Dock flood prevention door water stop device and using method thereof

By using a combination device of water stop short board and water stop long board on the dock flood control door, the problem of flood control door cannot be completely closed is solved, and higher sealing performance and safety is achieved, while reducing costs and complexity.

CN119411527AActive Publication Date: 2025-02-11HUDONG ZHONGHUA SHIPBUILDINGGROUP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411558714.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-04
Publication Date
2025-02-11
Estimated Expiration
2044-11-04

AI Technical Summary

Technical Problem

When the existing dock flood control door is closed, it cannot be completely closed due to the interference of crane tracks, causing river water or seawater to flow into the gap during the flood season, affecting the flood control effect.

Method used

The flood control door water-stop device is adopted that combines water-stop short boards and water-stop long boards. By clamping the water-stop long boards and water-stop short boards on the crane track and tightly fixing them on the flood control door, a sealing structure is formed to ensure sealing. performance.

Benefits of technology

It effectively solves the water leakage problem caused by interference between flood control doors and crane tracks, improves the safety of the dock during flood season, simplifies the device structure and installation process, and reduces labor and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119411527A_ABST
    Figure CN119411527A_ABST
Patent Text Reader

Abstract

The dock flood prevention door water stopping device is used for a flood prevention door provided with a rail notch, the water stopping device comprises a water stopping long plate and a water stopping short plate which are fastened and fixed through a fastener to form a blocking structure, and the outer edge of the blocking structure is larger than the outer edge of the rail notch. A sealing groove matched with the cross section of the crane rail in shape is formed in the lower end of the plugging structure and comprises a first notch and a second notch, and the first notch and the second notch are located in the inner side faces of the lower ends of the long water stop plate and the short water stop plate correspondingly. The device is easy to assemble and disassemble and has wide applicability, the long water stop plate is detachably fixed to the flood prevention door after the long water stop plate and the short water stop plate are adjusted and clamped to the crane rail, the problem of water leakage at the notch of the flood prevention door rail in the flood season can be effectively solved, the sealing performance of the flood prevention door is remarkably improved, and in addition, the service life of the flood prevention door is prolonged. The fixed connection design of the device and the flood prevention gate can effectively disperse the impact force of the water flow, so that the safety of the dock in the flood season is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of hydraulic structures, and in particular relates to a dock flood control door water stopping device and a use method thereof. Background Art

[0002] The docks of a shipyard are generally located near the river or the sea, where there are usually flood seasons. Therefore, it is necessary to set up flood control walls near the river or the sea. There are flood control gates in the flood control walls, and the purpose of flood control can be achieved by closing the flood control gates during the flood season.

[0003] The shipyard needs to use the crane at the dock to lift and land the materials transported by water. However, the track of the crane interferes with the flood control gate. Therefore, when manufacturing the flood control gate, a track gap will be reserved according to the actual position of the crane track on site to avoid interference with the crane track when the flood control gate is closed. However, the gap will make it impossible to completely close the flood control gate when it is closed. During the flood season, river water or sea water will flow in from the gap, which greatly reduces the role of the flood control gate. Usually, the solution to this problem is to use sandbags to block the gap to meet the closing function of the flood control gate. This method can play a certain role, but the speed at which river water or sea water flows into the gap is relatively fast, and the effect is not very obvious.

[0004] After searching, the Chinese invention application document with the existing publication number CN115419015A discloses a flood control door sealing device for a crane track, "including a flood control door body, a first sealing member and a plurality of filling members, a sealing hole for the crane track to pass through is opened at the bottom of the flood control door body, and the plurality of filling members are respectively sealed in the grooves on both sides of the crane track, and the first sealing member is located in the sealing hole and pressed between the flood control door body and the plurality of filling members and the crane track." However, the flood control function of the device still relies on the sealing effect of the separate and independent filling materials and the first sealing member, and the separation and independence will still affect the fitting density between the crane track and the flood control door, especially when the water flow is turbulent and the impact force is large during the flood season, it will cause deviation, and the problem of water leakage of the flood control door cannot be avoided, which has certain limitations. Summary of the invention

