Tube well blank door and surface layer material application type installation method

By using components such as wall keels, fixing plates, hinges and flame retardant plates in the installation of conical doors of the pipe wells and the surface layer material, combined with the adjustment of the opening angle of the hinge and the precise calculation of the surface layer material, the quality in the traditional installation method is solved. and cost issues, achieving efficient and cost-effective overall installation effect.

CN119392891APending Publication Date: 2025-02-07CHINA POWER CONSTR (NANJING) ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411305505.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-19
Publication Date
2025-02-07

AI Technical Summary

Technical Problem

The installation methods of traditional pipe wells' concealed doors and surface layer materials have quality problems, such as uneven surface layer gaps, deformation of concealed doors, many construction steps and inconvenient use, resulting in high materials, construction periods and labor costs.

Method used

Adopt the applicable installation method of the fireproof door and surface layer material of the pipe well. Through the wall keel, fixing plate, hinge and flame retardant plate and other components, combined with the hinge opening angle adjustment and the precise calculation of the surface layer material, the concealed door and surface are realized. Integral installation of layer material.

Benefits of technology

The basic frame of the wall surface layer material is reduced, the overall structure is formed, the angle and gap of the secret door opening are increased, which meets the design effect, while reducing the material, construction period and labor costs, and improving construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119392891A_ABST
    Figure CN119392891A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building tube well systems, and discloses a tube well blank door and surface layer material application type installation method, which comprises a building tube well and a building wall body, and is characterized in that a wall-attached keel is arranged on the surface of the building wall body, a fixing plate is arranged on one side of the wall-attached keel, and a connecting block is arranged in the fixing plate; the characteristics of the tube well fireproof door are utilized, the characteristics of the hinges are fully utilized, a foundation frame of wall surface layer materials is reduced, the wall surface layer materials are made to form a whole, the opening angle of the door leaf and the opening gap are increased through the opening angle of the concealed hinges, and therefore the opening angle of the door leaf is increased; the design effect is met, meanwhile, the problems that a conventional technology is prone to deformation, multiple in construction step, inconvenient to use and the like are solved, the purposes of saving materials, shortening the construction period and saving labor can be achieved by adopting the scheme, and optimization preparation is made for large-area construction of a project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building pipe well systems, and in particular to a method for installing a pipe well concealed door and a surface material in a pasting manner. Background Art

[0002] A pipe well hidden door is a highly concealed door installed inside a building, especially in areas such as pipe wells. It is usually installed on the wall or the ground in an inconspicuous way, which is convenient for maintenance and inspection and keeps the appearance of the building clean and tidy.

[0003] Traditionally, pipe shaft hidden doors and decorative surface layers are installed separately, with the hidden door opened first and then the pipe shaft fire door. Hidden doors made on site are mostly welded, resulting in uneven surface gaps, deformation of the hidden door and inability to open smoothly, and other quality defects. In addition, the materials, construction period and labor costs of installing existing pipe shaft hidden doors are high, which is time-consuming and labor-intensive. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a method for installing a hidden door of a pipe well and a surface material by applying the same, which solves the problems raised in the above-mentioned background technology.

[0005] To solve the above technical problems, according to one aspect of the present invention, more specifically, a method for applying a pipe shaft concealed door to a surface material, comprising a building pipe shaft and a building wall, characterized in that: a wall keel is arranged on the surface of the building wall, a fixing plate is arranged on one side of the wall keel, a connecting block is arranged inside the fixing plate, a hinge is arranged on the surface of the connecting block, and a pipe shaft fire door is arranged at one end of the hinge away from the connecting block;

[0006] The side walls of the wall-attached keels are provided with flame-retardant panels, the flame-retardant panels and the surfaces of the pipe shaft fire doors are provided with wall bricks, and the surfaces of the pipe shaft fire doors are provided with metal locks.

