Electric box reservation construction method suitable for ALC plate
By embedded the electric pipes in the ALC board and reserved the constructor pillar steel bars and wire pipes during the construction process, the problem of cracks caused by the dense of the electrical box tube in the ALC board construction, and achieved a more stable and secure construction process.
Patent Information
- Application Number
- CN202411499276.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-25
- Publication Date
- 2025-01-28
AI Technical Summary
During the construction of ALC plates, dense wire pipes around the electric box lead to prone to cracks in the ALC plates.
Adopt a special ALC board, embed the electrical pipe in the ALC board, and reserve the constructor column steel bars and wire tube in advance during the construction process to form the electric box installation space to avoid the direct and constructor pillar templates of the electrical box position. touch.
By embedding the electric pipe, the problem of ALC plate cracks caused by the dense line pipes at the electric box, which improves the stability and safety of the construction.
Smart Images

Figure CN119373271A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to an electric box reservation construction method suitable for an ALC board. Background Art
[0002] As an energy-saving material, ALC boards are gradually being widely used in the construction of filling walls in large venues. During the construction process, ALC boards are installed vertically row by row, with connectors used to fix the upper and lower ends of the boards and adhesives used to bond them horizontally into a whole. When a position for an electric box needs to be reserved in the middle of the board, most of the time a hole is reserved on the board, and then the electric box is installed in the reserved hole. During construction, the ALC board is prone to cracks due to the dense wire pipes around the electric box and the low strength of the ALC board itself. Summary of the invention
[0003] In view of the above problems, an embodiment of the present invention provides a construction method for reserving an electric box applicable to an ALC panel.
[0004] An embodiment of the present invention provides a method for pre-constructing an electric box applicable to an ALC board, comprising: S1. Make a special ALC board Determine the number of electric pipes to be installed according to the line pipe layout diagram at the electric box, tie the internal reinforcement of the ALC board in the ALC board mold, and install electric pipe fixing plates in the internal reinforcement of the ALC board along the length direction of the ALC board. The electric pipe fixing plates are provided with pipe penetration holes according to the number of electric pipes. Select electric pipes of equal length according to the length of the ALC board, and install the electric pipes in the electric pipe fixing plates in sequence. Pour cement mortar into the ALC board mold to complete the production of the special ALC board. S2, ALC board construction Construct the main building according to the conventional procedures. During the construction process, reserve the structural column reinforcement at the position of the electric box and the electric wire pipe at the corresponding position of the floor slab in advance. Tie the structural column reinforcement and avoid the position of the electric box during the tying process to form an installation space for the electric box. Support the structural column formwork and use a clamp to fix the template at the installation space of the electric box and the structural column formwork during the support process. During the pouring of structural column concrete, the formwork is removed and the ALC board is installed after the concrete strength reaches the expected level. During the installation of the ALC board, ordinary ALC boards are first installed on the walls on both sides of the electric box position according to conventional procedures, and then special ALC boards are installed at the electric box position, and the electric pipes in the special ALC boards are connected to the electric wire pipes reserved in the floor slab.
[0005] Compared with the prior art, the beneficial effects of the present invention are: using a special ALC board, pre-burying the electric pipes in the ALC board, and eliminating the problem of cracks easily generated when installing the ALC board due to dense wire pipes at the electrical box.
[0006] Optionally, in S2, a process of installing a special ALC board at the location of the electric box and connecting the electric conduit in the special ALC board to the electric conduit reserved in the floor slab includes: Cut the special ALC board according to the bottom elevation of the electric box, and use the electric pipe hose to connect the electric pipe in the cut special ALC board with the reserved electric wire pipe in the floor slab; The bottom of the cut special ALC board is temporarily fixed with wedge-shaped anti-corrosion wooden squares, and then filled with fine stone concrete. After the strength of the fine stone concrete reaches the expected level, the installed ALC board is reinforced with glass fiber mesh.
[0007] Optionally, the process of reserving structural column reinforcement at the electrical box position in advance during the construction process in S2 includes: When the electric box to be installed is a high-voltage box, structural column reinforcements are reserved on both the upper and lower sides of the electric box position; when the electric box to be installed is a low-voltage box, structural column reinforcements are reserved only on the lower side of the electric box position.
[0008] Optionally, in the process of cutting the special ALC board according to the bottom elevation at the location of the electric box, the height of the cut special ALC board is 5 cm less than the bottom elevation at the location of the electric box.