[0005] In order to solve the problems existing in the prior art mentioned above, the purpose of the present invention is to provide a dock flood control door water-stop device, which ensures the sealing performance of the flood control door by combining the arrangement of a short water-stop plate and a long water-stop plate, and solves the leakage problem caused by the interference between the flood control door and the crane track, thereby greatly improving the safety of the dock during the flood season. At the same time, the purpose of the present invention is also to provide a method for using a water-stop device for flood-control doors of a dock. This method has been innovated in view of the relevant requirements for flood control of the dock. By hoisting a short water-stop plate and a long water-stop plate into the notch position of the flood-control door, the long water-stop plate and the short water-stop plate are clamped on the crane track and tightly fixed on the flood-control door, thereby ensuring the sealing effect of the flood-control door, and can well solve the problem of water leakage of the flood-control door, avoid serious water seepage that damages shipyard equipment, thereby avoiding economic losses, and greatly improving the safety of the dock during the flood season; at the same time, the water-stop device has a simple structure, is easy to assemble and disassemble, can provide a fast and reliable water-stop function for flood control of the flood-control door, and will not cause damage to the crane track or the flood-control door, effectively saving labor costs and maintenance costs; and, by fixedly connecting the water-stop device to the flood-control door, the impact force of the water flow can be dispersed to the flood-control door, thereby providing a solid safety guarantee for the dock during the flood season.

[0006] In order to achieve the above-mentioned purpose and other related purposes, the present invention adopts the following technical solutions:

[0007] According to a first aspect of the present invention, a dock flood control door water-stopping device is provided, comprising a long water-stopping plate and a short water-stopping plate, wherein the long water-stopping plate is provided with a first lifting hole and a fixing hole, and the short water-stopping plate is provided with a second lifting hole matching the fixing hole, and the flood control door is provided with a mounting groove matching the first lifting hole, and the second lifting hole is fastened and fixed to the fixing hole by a fastener, so that the short water-stopping plate and the long water-stopping plate form a blocking structure, the outer edge of the blocking structure is larger than the outer edge of the track notch, and a sealing groove is provided at the lower end of the blocking structure, the sealing groove is located between the inner side surface of the lower end of the long water-stopping plate and the inner side surface of the lower end of the short water-stopping plate, and the sealing groove has a shape matching the cross-sectional shape of the crane track, and the sealing groove comprises a first notch and a second notch, wherein the first notch is located on the inner side surface of the lower end of the long water-stopping plate, and the second notch is located on the inner side surface of the lower end of the short water-stopping plate, so that the long water-stopping plate and the short water-stopping plate can be clamped on the crane track through the first notch and the second notch, respectively.

[0008] As a preferred technical solution, the positions of the fixing hole and the second lifting hole fall within the track gap range of the flood control door.

[0009] As a preferred technical solution, the short water-stop plate further includes a folding plate, the folding plate is located at the outer edge of the short water-stop plate, and the rear end surface of the folding plate is flush with the rear end surface of the long water-stop plate.

[0010] A second aspect of the present invention provides a method for using a dock flood control door water stop device, comprising the following steps:

[0011] S1. Hoist the short water-stop plate and the long water-stop plate to the prepared installation position of the flood control door on the crane track respectively, and vertically clamp the short water-stop plate and the long water-stop plate on the crane track in turn;

[0012] S2. Lock and fix the long water-stop plate and the short water-stop plate to form a blocking structure, and adjust the position of the blocking structure until the rear end face of the blocking structure is close to the plane where the front end face of the prepared installation position of the flood control door is located;

[0013] S3. Hoist the flood control door to the prepared installation position of the flood control door, and install the blocking structure assembly on the flood control door to complete the installation of the water-stop device.

[0014] As a preferred technical solution, the specific steps of step S1 include:

[0015] S1-1. Hoist the short water-stop plate to the prepared installation position of the flood control door on the crane track, adjust the angle and position of the short water-stop plate, and make the short water-stop plate vertically embedded in the crane track through the second notch;

[0016] S1-2. Hoist and adjust the angle, orientation and position of the long waterstop plate until the front end surface of the long waterstop plate fits with the rear end surface of the short waterstop plate, and vertically embed the long waterstop plate on the crane track through the first notch.

[0017] Furthermore, the specific steps of step S1-1 include: installing a shackle with a lifting rope hanging on it on the second lifting hole, lifting the waterstop short plate steadily and moving it along the length direction of the crane track to the range of the prepared installation position of the flood control gate; then, by adjusting the angle of the waterstop short plate, the waterstop short plate is rotated to be perpendicular to the length direction of the crane track; at the same time, the position of the waterstop short plate is adjusted, and the inner side surface of the lower end of the waterstop short plate is tightly fitted to the outer side surface of the crane track, so that the waterstop short plate is vertically embedded in the crane track through the second slot; after the waterstop short plate is adjusted into place, the hook is released and the shackle on the second lifting hole is unhooked.

