Automatic operation and maintenance management method and system for power grid metering, terminal equipment and storage medium

By acquiring and updating the collection data of the grid terminal, the status of the operation and maintenance personnel, and the status of the work order, the use of the distance to calculate the distribution work order, solve the problem of low operating and maintenance management efficiency of power grid in the existing technology, and realize the operation and maintenance management Reasonable use of efficiency and resources.

CN119379206APending Publication Date: 2025-01-28GUANGDONG POWER GRID CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411473375.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-22
Publication Date
2025-01-28

AI Technical Summary

Technical Problem

The prior art relies on manual operations in the operation and maintenance management of power grid metering automation systems, resulting in inefficiency, prone to data errors and management loopholes.

Method used

By acquiring and updating the collection data of the power grid terminal, the status of the operation and maintenance personnel, and the status of the work order, the distribution of the work order is used to achieve the efficient matching and management of the operation and maintenance personnel and the terminal.

Benefits of technology

It has significantly improved the efficiency of operation and maintenance management, reduced the movement and distance of operation and maintenance personnel, and ensures the full use of the operation and maintenance personnel and the reasonable distribution of resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119379206A_ABST
    Figure CN119379206A_ABST
Patent Text Reader

Abstract

The invention discloses a power grid metering automatic operation and maintenance management method and system, terminal equipment and a storage medium. The method comprises the following steps: acquiring a first number of to-be-managed power grid terminals, initial terminal acquisition data, terminal position coordinates, initial operation and maintenance personnel states, operation and maintenance personnel position coordinates and initial work order states; taking the terminal corresponding to the first work order of which the current work order state is to be processed as a first terminal; taking the operation and maintenance personnel of which the current operation and maintenance personnel state is idle as first operation and maintenance personnel; calculating a first distance according to the operation and maintenance personnel position coordinates and the terminal position coordinates; distributing the first work order to the first operation and maintenance personnel according to the sequence of the first distances from small to large, and updating the current terminal acquisition data, the current operation and maintenance personnel state and the current work order state; judging whether the data acquired by the current terminal is complete; if yes, the terminal online rate is calculated; and marking the terminal online rate on a preset power grid map. According to the invention, the operation and maintenance management efficiency of the power grid is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid system management, and in particular to a power grid metering automated operation and maintenance management method, system, terminal equipment and storage medium. Background Art

[0002] The metering automation system is an important component of the power system, covering all aspects of the power system, including power production, transmission and distribution. The metering automation system has a wide range of applications, involving various departments and positions of power companies, and is of great significance to the operation and management of the power system. With the continuous upgrading and transformation of the power system, the scale and complexity of the metering automation system are also increasing. The existing operation and maintenance management methods often have limitations and mainly rely on manual operation and management, which can hardly meet the high requirements of modern power systems for efficiency and accuracy. Manual operation is not only time-consuming and labor-intensive, but also easily affected by human factors, resulting in data errors or management loopholes. Therefore, how to improve the operation and maintenance management efficiency of the metering automation system and reduce the error rate has become an urgent problem to be solved. Summary of the invention

[0003] The embodiments of the present invention provide a method, system, terminal device and storage medium for automatic operation and maintenance management of power grid metering, which can effectively solve the problems of time-consuming, labor-intensive and inefficient manual operation in the operation and maintenance management process of the prior art.

[0004] An embodiment of the present invention provides a method for automatic operation and maintenance management of power grid metering, comprising:

[0005] Obtaining a first number for representing the total number of terminals of the power grid to be managed, initial terminal collection data, terminal location coordinates, a work order number corresponding to the terminal, an initial operation and maintenance personnel status, an operation and maintenance personnel location coordinates, and an initial work order status;

[0006] According to the current work order status and the work order number corresponding to the terminal, the terminal corresponding to the first work order whose current work order status is pending is used as the first terminal; and according to the current operation and maintenance personnel status, the operation and maintenance personnel whose current operation and maintenance personnel status is idle is used as the first operation and maintenance personnel;

[0007] Calculate the first distance between each first operation and maintenance personnel and the first terminal according to the operation and maintenance personnel position coordinates corresponding to the first operation and maintenance personnel and the terminal position coordinates corresponding to the first terminal;

[0008] According to the order of the first distances from small to large, the first work order is assigned to the corresponding first operation and maintenance personnel, so that the operation and maintenance personnel can check the first terminal; and the current terminal collection data, the current operation and maintenance personnel status and the current work order status are updated;

[0009] Determine whether the data collected by the current terminal is complete; if so, use the corresponding terminal as the second terminal, and determine a second number used to represent the number of the second terminals;

[0010] Based on the first quantity and the second quantity, the terminal online rate of the power grid to be managed is calculated; and the terminal online rate is marked on a preset power grid map; wherein, the current terminal collection data at the time of the first judgment is the initial terminal collection data, the current work order status is the initial work order status, and the current operation and maintenance personnel status is the initial operation and maintenance personnel status.

[0011] Further, allocating the first work order to a corresponding first operation and maintenance personnel according to the order of the first distances from small to large includes:

[0012] Get the personnel number of the operation and maintenance personnel;

[0013] According to the order of the first distances from small to large, the first distance corresponding to each first terminal is used as the second distance;

[0014] Determining whether the personnel number of the first operation and maintenance personnel corresponding to the first terminal with the smallest second distance is repeated according to the personnel number;

[0015] If there is no duplication, the first work order corresponding to the first terminal with the smallest second distance is assigned to the corresponding first operation and maintenance personnel;

[0016] If there is a duplicate, the second distances of the first operation and maintenance personnel with the duplicate personnel number are compared in order from small to large according to the second distance, and the first work order with the smaller second distance is assigned to the first operation and maintenance personnel.

