Argil brick and glass brick mixed hanging building curtain wall system and construction method thereof

By using galvanized steel plates, slot steel connectors, and galvanized square tube dry hanging skeleton in the mixed cash -up wall of pottery bricks and glass bricks. Combining the structure of the structure of the structure of the structure The problem of large steel content and inconvenient maintenance in the later period achieve the economic, efficient and environmental curtain wall construction effects.

CN119352695APending Publication Date: 2025-01-24BCEG ROAD & BRIDGE CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411579852.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-07
Publication Date
2025-01-24

AI Technical Summary

Technical Problem

When clay bricks and glass bricks are mixed to be hung curtain walls, the overall stability of the structure is poor, the steel content is large, the later maintenance is inconvenient, the masonry is difficult to achieve, and the on-site cutting of bricks leads to increased waste and environmental pollution.

Method used

Use interval to set up galvanized steel plates, groove steel connectors, galvanized square steel columns and galvanized square tube dry hanging skeleton, combined with structured cantilee board design and full -sized masonry processing process. Glass bricks realize the stability of dry hanging skeleton and the convenience of masonry.

Benefits of technology

It improves the overall stability of the structure, saves the steel content of the curtain wall structure, facilitates later maintenance, reduces on-site waste and environmental pollution, and achieves the purpose of building energy conservation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119352695A_ABST
    Figure CN119352695A_ABST
Patent Text Reader

Abstract

The invention relates to an argil brick and glass brick mixed hanging and building curtain wall system and a construction method thereof, and the system comprises a plurality of galvanized steel plates, channel steel connecting pieces, galvanized square steel stand columns and outer wall argil brick and glass brick dry hanging framework galvanized square pipes which are arranged at the positions of an upper beam, a shear wall, a column and a first-layer structure cantilever plate of a main body outer wall face at intervals. The bottom of the dry-hanging framework galvanized square tube is provided with a bottom-supporting galvanized angle steel framework, the outer wall argil bricks and the glass bricks are dry-hanging framework galvanized square tubes, the bottom-supporting galvanized angle steel framework is further provided with a galvanized screw, and the argil bricks and the glass bricks are hung on the galvanized screw in series. The structure has the advantages of being reasonable in structural design, capable of reducing cost and convenient to construct, not only can solve the problems that an argil brick and glass brick mixed hanging building curtain wall structure is large in overall steel content and poor in overall structural stability, but also can solve the problems that a curtain wall staggered peak building installation requirement is high, and later overall maintenance is convenient, and the purpose of building energy saving is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building curtain wall construction, in particular to a clay brick and glass brick mixed hanging curtain wall system and a construction method thereof. Background Art

[0002] With the rapid progress of science and technology in my country's construction industry and the development of diversified buildings, more and more local historical buildings are built with local traditional customs. The design of the building facade should continue the basic theme of local regional culture and reflect the simple and powerful shape of the building. Different bricklaying methods should be used to show the diversity of the facades of traditional buildings in the streets and alleys, so that the building seems to grow out of the historical architectural relics, fully reflecting the design concept of combining the old and the new and the virtual and the real.

[0003] In order to realize the design concept of combining the old and the new and the virtual and the real on the facade of the historical building, we have to use a mixed masonry method of clay bricks and glass bricks to achieve it, but the modern technology is only a single clay brick hanging construction technology, which is difficult to meet the design requirements. As a new technical means, the construction method of mixed hanging curtain wall of clay bricks and glass bricks solves the design concept of using modern technology to realize the characteristic construction of historical buildings combined with local traditional folk customs. It not only meets the durability, safety and aesthetics of the building, but also meets the national advocacy of energy conservation and sustainable development. It combines modern hanging technology with curtain wall support system. It is an exterior wall decoration construction method. While ensuring the exterior wall decoration effect, it also takes into account the stability of the entire exterior wall system and building energy conservation. It is more suitable for multi-story buildings and historical buildings that need to use clay bricks and other brick masonry mixed masonry curtain walls as exterior wall decoration. At the same time, in the construction process of mixed hanging curtain walls of historical buildings, waste will be generated due to improper on-site brick cutting, which will increase the use of building materials. In addition, workers cutting bricks on site will also cause environmental pollution and affect the construction period. Specifically, its shortcomings are as follows:

[0004] ① The hollow ratio of clay bricks is small, their weight is heavy, the steel content of the curtain wall structure is large, and the overall stability of the structure is poor.

[0005] ②The curtain wall system is closely attached to the main structure, which is not conducive to later maintenance.

[0006] ③ The 0-180° inclined corner bricks of the curtain wall are cut on site, and the brick shapes are not standardized and uniform, which makes it difficult to meet the requirements of staggered masonry.

[0007] ④ The beveled corner bricks and half bricks of clay bricks are all cut and processed on-site by workers. Improper on-site brick cutting will lead to the generation of waste, increase the use of building materials, cause environmental pollution, and affect the construction period.

[0008] The present invention is proposed in view of the above research background, and aims to provide a clay brick and glass brick mixed hanging curtain wall system and a construction method thereof to meet actual design and use needs. Summary of the invention

[0009] In view of the above-mentioned deficiencies in the background technology, the object of the present invention is to provide a clay brick and glass brick mixed hanging curtain wall system and a construction method thereof, which has the characteristics of reasonable structural design, reduced cost and convenient construction. It can not only solve the problem of large overall steel content and poor overall structural stability of the clay brick and glass brick mixed hanging curtain wall structure, but also solve the problem of high requirements for staggered masonry and installation of curtain walls and convenient overall maintenance in the later stage, thereby achieving the purpose of building energy saving.