[0007] Furthermore, the following steps are included:

[0008] S1. Install the wall keel on the building wall, set a fixing plate on the surface of the wall keel, set a hinge on the surface of the fixing plate, and install the pipe shaft fire door through the hinge;

[0009] S2. Carry out secondary layout according to the on-site civil engineering structure, confirm the wall layout and seams in advance, and integrate the ceiling point technology to ensure that there are no equipment factors that affect the opening of the pipe shaft hidden door after the pipe shaft fire door is opened;

[0010] S3. Calculate the weight of the surface material and the weight of the pipe shaft fire door in advance, select hinges based on the overall total amount, and ensure that the hinge bearing capacity is redundant by more than 20% to ensure that there is no problem with the hinge bearing after installation;

[0011] S4. Install a flame retardant board on the surface of the wall keel, and fit the wall bricks to the flame retardant board and the surface of the pipe shaft fire door;

[0012] S5. Apply latex paint to the inside of the gaps between the wall tiles to fix the wall tiles.

[0013] Furthermore, in S2 and S3, when the pipe shaft fire door is installed, the equipment prediction calculation

[0014]

[0015] Where N is the force on the pipe shaft fire door; M z is the weight of the pipe shaft fire door; Z is the gravitational acceleration of the pipe shaft fire door; L B L is the vertical distance from the hinge axis to the center of gravity of the door leaf; J is the force exerted by the environment on the pipe shaft fire door; P is the pressure inside the building pipe shaft; A is the area of ​​the pipe shaft fire door; M K M is the opening angle of the pipe shaft fire door; B is the closing angle of the pipe shaft fire door; α is the angle caused by the force on the pipe shaft fire door.

[0016] Furthermore, in S2, the opening angle and closing angle of the manhole fire door are calculated according to a calculation formula. If the opening angle of the manhole fire door does not meet the fire inspection and acceptance requirements, the hinge is replaced.

[0017] Furthermore, a cavity is opened on the surface of the building wall, and a fire hydrant is arranged inside the cavity.

[0018] Furthermore, the side walls of the wall tiles are provided with slots, and a connecting plate is provided between every two groups of wall tiles.

[0019] Furthermore, a movable column is movably provided inside the connecting plate, a clamping block is provided on the surface of the movable column, a through groove is provided on the side wall of the connecting plate, and a clamping plate is movably provided inside the through groove, and the clamping plate corresponds to the clamping groove provided in the wall brick, a triangular groove is provided on one side of the connecting plate inside the clamping plate, and the triangular groove is consistent with the surface of the clamping block.

[0020] Furthermore, a threaded hole is provided inside the movable column, a bolt is arranged inside the threaded hole, a through hole is provided at one end of the connecting plate, a bearing is arranged inside the through hole, and the inside of the inner ring of the bearing is connected to the surface of the bolt.

[0021] The beneficial effects of the pipe well hidden door and surface material application installation method of the present invention are:

[0022] The present invention utilizes the characteristics of the pipe shaft fire door, fully utilizes the characteristics of the hinge, reduces the basic frame of the wall surface material, and forms it as a whole. The opening angle of the door leaf and the opening gap are increased by the opening angle of the concealed hinge. While meeting the design effect, it reduces the problems of easy deformation, many construction steps, and inconvenient use in conventional processes. The adoption of this solution can achieve the purpose of saving materials, saving construction time, and saving labor, and make optimized preparations for large-scale construction of the project. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The present invention is further described in detail below with reference to the accompanying drawings and specific implementation methods.

[0024] Figure 1 It is a structural schematic diagram of the present invention.

[0025] Figure 2 It is a structural schematic diagram of another viewing angle of the present invention.

[0026] Figure 3 It is a schematic diagram of the structure between the wall brick and the connecting plate of the present invention.

[0027] Figure 4 It is a structural schematic diagram of the internal cross-section of the connecting plate of the present invention.

[0028] The accompanying drawings are marked as follows: 1. building pipe shaft; 2. pipe shaft fire door; 3. wall brick; 4. metal lock; 5. hinge; 6. flame retardant plate; 7. fixing plate; 8. wall keel; 9. connecting block; 10. building wall; 11. chamber; 12. fire hydrant; 13. slot; 14. connecting plate; 15. clamping plate; 16. movable column; 17. triangular groove; 18. clamping block; 19. bolt. DETAILED DESCRIPTION

[0029] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.