[0017] Furthermore, the terminal collected data includes: terminal node voltage, terminal node current and terminal node power; the operation and maintenance personnel status includes: idle, work order receipt and on-site processing; the work order status includes: pending, registered and processed;

[0018] The method further comprises:

[0019] The terminal corresponding to the second work order whose current work order status is registered is used as the third terminal;

[0020] The terminal corresponding to the third work order whose current work order status is processed is used as the fourth terminal;

[0021] The operation and maintenance personnel whose current status is work order signing is used as the second operation and maintenance personnel;

[0022] The operation and maintenance personnel whose current operation and maintenance personnel status is on-site processing shall be regarded as the third operation and maintenance personnel;

[0023] The first terminal, the second terminal, the third terminal, the fourth terminal, the first operation and maintenance personnel, the second operation and maintenance personnel and the third operation and maintenance personnel are marked with different colors on the preset power grid map.

[0024] Furthermore, it also includes:

[0025] Acquire a third number for indicating the number of terminals planned to be installed in the power grid to be managed;

[0026] Calculating the terminal coverage rate of the power grid to be managed according to the first number and the third number;

[0027] According to the terminal coverage rate and a preset coverage rate threshold, determining whether the power grid to be managed meets the collection conditions;

[0028] If so, the first number of power grids to be managed is maintained; if not, a first prompt message is generated according to the terminal coverage rate, so that the operation and maintenance personnel can speed up the progress of the operation and maintenance work according to the first prompt message.

[0029] Furthermore, it also includes:

[0030] Obtain the actual node power of the power grid to be managed;

[0031] Calculating the power error rate of the power grid to be managed according to the actual node power and the terminal node power;

[0032] According to the power error rate and the preset power error threshold, the power accuracy of the managed power grid is evaluated to obtain a power accuracy evaluation result;

[0033] When the power error rate is less than the power error threshold, determining that the power accuracy assessment result is high, and generating a power accuracy assessment report;

[0034] When the power error rate is greater than or equal to the power error threshold, the power accuracy assessment result is determined to be low power assessment accuracy, and a second prompt message is generated and displayed on a preset power grid map.

[0035] Furthermore, it also includes:

[0036] Obtain the upgrade package and terminal version data of the terminal of the power grid to be managed in real time;

[0037] Determining the upgrade environment of the corresponding terminal according to the upgrade program package;

[0038] According to the upgrade environment, a communication channel with the corresponding terminal is established;

[0039] Sending the upgrade package to the corresponding terminal through the constructed communication channel, so that the terminal performs terminal upgrade according to the upgrade package;

[0040] Compare the terminal version data after the terminal upgrade with the terminal version data before the upgrade to determine whether the terminal has been successfully upgraded;

[0041] If not, resend the upgrade package, re-determine whether the terminal is successfully upgraded, and generate a third prompt message if the second upgrade fails;

[0042] According to the third prompt information and the preset work order format, a work order with a work order status of pending is generated.

[0043] Furthermore, it also includes:

[0044] Generate a test instruction according to a preset test start time, a preset test end time, and preset test items;

[0045] Sending a detection instruction to each terminal of the power grid to be managed, so that each terminal performs terminal detection according to the detection instruction and generates a terminal detection message;

[0046] According to the terminal detection message and the preset detection message format, judging whether each terminal executes the detection instruction correctly;

[0047] If the terminal detection message is inconsistent with the preset detection message format, determine the terminal error type according to the code in the terminal detection message and the preset error code database;

[0048] If the terminal detection message is consistent with the preset detection message format, it is determined that the terminal executes the detection instruction correctly.

[0049] As an improvement of the above solution, another embodiment of the present invention provides a power grid metering automatic operation and maintenance management system, including:

[0050] A first data acquisition module, used to acquire a first number representing the total number of terminals of the power grid to be managed, initial terminal collection data, terminal location coordinates, a work order number corresponding to the terminal, an initial operation and maintenance personnel status, an operation and maintenance personnel location coordinates, and an initial work order status;

[0051] The first data determination module is used to determine the terminal corresponding to the first work order whose current work order status is pending as the first terminal according to the current work order status and the work order number corresponding to the terminal; and determine the operation and maintenance personnel whose current operation and maintenance personnel status is idle as the first operation and maintenance personnel according to the current operation and maintenance personnel status;

[0052] A distance calculation module, used to calculate a first distance between each first operation and maintenance personnel and the first terminal according to the operation and maintenance personnel position coordinates corresponding to the first operation and maintenance personnel and the terminal position coordinates corresponding to the first terminal;

[0053] A work order allocation module is used to allocate the first work order to the corresponding first operation and maintenance personnel according to the order of the first distance from small to large, so that the operation and maintenance personnel can check the first terminal; and update the current terminal collection data, the current operation and maintenance personnel status and the current work order status;

[0054] A first judgment module is used to judge whether the data collected by the current terminal is complete; if so, the corresponding terminal is used as the second terminal, and a second number used to represent the number of the second terminals is determined;

[0055] A data marking module, configured to calculate the terminal online rate of the power grid to be managed according to the first number and the second number; and mark the terminal online rate on a preset power grid map;

[0056] Among them, the current terminal collection data at the time of the first judgment is the initial terminal collection data, the current work order status is the initial work order status, and the current operation and maintenance personnel status is the initial operation and maintenance personnel status.

[0057] Another embodiment of the present invention provides a terminal device, including a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, and when the processor executes the computer program, a power grid metering automated operation and maintenance management method as described in the above embodiment is implemented.

[0058] Another embodiment of the present invention provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute a power grid metering automation operation and maintenance management method described in the above embodiment.