[0010] In order to achieve the above object, the present invention is implemented by the following scheme:

[0011] A clay brick and glass brick mixed hanging curtain wall system, characterized in that it includes: a plurality of galvanized steel plates arranged at intervals on the main body outer wall surface at the positions of beams, shear walls, columns and a layer of structural cantilever plates, channel steel connectors arranged on each galvanized steel plate, galvanized square steel columns arranged on each channel steel connector, and a galvanized square tube of an outer wall clay brick and glass brick dry hanging skeleton that connects the galvanized square steel columns into one, the basic form of the structural cantilever plate is a corbel cantilever or a straight section cantilever plate, the bottom of the galvanized square tube of the dry hanging skeleton is provided with a bottom supporting galvanized angle steel skeleton for transferring the permanent load of the curtain wall to the galvanized square steel column, the galvanized square tube of the outer wall clay brick and glass brick dry hanging skeleton and the bottom supporting galvanized angle steel skeleton are also provided with galvanized screws, the clay bricks and glass bricks are hung on the galvanized screws, a galvanized screw is used for each clay brick and glass brick in the horizontal direction of the brick curtain wall, and the vertical connection is continuously from bottom to top.

[0012] As a further optimization of the above scheme, the galvanized steel plates are arranged in two ways: pre-embedded or post-embedded. The pre-embedded method is that the galvanized steel plates are welded and fixed in the steel bars of beams, columns and shear walls, and the steel plate embedded claws and the intersection points of the steel bars are all fully welded to prevent the steel plates from being displaced during concrete pouring. The post-embedded method is that the galvanized steel plates are post-anchored with expansion bolts or chemical bolts. The channel steel connectors are connected to the galvanized square steel columns with tension bolts. It also includes a galvanized channel steel cantilever with one end connected to the galvanized square steel column and the other end connected to the beam, shear wall or column on the outer wall of the main body, and a steel skeleton galvanized channel steel diagonal brace with one end connected to the galvanized square steel column and the other end connected to the galvanized channel steel cantilever.

[0013] A construction method for a clay brick and glass brick mixed hanging curtain wall system comprises the following steps:

[0014] 1) Curtain wall detailed design: including curtain wall structure cantilever panel design, curtain wall main keel and secondary keel design, curtain wall clay brick and glass brick layout design;

[0015] 2) Construction preparation: including positioning and setting out, preparation of construction materials, installation of post-embedded parts on the exterior wall and post-embedded parts at the main keel foundation. The post-embedded parts on the exterior wall are the welding stress points of the channel steel cantilevers on the exterior wall facades, and the post-embedded parts on the main keel foundation are the horizontal embedded parts of the first-floor corbel cantilever or flat plate cantilever cantilever to limit the horizontal displacement of the bottom of the vertical main keel;

[0016] 3) Install and position the channel steel and carry out anti-corrosion treatment: including channel steel processing, channel steel welding and channel steel rust prevention;

[0017] 4) Insulation and waterproof installation: Insulation construction is carried out on the wall. The insulation is set up with rock wool board through the height. After the overall insulation of the exterior wall is installed, a layer of galvanized steel wire mesh is fixed from the bottom to the top of the exterior wall with anchor bolts, and the surface is covered with waterproof mortar. Double-layer SBS waterproof membrane is used at the eaves of the first floor slab to turn the eaves up 500mm from the basement and perform protective layer operations. After the pull-out test of the post-embedded parts is accepted, the base of the eaves is leveled, the waterproof mortar is used to level the slope of the embedded parts, and the additional layer is pasted, followed by large-area waterproof pasting. After the waterproof acceptance is qualified, the protective layer is constructed, followed by the detailed construction of the corner protective layer;

[0018] 5) Install the vertical main keel: The vertical main keel adopts a rectangular square tube column structure. The size of a single square tube rectangular column is 3m or 6m. When the floor height is greater than the entire length of a single rectangular square tube column, the specifications of the incoming square tubes are reasonably configured according to the on-site floor height, and the rectangular square tube columns need to be welded and formed. During installation, adjacent welding seams should be staggered up and down; before installing the rectangular square tube columns, first use the wire drawing method to check the straightness of the rectangular square tube columns. According to the allowable deviation in the Technical Specification for Metal and Stone Curtain Wall Engineering JGJ133-2001, measure whether there is a deviation in the pre-processed rods. The deviation of the rods after processing should not be greater than 50% of the allowable deviation required by the specification. If it does not meet the requirements, it should be installed on the wall after correction to control the error within the allowable deviation range; the curtain wall height and curtain wall installation When the width of the wall where the curtain wall is installed is not more than 30m, the allowable deviation is ≤10mm; when the curtain wall height and the width of the wall where the curtain wall is installed are greater than 30m and ≤60m, the allowable deviation is ≤15mm; when the curtain wall height and the width of the wall where the curtain wall is installed are greater than 60m and ≤90m, the allowable deviation is ≤20mm; when the curtain wall height and the width of the wall where the curtain wall is installed are greater than 90m, the allowable deviation is ≤25mm; install rectangular square tube columns layer by layer, and perform installation inspection on each rectangular square tube column after it is installed in place according to the construction drawing. After all dimensions meet the requirements, use a theodolite to check the verticality of the vertical main keel to ensure the axis deviation of the vertical main keel; set vertical expansion joints between layers, and the expansion joints are installed by diagonal welding of angle steels, and the joint width is constructed according to the design requirements;

[0019] 6) Install the bottom galvanized angle steel frame: Considering the aesthetics of the overall building facade and the requirements for beautiful seams, the bottom elevation of the clay bricks is ±0.000, and the bottom height of the bottom galvanized angle steel frame installation is the bottom elevation of the clay bricks minus the mortar seam width and the thickness of the angle steel. The size of each bottom galvanized angle steel frame should correspond to the spacing of the main keels on site, and the ends of each bottom galvanized angle steel frame should be fully welded to the vertical main keel on one side;