[0009] Optionally, the inner diameter of the electric conduit pre-buried in the special ALC board is equal to the outer diameter of the electric conduit designed for the building. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] The drawings described herein are used to provide a further understanding of the present invention, constitute a part of the present application, and do not constitute a limitation of the present invention. In the drawings: Figure 1 A schematic diagram of the structure of a special ALC board provided in an embodiment of the present invention; Figure 2 A schematic diagram of steel bars reserved for structural columns of a strong electric box provided in an embodiment of the present invention; Figure 3 A schematic diagram of steel bars reserved for structural columns in a weak current box provided in an embodiment of the present invention; Figure 4 A schematic diagram of tying structural column reinforcement bars at a strong current box location provided by an embodiment of the present invention; Figure 5 A schematic diagram of tying structural column reinforcement bars at the location of a weak current box provided by an embodiment of the present invention Figure 6 A schematic diagram of a formwork structure at an electrical box location provided by an embodiment of the present invention; Figure 7 A schematic diagram of the connection between the electric pipe in a special ALC board and the electric wire pipe reserved in the floor slab provided in an embodiment of the present invention; Figure 8 A schematic diagram of temporary fixing of a specially made ALC board at an electric box position provided by an embodiment of the present invention; Fig. 9 A schematic diagram of a special ALC board after installation at an electrical box location provided by an embodiment of the present invention.
[0011] Among them, 1. Internal reinforcement of ALC board; 2. Electric pipe fixing plate; 3. Electric pipe; 4. Reserved structural column steel bars; 5. Structural column steel bars; 6. Electric box position; 7. Electric wire pipe; 8. Template for the installation space of the electric box; 9. Structural column template; 10. Clamp; 11. Electric pipe hose; 12. Wedge-shaped anti-corrosion wooden square; 13. Fine stone concrete. DETAILED DESCRIPTION
[0012] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments and the accompanying drawings. Here, the illustrative embodiments of the present invention and their descriptions are used to explain the present invention, but are not intended to limit the present invention.
[0013] An embodiment of the present invention provides a method for pre-constructing an electric box applicable to an ALC board, comprising: S1. Make a special ALC board Determine the number of electric pipes required according to the layout of the wire pipes at the electric box, that is, divide the number of electric pipes into several categories according to the requirements of the layout, and the number of electric pipes in each category can meet the wiring requirements of some electric boxes. For example: there are four types of electric boxes with 5, 6, 9, and 10 wires on site. When prefabricating special ALC panels, we produce wall panels with two specifications of 6 and 10 pre-embedded electric pipes. By reducing the specifications of the wall panels, we can reduce the difficulty of panel processing and on-site construction.
[0014] The internal reinforcement 1 of the ALC board is tied in the ALC board mold, and the electric pipe fixing plate 2 is arranged in the internal reinforcement 1 of the ALC board along the length direction of the ALC board. The electric pipe fixing plate 2 is provided with pipe penetration holes according to the number of electric pipes 3. Electric pipes 3 of equal length are selected according to the length of the ALC board, and the electric pipes 3 are sequentially inserted into the electric pipe fixing plate 2. Cement mortar is poured into the ALC board mold to complete the production of the special ALC board. The specific structure is as follows: Figure 1 As shown; the width of the special ALC board matches the reserved installation position of the electrical box, and the length is consistent with the standard board, which is easy to transport.
[0015] S2, ALC board construction The main structure of the building is constructed according to the conventional procedures, such as Figure 2 and Figure 3 As shown, during the construction process, the structural column steel bars 4 and the electric wire pipes 7 are reserved in advance at the position of the electric box, as shown in FIG. Figure 4 and Figure 5As shown, the structural column reinforcement 5 is tied and the electric box position 6 is avoided during the tying process to form an electric box installation space, and the structural column is supported by formwork and during the support process, the template 8 at the electric box installation space and the structural column template 9 are fixed by a clamp 10, as shown in FIG. Figure 6 As shown; During the pouring of structural column concrete, the formwork is removed and the ALC board is installed after the concrete strength reaches the expected level. During the installation of the ALC board, ordinary ALC boards are first installed on the walls on both sides of the electric box position 6 according to conventional procedures, and then special ALC boards are installed at the electric box position 6, and the electric pipe 3 in the special ALC board is connected to the electric wire pipe 7 reserved in the floor slab.