[0059] By implementing the present invention, at least the following beneficial effects are achieved:

[0060] The present invention provides a method, device, terminal equipment and storage medium for automatic operation and maintenance management of power grid metering. The method can obtain a first number for representing the total number of terminals of a power grid to be managed, initial terminal acquisition data, terminal location coordinates, a work order number corresponding to the terminal, an initial operation and maintenance personnel status, operation and maintenance personnel location coordinates and an initial work order status; according to the current work order status and the work order number corresponding to the terminal, a terminal corresponding to a first work order whose current work order status is to be processed is taken as a first terminal; and according to the current operation and maintenance personnel status, an operation and maintenance personnel whose current operation and maintenance personnel status is idle is taken as a first operation and maintenance personnel; according to the operation and maintenance personnel location coordinates corresponding to the first operation and maintenance personnel and the terminal location coordinates corresponding to the first terminal, each first operation and maintenance personnel is calculated. a first distance from the first terminal; assigning the first work order to the corresponding first operation and maintenance personnel in order of the first distance from small to large, so that the operation and maintenance personnel can check the first terminal; and updating the current terminal acquisition data, the current operation and maintenance personnel status and the current work order status; judging whether the current terminal acquisition data is complete; if so, taking the corresponding terminal as the second terminal, and determining a second number for representing the number of second terminals; calculating the terminal online rate of the power grid to be managed according to the first number and the second number; and marking the terminal online rate on a preset power grid map; wherein, the current terminal acquisition data at the time of the first judgment is the initial terminal acquisition data, the current work order status is the initial work order status, and the current operation and maintenance personnel status is the initial operation and maintenance personnel status. By allocating work orders to idle operation and maintenance personnel based on the first distance, and allocating work orders corresponding to the nearest terminal to operation and maintenance personnel, the movement time and distance of operation and maintenance personnel can be significantly reduced, thereby improving the efficiency of operation and maintenance management, ensuring that each operation and maintenance personnel can be fully utilized, and avoiding the waste of human resources; real-time acquisition and updating of terminal collection data, operation and maintenance personnel status and work order status can timely understand the operation status of the power grid and the progress of operation and maintenance work, reduce manpower and material resources, and improve the efficiency of operation and maintenance management. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] Figure 1 It is a flow chart of a method for automatic operation and maintenance management of power grid metering provided by one embodiment of the present invention;

[0062] Figure 2 It is a structural diagram of a power grid metering automated operation and maintenance management system provided by one embodiment of the present invention. DETAILED DESCRIPTION

[0063] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0064] See also Figure 1 , is a flow chart of a method for automatic operation and maintenance management of power grid metering provided by an embodiment of the present invention, comprising:

[0065] S1. Obtain a first number for representing the total number of terminals of the power grid to be managed, initial terminal collection data, terminal location coordinates, a work order number corresponding to the terminal, an initial operation and maintenance personnel status, an operation and maintenance personnel location coordinates, and an initial work order status;

[0066] S2. According to the current work order status and the work order number corresponding to the terminal, the terminal corresponding to the first work order whose current work order status is pending is used as the first terminal; and according to the current operation and maintenance personnel status, the operation and maintenance personnel whose current operation and maintenance personnel status is idle is used as the first operation and maintenance personnel;

[0067] S3. Calculate a first distance between each first operation and maintenance personnel and the first terminal according to the operation and maintenance personnel position coordinates corresponding to the first operation and maintenance personnel and the terminal position coordinates corresponding to the first terminal;

[0068] S4. Allocate the first work order to the corresponding first operation and maintenance personnel according to the order of the first distances from small to large, so that the operation and maintenance personnel can check the first terminal; and update the current terminal collection data, the current operation and maintenance personnel status, and the current work order status;

[0069] S5. Determine whether the data collected by the current terminal is complete; if so, use the corresponding terminal as the second terminal, and determine a second number used to represent the number of second terminals;

[0070] S6. Calculate the terminal online rate of the power grid to be managed based on the first quantity and the second quantity; and mark the terminal online rate on a preset power grid map; wherein the current terminal collection data at the time of the first judgment is the initial terminal collection data, the current work order status is the initial work order status, and the current operation and maintenance personnel status is the initial operation and maintenance personnel status.

[0071] Specifically, the first quantity represents the total number of power grid terminals to be managed; the first work order represents a work order whose status is to be processed; the first terminal represents the terminal corresponding to the first work order; the first operation and maintenance personnel represents an operation and maintenance personnel whose status is idle; the first distance represents the coordinate straight-line distance between the first terminal corresponding to the work order to be processed and the idle operation and maintenance personnel; the preset power grid map is an integrated comprehensive view provided for operation and maintenance personnel.

[0072] In a preferred embodiment of the present invention, a first number representing the total number of terminals of the power grid to be managed, initial terminal collection data, terminal location coordinates, work order numbers corresponding to the terminals, initial operation and maintenance personnel status, operation and maintenance personnel location coordinates, and initial work order status are first obtained; then, according to the current work order status and the work order number corresponding to the terminal, the terminal corresponding to the first work order whose current work order status is to be processed is taken as the first terminal; and according to the current operation and maintenance personnel status, the operation and maintenance personnel whose current operation and maintenance personnel status is idle is taken as the first operation and maintenance personnel; then, according to the operation and maintenance personnel location coordinates corresponding to the first operation and maintenance personnel, and the terminal location coordinates corresponding to the first terminal, a first distance between each first operation and maintenance personnel and the first terminal is calculated; then According to the order of the first distances from small to large, the first work order is assigned to the corresponding first operation and maintenance personnel, so that the operation and maintenance personnel can check the first terminal; and the current terminal collection data, the current operation and maintenance personnel status and the current work order status are updated; it is judged whether the current terminal collection data is complete; if so, the corresponding terminal is used as the second terminal, and a second number used to represent the number of second terminals is determined; finally, according to the first number and the second number, the terminal online rate of the power grid to be managed is calculated; and the terminal online rate is marked on the preset power grid map; wherein, the current terminal collection data at the first judgment is the initial terminal collection data, the current work order status is the initial work order status, and the current operation and maintenance personnel status is the initial operation and maintenance personnel status.