[0020] 7) Clay brick and glass brick masonry: including clay brick and glass brick processing, clay brick and glass brick masonry;

[0021] 8) Roof decoration aluminum plate closing: Aluminum plates are used to close the roof parapets and door and window openings;

[0022] 9) Drainage and diversion setting at the bottom of the air interlayer: a certain distance of air interlayer is left between the mixed hanging curtain wall and the outer wall of the main structure, and a 10mm overflow joint is left between the mixed hanging curtain wall and the main eaves. The bottom of the air interlayer is grouted with 3% cement mortar for slope adjustment, and the thinnest thickness is 40mm to increase the stress area of ​​the masonry base, and rainwater is discharged by external drainage;

[0023] 10) Detailed node processing, grouting, and acceptance: Carry out detailed finishing treatment on the vertical main keel foundation, doors and windows, and roof parapets, and clean the wall surface. After the maintenance of clay tiles and glass tiles, use special grouting agent to grout the tiles in time. The depth should not be less than 5mm, and the seam surface should be recessed into the tile facade by not less than 0.5mm. The acceptance includes judging whether the exposed glue seams of the curtain wall are horizontal and vertical, whether the color of the clay tiles is uniform and the surface is clean and pollution-free, and whether the overall surface of the curtain wall is flat. Acceptance can only be qualified after it fully meets the standards.

[0024] As a further optimization of the above scheme, the design of the curtain wall structure cantilever panel in the step 1) includes: the curtain wall main body design unit determines the foundation form of the structure cantilever panel according to the load parameter requirements and the design drawings, and the foundation form of the structure cantilever panel is a corbel cantilever or a straight section cantilever panel; the design of the main purlin and secondary purlin of the curtain wall includes determining the angle steel spacing transmitted by the clay bricks and glass bricks to the vertical main purlins, the vertical purlin specifications and dimensions, the chemical anchor specifications and the purlin connection method according to the stress conditions of the chemical anchors, the end weld strength requirements, and the inertia moments of the main purlins and secondary purlins; the layout design of the clay bricks and glass bricks of the external curtain wall includes completing the facade layout design of door and window openings, parapets, ground junctions and facade entry and exit parts under the established clay brick and glass brick modulus and vertical and horizontal brick joints design requirements, so as to meet the requirements of modulus and aesthetics.

[0025] As a further optimization of the above scheme, the positioning and laying out in step 2) includes using a pendant to project points and draw lines from the corners of each roof to a layer of cantilevered waterproof protective layer, and marking the anchor plate dividing line perpendicular to the drawn line. According to the drawn line and the size of the drawing, the keel outer skin control line and the outer edge line of the curtain wall decorative surface are drawn, and the ceramic brick and glass brick grid positioning lines are divided along the outer edge line of the curtain wall; the preparation of construction materials includes proposing a supply plan for the tools, appliances and construction materials required for construction and implementing the preparation, completing the material processing, material transportation and transfer and Finished product protection; The installation of the post-embedded parts on the exterior wall includes the surveying and setting-out personnel marking the position of the post-embedded parts on the structure with an ink line, and the construction personnel drilling holes according to the marked cross positioning lines. The post-embedded parts on the exterior wall of the structural beams, columns and parapets are fixed with galvanized steel plates, expansion bolts and chemical anchors, and the ring beams are fixed with galvanized steel plates and expansion bolts; The installation of the post-embedded parts at the main keel foundation includes the surveying and setting-out personnel marking the position of the post-embedded parts on the structural eaves with an ink line, and the post-embedded parts are fixed to the eaves with galvanized steel plates, expansion bolts and chemical anchors.

[0026] As a further optimization of the above scheme, the channel steel processing in the step 3) includes cutting the channel steel at the construction site according to size and numbering it, drilling the numbered channel steel, using a drilling machine to drill holes of specified size according to design requirements, and grinding the galvanized layer between the channel steel and the embedded steel plate. After completion, they are uniformly stored in designated locations and then uniformly transported to various installation locations; the channel steel welding includes using a mechanical hoist to position the channel steel to the designated installation location, and with the cooperation of the surveying personnel, performing initial positioning spot welding on the positioning channel steel. After the positioning is completed, professional welders use welding equipment to perform double-sided welding; the channel steel rust prevention includes cleaning the welding parts after the channel steel is welded, and uniformly spraying each weld with no less than 2 coats of anti-rust paint using paint.

[0027] As a further optimization of the above scheme, the step 7) clay brick and glass brick processing includes clay brick processing and glass brick processing. For vents or other special parts on the wall, clay bricks and glass bricks adopt V-shaped or L-shaped non-standard bricks; for other flat wall positions without keels, clay bricks and glass bricks adopt 240*50*50 standard size bricks, and the non-standard bricks are prefabricated in the factory. The clay bricks of the non-standard brick type are 240*115*50, and the angle between the brick length and the brick width is 70-120°; the clay brick and glass brick masonry includes clay bricks; For earth brick and glass brick masonry, after the vertical main keel is installed, clay bricks and glass bricks are arranged on site with reference to the brick arrangement drawings. After the arrangement is completed, an infrared line projector is used to draw the hanging line from the parapet angle steel, and the horizontal seam position of each brick is marked along the hanging line to verify the horizontal modulus error of the masonry; the galvanized screws are positioned according to the layout drawing and the size of the opening of the ceramic bricks. The spacing of the galvanized screws is based on the spacing of the reserved holes of three modular bricks, one for each, and the galvanized screws are connected with sleeves, which penetrate the entire curtain wall at a high level. After the galvanized angle steel is positioned, the galvanized screws are welded to the angle steel; Hang the plumb line and pull the horizontal line according to the layout drawing, pass each clay brick and glass brick through the galvanized screw from top to bottom according to the layout pattern, use M7.5 cement mortar to lay the clay bricks and glass bricks, install the crossbeam angle steel every time when laying to the designed height, make the galvanized screw pass through the angle steel opening, and wipe the seam in time; use 8mm PVC rubber pads to control the brick joints according to the clay brick and glass brick dividing lines, place plastic gaskets between each layer of gray bricks, control the verticality and flatness of the clay brick and glass brick; set the thread on the top of the galvanized screw, and tighten it with the sleeve to facilitate the extension of the next galvanized screw. The work is completed before the installation of the clay bricks and glass bricks at the top; after the first layer of clay bricks and glass bricks at the bottom are hung, weld the upper layer of positioning galvanized steel plate, use the sleeve fixed on the lower section of the galvanized screw to extend the galvanized screw, continue to hang the clay bricks and glass bricks, and construct them layer by layer from bottom to top. After the last layer is completed, weld the last steel plate and screw in the last section of the galvanized screw to complete the hanging of the clay bricks and glass bricks; after the clay bricks and glass bricks are laid, they need to be cured in time, and the curing time should be no less than 3 days.

