter reading success rate difference parameter to obtain the limit value. If the meter reading success rate of the new concentrator is greater than the limit value, it means that after replacing the concentrator, the meter reading success rate of the meter will be greatly improved, and the first measure will be executed; if the meter reading success rate of the new concentrator is less than the limit value, it means that even if the concentrator is replaced, the meter reading success rate of the meter will not be greatly improved, and the second measure will be executed. Set the meter reading success rate difference parameter. If the meter reading success rate of the meter on the new concentrator is higher, connect the meter to the new concentrator, and then continuously optimize the meter reading success rate of the meter under the concentrator, thereby improving the meter reading success rate of the meter of the entire meter reading system.

[0037] For example, there are concentrators A and B in the meter reading system. If there is a meter file under concentrator A, but concentrator B receives the registration information sent by the meter, the meter will be attached to the new concentrator only if one of the following two conditions is met. Assuming that the meter reading success rate parameter is 40% and the meter reading success rate difference parameter is 20%, if the meter reading success rate reported by concentrator A is 30%, because it is less than 40%, the master station will unbind the association between the meter and concentrator A, and send the meter file of the meter to concentrator B; if the meter reading success rate reported by concentrator A is 60%, because 60% is greater than 40%, it needs to be compared with the meter reading success rate of concentrator B. The meter reading success rate reported by concentrator B is 90%, because 60%+20%=80%, 80% is less than 90%, so the master station will unbind the association between the meter and concentrator A, and send the meter file of the meter to concentrator B. Otherwise, the master station does not do anything.

[0038] The following will be combined with the attached Figure 2 , the device for preventing disorderly connection of electric meters provided in the embodiment of the present application is introduced in detail. It should be noted that the attached Figure 2 The device for preventing the disorderly connection of electric meters shown in the figure is used to implement the present application Figure 1 For the convenience of explanation, only the part related to the embodiment of the present application is shown. For the specific technical details not disclosed, please refer to the present application. Figure 1 The embodiment shown.

[0039] See also Figure 2 , Figure 2 Schematic diagram of the structure of the device for preventing disorderly connection of electric meters provided in the embodiment of the present application. Figure 2 As shown, the device comprises: The preprocessing module 201 is used to obtain the preset meter number of the meter under the current concentrator, and send the meter file of the meter under the current concentrator to the current concentrator; obtain the meter reading success rate information reported by the current concentrator at the collection time, the reported meter reading success rate information includes the number of meter readings and the number of successes, and the number of successes is compared with the number of meter readings to obtain the meter reading success rate under the current concentrator; The judgment module 202 is used to obtain the registration information sent by the electric meter, wherein the registration information includes the electric meter number. If the electric meter number in the registration information is consistent with the preset electric meter number, no processing is performed. If the electric meter number in the registration information is inconsistent with the preset electric meter number, S103 is executed; The execution module 203 is used to build a serial station network, input the success rate of a meter reading under the current concentrator into the serial station network, obtain the serial station value, judge whether the meter allows serial stations according to the serial station value, and execute the first measure when the meter allows serial stations. The first measure includes sending the meter file under the current concentrator to the new concentrator.

[0040] In one possible implementation, the said constructing a serial meter network, inputting the success rate of a meter reading under the current concentrator into the serial meter network, and obtaining the serial meter value includes: Setting the network parameters of the serial stations, wherein the network parameters of the serial stations include a one-time meter reading success rate parameter; Perform a difference operation between the one-time meter reading success rate of the current concentrator and the one-time meter reading success rate parameter to obtain the cross-station value.

[0041] In one possible implementation, the network parameter for connecting stations further includes a difference parameter of the success rate of meter reading once, and judging whether the meter allows connecting stations according to the connecting station value, and executing the first measure when the meter allows connecting stations includes: If the cross-station value is less than 0, execute the first measure; If the string value is greater than 0, the second measure or the first measure is executed according to the relationship between the first meter reading success rate under the current concentrator and the first meter reading success rate difference parameter, and the second measure includes no processing.

[0042] In one possible implementation, the relationship between the one-time meter reading success rate under the current concentrator and the one-time meter reading success rate difference parameter is executed as the second measure or the first measure includes: Obtain the success rate of a meter reading of the new concentrator, add the success rate of a meter reading of the current concentrator to the difference parameter of the success rate of a meter reading, and obtain the limit value; If the success rate of meter reading of the new concentrator is greater than the limit value, the first measure is executed; If the meter reading success rate of the new concentrator is less than the limit value, the second measure is executed.

[0043] In one possible implementation manner, the reported information on the success rate of meter reading once also includes a concentrator number and data time.