[0018] Furthermore, the specific steps of step S1-2 include: first, installing a shackle with a lifting rope hanging on it on the first lifting hole, steadily lifting the long waterstop plate and moving it along the length direction of the crane track to the rear end face close to the short waterstop plate; then, by adjusting the angle of the long waterstop plate, the long waterstop plate is rotated to be perpendicular to the length direction of the crane track; at the same time, the position of the long waterstop plate is adjusted until the front end face of the long waterstop plate is fitted with the rear end face of the short waterstop plate, and the inner side face of the lower end of the long waterstop plate is tightly fitted with the outer side face of the crane track, and the long waterstop plate is vertically embedded on the crane track through the first slot.

[0019] As a preferred technical solution, the specific steps of step S2 include: after the long water-stop plate is adjusted into place, the fixing hole of the long water-stop plate is locked and fixed with the second lifting hole of the short water-stop plate by fasteners, so that the long water-stop plate and the short water-stop plate are assembled to form a blocking structure, and the blocking structure is pulled horizontally by using the shackle installed on the first lifting hole until the rear end face of the blocking structure is close to the plane where the front end face of the prepared installation position of the flood control door is located, and after the blocking structure is adjusted into place, the hook is released and the shackle on the second lifting hole is unfastened.

[0020] As a preferred technical solution, the specific steps of step S3 include: hoisting the flood control door to the flood control door pre-installation position on the crane track, the front end face of the flood control door is fitted to the rear end face of the blocking structure, the rear end face of the flood control door is fitted to the front end face of the ground, and the long water-stop plate is fixed in the installation groove on the flood control door through the second hoisting hole, thereby fastening the blocking structure to the flood control door to complete the installation of the water-stop device.

[0021] As a further preferred technical solution, the method of use further includes step S0: before installing the water-stop device, confirm that there is no debris on the crane track within the prepared installation position of the flood control gate, and if there is any debris, clean it up in advance.

[0022] As described above, the present invention has the following beneficial effects:

[0023] The dock flood control door water-stopping device and the use method thereof of the present invention ensure the sealing performance of the flood control door by combining the arrangement of a short water-stopping plate and a long water-stopping plate, and well solve the water leakage problem at the gap of the flood control door track during the flood season, thereby greatly improving the safety of the dock during the flood season. At the same time, the purpose of the present invention is also to provide a method for using a water-stop device for a dock flood control door. The method is innovative in view of the relevant requirements for dock flood control. By hoisting a short water-stop plate and a long water-stop plate into the notch position of the flood control door track, the long water-stop plate and the short water-stop plate are clamped on the crane track and tightly fixed on the flood control door, thereby ensuring the sealing effect of the flood control door, and can well solve the leakage problem caused by the interference between the flood control door and the crane track, avoid serious water seepage and damage to shipyard equipment, thereby avoiding economic losses and greatly improving the safety of the dock during the flood season; at the same time, the water-stop device has a simple structure, is easy to operate and assemble, and is easy to disassemble. It can provide a fast and reliable water-stop function for flood control of the flood control door, and will not cause damage to the crane track or the flood control door, effectively saving labor costs and maintenance costs, and has wide applicability; in addition, the present invention can disperse the impact force of the water flow to the flood control door by fixedly connecting the water-stop device to the flood control door, thereby providing a solid safety guarantee for the dock during the flood season. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the prepared installation position of the flood control door at the crane track in the present invention.

[0025] Figure 2 It is a schematic diagram of hoisting the water stop short plate in the present invention.

[0026] Figure 3 It is a schematic diagram of hoisting the water-stop long board of the present invention.

[0027] Figure 4 It is a schematic diagram of the installation of the blocking structure and the flood control door in the present invention.