[0030] like Figure 1 As shown, according to one aspect of the present invention, a pipe shaft concealed door is provided, comprising a building pipe shaft 1 and a building wall 10, a wall keel 8 is provided on the surface of the building wall 10, a fixing plate 7 is provided on one side of the wall keel 8, a connecting block 9 is provided inside the fixing plate 7, a hinge 5 is provided on the surface of the connecting block 9, and a pipe shaft fire door 2 is provided at one end of the hinge 5 away from the connecting block 9;

[0031] The side wall of the wall-attached keel 8 is provided with a flame-retardant plate 6 , the flame-retardant plate 6 and the surface of the pipe shaft fire door 2 are provided with wall bricks 3 , and the surface of the pipe shaft fire door 2 is provided with a metal lock 4 .

[0032] In this embodiment, the following steps are included:

[0033] S1, installing the wall keel 8 on the building wall 10, setting a fixing plate 7 on the surface of the wall keel 8, setting a hinge 5 on the surface of the fixing plate 7, and installing the pipe shaft fire door 2 through the hinge 5;

[0034] S2. Conduct secondary layout according to the on-site civil engineering structure, confirm the wall layout and seams in advance, and integrate the ceiling point technology to ensure that there are no equipment factors that affect the opening of the pipe shaft hidden door after the pipe shaft fire door 2 is opened;

[0035] S3. Calculate the weight of the surface material and the weight of the pipe shaft fire door 2 in advance, and select the hinge 5 according to the overall total amount. The hinge 5 has a bearing capacity redundancy of more than 20% to ensure that the hinge 5 has no bearing capacity problems after installation;

[0036] S4, a flame retardant board 6 is arranged on the surface of the wall keel 8, and the wall bricks 3 are attached to the flame retardant board 6 and the surface of the pipe shaft fire door 2;

[0037] S5. Apply latex paint to the inside of the gaps of the wall tiles 3 to fix the wall tiles 3.

[0038] In this embodiment, in S2 and S3, when the pipe shaft fire door 2 is installed, the calculation formula for equipment prediction is:

[0039]

[0040] Where N is the force on the shaft fire door 2; M z is the weight of the pipe shaft fire door 2; Z is the gravitational acceleration of the pipe shaft fire door 2; L B L is the vertical distance from the hinge 5 axis to the door leaf’s center of gravity; j is the force exerted by the hinge 5 on the pipe shaft fire door 2; P is the pressure inside the building pipe shaft 1; A is the area of ​​the pipe shaft fire door 2; M K M is the opening angle of the manhole fire door 2; B is the closing angle of the pipe shaft fire door 2; α is the angle caused by the force on the pipe shaft fire door 2.

[0041] In this embodiment, in S2, the opening angle and the closing angle of the manhole fire door 2 are calculated according to the calculation formula. If the opening angle of the manhole fire door 2 does not meet the fire acceptance requirements, the hinge 5 is replaced. Furthermore, the opening angle of the manhole fire door 2 is tested according to the calculation formula. When it does not meet the fire acceptance requirements, the strength of the hinge 5 is adjusted by adjusting or replacing the hinge 5.

[0042] In this embodiment, a cavity 11 is opened on the surface of the building wall 10 , and a fire hydrant 12 is arranged inside the cavity 11 .

[0043] In this embodiment, the side walls of the wall tiles 3 are provided with card slots 13, and a connecting plate 14 is provided between every two groups of wall tiles 3. Furthermore, the card slots 13 provided on the side walls of the wall tiles 3 are connected to the connecting plates 14, and the side walls of the connecting plates 14 are made of flexible material to prevent the wall tiles 3 from being damaged due to contact.

