Project supervision log automatic generation method and management system

By introducing data acquisition module, processing center, cloud server and database systems in the project supervision log generation, the problems of missing content and time consumption in the traditional supervision log generation method are solved, and the automatic generation of supervision logs and real-time construction site are realized. Monitoring improves the efficiency and standardization of project supervision.

CN119443906AInactive Publication Date: 2025-02-14安徽省科兴交通建设工程监理有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411426151.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-14
Publication Date
2025-02-14
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The traditional supervision log generation method has lost or incomplete log records due to inadequate communication, and supervision personnel need to frequently go to the construction site, which consumes a lot of time and energy.

Method used

An automatic generation method and management system for engineering supervision logs was designed. The construction site was photographed and collected through the data acquisition module, and the data was transferred to the processing center for classification and processing, and transmitted to the database through the cloud server for comparison and analysis with the previous data. Generate supervision log.

Benefits of technology

The standardized generation of supervision logs has been achieved, the work intensity of supervision personnel on site has been reduced, the work efficiency of engineering supervision has been improved, and the standardization of engineering construction and management has been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119443906A_ABST
    Figure CN119443906A_ABST
Patent Text Reader

Abstract

The invention provides an automatic generation method and management system of a project supervision log, and relates to the technical field of project supervision, and the system comprises a data acquisition module, a processing center, a cloud server and a database. The data acquisition module is used for acquiring construction site data and then transmitting the construction site data to the processing center for classification processing; and the processing center transmits the collected data to the database through the cloud server, and collects and processes the data returned by the database. The data acquisition module is arranged to photograph and acquire a construction site, and then the construction site is classified by the processing center and is transmitted to the database through the cloud server to be analyzed and compared with data in the past, so that the change of the construction site, such as the construction progress and the safety condition, is detected; a supervisor can also shoot and check on-site construction through the data acquisition module, so that the working intensity is reduced, and the working efficiency of project supervision is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering supervision, and in particular to an automatic generation method and management system of an engineering supervision log. Background Art

[0002] At present, the supervision log is the original record of the supervision activities implemented by the supervision engineer. It is an important material for executing the supervision entrustment contract, preparing the supervision completion documents and handling claims, extensions and changes. It is also the important, most original and most reliable material for analyzing project quality problems. It is also the most basic component of the project supervision file.

[0003] The traditional method of generating supervision logs requires the recorder to ask colleagues on the project one by one whether there is any work content that needs to be included in the supervision log. Due to untimely communication, the log records are often missing or incomplete. At the same time, in the process of supervising the construction progress, the supervisor is often required to go to the construction site to follow up the construction progress and organize the logs, which is time-consuming and energy-consuming.

[0004] To solve the above problems, we propose an automatic generation method and management system for engineering supervision logs to solve the above problems. Summary of the invention

[0005] In order to solve the problems in the background technology, the present invention provides an automatic generation method and management system of an engineering supervision log.

[0006] To achieve the above object, the technical solution adopted by the present invention is: An automatic generation method and management system for an engineering supervision log, the management system comprising a data acquisition module, a processing center, a cloud server and a database; The data acquisition module is used to collect construction site data and then transmit it to the processing center for classification and processing; The processing center transmits the collected data to the database through the cloud server, collects and processes the data returned by the database, and forms a log through the log generation module; The cloud server is used to store the data that has been classified and processed, and the database is used to compare and analyze the collected data; The processing center is also provided with a task module, which is used to issue supervision tasks, including construction progress and safety inspection; The task module includes on-site inspection and data upload modules.

[0007] Preferably, the on-site inspection module is used to conduct on-site inspections and take photos for the issued tasks, and upload the photos taken on-site through the data upload module, and fill in and upload the results to complete the task; wherein, if the inspection result is non-compliant, the relevant problem information is entered, and the attachments support the addition of watermarked pictures or videos, which are returned to the processing center, and the supervision log is automatically generated by category.