[0028] Among them, the specific descriptions of the accompanying drawings are as follows: 1. Sealing structure; 11. Long water-stop plate; 111. First lifting hole; 112. Fixing hole; 12. Short water-stop plate; 121. Second lifting hole; 13. Sealing groove; 131. First notch; 132. Second notch; 3. Crane rail; 4. Fastener; 41. Fixing bolt; 42. Fixing nut; 5. Flood control door; 51. Track gap; 6. Lifting rope; 7. Ground; 8. Shackle. DETAILED DESCRIPTION

[0029] In order to better understand the purpose, structure and function of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0030] In the description of the present invention, it should be noted that the positional relationships indicated by terms such as “longitudinal”, “lateral”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside” and “outside” etc. cited in this specification are based on the positional relationships shown in the accompanying drawings, and are only for the convenience of describing the embodiments of the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0031] Example 1

[0032] like Figure 4As shown, this embodiment provides a dock flood control door water-stopping device, which is suitable for a flood control door 5 with a track gap 51 for the crane track 3 to pass through, and includes a long water-stopping plate 11 and a short water-stopping plate 12. The long water-stop plate 11 is provided with a first hoisting hole 111 and a fixing hole 112, and the flood control door 5 is provided with a mounting groove (not shown in the figure), and the opening position and specification of the mounting groove match the first hoisting hole 111, and the short water-stop plate 12 is provided with a second hoisting hole 121, and the opening position and specification of the second hoisting hole 121 match the fixing hole 112, and the short water-stop plate 12 and the long water-stop plate 11 are detachably connected through the second hoisting hole 121 and the fixing hole 112, so that the short water-stop plate 12 and the long water-stop plate 11 are fastened and fixed front and back by fasteners 4 to form a blocking structure 1, and the outer edge of the blocking structure 1 is larger than the outer edge of the track notch 51, and the lower end of the blocking structure 1 is provided with a sealing groove 13, and the sealing groove 13 is located on the inner side surface of the lower end of the long water-stop plate 11 and the inner side surface of the lower end of the short water-stop plate 12 The sealing groove 13 has a shape matching the cross-sectional shape of the crane rail 3, so that the inner side surface of the lower end of the long water-stop plate 11 and the inner side surface of the lower end of the short water-stop plate 12 in the fitted and fixed state can be tightly against the crane rail 3 respectively to ensure the sealing; the sealing groove 13 includes a first notch 131 and a second notch 132, the first notch 131 is located on the inner side surface of the lower end of the long water-stop plate 11, and the second notch 132 is located on the inner side surface of the lower end of the short water-stop plate 12, so that the long water-stop plate 11 and the short water-stop plate 12 can be clamped on the crane rail 3 through the first notch 131 and the second notch 132 respectively, thereby ensuring the stability of the long water-stop plate 11 and the short water-stop plate 12 during installation, and the first notch 131 and the second notch 132 can be used to realize the rapid positioning and installation of the device and can be used to check the fitting flatness between the device and the crane rail 3, thereby improving the flood prevention sealing.

[0033] Preferably, the fixing hole 112 and the second lifting hole 121 are located within the range of the track notch 51 of the flood control door 5, so that the fixing hole 112 and the second lifting hole 121 can be connected through, while increasing the connection tightness. After the flood control door 5 is installed, the sealing structure 1 of the water-stopping device can still be easily disassembled and adjusted, reducing labor costs and improving construction efficiency.

[0034] Example 2

[0035] This embodiment provides a method for using a dock flood control door water stop device using the embodiment 1, comprising the following steps:

[0036] S0, such as Figure 1 As shown, before installing the water-stop device, confirm that there is no debris on the crane track 3 within the range of the prepared installation position of the flood control door 5. If there is any debris, clean it up in advance.

[0037] S1. Hoist the short water-stop board 12 and the long water-stop board 11 to the prepared installation position of the flood control door 5 on the crane track 3, and then vertically clamp the short water-stop board 12 and the long water-stop board 11 on the crane track 3. According to the flood and typhoon warning, when the flood season is coming and the dock flood control door 5 needs to be closed, prepare the crane in place in advance and take out the water-stop device from the storage position of the water-stop device.

[0038] S1-1, hoist the short water-stop plate 12 to the prepared installation position range of the flood control door 5 on the crane track 3, adjust the angle direction and position of the short water-stop plate 12, so that the short water-stop plate 12 is vertically embedded in the crane track 3 through the second notch 132.