[0028] The clay brick and glass brick mixed hanging curtain wall system and the construction method thereof of the present invention have the following beneficial effects:

[0029] 1. By adopting the mixed hanging construction technology of clay bricks and glass bricks with a layer of structural cantilevered panels, the overall stability of the structure is improved, the steel content of the curtain wall structure is saved, and the economic effect is significant.

[0030] 2. By adopting the all-smooth masonry technology and the "two bricks and one pole" connection form, it is convenient for masonry and enhances the stability of the masonry structure.

[0031] 3. The use of large cavity curtain wall waterproof system construction technology is conducive to later maintenance. It has moisture-proof, waterproof, heat-insulating, heat-insulating and sound-insulating effects, which is conducive to later maintenance.

[0032] 4. By designing and manufacturing "V" and "L" shaped clay bricks, the masonry of 0-180° inclined corner bricks and the staggered masonry construction were solved.

[0033] 5. By reasonably increasing the hollow ratio of clay bricks and reducing their own weight, the hanging construction technology with cantilevered plate structure is adopted to replace the traditional hanging system without cantilevered structural plate, which improves the overall stability of the structure, saves the steel content of the curtain wall structure, and has a significant economic effect.

[0034] 6. A large cavity is formed between the curtain wall and the main structure by hanging a mixture of clay bricks and glass bricks, which is conducive to later maintenance and has the effects of moisture-proof, waterproof, heat-insulating, heat-insulating, sound-proofing and ventilation, thereby achieving the purpose of building energy saving.

[0035] 7. By using all masonry brick types (including curtain wall bevel corner bricks and half bricks) prefabricated in the factory, construction workers do not need to cut bricks on the construction site, which saves energy and environmental protection and saves construction time. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Attached Figure 1 It is a horizontal cross-sectional schematic diagram (part) of a clay brick and glass brick mixed hanging curtain wall system of the present invention.

[0037] Attached Figure 2 Schematic diagram of the structure of 9 common forms of non-standard clay bricks of the present invention.

[0038] Attached Figure 3 This is a vertical view of the mixed structure of clay bricks and glass bricks of the present invention.

[0039] Attached Figure 4 It is a longitudinal cross-sectional schematic diagram (part) of the clay brick and glass brick mixed hanging curtain wall system of the present invention. DETAILED DESCRIPTION

[0040] The following is combined with Figure 1-4 A clay brick and glass brick mixed hanging curtain wall system and a construction method thereof are described in detail.

[0041] A clay brick and glass brick mixed hanging curtain wall system, characterized in that it includes: a plurality of galvanized steel plates arranged at intervals on the main body outer wall surface at the positions of beams, shear walls, columns and a layer of structural cantilever plates, channel steel connectors arranged on each galvanized steel plate, galvanized square steel columns arranged on each channel steel connector, and a galvanized square tube of an outer wall clay brick and glass brick dry hanging skeleton that connects the galvanized square steel columns into one, the basic form of the structural cantilever plate is a corbel cantilever or a straight section cantilever plate, the bottom of the galvanized square tube of the dry hanging skeleton is provided with a bottom supporting galvanized angle steel skeleton for transferring the permanent load of the curtain wall to the galvanized square steel column, the galvanized square tube of the outer wall clay brick and glass brick dry hanging skeleton and the bottom supporting galvanized angle steel skeleton are also provided with galvanized screws, the clay bricks and glass bricks are hung on the galvanized screws, a galvanized screw is used for each clay brick and glass brick in the horizontal direction of the brick curtain wall, and the vertical connection is continuously from bottom to top. The galvanized steel plates are arranged in two ways: reserved and embedded or post-embedded. The reserved and embedded method is that the galvanized steel plates are welded and fixed in the steel bars of beams, columns and shear walls, and the steel plate embedded claws and the intersection points of the steel bars are all fully welded to prevent the steel plates from being displaced during concrete pouring. The post-embedded method is that the galvanized steel plates are post-anchored with expansion bolts or chemical bolts. The channel steel connectors are connected to the galvanized square steel columns with tension bolts. It also includes a galvanized channel steel cantilever with one end connected to the galvanized square steel column and the other end connected to the beam, shear wall or column on the outer wall of the main body, and a steel skeleton galvanized channel steel diagonal brace with one end connected to the galvanized square steel column and the other end connected to the galvanized channel steel cantilever.