[0073] Specifically, allocating the first work order to the corresponding first operation and maintenance personnel according to the order of the first distances from small to large includes:

[0074] Get the personnel number of the operation and maintenance personnel;

[0075] According to the order of the first distances from small to large, the first distance corresponding to each first terminal is used as the second distance;

[0076] Determining whether the personnel number of the first operation and maintenance personnel corresponding to the first terminal with the smallest second distance is repeated according to the personnel number;

[0077] If there is no duplication, the first work order corresponding to the first terminal with the smallest second distance is assigned to the corresponding first operation and maintenance personnel;

[0078] If there is a duplicate, the second distances of the first operation and maintenance personnel with the duplicate personnel number are compared in order from small to large according to the second distance, and the first work order with the smaller second distance is assigned to the first operation and maintenance personnel.

[0079] In a preferred embodiment of the present invention, there are three idle operation and maintenance personnel, numbered A01, A02 and A03, and the work orders to be processed are numbered B01, B02 and B03. The first distance includes the distance between A01 and B01, B02 and B03, which are 100m, 200m and 300m respectively; the distance between A02 and B01, B02 and B03, which are 100m, 250m and 350m respectively; the distance between A03 and B01, B02 and B03, which are 80m, 190m and 290m respectively. It is judged that the distance between work order B01 and operation and maintenance personnel A03 is the smallest, and work order B01 is assigned to operation and maintenance personnel A03. At this time, the distance between work order B02 and operation and maintenance personnel A01 is 200m, and the distance between work order B02 and operation and maintenance personnel A02 is 250m, so the B02 work order is assigned to the A01 operation and maintenance personnel, and the B01 work order is assigned to the A02 operation and maintenance personnel.

[0080] Preferably, the terminal collected data includes: terminal node voltage, terminal node current and terminal node power; the operation and maintenance personnel status includes: idle, work order receipt and on-site processing; the work order status includes: pending, registered and processed;

[0081] The method further comprises:

[0082] The terminal corresponding to the second work order whose current work order status is registered is used as the third terminal;

[0083] The terminal corresponding to the third work order whose current work order status is processed is used as the fourth terminal;

[0084] The operation and maintenance personnel whose current status is work order signing is used as the second operation and maintenance personnel;

[0085] The operation and maintenance personnel whose current operation and maintenance personnel status is on-site processing shall be regarded as the third operation and maintenance personnel;

[0086] The first terminal, the second terminal, the third terminal, the fourth terminal, the first operation and maintenance personnel, the second operation and maintenance personnel and the third operation and maintenance personnel are marked with different colors on the preset power grid map.

[0087] Pending work orders refer to work orders that have not been assigned to operation and maintenance personnel; registered work orders refer to work orders that have been assigned to operation and maintenance personnel but have not been processed yet, which reflects the work tasks that the operation and maintenance personnel currently need to handle; processed work orders refer to work orders that have been processed and archived, which record the history and completion status of operation and maintenance work. The total number of work orders can be calculated based on the number of pending work orders, registered work orders, and processed work orders. The total number of work orders refers to the total number of all registered, pending, and processed work orders in the system, which reflects the total amount and load of system operation and maintenance work.

[0088] Provide operation and maintenance personnel with positioning devices that support positioning functions (such as smart phones, GPS locators, etc.). The positioning devices regularly upload the location data of the operation and maintenance personnel to the server, and then mark the current location of the operation and maintenance personnel on the GIS map according to the different status of the operation and maintenance personnel, and use different icons or colors to distinguish different personnel. The terminal's location data is regularly collected through the terminal's built-in GPS module or network positioning service, and the collected terminal location data is stored in the database. Then the terminal's location is updated in real time on the GIS map, and the movement of the terminal is displayed using dynamic markers or trajectory lines. Terminals and operation and maintenance personnel in different states are marked with different colors on the power grid map, so that managers can intuitively understand the current operation and maintenance status. This visual management method facilitates rapid identification of problem areas and timely adjustment of strategies, thereby providing higher quality services.

[0089] Indicatively, it also includes:

[0090] Acquire a third number for indicating the number of terminals planned to be installed in the power grid to be managed;

[0091] Calculating the terminal coverage rate of the power grid to be managed according to the first number and the third number;

[0092] According to the terminal coverage rate and a preset coverage rate threshold, determining whether the power grid to be managed meets the collection conditions;

[0093] If so, the first number of power grids to be managed is maintained; if not, a first prompt message is generated according to the terminal coverage rate, so that the operation and maintenance personnel can speed up the progress of the operation and maintenance work according to the first prompt message.

[0094] Based on the terminal coverage rate, operation and maintenance resources can be reasonably allocated to avoid waste of resources; by generating prompt information in a timely manner, operation and maintenance personnel can be prompted to deal with problems in a timely manner, thereby improving the operating efficiency and stability of the power grid; by optimizing the progress of operation and maintenance work, unnecessary operation and maintenance work can be reduced, thereby reducing operation and maintenance costs.

[0095] In another preferred embodiment of the present invention, the terminal online rate refers to the proportion of metering terminals that can communicate normally with the main station and report data to the total number of installed terminals at the current moment or statistical period, which reflects the communication stability and reliability of the terminal; the terminal coverage rate refers to the proportion of metering terminals (such as smart meters, data acquisition terminals, etc.) that have been installed and put into use to the total number of terminals that should be installed. A high terminal coverage rate means that the site already has a good acquisition infrastructure, and the existing terminals can operate normally and transmit data. It also includes the automatic meter reading rate, which is calculated based on the number of terminals that can upload terminal acquisition data and the total number of meter reading terminals. The automatic meter reading rate refers to the proportion of terminals that successfully read and upload electricity data automatically through the metering automation system to the total number of terminals that should be read, which reflects the ability and efficiency of the system's automatic meter reading. It also includes the file consistency rate, which is calculated based on the number of terminals whose terminal file information stored in the system is consistent with the actual installation situation on site to the total number of terminals that have been filed, reflecting the accuracy and completeness of the system file information.