[0039] like Figure 2 As shown, in the present embodiment, first, a shackle 8 with a hanging rope 6 is installed on the second lifting hole 121, and the water-stop short plate 12 is lifted steadily by a crane and moved along the length direction of the crane rail 3 to the range of the prepared installation position of the flood control door 5; then, by adjusting the angle of the water-stop short plate 12, the water-stop short plate 12 is rotated to be perpendicular to the length direction of the crane rail 3; at the same time, the position of the water-stop short plate 12 is adjusted, and the water-stop short plate 12 is moved to a position about 500 mm away from the prepared installation position of the flood control door 5, and the inner side surface of the lower end of the water-stop short plate 12 is tightly fitted to the outer side surface of the crane rail 3; after the water-stop short plate 12 is adjusted into place, the crane unhooks and unfastens the shackle 8 on the second lifting hole 121, at this time, the water-stop short plate 12 is vertically embedded in the crane rail 3 through the second slot 132.

[0040] S1-2, hoist and adjust the angle direction and position of the long water-stop plate 11 until the front end surface of the long water-stop plate 11 fits with the rear end surface of the short water-stop plate 12, and the long water-stop plate 11 is vertically embedded in the crane rail 3 through the first notch 131.

[0041] like Figure 3 As shown, in the present embodiment, first, a shackle 8 with a lifting rope 6 suspended thereon is installed on the first lifting hole 111, and the long water-stop plate 11 is lifted stably by a crane and moved along the length direction of the crane rail 3 to the rear end face close to the short water-stop plate 12; then, the long water-stop plate 11 is rotated to be perpendicular to the length direction of the crane rail 3 by adjusting the angle orientation of the long water-stop plate 11; at the same time, the position of the long water-stop plate 11 is adjusted so that the front end face of the long water-stop plate 11 is fitted with the rear end face of the short water-stop plate 12, and the inner side face of the lower end of the long water-stop plate 11 is tightly fitted with the outer side face of the crane rail 3. At this time, the long water-stop plate 11 is vertically embedded in the crane rail 3 through the first slot 131.

[0042] S2. Lock and fix the long water-stop plate 11 and the short water-stop plate 12 to form a blocking structure 1, and adjust the position of the blocking structure 1 until the rear end face of the blocking structure 1 is close to the plane where the front end face of the prepared installation position of the flood control door 5 is located.

[0043] like Figure 4 As shown, after the long water-stop plate 11 is adjusted into place, the fixing hole 112 of the long water-stop plate 11 and the second lifting hole 121 of the short water-stop plate 12 are locked and fixed by the fastener 4, so that the long water-stop plate 11 and the short water-stop plate 12 are assembled to form a blocking structure 1, and the blocking structure 1 is pulled horizontally by a crane using the shackle 8 installed on the first lifting hole 111 until the rear end face of the blocking structure 1 is close to the plane where the front end face of the prepared installation position of the flood control door 5 is located. After the blocking structure 1 is adjusted into place, the crane unhooks and unfastens the shackle 8 on the second lifting hole 121. In this embodiment, the fastener 4 adopts a fixing bolt 41 and a fixing nut 42.

[0044] S3, hoisting the flood control door 5 to the preparatory installation position of the flood control door 5, and installing the blocking structure 1 on the flood control door 5 to complete the installation of the water stopping device.

[0045] like Figure 4 As shown, the flood control door 5 is hoisted by a crane to the pre-installation position of the flood control door 5 on the crane track 3. At this time, the front end face of the flood control door 5 is successfully fitted with the rear end face of the blocking structure 1, and the rear end face of the flood control door 5 is fitted with the front end face of the ground 7. The fastener 4 and the second hoisting hole 121 on the water stop long plate 11 are used to fix the water stop long plate 11 in the installation groove on the flood control door 5, thereby fastening the blocking structure 1 to the flood control door 5 and completing the installation of the water stop device. In this embodiment, the second hoisting hole 121 and the installation groove are locked and fixed by fastening bolts, and a gasket is provided between the second installation hole and the fastening bolt to further increase the stability of the installation.

[0046] In this embodiment, the design of the blocking structure 1 cleverly utilizes the fit of the long water-stopping plate 11 and the short water-stopping plate 12 to form a tight sealing system. However, due to the front-to-back positional relationship between the long water-stopping plate 11 and the short water-stopping plate 12, Figure 4 As shown, there is a side seam between the short water-stop plate 12 and the track notch 51 of the flood control door 5, and the width of the side seam is the same as the thickness of the long water-stop plate 11. Although in theory the side seam provides a potential infiltration path for water flow, in actual work, by reducing the thickness of the long water-stop plate 11 and increasing the length of the short water-stop plate 12 on one side of the side seam, combined with the special position and design of the side seam between the sides, the overall sealing structure 1 can still have a high impermeability under the impact of water flow during flood season, and has good water-stopping performance.