[0044] In one possible implementation, after the registration information sent by the electric meter is acquired, the electric meter corresponding to the registration information is marked as a first state.

[0045] In one possible implementation, the first state indicates that the electric meter is to be processed.

[0046] Those skilled in the art can clearly understand that the technical solutions of the embodiments of the present application can be implemented with the help of software and / or hardware. The "unit" and "module" in this specification refer to software and / or hardware that can independently complete or cooperate with other components to complete specific functions, where the hardware can be, for example, a field programmable gate array (FPGA), an integrated circuit (IC), etc.

[0047] Each processing unit and / or module of the embodiments of the present application may be implemented by an analog circuit that implements the functions described in the embodiments of the present application, or may be implemented by software that executes the functions described in the embodiments of the present application.

[0048] See also Figure 3 , which shows a schematic diagram of the structure of an electronic device involved in an embodiment of the present application, the electronic device can be used to implement Figure 1 The method in the embodiment shown. Figure 3 As shown, the electronic device 300 may include: at least one central processor 301 , at least one network interface 304 , a user interface 303 , a memory 305 , and at least one communication bus 302 .

[0049] The communication bus 302 is used to realize the connection and communication between these components.

[0050] The user interface 303 may include a display screen (Display) and a camera (Camera). Optionally, the user interface 303 may also include a standard wired interface and a wireless interface.

[0051] The network interface 304 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).

[0052] Among them, the central processing unit 301 may include one or more processing cores. The central processing unit 301 uses various interfaces and lines to connect various parts of the entire electronic device 300, and executes various functions and processes data of the terminal 300 by running or executing instructions, programs, code sets or instruction sets stored in the memory 305, and calling data stored in the memory 305. Optionally, the central processing unit 301 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The central processing unit 301 can integrate one or a combination of a central processing unit (Central Processing Unit, CPU), a graphics processing unit (Graphics Processing Unit, GPU) and a modem. Among them, the CPU mainly processes the operating system, user interface and application programs; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the central processing unit 301, and it can be implemented separately through a chip.

[0053] Among them, the memory 305 may include a random access memory (Random Access Memory, RAM) and may also include a read-only memory (Read-Only Memory). Optionally, the memory 305 includes a non-transitory computer-readable storage medium. The memory 305 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 305 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc.; the data storage area may store data involved in the above-mentioned various method embodiments, etc. The memory 305 may optionally be at least one storage device located away from the aforementioned central processor 301. As Figure 3 As shown, the memory 305 as a computer storage medium may include an operating system, a network communication module, a user interface module, and program instructions.

[0054] exist Figure 3In the electronic device 300 shown, the user interface 303 is mainly used to provide an input interface for the user and obtain data input by the user; and the central processor 301 can be used to call the application stored in the memory 305 and specifically perform the following operations: S101, obtaining a preset meter number of a meter under the current concentrator, and sending a meter file of the meter under the current concentrator to the current concentrator; obtaining a meter reading success rate information reported by the current concentrator at the time of collection, wherein the reported meter reading success rate information includes the number of meter readings and the number of successes, and the number of successes is compared with the number of meter readings to obtain the meter reading success rate under the current concentrator; S102, obtaining registration information sent by the electric meter, wherein the registration information includes the electric meter number. If the electric meter number in the registration information is consistent with the preset electric meter number, no processing is performed. If the electric meter number in the registration information is inconsistent with the preset electric meter number, S103 is executed; S103, construct a serial station network, input the success rate of meter reading under the current concentrator into the serial station network, obtain the serial station value, determine whether the meter allows serial stations according to the serial station value, and execute the first measure when the meter allows serial stations, the first measure includes sending the meter file under the current concentrator to the new concentrator.

[0055] The present application also provides a computer-readable storage medium on which a computer program is stored, and when the program is executed by a processor, the steps of the above method are implemented. The computer-readable storage medium may include, but is not limited to, any type of disk, including a floppy disk, an optical disk, a DVD, a CD-ROM, a micro drive, and a magneto-optical disk, a ROM, a RAM, an EPROM, an EEPROM, a DRAM, a VRAM, a flash memory device, a magnetic card or an optical card, a nanosystem (including a molecular memory IC), or any type of medium or device suitable for storing instructions and / or data.

[0056] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.

[0057] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0058] In the several embodiments provided in the present application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of the units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.

[0059] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0060] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0061] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a memory, including a number of instructions to enable a computer device (which can be a personal computer, server or network device, etc.) to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned memory includes: U disk, read-only memory (ROM), random access memory (RAM), mobile hard disk, disk or optical disk and other media that can store program codes.

[0062] A person skilled in the art may understand that all or part of the steps in the various methods of the above embodiments may be completed by entering a program to instruct related hardware. The program may be stored in a computer-readable memory, and the memory may include: a flash drive, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, etc.