[0008] Preferably, the on-site inspection module is used by the enterprise to define and edit the inspection and photo sampling items of the supervision project site according to actual management needs, so as to form a standard template for enterprise inspection items.

[0009] Preferably, the processing center sets up several construction processes according to actual conditions, and each construction process is provided with corresponding construction data.

[0010] Preferably, the data acquisition module includes multiple groups of high-definition cameras, which are respectively installed at various locations on the construction site, and the multiple groups of high-definition cameras are classified and numbered.

[0011] Preferably, a method for automatically generating a project supervision log comprises the following steps: Step 1: Use the data acquisition module to capture and collect data on the construction site, and then transmit it to the processing center for classification and processing; Step 2: The processing center transfers the classified data to the cloud server for storage; Step 3: Compare and analyze the collected construction site data with previous data through the database, including construction progress and safety hazards, and transmit the analysis results to the processing center; Step 4: Based on the analysis results, the processing center issues tasks; Step 5: The staff receives the task issued by the task module to inspect the construction site and take photos of the site to collect construction data; Step 6: Upload the pictures taken on site through the data upload module and complete the task. If the task cannot be completed, enter the relevant question information for reply; Step 7: The processing center automatically generates logs by category based on the received results and sends them to the user end.

[0012] Compared with the prior art, the present invention has the following beneficial effects: The present invention standardizes the supervision log by setting up an engineering supervision management system, and at the same time, takes photos and collects photos of the construction site by setting up a data acquisition module, which is then classified by a processing center and transmitted to a database through a cloud server for analysis and comparison with past data, so as to detect changes in the construction site, such as construction progress and safety conditions. Supervisors can also use the data acquisition module to take photos and view on-site construction without having to manually go to the site to check one by one, thereby reducing work intensity and effectively improving the work efficiency of engineering supervision. In addition, by setting up a task module to issue task indicators, it is convenient for supervisors to follow up on the construction progress in real time and improve the standardization of engineering construction and management. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a flow chart of the engineering supervision management system of the present invention. DETAILED DESCRIPTION

[0014] The technical solution in the embodiment of the present application is to solve the problems of the above-mentioned background technology, and the overall idea is as follows: Example 1: Reference Figure 1 As shown, an automatic generation method and management system of an engineering supervision log of this embodiment includes a data acquisition module, a processing center, a cloud server and a database; Among them, the data acquisition module is used to collect construction site data and then transmit it to the processing center for classification and processing.

[0015] The processing center transmits the collected data to the database through the cloud server, collects and processes the data returned by the database, and forms logs through the log generation module; Among them, the cloud server is used to store the data that has completed classification processing, and the database is used to compare and analyze the collected data.

[0016] The processing center is also equipped with a task module, which is used to issue supervision tasks, including construction progress and safety inspections.

[0017] The task module includes on-site inspection and data upload modules.

[0018] Among them, the on-site inspection module is used to conduct on-site inspections and take photos for assigned tasks. For example, construction progress and safety issues require supervisors to go to the site to confirm and resolve them. When the task is completed, the photos taken on-site are uploaded and processed through the data upload module, and the results are filled in and uploaded to complete the task. In addition, the on-site inspection module is used by enterprises to define and edit the inspections and photo sampling items of the supervision project site according to actual management needs, forming a standard template for enterprise inspection items.

[0019] During the inspection process, if the inspection result is non-compliant, the relevant problem information will be entered, and attachments can be added with watermarked pictures or videos. The information will be returned to the processing center and the supervision log will be automatically generated by category.

[0020] In some examples, the processing center sets up several construction processes according to actual conditions, and each construction process is provided with corresponding construction data.

[0021] In some examples, the data acquisition module includes multiple groups of high-definition cameras, which are installed at various locations on the construction site, and the multiple groups of high-definition cameras are classified and numbered.