[0096] For the terminal online rate, the terminal online rate index is calculated based on the distributed computing framework, and the online rate index of special transformers, public transformers, and concentrators is summarized and calculated according to the statistical type (real-time online rate, daily average online rate, monthly average online rate), organizational structure (provincial, municipal, district and county bureaus, power supply stations), and statistical caliber (full caliber, direct supply and direct management, county-level subsidiaries). For the terminal coverage rate, the terminal coverage rate index is calculated based on the distributed computing framework, and the collection completeness rate index is summarized and calculated according to the organizational structure (provincial, municipal, district and county bureaus, power supply stations), statistical caliber (full caliber, direct supply and direct management, county-level subsidiaries), time type (time point, time period), and statistical type (real-time, daily, monthly). For the automatic meter reading rate, the automatic meter reading rate index is calculated based on the distributed computing framework, and the automatic meter reading rate index is summarized and calculated according to the organizational structure (provincial, municipal, district and county bureaus, power supply stations), statistical caliber (full caliber, direct supply and direct management, county-level subsidiaries), data type (daily data, monthly data, zero-hour data), and time category (time point, time period).

[0097] Preferably, it also includes:

[0098] Obtain the actual node power of the power grid to be managed;

[0099] Calculating the power error rate of the power grid to be managed according to the actual node power and the terminal node power;

[0100] According to the power error rate and the preset power error threshold, the power accuracy of the managed power grid is evaluated to obtain a power accuracy evaluation result;

[0101] When the power error rate is less than the power error threshold, determining that the power accuracy assessment result is high, and generating a power accuracy assessment report;

[0102] When the power error rate is greater than or equal to the power error threshold, the power accuracy assessment result is determined to be low power assessment accuracy, and a second prompt message is generated and displayed on a preset power grid map.

[0103] In another preferred embodiment of the present invention, the line loss calculation rate is calculated based on the power supply and the power sales. The line loss calculation rate refers to the degree of proximity between the line loss rate calculated by the system and the actual line loss rate, and the line loss calculation rate is compared with the actually measured line loss rate to evaluate the accuracy of the line loss calculation rate. According to the ratio of the load actually carried by the distribution transformer to its rated capacity, the distribution transformer load rate is calculated to evaluate the operating status of the distribution transformer and timely discover overload or underload problems. According to the ratio of the actual published voltage data to the total published voltage data, the voltage publication completeness rate is calculated, and the voltage publication completeness rate is used to evaluate the comprehensiveness and accuracy of the voltage data. The remote inspection rate of the metering device refers to the ratio of the number of metering devices inspected remotely to the total number of metering devices. The statistical method is: the system application indicator statistical unit will record the metering device information of each remote inspection, including the inspection time, inspection results, etc. By calculating the ratio of the number of metering devices inspected remotely to the total number of metering devices, the remote inspection rate of the metering device can be obtained to evaluate the efficiency and effectiveness of the remote inspection work.

[0104] In a preferred embodiment of the present invention, it also includes:

[0105] Obtain the upgrade package and terminal version data of the terminal of the power grid to be managed in real time;

[0106] Determining the upgrade environment of the corresponding terminal according to the upgrade program package;

[0107] According to the upgrade environment, a communication channel with the corresponding terminal is established;

[0108] Sending the upgrade package to the corresponding terminal through the constructed communication channel, so that the terminal performs terminal upgrade according to the upgrade package;

[0109] Compare the terminal version data after the terminal upgrade with the terminal version data before the upgrade to determine whether the terminal has been successfully upgraded;

[0110] If not, resend the upgrade package, re-determine whether the terminal is successfully upgraded, and generate a third prompt message if the second upgrade fails;

[0111] According to the third prompt information and the preset work order format, a work order with a work order status of pending is generated.

[0112] Specifically, by obtaining the latest terminal upgrade package and the currently running terminal version data in real time, and parsing the upgrade package, it is possible to clarify which terminals need to be upgraded and the specific hardware and software environment requirements of these terminals, so that each terminal can use the upgrade package suitable for its specific environment to avoid upgrade failures due to incompatibility. Establishing a stable and secure communication channel is the key to a successful upgrade. This step ensures that the upgrade package can be reliably transmitted to the target terminal and that two-way communication can be performed when necessary to solve possible problems; once the communication channel is established, the upgrade package can be transmitted. After the terminal device receives the upgrade package, it will self-update according to the preset program, which usually includes software replacement, configuration adjustment and other operations. In order to verify the effect of the upgrade, it is necessary to compare the version data before and after the upgrade. If the two are inconsistent, it means that the upgrade may not be completed as expected, and further inspection or re-upgrade is required. If the initial upgrade attempt fails, the system will automatically try to resend the upgrade package and upgrade. If it fails again, a prompt message will be generated to notify the operation and maintenance team of potential problems. When continuous upgrade failures occur, the system will create a new work order based on the predefined work order template and set its status to "pending", which can help operation and maintenance personnel quickly locate the problem and take corresponding measures.

[0113] Indicatively, it also includes:

[0114] Generate a test instruction according to a preset test start time, a preset test end time, and preset test items;

[0115] Sending a detection instruction to each terminal of the power grid to be managed, so that each terminal performs terminal detection according to the detection instruction and generates a terminal detection message;

[0116] According to the terminal detection message and the preset detection message format, judging whether each terminal executes the detection instruction correctly;

[0117] If the terminal detection message is inconsistent with the preset detection message format, determine the terminal error type according to the code in the terminal detection message and the preset error code database;

[0118] If the terminal detection message is consistent with the preset detection message format, it is determined that the terminal executes the detection instruction correctly.