[0044] In this embodiment, a movable column 16 is movably provided inside the connecting plate 14, and a clamping block 18 is provided on the surface of the movable column 16. A through groove is provided on the side wall of the connecting plate 14, and a clamping plate 15 is movably provided inside the through groove, and the clamping plate 15 corresponds to the clamping groove 13 provided on the wall tile 3. A triangular groove 17 is provided on one side of the connecting plate 14 of the clamping plate 15, and the triangular groove 17 is consistent with the surface of the clamping block 18. Furthermore, the movable column 16 is horizontally moved inside the connecting plate 14 to drive the clamping block 18 to move, so that the clamping block 18 moves to the outside of the triangular groove 17, and the clamping block 18 is used to push the clamping plate 15 to move outward, so that the clamping plate 15 is clamped with the clamping groove 13, thereby completing the installation of the two groups of wall tiles 3.

[0045] In this embodiment, a threaded hole is opened inside the movable column 16, and a bolt 19 is arranged inside the threaded hole. A through hole is opened at one end of the connecting plate 14, and a bearing is arranged inside the through hole. The inner ring of the bearing is connected to the surface of the bolt 19. Furthermore, since the bolt 19 is threadedly connected to the threaded hole opened by the movable column 16, when the bolt 19 rotates, it will drive the movable column 16 to move horizontally inside the connecting plate 14.

[0046] During the construction process of the present invention, when the pipe well blind door is installed as a single door blind door, the material and labor costs saved are as follows:

[0047] 40*40*3mm square steel pipe: value 240 yuan; 2 9cm boards: value 250 yuan; 1 gypsum board: value 30 yuan; 2.5 square meters of latex paint: 85 yuan; 2 sky and earth axes: value 30 yuan;

[0048] When the pipe well hidden door is installed on a door hidden door, the traditional labor cost and the labor cost of the present invention are compared as follows:

[0049] The labor costs for on-site production of traditional hidden doors are as follows: 1 welder: labor cost is 450 yuan; 2 carpenters: labor cost is 700 yuan; 2 painters: labor cost is 600 yuan; 1 installer: labor cost is 300 yuan;

[0050] The labor cost for installing the hidden door of the present invention is as follows:

[0051] 1 installer: labor cost is 300 yuan

[0052] The working process of the present invention is as follows:

[0053] According to the characteristics of the pipe shaft fire door 2, the characteristics of its door shaft (hinge 5) are fully utilized, the basic framework of the wall surface material is reduced to form an integral body, and the opening angle of the door leaf and the opening gap are increased by the opening angle of the concealed hinge 5. While meeting the design effect, the conventional process is reduced in deformation, construction steps, inconvenience, and other problems. The present invention has the following characteristics:

[0054] 1. By changing the installation position of the pipe shaft fire door 2, the opening angle of the hinge 5 and lengthening the lock core and other technical requirements, the door panel is used as the basis of the surface material for installation.

[0055] 2. Calculate the finished surface according to the thickness of the surface material and the installation method, conduct secondary layout according to the on-site civil engineering structure, confirm the wall layout and joints in advance, and comprehensively consider the technical specifications such as the ceiling points to ensure that there is no impact from factors such as equipment after the door leaf is opened, ensure the opening angle of the fire door, and meet the fire inspection and acceptance requirements.

[0056] 3. Calculate the weight of the surface material and the door leaf in advance, and select the appropriate hinge 5 based on the overall total amount. The hinge 5 load-bearing capacity redundancy should be more than 20% to ensure that the hinge 5 has no load-bearing problems after installation, the concealed door opens smoothly, and the door leaf joints are flat without height differences. The door leaf hinge 5 will not sag, deform, twist, or have problems such as large and small heads after being stressed due to the addition of the surface material.

[0057] 4. Traditional hidden doors are closed by means of beads or magnetic contacts, which may cause problems such as poor opening, insufficient magnetic force or damaged beads, which may lead to failure to open. The installation position of the beads or magnetic contacts may be easily warped or deformed due to stress. The on-site method is to change the length of the lock core, directly open a hole on the surface material, and process it through the lock cover or flange edge. Later, it can be opened directly with a key, which is convenient for opening and maintenance, and can meet the design effect and provide convenience for later maintenance.

[0058] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present invention also fall within the protection scope of the present invention.