[0047] In another embodiment, in order to further achieve complete sealing, when there is a side seam between the water-stopping device and the track gap 51 of the flood control gate 5, the side seam is sealed with sealants such as sandbags to complete the sealing of the track gap 51 of the flood control gate 5. Through the sealing of the sealants, a tighter waterproof barrier can be formed, which can not only fill any tiny gaps, but also provide additional physical pressure to enhance the sealing effect between the water-stopping device and the flood control gate 5. At the same time, the dual protection mechanism of the natural water-stopping characteristics of the side seam and the physical sealing of the sandbag is combined to ensure that the flood control gate 5 can effectively prevent the infiltration and backflow of water when facing the challenge of water flow during the flood season. In other embodiments, a folding plate is further provided on the short water-stop plate 12, and the folding plate is located at the outer edge of the short water-stop plate 12, and the rear end face of the folding plate is flush with the rear end face of the long water-stop plate 11, that is, the folding plate extends backward to fit the front end face of the flood control door 5. Preferably, the folding plate is perpendicular to the front end face of the flood control door 5, so that the blocking structure 1 can be completely sealed when installed on the flood control door 5, and no side seams exist, and the stability of the structure is ensured, thereby completing the blocking of the track gap 51 of the flood control door 5. By improving the structure of the short water-stop plate 12, the operating steps of sealing the side seams with sealants such as sandbags are omitted, thereby further improving the convenience of installation and use, and being able to respond to flood season warnings more quickly. In addition, due to the integrity of the blocking structure 1, the stability and flood control safety are improved.

[0048] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. It is known to those skilled in the art that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited by the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application belong to the scope protected by the present invention.

Claims

1. A dock flood control door water stop device, used for a flood control door (5) with a track gap (51), characterized in that: The invention comprises a long water-stopping plate (11) and a short water-stopping plate (12), wherein the long water-stopping plate (11) is provided with a first hoisting hole (111) and a fixing hole (112), the short water-stopping plate (12) is provided with a second hoisting hole (121) matching the fixing hole (112), the flood control door (5) is provided with a mounting groove matching the first hoisting hole (111), the second hoisting hole (121) is fastened and fixed to the fixing hole (112) by a fastener (4), so that the short water-stopping plate (12) and the long water-stopping plate (11) form a blocking structure (1), the outer edge of the blocking structure (1) is larger than the outer edge of the track notch (51), and the lower end of the blocking structure (1) is opened. A sealing groove (13) is provided, and the sealing groove (13) is located between the inner side surface of the lower end of the long water-stop plate (11) and the inner side surface of the lower end of the short water-stop plate (12). The sealing groove (13) has a shape that matches the cross-sectional shape of the crane track (3). The sealing groove (13) includes a first notch (131) and a second notch (132), wherein the first notch (131) is located on the inner side surface of the lower end of the long water-stop plate (11), and the second notch (132) is located on the inner side surface of the lower end of the short water-stop plate (12), so that the long water-stop plate (11) and the short water-stop plate (12) can be clamped on the crane track (3) through the first notch (131) and the second notch (132), respectively.

2. A dock flood control door water stop device according to claim 1, characterized in that: The positions of the fixing hole (112) and the second hoisting hole (121) fall within the range of the track notch (51) of the flood control door (5).

3. A dock flood control door water stop device according to claim 1, characterized in that: The short water-stopping plate (12) further comprises a folding plate, which is located at the outer edge of the short water-stopping plate (12), and the rear end surface of the folding plate is flush with the rear end surface of the long water-stopping plate (11).

4. A method for using a dock flood control door water stop device, using the water stop device according to any one of claims 1 to 3, characterized in that: The following steps are involved: S1, hoisting the short water-stop plate (12) and the long water-stop plate (11) respectively to the prepared installation position of the flood control door (5) on the crane track (3), and vertically clamping the short water-stop plate (12) and the long water-stop plate (11) on the crane track (3) in sequence; S2, locking and fixing the long water-stopping plate (11) and the short water-stopping plate (12) to form a blocking structure (1), and adjusting the position of the blocking structure (1) until the rear end face of the blocking structure (1) is close to the plane where the front end face of the prepared installation position of the flood control door (5) is located; S3, hoisting the flood control door (5) to the preparatory installation position of the flood control door (5), and assembling and installing the blocking structure (1) on the flood control door (5), thereby completing the installation of the water stop device.