[0016] In the implementation, the process of installing the special ALC board at the location of the electric box in S2 and connecting the electric pipe 3 in the special ALC board with the electric wire pipe 7 reserved in the floor slab includes: According to the bottom elevation of the electric box position 6, the special ALC board is cut, such as Figure 7 As shown, an electric pipe hose 11 is used to connect the electric pipe 3 in the intercepted special ALC board with the electric wire pipe 7 reserved in the floor slab; like Figure 8 The bottom of the specially made ALC board cut out as shown is temporarily fixed with a wedge-shaped antiseptic wood square 12, and then Fig. 9 As shown, fine stone concrete 13 is used to fill it, and after the strength of the fine stone concrete 13 reaches the expected level, the installed ALC board is reinforced with glass fiber mesh.
[0017] The process of reserving structural column reinforcement in advance at the electrical box position during the construction process in S2 includes: When the electric box to be installed is a high-voltage box, structural column steel bars 4 are reserved on both the upper and lower sides of the electric box position 6 . When the electric box to be installed is a low-voltage box, structural column steel bars 4 are reserved only on the lower side of the electric box position 6 .
[0018] In the process of cutting the special ALC board according to the bottom elevation of the electric box position 6, the height of the cut special ALC board is 5 cm less than the bottom elevation of the electric box position 6.
[0019] The inner diameter of the electric pipe 3 embedded in the special ALC board is equal to the outer diameter of the electric pipe designed for the building.
[0020] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention are included in the protection scope of the present invention.
Claims
1. A method for pre-constructing an electric box suitable for an ALC board, characterized in that: include: S1. Make a special ALC board Determine the number of electric pipes to be installed according to the line pipe layout diagram at the electric box, tie the internal reinforcement of the ALC board in the ALC board mold, and install electric pipe fixing plates in the internal reinforcement of the ALC board along the length direction of the ALC board. The electric pipe fixing plates are provided with pipe penetration holes according to the number of electric pipes. Select electric pipes of equal length according to the length of the ALC board, and install the electric pipes in the electric pipe fixing plates in sequence. Pour cement mortar into the ALC board mold to complete the production of the special ALC board. S2, ALC board construction Construct the main building according to the conventional procedures. During the construction process, reserve the structural column reinforcement at the position of the electric box and the electric wire pipe at the corresponding position of the floor slab in advance. Tie the structural column reinforcement and avoid the position of the electric box during the tying process to form an installation space for the electric box. Support the structural column formwork and use a clamp to fix the template at the installation space of the electric box and the structural column formwork during the support process. During the pouring of structural column concrete, the formwork is removed and the ALC board is installed after the concrete strength reaches the expected level. During the installation of the ALC board, ordinary ALC boards are first installed on the walls on both sides of the electric box position according to conventional procedures, and then special ALC boards are installed at the electric box position, and the electric pipes in the special ALC boards are connected to the electric wire pipes reserved in the floor slab.
2. The electric box reservation construction method applicable to the ALC board according to claim 1 is characterized in that: The process of installing a special ALC board at the location of the electrical box in S2 and connecting the electrical conduit in the special ALC board with the electrical conduit reserved in the floor slab includes: Cut the special ALC board according to the bottom elevation of the electric box, and use the electric pipe hose to connect the electric pipe in the cut special ALC board with the reserved electric wire pipe in the floor slab; The bottom of the cut special ALC board is temporarily fixed with wedge-shaped anti-corrosion wooden squares, and then filled with fine stone concrete. After the strength of the fine stone concrete reaches the expected level, the installed ALC board is reinforced with glass fiber mesh.
3. The electric box reservation construction method applicable to the ALC board according to claim 1 is characterized in that: The process of reserving structural column reinforcement in advance at the electrical box position during the construction process in S2 includes: When the electric box to be installed is a high-voltage box, structural column reinforcements are reserved on both the upper and lower sides of the electric box position; when the electric box to be installed is a low-voltage box, structural column reinforcements are reserved only on the lower side of the electric box position.
4. The electric box reservation construction method applicable to the ALC board according to claim 2 is characterized in that: In the process of cutting the special ALC board according to the bottom elevation at the location of the electric box, the height of the cut special ALC board is 5 cm less than the bottom elevation at the location of the electric box.
5. The electric box reservation construction method applicable to the ALC board according to claim 1 is characterized in that: The inner diameter of the electric pipe embedded in the special ALC board is equal to the outer diameter of the electric pipe designed for the building.