[0042] The construction method of the above-mentioned clay brick and glass brick mixed hanging curtain wall system of the present invention comprises the following steps:

[0043] 1) Curtain wall detailed design: including curtain wall structure cantilever panel design, curtain wall main keel and secondary keel design, curtain wall clay brick and glass brick layout design;

[0044] 2) Construction preparation: including positioning and setting out, preparation of construction materials, installation of post-embedded parts on the exterior wall and post-embedded parts at the main keel foundation. The post-embedded parts on the exterior wall are the welding stress points of the channel steel cantilevers on the exterior wall facades, and the post-embedded parts on the main keel foundation are the horizontal embedded parts of the first-floor corbel cantilever or flat plate cantilever cantilever to limit the horizontal displacement of the bottom of the vertical main keel;

[0045] 3) Install and position the channel steel and carry out anti-corrosion treatment: including channel steel processing, channel steel welding and channel steel rust prevention;

[0046] 4) Insulation and waterproof installation: Insulation construction is carried out on the wall. The insulation is set up with rock wool board through the height. After the overall insulation of the exterior wall is installed, a layer of galvanized steel wire mesh is fixed from the bottom to the top of the exterior wall with anchor bolts, and the surface is covered with waterproof mortar. Double-layer SBS waterproof membrane is used at the eaves of the first floor slab to turn the eaves up 500mm from the basement and perform protective layer operations. After the pull-out test of the post-embedded parts is accepted, the base of the eaves is leveled, the waterproof mortar is used to level the slope of the embedded parts, and the additional layer is pasted, followed by large-area waterproof pasting. After the waterproof acceptance is qualified, the protective layer is constructed, followed by the detailed construction of the corner protective layer;

[0047] 5) Install the vertical main keel: The vertical main keel adopts a rectangular square tube column structure. The size of a single square tube rectangular column is 3m or 6m. When the floor height is greater than the entire length of a single rectangular square tube column, the specifications of the incoming square tubes are reasonably configured according to the on-site floor height, and the rectangular square tube columns need to be welded and formed. During installation, adjacent welding seams should be staggered up and down; before installing the rectangular square tube columns, first use the wire drawing method to check the straightness of the rectangular square tube columns. According to the allowable deviation in the Technical Specification for Metal and Stone Curtain Wall Engineering JGJ133-2001, measure whether there is a deviation in the pre-processed rods. The deviation of the rods after processing should not be greater than 50% of the allowable deviation required by the specification. If it does not meet the requirements, it should be installed on the wall after correction to control the error within the allowable deviation range; the curtain wall height and curtain wall installation When the width of the wall where the curtain wall is installed is not more than 30m, the allowable deviation is ≤10mm; when the curtain wall height and the width of the wall where the curtain wall is installed are greater than 30m and ≤60m, the allowable deviation is ≤15mm; when the curtain wall height and the width of the wall where the curtain wall is installed are greater than 60m and ≤90m, the allowable deviation is ≤20mm; when the curtain wall height and the width of the wall where the curtain wall is installed are greater than 90m, the allowable deviation is ≤25mm; install rectangular square tube columns layer by layer, and perform installation inspection on each rectangular square tube column after it is installed in place according to the construction drawing. After all dimensions meet the requirements, use a theodolite to check the verticality of the vertical main keel to ensure the axis deviation of the vertical main keel; set vertical expansion joints between layers, and the expansion joints are installed by diagonal welding of angle steels, and the joint width is constructed according to the design requirements;

[0048] 6) Install the bottom galvanized angle steel frame: Considering the aesthetics of the overall building facade and the requirements for beautiful seams, the bottom elevation of the clay bricks is ±0.000, and the bottom height of the bottom galvanized angle steel frame installation is the bottom elevation of the clay bricks minus the mortar seam width and the thickness of the angle steel. The size of each bottom galvanized angle steel frame should correspond to the spacing of the main keels on site, and the ends of each bottom galvanized angle steel frame should be fully welded to the vertical main keel on one side;

[0049] 7) Clay brick and glass brick masonry: including clay brick and glass brick processing, clay brick and glass brick masonry;

[0050] 8) Roof decoration aluminum plate closing: Aluminum plates are used to close the roof parapets and door and window openings;

[0051] 9) Drainage and diversion setting at the bottom of the air interlayer: a certain distance of air interlayer is left between the mixed hanging curtain wall and the outer wall of the main structure, and a 10mm overflow joint is left between the mixed hanging curtain wall and the main eaves. The bottom of the air interlayer is grouted with 3% cement mortar for slope adjustment, and the thinnest thickness is 40mm to increase the stress area of ​​the masonry base, and rainwater is discharged by external drainage;

[0052] 10) Detailed node processing, grouting, and acceptance: Carry out detailed finishing treatment on the vertical main keel foundation, doors and windows, and roof parapets, and clean the wall surface. After the maintenance of clay tiles and glass tiles, use special grouting agent to grout the tiles in time. The depth should not be less than 5mm, and the seam surface should be recessed into the tile facade by not less than 0.5mm. The acceptance includes judging whether the exposed glue seams of the curtain wall are horizontal and vertical, whether the color of the clay tiles is uniform and the surface is clean and pollution-free, and whether the overall surface of the curtain wall is flat. Acceptance can only be qualified after it fully meets the standards.

[0053] The design of the curtain wall structure cantilever panel in the step 1) includes: the curtain wall main body design unit determines the foundation form of the structure cantilever panel according to the load parameter requirements and design drawings, and the foundation form of the structure cantilever panel is a corbel cantilever or a straight section cantilever panel; the design of the main keel and secondary keel of the curtain wall includes determining the angle steel spacing transmitted by the clay bricks and glass bricks to the vertical main keel, the vertical keel specifications, the chemical anchor specifications and the keel connection method according to the stress conditions of the chemical anchor bolts, the end weld strength requirements, and the inertia moments of the main keels and secondary keels; the layout design of the clay bricks and glass bricks of the external curtain wall includes completing the facade layout design of the door and window openings, parapets, ground junctions and facade entry and exit parts under the established clay brick and glass brick modulus and vertical and horizontal brick joints design requirements, so as to meet the requirements of modulus and aesthetics.