5. The method for using the dock flood control door water stop device according to claim 4, characterized in that: The specific steps of step S1 include: S1-1, hoisting the short water-stop plate (12) to the prepared installation position of the flood control door (5) on the crane track (3), adjusting the angle direction and position of the short water-stop plate (12) so that the short water-stop plate (12) is vertically embedded in the crane track (3) through the second notch (132); S1-2, hoist and adjust the angle direction and position of the long water-stop plate (11) until the front end surface of the long water-stop plate (11) fits with the rear end surface of the short water-stop plate (12), and the long water-stop plate (11) is vertically embedded in the crane track (3) through the first notch (131).

6. The method for using the dock flood control door water stop device according to claim 4, characterized in that: The specific steps of step S1-1 include: installing a shackle (8) with a hanging rope (6) on the second lifting hole (121), steadily lifting the water-stopping short plate (12) and moving it along the length direction of the crane track (3) to the prepared installation position range of the flood control door (5); then, by adjusting the angle of the water-stopping short plate (12), rotating the water-stopping short plate (12) to be perpendicular to the length direction of the crane track (3); at the same time, adjusting the position of the water-stopping short plate (12), making the inner side surface of the lower end of the water-stopping short plate (12) tightly fit the outer side surface of the crane track (3), so that the water-stopping short plate (12) is vertically embedded on the crane track (3) through the second notch (132); after the water-stopping short plate (12) is adjusted into place, unhooking and releasing the shackle (8) on the second lifting hole (121).

7. The method for using the dock flood control door water stop device according to claim 4, characterized in that: The specific steps of step S1-2 include: first, installing a shackle (8) with a lifting rope (6) suspended thereon on the first lifting hole (111), steadily lifting the long water-stop plate (11) and moving it along the length direction of the crane track (3) to the rear end face close to the short water-stop plate (12); then, by adjusting the angle of the long water-stop plate (11), rotating the long water-stop plate (11) to be perpendicular to the length direction of the crane track (3); at the same time, adjusting the position of the long water-stop plate (11) until the front end face of the long water-stop plate (11) fits with the rear end face of the short water-stop plate (12), and the inner side face of the lower end of the long water-stop plate (11) fits tightly with the outer side face of the crane track (3), and the long water-stop plate (11) is vertically clamped on the crane track (3) through the first slot (131).

8. The method for using the dock flood control door water stop device according to claim 4, characterized in that: The specific steps of step S2 include: after the long water-stop plate (11) is adjusted into place, the fixing hole (112) of the long water-stop plate (11) is locked and fixed with the second lifting hole (121) of the short water-stop plate (12) by means of the fastener (4), so that the long water-stop plate (11) and the short water-stop plate (12) are assembled to form a blocking structure (1); the blocking structure (1) is pulled in translation by means of a shackle (8) installed on the first lifting hole (111) until the rear end face of the blocking structure (1) is close to the plane where the front end face of the prepared installation position of the flood control door (5) is located; after the blocking structure (1) is adjusted into place, the hook is released and the shackle (8) on the second lifting hole (121) is unhooked.

9. The method for using the dock flood control door water stop device according to claim 4, characterized in that: The specific steps of step S3 include: hoisting the flood control door (5) to the flood control door (5) pre-installation position on the crane track (3), the front end face of the flood control door (5) is affixed to the rear end face of the blocking structure (1), the rear end face of the flood control door (5) is affixed to the front end face of the ground (7), and the long water-stopping plate (11) is fixed to the installation groove on the flood control door (5) through the second hoisting hole (121), so that the blocking structure (1) is fastened to the flood control door (5), and the installation of the water-stopping device is completed.

10. The method for using the dock flood control door water stop device according to claim 4, characterized in that: The method further comprises step S0: before installing the water-stop device, confirming that there is no debris on the crane track (3) within the range of the prepared installation position of the flood control door (5), and if there is any debris, clearing it in advance.

Citation Information

Patent Citations

  • Flood prevention wall quick-repairing flood prevention door capable of quickly blocking notch

    CN113668995A

  • Flood prevention door sealing device passing through crane rail

    CN115419015A

  • Flood prevention device

    CN210396585U

  • Dam orifice temporary flood prevention water retaining structure

    CN212742399U

  • Combined plugging type flood prevention cement pipeline

    CN220789631U