Claims

1. A pipe shaft hidden door, comprising a building pipe shaft (1) and a building wall (10), characterized in that: The surface of the building wall (10) is provided with a wall keel (8), one side of the wall keel (8) is provided with a fixing plate (7), a connecting block (9) is provided inside the fixing plate (7), a hinge (5) is provided on the surface of the connecting block (9), and a pipe shaft fire door (2) is provided at one end of the hinge (5) away from the connecting block (9); The side wall of the wall-attached keel (8) is provided with a flame retardant plate (6), the flame retardant plate (6) and the surface of the pipe shaft fire door (2) are provided with wall bricks (3), and the surface of the pipe shaft fire door (2) is provided with a metal lock (4).

2. The surface material application type installation method of a pipe well hidden door according to claim 1 is characterized in that: The following steps are involved: S1, installing a wall keel (8) on a building wall (10), arranging a fixing plate (7) on the surface of the wall keel (8), arranging a hinge (5) on the surface of the fixing plate (7), and installing a pipe shaft fire door (2) through the hinge (5); S2. Conduct secondary layout according to the on-site civil engineering structure, confirm the wall layout and seams in advance, and integrate the ceiling point technology to ensure that there are no equipment factors that affect the opening of the pipe shaft hidden door after the pipe shaft fire door (2) is opened; S3. Calculate the weight of the surface material and the weight of the pipe shaft fire door (2) in advance, select the hinge (5) according to the total weight, and make sure that the hinge (5) has a bearing capacity redundancy of more than 20% to ensure that the hinge (5) has no bearing capacity problems after installation. S4, a flame retardant board (6) is arranged on the surface of the wall keel (8), and the wall bricks (3) are attached to the flame retardant board (6) and the surface of the pipe shaft fire door (2); S5. Apply latex paint to the inside of the gaps of the wall tiles (3), thereby fixing the wall tiles (3).

3. A surface material application installation method according to claim 2, characterized in that: In S2 and S3, when the pipe shaft fire door (2) is installed, the calculation formula for equipment prediction is: Where N is the force acting on the shaft fire door (2); is the weight of the pipe shaft fire door (2); Z is the gravitational acceleration of the pipe shaft fire door (2); is the vertical distance from the hinge (5) axis to the door leaf’s center of gravity; is the force exerted on the pipe shaft fire door (2) by the hinge (5); P is the pressure inside the building pipe shaft 1; A is the area of ​​the pipe shaft fire door (2); is the opening angle of the manhole fire door (2); is the closing angle of the manhole fire door (2); It is the angle caused by the force on the pipe shaft fire door (2).

4. A surface material application installation method according to claim 2, characterized in that: In S2, the opening angle and closing angle of the pipe shaft fire door (2) are calculated according to a calculation formula. If the opening angle of the pipe shaft fire door (2) does not meet the fire inspection and acceptance requirements, the hinge (5) is replaced.

5. The hidden door for a pipe well according to claim 1, characterized in that: A cavity (11) is provided on the surface of the building wall (10), and a fire hydrant (12) is provided inside the cavity (11).

6. A surface material application installation method according to claim 2, characterized in that: The side walls of the wall bricks (3) are each provided with a slot (13), and a connecting plate (14) is provided between every two groups of wall bricks (3).

7. A surface material application installation method according to claim 6, characterized in that: A movable column (16) is movably arranged inside the connecting plate (14), and a clamping block (18) is arranged on the surface of the movable column (16). A through groove is provided on the side wall of the connecting plate (14), and a clamping plate (15) is movably arranged inside the through groove, and the clamping plate (15) corresponds to the clamping groove (13) provided on the wall brick (3). A triangular groove (17) is provided on one side of the connecting plate (14), and the triangular groove (17) matches the surface of the clamping block (18).

8. A surface material application installation method according to claim 7, characterized in that: A threaded hole is provided inside the movable column (16), a bolt (19) is arranged inside the threaded hole, a through hole is provided at one end of the connecting plate (14), a bearing is arranged inside the through hole, and the inside of the inner ring of the bearing is connected to the surface of the bolt (19).