[0022] Example 2: Reference Figure 1 As shown, based on Example 1, a method for automatically generating a project supervision log includes the following steps: Step 1: Use the data acquisition module to capture and collect data on the construction site, and then transmit it to the processing center for classification and processing; Step 2: The processing center transfers the classified data to the cloud server for storage; Step 3: Compare and analyze the collected construction site data with previous data through the database, including construction progress and safety hazards, and transmit the analysis results to the processing center; Step 4: Based on the analysis results, the processing center issues tasks; Step 5: The staff receives the task issued by the task module to inspect the construction site and take photos of the site to collect construction data; Step 6: Upload the pictures taken on site through the data upload module and complete the task. If the task cannot be completed, enter the relevant question information for reply; Step 7: The processing center automatically generates logs by category based on the received results and sends them to the user end.

[0023] The working principle of the present invention is: The present invention is provided with a data acquisition module to take photos of the construction site, and then the data is classified by the processing center and transmitted to the database through the cloud server for analysis and comparison with the previous data, so as to detect the changes of the construction site, such as the construction progress and the safety environment. By setting the task module to issue task indicators, it is convenient for the supervisor to follow up the construction progress in real time, improve the standardization of engineering construction and management, and at the same time, the supervisor can also take photos and check the on-site construction through the data acquisition module, without having to go to the site manually to check one by one, reducing the work intensity, thereby effectively improving the work efficiency of engineering supervision; In addition, by setting up task modules and issuing task indicators, it is convenient for supervisors to follow up on the construction progress in real time and improve the standardization of project construction and management.

[0024] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A management system for engineering supervision logs, characterized in that: Includes data acquisition module, processing center, cloud server and database; The data acquisition module is used to collect construction site data and then transmit it to the processing center for classification and processing; The processing center transmits the collected data to the database through the cloud server, collects and processes the data returned by the database, and forms a log through the log generation module; The cloud server is used to store the data that has been classified and processed, and the database is used to compare and analyze the collected data; The processing center is also provided with a task module, which is used to issue supervision tasks, including construction progress and safety inspection; The task module includes on-site inspection and data uploading modules.

2. According to claim 1, a method and management system for automatically generating a project supervision log, characterized in that: The on-site inspection module is used to take photos of on-site inspections for the assigned tasks, upload the photos taken on-site through the data upload module, and complete the tasks by filling in and uploading the results; If the inspection result is non-compliant, the relevant problem information will be entered, and the attachments support adding pictures or videos with watermarks. The information will be returned to the processing center and the supervision log will be automatically generated by category.

3. According to claim 2, a method and management system for automatically generating a project supervision log, characterized in that: The on-site inspection module is used by enterprises to define and edit on-site inspections and photo sampling inspections of supervision projects according to actual management needs, thereby forming a standard template for enterprise inspection items.

4. The automatic generation method and management system of a project supervision log according to claim 3 is characterized in that: The processing center sets up several construction processes according to actual conditions, and each construction process is provided with corresponding construction data.

5. The method and management system for automatically generating a project supervision log according to claim 4, characterized in that: The data acquisition module includes multiple groups of high-definition cameras, which are respectively installed at various locations on the construction site, and the multiple groups of high-definition cameras are classified and numbered.

6. A method for automatically generating a project supervision log, the method applying the project supervision log management system according to any one of claims 1 to 5, characterized in that: The following steps are involved: Step 1: Use the data acquisition module to capture and collect data on the construction site, and then transmit it to the processing center for classification and processing; Step 2: The processing center transfers the classified data to the cloud server for storage; Step 3: Compare and analyze the collected construction site data with previous data through the database, including construction progress and safety hazards, and transmit the analysis results to the processing center; Step 4: Based on the analysis results, the processing center issues tasks; Step 5: The staff receives the task issued by the task module to inspect the construction site and take photos of the site to collect construction data; Step 6: Upload the pictures taken on site through the data upload module and complete the task. If the task cannot be completed, enter the relevant question information for reply; Step 7: The processing center automatically generates logs by category based on the received results and sends them to the user end.