[0054] The positioning and laying out in step 2) includes using a pendant to project points and draw lines from the corners of each roof to a layer of cantilever board waterproof protection layer, and marking the anchor board dividing line perpendicular to the drawn line. According to the drawn line and the size of the drawing, the keel outer skin control line and the outer edge line of the curtain wall decorative surface are drawn, and the ceramic brick and glass brick grid positioning lines are divided along the outer edge line of the curtain wall; the preparation of construction materials includes proposing a supply plan for the tools, appliances and construction materials required for construction and implementing the preparation, completing the processing of materials, material transportation and transfer, and finished product protection; The installation of the post-embedded parts on the exterior wall includes the surveying and setting-out personnel marking the position of the post-embedded parts on the structure with an ink line, and the construction personnel drilling holes according to the marked cross positioning lines. The post-embedded parts on the exterior wall of the structural beams, columns and parapets are fixed with galvanized steel plates, expansion bolts and chemical anchors, and the ring beams are fixed with galvanized steel plates and expansion bolts; the installation of the post-embedded parts at the main keel foundation includes the surveying and setting-out personnel marking the position of the post-embedded parts on the structural eaves with an ink line, and the post-embedded parts are fixed to the eaves with galvanized steel plates, expansion bolts and chemical anchors.

[0055] The processing of the channel steel in the step 3) includes cutting the channel steel at the construction site according to size and numbering it, drilling the numbered channel steel, using a drilling machine to drill holes of specified size according to design requirements, grinding the galvanized layer between the channel steel and the embedded steel plate, and storing them in a designated location after completion, and then transporting them to various installation locations; the welding of the channel steel includes using a mechanical hoist to position the channel steel to the designated installation location, performing initial positioning spot welding on the positioning channel steel with the cooperation of the surveying personnel, and after the positioning is completed, professional welders use welding equipment to perform double-sided welding; the rust prevention of the channel steel includes cleaning the welding parts after the channel steel is welded, and spraying each weld with anti-rust paint for no less than 2 times.

[0056] The step 7) clay brick and glass brick processing includes clay brick processing and glass brick processing. For vents or other special parts on the wall, clay bricks and glass bricks use V-shaped or L-shaped non-standard bricks; for other flat wall positions without keels, clay bricks and glass bricks use 240*50*50 standard size bricks, and the non-standard bricks are prefabricated in the factory. The clay bricks of the non-standard brick type are 240*115*50, and the angle between the brick length and the brick width is 70-120°; the clay brick and glass brick masonry includes clay brick masonry and glass brick masonry When the vertical main keel is installed, refer to the brick arrangement drawing to arrange the clay bricks and glass bricks on site. After the arrangement is completed, use an infrared line projector to draw the hanging line from the parapet angle steel, and mark the horizontal seam position of each brick along the hanging line to verify the horizontal module error of masonry; locate the galvanized screws according to the layout drawing and the size of the ceramic tile opening. The spacing of the galvanized screws is based on the spacing of the reserved holes of three modular bricks, one for each, and the galvanized screws are connected with sleeves, which penetrate the entire curtain wall in height. After the galvanized angle steel is positioned, the galvanized screws are welded to the angle steel; hang according to the layout drawing Draw a vertical line and a horizontal line, and pass each clay brick and glass brick through the galvanized screw from top to bottom according to the pattern of the board. Use M7.5 cement mortar to lay the clay bricks and glass bricks. Install the crossbeam angle steel every time the bricks are laid to the designed height, so that the galvanized screw passes through the opening of the angle steel, and wipe the seam in time; use 8mmPVC rubber pads to control the brick seams according to the clay brick and glass brick dividing lines, and place plastic gaskets between each layer of gray bricks to control the verticality and flatness of the clay bricks and glass bricks; set a thread on the top of the galvanized screw, and tighten it with the sleeve to facilitate the extension of the next galvanized screw. This work should be done at the most The clay bricks and glass bricks on the top should be completed before installation; after the first layer of clay bricks and glass bricks at the bottom are hung, weld the upper layer of positioning galvanized steel plate, use the sleeve fixed on the lower section of galvanized screw to extend the galvanized screw, continue to hang the clay bricks and glass bricks, and construct them layer by layer from bottom to top. After the last layer is completed, weld the last steel plate and screw in the last section of galvanized screw to complete the hanging of clay bricks and glass bricks; after the clay bricks and glass bricks are laid, they need to be cured in time, and the curing time should be no less than 3 days.

[0057] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them; although the present invention is described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments can still be modified, or some or all of the technical features can be replaced by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention. In the description provided herein, a large number of specific details are described. However, it can be understood that the embodiments of the present invention can be practiced without these specific details. In some examples, well-known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this description. In addition, those skilled in the art can understand that although some embodiments described herein include certain features included in other embodiments but not other features, the combination of features of different embodiments means being within the scope of the present invention and forming different embodiments.

Claims

1. A clay brick and glass brick mixed hanging curtain wall system, characterized by: It includes a plurality of galvanized steel plates arranged at intervals on the beams, shear walls, columns and a first-layer structural cantilever plate on the main outer wall, channel steel connectors arranged on each galvanized steel plate, galvanized square steel columns arranged on each channel steel connector, and a galvanized square tube for connecting the galvanized square steel columns into one body of an external wall clay brick and glass brick dry-hanging skeleton. The basic form of the structural cantilever plate is a corbel eave or a straight section cantilever plate. The bottom of the galvanized square tube for the dry-hanging skeleton is provided with a bottom galvanized angle steel skeleton for transferring the permanent load of the curtain wall to the galvanized square steel column. The galvanized square tube for the dry-hanging skeleton of the external wall clay brick and glass brick and the bottom galvanized angle steel skeleton are also provided with galvanized screws. The clay bricks and glass bricks are hung on the galvanized screws. A galvanized screw is used for each clay brick and glass brick in the horizontal direction of the brick curtain wall, and the vertical connection is continuously made from bottom to top.