[0119] Indicatively, for traffic statistics, terminal traffic statistics analysis is provided, and traffic statistics by day, month, and year are supported; terminal traffic analysis and statistics are supported according to organization, query time, and statistical type (by organization, by manufacturer); analysis of terminal traffic status (normal, general abnormality, severe abnormality) ratio is supported, and the terminal traffic and excessive traffic of each management unit are displayed in a visual way such as map and list. For terminal whitelist management, it supports the inclusion of terminals that do not require access verification into the whitelist, and supports whitelist maintenance and query. For suspected terminal identification, for non-whitelist terminals, terminal login information is collected and analyzed each time the terminal logs in, and terminal operation abnormalities are analyzed at the same time, suspected terminals are identified, and terminal operation abnormality verification is performed on suspected terminals, and finally a list of illegal devices is formed. For suspected terminal processing, illegal equipment work orders are automatically generated and processed, illegal equipment information query is supported, and regular analysis of illegal equipment access is supported.

[0120] Preferably, the basic information of the terminal includes basic information such as the terminal model, serial number, manufacturer, and user. According to the functional characteristics of the terminal and the latest manufacturer's regulations, the specific functional items that need to be tested are listed, such as data acquisition function, remote control function, communication function, alarm function, etc.; clear testing standards and expected results are set for each test item as a basis for judging whether the terminal function is effective; a schedule for testing is planned, including the start time of the test, the expected completion time, etc., to ensure that the testing work is carried out as planned. The information returned after the test is completed includes: the actual execution results of each test item, including three states of success, failure or abnormality; related data generated during the test process, such as communication logs, data collection samples, control command responses, etc.; if any abnormal situation or error is found during the test process, a detailed abnormality report will be generated, including problem description, occurrence time, possible causes, etc.; Among them, the standard template in the above scheme refers to a predefined template used for comparison and analysis with the test return information, which contains the following types of data: list all functional items to be tested, each item corresponds to one or more standard values ​​or expected results; define the format specifications of the returned information, including data structure, field name, data type, etc., to ensure that the returned information can be correctly parsed and compared; define how to record and handle when errors or abnormal situations are detected, including the allocation of error codes, error description specifications, etc. For example, HTTP status code 200 indicates success, 404 indicates resource not found, and 500 indicates internal server error.

[0121] By implementing this embodiment, a first number representing the total number of terminals of the power grid to be managed, initial terminal collection data, terminal location coordinates, a work order number corresponding to the terminal, an initial operation and maintenance personnel status, an operation and maintenance personnel location coordinates, and an initial work order status are obtained; according to the current work order status and the work order number corresponding to the terminal, the terminal corresponding to the first work order whose current work order status is to be processed is taken as the first terminal; and according to the current operation and maintenance personnel status, the operation and maintenance personnel whose current operation and maintenance personnel status is idle is taken as the first operation and maintenance personnel; according to the operation and maintenance personnel location coordinates corresponding to the first operation and maintenance personnel, and the terminal location coordinates corresponding to the first terminal, a first distance between each first operation and maintenance personnel and the first terminal is calculated; according to the first Assign the first work order to the corresponding first operation and maintenance personnel in order of distance from small to large, so that the operation and maintenance personnel can check the first terminal; and update the current terminal collection data, the current operation and maintenance personnel status and the current work order status; determine whether the current terminal collection data is complete; if so, take the corresponding terminal as the second terminal, and determine a second number used to represent the number of second terminals; calculate the terminal online rate of the power grid to be managed based on the first number and the second number; and mark the terminal online rate on the preset power grid map; wherein, the current terminal collection data at the first judgment is the initial terminal collection data, the current work order status is the initial work order status, and the current operation and maintenance personnel status is the initial operation and maintenance personnel status. By allocating work orders to idle operation and maintenance personnel based on the first distance, and allocating work orders corresponding to the nearest terminal to operation and maintenance personnel, the movement time and distance of operation and maintenance personnel can be significantly reduced, thereby improving the efficiency of operation and maintenance management, ensuring that each operation and maintenance personnel can be fully utilized, and avoiding the waste of human resources; real-time acquisition and updating of terminal collection data, operation and maintenance personnel status and work order status can timely understand the operation status of the power grid and the progress of operation and maintenance work, reduce manpower and material resources, and improve the efficiency of operation and maintenance management.

[0122] See also Figure 2 , is a schematic diagram of a structure of a power grid metering automation operation and maintenance management system provided by an embodiment of the present invention, including:

[0123] A first data acquisition module, used to acquire a first number representing the total number of terminals of the power grid to be managed, initial terminal collection data, terminal location coordinates, a work order number corresponding to the terminal, an initial operation and maintenance personnel status, an operation and maintenance personnel location coordinates, and an initial work order status;

[0124] The first data determination module is used to determine the terminal corresponding to the first work order whose current work order status is pending as the first terminal according to the current work order status and the work order number corresponding to the terminal; and determine the operation and maintenance personnel whose current operation and maintenance personnel status is idle as the first operation and maintenance personnel according to the current operation and maintenance personnel status;

[0125] A distance calculation module, used to calculate a first distance between each first operation and maintenance personnel and the first terminal according to the operation and maintenance personnel position coordinates corresponding to the first operation and maintenance personnel and the terminal position coordinates corresponding to the first terminal;

[0126] A work order allocation module is used to allocate the first work order to the corresponding first operation and maintenance personnel according to the order of the first distance from small to large, so that the operation and maintenance personnel can check the first terminal; and update the current terminal collection data, the current operation and maintenance personnel status and the current work order status;

[0127] A first judgment module is used to judge whether the data collected by the current terminal is complete; if so, the corresponding terminal is used as the second terminal, and a second number used to represent the number of the second terminals is determined;

[0128] A data marking module, configured to calculate the terminal online rate of the power grid to be managed according to the first number and the second number; and mark the terminal online rate on a preset power grid map;

[0129] Among them, the current terminal collection data at the time of the first judgment is the initial terminal collection data, the current work order status is the initial work order status, and the current operation and maintenance personnel status is the initial operation and maintenance personnel status.