[0063] The above is only an exemplary embodiment of the present disclosure, and the scope of the present disclosure cannot be limited thereto. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the specification and practicing the disclosure here, those skilled in the art will easily think of the implementation scheme of the present disclosure. This application is intended to cover any modification, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the technical field not recorded in the present disclosure. The description and examples are regarded as exemplary only, and the scope and spirit of the present disclosure are defined by the claims.

Claims

1. A method for preventing disorderly connection of electric meters, characterized in that: The method comprises: S101, obtaining a preset meter number of a meter under the current concentrator, and sending a meter file of the meter under the current concentrator to the current concentrator; obtaining a meter reading success rate information reported by the current concentrator at the time of collection, wherein the reported meter reading success rate information includes the number of meter readings and the number of successes, and the number of successes is compared with the number of meter readings to obtain the meter reading success rate under the current concentrator; S102, obtaining registration information sent by the electric meter, wherein the registration information includes the electric meter number. If the electric meter number in the registration information is consistent with the preset electric meter number, no processing is performed. If the electric meter number in the registration information is inconsistent with the preset electric meter number, S103 is executed; S103, construct a serial station network, input the success rate of meter reading under the current concentrator into the serial station network, obtain the serial station value, determine whether the meter allows serial stations according to the serial station value, and execute the first measure when the meter allows serial stations, the first measure includes sending the meter file under the current concentrator to the new concentrator.

2. A method for preventing disorderly connection of electric meters according to claim 1, characterized in that: The said construction of the serial meter network, inputting the success rate of meter reading under the current concentrator into the serial meter network, and obtaining the serial meter value includes: Setting the network parameters of the serial stations, wherein the network parameters of the serial stations include a one-time meter reading success rate parameter; Perform a difference operation between the one-time meter reading success rate of the current concentrator and the one-time meter reading success rate parameter to obtain the cross-station value.

3. A method for preventing disorderly connection of electric meters according to claim 2, characterized in that: The network parameters for connecting stations also include a difference parameter of the success rate of meter reading once. According to the network parameters, it is judged whether the meter allows connecting stations, and when the meter allows connecting stations, the first measure is executed, including: If the cross-station value is less than 0, execute the first measure; If the string value is greater than 0, the second measure or the first measure is executed according to the relationship between the first meter reading success rate under the current concentrator and the first meter reading success rate difference parameter, and the second measure includes no processing.

4. A method for preventing disorderly connection of electric meters according to claim 3, characterized in that: The executing of the second measure or the first measure according to the relationship between the first meter reading success rate under the current concentrator and the first meter reading success rate difference parameter comprises: Obtain the success rate of a meter reading of the new concentrator, add the success rate of a meter reading of the current concentrator to the difference parameter of the success rate of a meter reading, and obtain the limit value; If the success rate of meter reading of the new concentrator is greater than the limit value, the first measure is executed; If the success rate of meter reading of the new concentrator is less than the limit value, the second measure is executed.

5. A method for preventing disorderly connection of electric meters according to claim 1, characterized in that: The reported meter reading success rate information also includes the concentrator number and data time.

6. A method for preventing disorderly connection of electric meters according to claim 1, characterized in that: After obtaining the registration information sent by the electric meter, the electric meter corresponding to the registration information is marked as a first state.

7. A method for preventing disorderly connection of electric meters according to claim 7, characterized in that: The first state indicates that the electric meter is pending.

8. A device to prevent disorderly connection of electric meters, characterized in that: The device comprises: A preprocessing module is used to obtain the preset meter number of the meter under the current concentrator, and send the meter file of the meter under the current concentrator to the current concentrator; obtain the meter reading success rate information reported by the current concentrator at the collection time, the reported meter reading success rate information includes the number of meter readings and the number of successes, and the number of successes is compared with the number of meter readings to obtain the meter reading success rate under the current concentrator; A judgment module is used to obtain registration information sent by the electric meter, wherein the registration information includes an electric meter number. If the electric meter number in the registration information is consistent with the preset electric meter number, no processing is performed. If the electric meter number in the registration information is inconsistent with the preset electric meter number, S103 is executed; An execution module is used to build a serial meter network, input the success rate of a meter reading under the current concentrator into the serial meter network, obtain the serial meter value, judge whether the meter allows serial meter connection based on the serial meter value, and execute the first measure when the meter allows serial meter connection, wherein the first measure includes sending the meter file under the current concentrator to the new concentrator.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, wherein the computer-readable storage medium has instructions stored therein, and when the instructions are executed on a computer or a processor, the computer or the processor executes the steps of the method according to any one of claims 1 to 7.