2. The clay brick and glass brick mixed hanging curtain wall system according to claim 1, characterized in that: The galvanized steel plates are arranged in two ways: reserved and embedded or post-embedded. The reserved and embedded method is that the galvanized steel plates are welded and fixed in the steel bars of beams, columns and shear walls, and the steel plate embedded claws and the intersection points of the steel bars are all fully welded to prevent the steel plates from being displaced during concrete pouring. The post-embedded method is that the galvanized steel plates are post-anchored with expansion bolts or chemical bolts. The channel steel connectors are connected to the galvanized square steel columns with tension bolts. It also includes a galvanized channel steel cantilever with one end connected to the galvanized square steel column and the other end connected to the beam, shear wall or column on the outer wall of the main body, and a steel skeleton galvanized channel steel diagonal brace with one end connected to the galvanized square steel column and the other end connected to the galvanized channel steel cantilever.

3. A construction method of a clay brick and glass brick mixed hanging curtain wall system according to any one of claims 1-2, characterized in that: The construction method comprises the following steps: 1) Curtain wall detailed design: including curtain wall structure cantilever panel design, curtain wall main keel and secondary keel design, curtain wall clay brick and glass brick layout design; 2) Construction preparation: including positioning and setting out, preparation of construction materials, installation of post-embedded parts on the exterior wall and post-embedded parts at the main keel foundation. The post-embedded parts on the exterior wall are the welding stress points of the channel steel cantilevers on the exterior wall facades, and the post-embedded parts on the main keel foundation are the horizontal embedded parts of the first-floor corbel cantilever or flat plate cantilever cantilever to limit the horizontal displacement of the bottom of the vertical main keel; 3) Install and position the channel steel and carry out anti-corrosion treatment: including channel steel processing, channel steel welding and channel steel rust prevention; 4) Insulation and waterproof installation: Insulation construction is carried out on the wall. The insulation is set up with rock wool board through the height. After the overall insulation of the exterior wall is installed, a layer of galvanized steel wire mesh is fixed from the bottom to the top of the exterior wall with anchor bolts, and the surface is covered with waterproof mortar. Double-layer SBS waterproof membrane is used at the eaves of the first floor slab to turn the eaves up 500mm from the basement and perform protective layer operations. After the pull-out test of the post-embedded parts is accepted, the base of the eaves is leveled, the waterproof mortar is used to level the slope of the embedded parts, and the additional layer is pasted, followed by large-area waterproof pasting. After the waterproof acceptance is qualified, the protective layer is constructed, followed by the detailed construction of the corner protective layer; 5) Install the vertical main keel: The vertical main keel adopts a rectangular square tube column structure. The size of a single square tube rectangular column is 3m or 6m. When the floor height is greater than the entire length of a single rectangular square tube column, the specifications of the incoming square tubes are reasonably configured according to the on-site floor height, and the rectangular square tube columns need to be welded and formed. During installation, adjacent welding seams should be staggered up and down; before installing the rectangular square tube columns, first use the wire drawing method to check the straightness of the rectangular square tube columns. According to the allowable deviation in the Technical Specification for Metal and Stone Curtain Wall Engineering JGJ133-2001, measure whether there is a deviation in the pre-processed rods. The deviation of the rods after processing should not be greater than 50% of the allowable deviation required by the specification. If it does not meet the requirements, it should be installed on the wall after correction to control the error within the allowable deviation range; the curtain wall height and curtain wall installation When the width of the wall where the curtain wall is installed is not more than 30m, the allowable deviation is ≤10mm; when the curtain wall height and the width of the wall where the curtain wall is installed are greater than 30m and ≤60m, the allowable deviation is ≤15mm; when the curtain wall height and the width of the wall where the curtain wall is installed are greater than 60m and ≤90m, the allowable deviation is ≤20mm; when the curtain wall height and the width of the wall where the curtain wall is installed are greater than 90m, the allowable deviation is ≤25mm; install rectangular square tube columns layer by layer, and perform installation inspection on each rectangular square tube column after it is installed in place according to the construction drawing. After all dimensions meet the requirements, use a theodolite to check the verticality of the vertical main keel to ensure the axis deviation of the vertical main keel; set vertical expansion joints between layers, and the expansion joints are installed by diagonal welding of angle steels, and the joint width is constructed according to the design requirements; 6) Install the bottom galvanized angle steel frame: Considering the aesthetics of the overall building facade and the requirements for beautiful seams, the bottom elevation of the clay bricks is ±0.000, and the bottom height of the bottom galvanized angle steel frame installation is the bottom elevation of the clay bricks minus the mortar seam width and the thickness of the angle steel. The size of each bottom galvanized angle steel frame should correspond to the spacing of the main keels on site, and the ends of each bottom galvanized angle steel frame should be fully welded to the vertical main keel on one side; 7) Clay brick and glass brick masonry: including clay brick and glass brick processing, clay brick and glass brick masonry; 8) Roof decoration aluminum plate closing: Aluminum plates are used to close the roof parapets and door and window openings; 9) Drainage and diversion setting at the bottom of the air interlayer: a certain distance of air interlayer is left between the mixed hanging curtain wall and the outer wall of the main structure, and a 10mm overflow joint is left between the mixed hanging curtain wall and the main eaves. The bottom of the air interlayer is grouted with 3% cement mortar for slope adjustment, and the thinnest thickness is 40mm to increase the stress area of ​​the masonry base, and rainwater is discharged by external drainage; 10) Detailed node processing, grouting, and acceptance: Carry out detailed finishing treatment on the vertical main keel foundation, doors and windows, and roof parapets, and clean the wall surface. After the maintenance of clay tiles and glass tiles, use special grouting agent to grout the tiles in time. The depth should not be less than 5mm, and the seam surface should be recessed into the tile facade by not less than 0.5mm. The acceptance includes judging whether the exposed glue seams of the curtain wall are horizontal and vertical, whether the color of the clay tiles is uniform and the surface is clean and pollution-free, and whether the overall surface of the curtain wall is flat. Acceptance can only be qualified after it fully meets the standards.