[0130] The present invention provides a power grid metering automated operation and maintenance management system, which obtains a first number for representing the total number of terminals of a power grid to be managed, initial terminal collection data, terminal location coordinates, a work order number corresponding to the terminal, an initial operation and maintenance personnel status, operation and maintenance personnel location coordinates and an initial work order status according to a first data acquisition module; in a first data determination module, according to a current work order status and a work order number corresponding to the terminal, a terminal corresponding to a first work order whose current work order status is to be processed is taken as a first terminal; and according to the current operation and maintenance personnel status, an operation and maintenance personnel whose current operation and maintenance personnel status is idle is taken as a first operation and maintenance personnel; in a distance calculation module, according to the operation and maintenance personnel location coordinates corresponding to the first operation and maintenance personnel and the terminal location coordinates corresponding to the first terminal, the first distance between each first operation and maintenance personnel and the first terminal is calculated. a distance; in a work order allocation module, according to the first distance in ascending order, the first work order is allocated to the corresponding first operation and maintenance personnel, so that the operation and maintenance personnel can check the first terminal; and the current terminal acquisition data, the current operation and maintenance personnel status and the current work order status are updated; through the first judgment module, it is judged whether the current terminal acquisition data is complete; if so, the corresponding terminal is used as the second terminal, and a second number used to represent the number of second terminals is determined; in a data marking module, according to the first number and the second number, the terminal online rate of the power grid to be managed is calculated; and the terminal online rate is marked on a preset power grid map; wherein, the current terminal acquisition data at the time of the first judgment is the initial terminal acquisition data, the current work order status is the initial work order status, and the current operation and maintenance personnel status is the initial operation and maintenance personnel status. By allocating work orders to idle operation and maintenance personnel based on the first distance, and allocating work orders corresponding to the nearest terminal to operation and maintenance personnel, the movement time and distance of operation and maintenance personnel can be significantly reduced, thereby improving the efficiency of operation and maintenance management, ensuring that each operation and maintenance personnel can be fully utilized, and avoiding the waste of human resources; real-time acquisition and updating of terminal collection data, operation and maintenance personnel status and work order status can timely understand the operation status of the power grid and the progress of operation and maintenance work, reduce manpower and material resources, and improve the efficiency of power grid operation and maintenance management.

[0131] It should be noted that the device embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, in the accompanying drawings of the device embodiments provided by the present invention, the connection relationship between the modules indicates that there is a communication connection between them, which may be specifically implemented as one or more communication buses or signal lines. A person of ordinary skill in the art may understand and implement it without paying any creative effort.

[0132] Those skilled in the art can clearly understand that, for the sake of convenience and brevity, the specific working process of the device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0133] Another embodiment of the present invention further provides a terminal device, including a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein the processor implements a power grid metering automatic operation and maintenance management method as described in the above embodiment when executing the computer program. The terminal device may be a computing device such as a desktop computer, a notebook, a PDA, and a cloud server. The terminal device may include, but is not limited to, a processor and a memory.

[0134] The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc. The processor is the control center of the terminal device, and uses various interfaces and lines to connect various parts of the entire terminal device.

[0135] The memory can be used to store the computer program, and the processor realizes various functions of the terminal device by running or executing the computer program stored in the memory and calling the data stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, at least one application required for a function, etc.; the data storage area can store data created according to the use of the mobile phone, etc. In addition, the memory can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Med ia Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device or other volatile solid-state storage device.

[0136] Another embodiment of the present invention provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute a power grid metering automation operation and maintenance management method described in the above embodiment.

[0137] The storage medium is a computer-readable storage medium, and the computer program is stored in the computer-readable storage medium. When the computer program is executed by the processor, the steps of each of the above-mentioned method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium.

[0138] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.

Claims

1. A method for automatic operation and maintenance management of power grid metering, characterized in that: include: Obtaining a first number for representing the total number of terminals of the power grid to be managed, initial terminal collection data, terminal location coordinates, a work order number corresponding to the terminal, an initial operation and maintenance personnel status, an operation and maintenance personnel location coordinates, and an initial work order status; According to the current work order status and the work order number corresponding to the terminal, the terminal corresponding to the first work order whose current work order status is to be processed is used as the first terminal; According to the current status of the operation and maintenance personnel, the operation and maintenance personnel whose current status is idle is selected as the first operation and maintenance personnel; Calculate the first distance between each first operation and maintenance personnel and the first terminal according to the operation and maintenance personnel position coordinates corresponding to the first operation and maintenance personnel and the terminal position coordinates corresponding to the first terminal; According to the order of the first distances from small to large, the first work order is assigned to the corresponding first operation and maintenance personnel, so that the operation and maintenance personnel can check the first terminal; and the current terminal collection data, the current operation and maintenance personnel status and the current work order status are updated; Determine whether the data collected by the current terminal is complete; if so, use the corresponding terminal as the second terminal, and determine a second number used to represent the number of the second terminals; Based on the first quantity and the second quantity, the terminal online rate of the power grid to be managed is calculated; and the terminal online rate is marked on a preset power grid map; wherein, the current terminal collection data at the time of the first judgment is the initial terminal collection data, the current work order status is the initial work order status, and the current operation and maintenance personnel status is the initial operation and maintenance personnel status.

2. A method for automatic operation and maintenance management of power grid metering according to claim 1, characterized in that: According to the order of the first distance from small to large, the first work order is assigned to the corresponding first operation and maintenance personnel, including: Get the personnel number of the operation and maintenance personnel; According to the order of the first distances from small to large, the first distance corresponding to each first terminal is used as the second distance; Determining whether the personnel number of the first operation and maintenance personnel corresponding to the first terminal with the smallest second distance is repeated according to the personnel number; If there is no duplication, the first work order corresponding to the first terminal with the smallest second distance is assigned to the corresponding first operation and maintenance personnel; If there is a duplicate, the second distances of the first operation and maintenance personnel with the duplicate personnel number are compared in order from small to large according to the second distance, and the first work order with the smaller second distance is assigned to the first operation and maintenance personnel.