4. The construction method according to claim 3, characterized in that: The design of the curtain wall structure cantilever panel in the step 1) includes: the curtain wall main body design unit determines the foundation form of the structure cantilever panel according to the load parameter requirements and design drawings, and the foundation form of the structure cantilever panel is a corbel cantilever or a straight section cantilever panel; the design of the main keel and secondary keel of the curtain wall includes determining the angle steel spacing transmitted by the clay bricks and glass bricks to the vertical main keel, the vertical keel specifications, the chemical anchor specifications and the keel connection method according to the stress conditions of the chemical anchor bolts, the end weld strength requirements, and the inertia moments of the main keels and secondary keels; the layout design of the clay bricks and glass bricks of the external curtain wall includes completing the facade layout design of the door and window openings, parapets, ground junctions and facade entry and exit parts under the established clay brick and glass brick modulus and vertical and horizontal brick joints design requirements, so as to meet the requirements of modulus and aesthetics.

5. The construction method according to claim 3, characterized in that: The positioning and laying out in step 2) includes using a pendant to project points and draw lines from the corners of each roof to a layer of cantilever board waterproof protection layer, and marking the anchor board dividing line perpendicular to the drawn line. According to the drawn line and the size of the drawing, the keel outer skin control line and the outer edge line of the curtain wall decorative surface are drawn, and the ceramic brick and glass brick grid positioning lines are divided along the outer edge line of the curtain wall; the preparation of construction materials includes proposing a supply plan for the tools, appliances and construction materials required for construction and implementing the preparation, completing the processing of materials, material transportation and transfer, and finished product protection; The installation of the post-embedded parts on the exterior wall includes the surveying and setting-out personnel marking the position of the post-embedded parts on the structure with an ink line, and the construction personnel drilling holes according to the marked cross positioning lines. The post-embedded parts on the exterior wall of the structural beams, columns and parapets are fixed with galvanized steel plates, expansion bolts and chemical anchors, and the ring beams are fixed with galvanized steel plates and expansion bolts; the installation of the post-embedded parts at the main keel foundation includes the surveying and setting-out personnel marking the position of the post-embedded parts on the structural eaves with an ink line, and the post-embedded parts are fixed to the eaves with galvanized steel plates, expansion bolts and chemical anchors.

6. The construction method according to claim 3, characterized in that: The processing of the channel steel in the step 3) includes cutting the channel steel at the construction site according to size and numbering it, drilling the numbered channel steel, using a drilling machine to drill holes of specified size according to design requirements, grinding the galvanized layer between the channel steel and the embedded steel plate, and storing them in a designated location after completion, and then transporting them to various installation locations; the welding of the channel steel includes using a mechanical hoist to position the channel steel to the designated installation location, performing initial positioning spot welding on the positioning channel steel with the cooperation of the surveying personnel, and after the positioning is completed, professional welders use welding equipment to perform double-sided welding; the rust prevention of the channel steel includes cleaning the welding parts after the channel steel is welded, and spraying each weld with anti-rust paint for no less than 2 times.

7. The construction method according to claim 3, characterized in that: The step 7) clay brick and glass brick processing includes clay brick processing and glass brick processing. For vents or other special parts on the wall, clay bricks and glass bricks use V-shaped or L-shaped non-standard bricks; for other flat wall positions without keels, clay bricks and glass bricks use 240*50*50 standard size bricks, and the non-standard bricks are prefabricated in the factory. The clay bricks of the non-standard brick type are 240*115*50, and the angle between the brick length and the brick width is 70-120°; the clay brick and glass brick masonry includes clay brick masonry and glass brick masonry When the vertical main keel is installed, refer to the brick arrangement drawing to arrange the clay bricks and glass bricks on site. After the arrangement is completed, use an infrared line projector to draw the hanging line from the parapet angle steel, and mark the horizontal seam position of each brick along the hanging line to verify the horizontal module error of masonry; locate the galvanized screws according to the layout drawing and the size of the ceramic tile opening. The spacing of the galvanized screws is based on the spacing of the reserved holes of three modular bricks, one for each, and the galvanized screws are connected with sleeves, which penetrate the entire curtain wall in height. After the galvanized angle steel is positioned, the galvanized screws are welded to the angle steel; hang according to the layout drawing Draw a vertical line and a horizontal line, and pass each clay brick and glass brick through the galvanized screw from top to bottom according to the pattern of the board. Use M7.5 cement mortar to lay the clay bricks and glass bricks. Install the crossbeam angle steel every time the bricks are laid to the designed height, so that the galvanized screw passes through the opening of the angle steel, and wipe the seam in time; use 8mmPVC rubber pads to control the brick seams according to the clay brick and glass brick dividing lines, and place plastic gaskets between each layer of gray bricks to control the verticality and flatness of the clay bricks and glass bricks; set a thread on the top of the galvanized screw, and tighten it with the sleeve to facilitate the extension of the next galvanized screw. This work should be done at the most The clay bricks and glass bricks on the top should be completed before installation; after the first layer of clay bricks and glass bricks at the bottom are hung, weld the upper layer of positioning galvanized steel plate, use the sleeve fixed on the lower section of galvanized screw to extend the galvanized screw, continue to hang the clay bricks and glass bricks, and construct them layer by layer from bottom to top. After the last layer is completed, weld the last steel plate and screw in the last section of galvanized screw to complete the hanging of clay bricks and glass bricks; after the clay bricks and glass bricks are laid, they need to be cured in time, and the curing time should be no less than 3 days.