3. A method for automatic operation and maintenance management of power grid metering according to claim 1, characterized in that: The terminal collected data includes: terminal node voltage, terminal node current and terminal node power; the operation and maintenance personnel status includes: idle, work order receipt and on-site processing; the work order status includes: pending, registered and processed; The method further comprises: The terminal corresponding to the second work order whose current work order status is registered is used as the third terminal; The terminal corresponding to the third work order whose current work order status is processed is used as the fourth terminal; The operation and maintenance personnel whose current status is work order signing is used as the second operation and maintenance personnel; The operation and maintenance personnel whose current operation and maintenance personnel status is on-site processing shall be regarded as the third operation and maintenance personnel; The first terminal, the second terminal, the third terminal, the fourth terminal, the first operation and maintenance personnel, the second operation and maintenance personnel and the third operation and maintenance personnel are marked with different colors on the preset power grid map.

4. A method for automatic operation and maintenance management of power grid metering according to claim 3, characterized in that: Also includes: Acquire a third number for indicating the number of terminals planned to be installed in the power grid to be managed; Calculating the terminal coverage rate of the power grid to be managed according to the first number and the third number; According to the terminal coverage rate and a preset coverage rate threshold, determining whether the power grid to be managed meets the collection conditions; If so, the first number of power grids to be managed is maintained; if not, a first prompt message is generated according to the terminal coverage rate, so that the operation and maintenance personnel can speed up the progress of the operation and maintenance work according to the first prompt message.

5. A method for automatic operation and maintenance management of power grid metering according to claim 3, characterized in that: Also includes: Obtain the actual node power of the power grid to be managed; Calculating the power error rate of the power grid to be managed according to the actual node power and the terminal node power; According to the power error rate and the preset power error threshold, the power accuracy of the managed power grid is evaluated to obtain a power accuracy evaluation result; When the power error rate is less than the power error threshold, determining that the power accuracy assessment result is high, and generating a power accuracy assessment report; When the power error rate is greater than or equal to the power error threshold, the power accuracy assessment result is determined to be low power assessment accuracy, and a second prompt message is generated and displayed on a preset power grid map.

6. A method for automatic operation and maintenance management of power grid metering according to claim 3, characterized in that: Also includes: Obtain the upgrade package and terminal version data of the terminal of the power grid to be managed in real time; Determining the upgrade environment of the corresponding terminal according to the upgrade program package; According to the upgrade environment, a communication channel with the corresponding terminal is established; Sending the upgrade program package to the corresponding terminal through the constructed communication channel, so that the terminal performs terminal upgrade according to the upgrade program package; Compare the terminal version data after the terminal upgrade with the terminal version data before the upgrade to determine whether the terminal has been successfully upgraded; If not, resend the upgrade package, re-determine whether the terminal is successfully upgraded, and generate a third prompt message if it is determined that the second upgrade fails; According to the third prompt information and the preset work order format, a work order with a work order status of pending is generated.

7. A method for automatic operation and maintenance management of power grid metering according to claim 3, characterized in that: Also includes: Generate a test instruction according to a preset test start time, a preset test end time, and preset test items; Sending a detection instruction to each terminal of the power grid to be managed, so that each terminal performs terminal detection according to the detection instruction and generates a terminal detection message; According to the terminal detection message and the preset detection message format, judging whether each terminal executes the detection instruction correctly; If the terminal detection message is inconsistent with the preset detection message format, determine the terminal error type according to the code in the terminal detection message and the preset error code database; If the terminal detection message is consistent with the preset detection message format, it is determined that the terminal executes the detection instruction correctly.

8. A power grid metering automated operation and maintenance management system, characterized in that: include: A first data acquisition module, used to acquire a first number representing the total number of terminals of the power grid to be managed, initial terminal collection data, terminal location coordinates, a work order number corresponding to the terminal, an initial operation and maintenance personnel status, an operation and maintenance personnel location coordinates, and an initial work order status; A first data determination module is used to determine, according to the current work order status and the work order number corresponding to the terminal, the terminal corresponding to the first work order whose current work order status is to be processed as the first terminal; According to the current status of the operation and maintenance personnel, the operation and maintenance personnel whose current status is idle is selected as the first operation and maintenance personnel; A distance calculation module, used to calculate a first distance between each first operation and maintenance personnel and the first terminal according to the operation and maintenance personnel position coordinates corresponding to the first operation and maintenance personnel and the terminal position coordinates corresponding to the first terminal; A work order allocation module is used to allocate the first work order to the corresponding first operation and maintenance personnel according to the order of the first distance from small to large, so that the operation and maintenance personnel can check the first terminal; and update the current terminal collection data, the current operation and maintenance personnel status and the current work order status; A first judgment module is used to judge whether the data collected by the current terminal is complete; if so, the corresponding terminal is used as the second terminal, and a second number used to represent the number of the second terminals is determined; A data marking module, configured to calculate the terminal online rate of the power grid to be managed according to the first number and the second number; and mark the terminal online rate on a preset power grid map; Among them, the current terminal collection data at the time of the first judgment is the initial terminal collection data, the current work order status is the initial work order status, and the current operation and maintenance personnel status is the initial operation and maintenance personnel status.

9. A terminal device, characterized in that: It comprises a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, and when the processor executes the computer program, it implements a power grid metering automated operation and maintenance management method as described in any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored computer program, wherein when the computer program is executed, the device where the computer-readable storage medium is located is controlled to execute the power grid metering automated operation and maintenance management method according to any one of claims 1 to 7.