Reusable integrated partition wall system

By designing a reusable integrated partition wall system, using the combined structure of core board, wall panel finish and border, the problem of long planning time during installation of existing partition wall systems is solved, and a fast, stable and beautiful partition wall is achieved. Install.

CN119466187APending Publication Date: 2025-02-18SHANGHAI PINZHAI DECORATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411881830.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-19
Publication Date
2025-02-18

AI Technical Summary

Technical Problem

The existing integrated partition wall system takes a lot of time to plan during installation, and lacks a general and stable installation form.

Method used

Provides a reusable integrated partition wall system, including a core panel that can be vertically fixed to the ceiling and the floor, with wall panels attached to the core panels, frames for mounting or docking door leafs, and through horizontal frames and grooves Combined structure achieves rapid fixation.

Benefits of technology

The system can quickly form a stable partition wall, with beautiful appearance and convenient installation, avoiding a long-term planning process and improving the installation efficiency of partition walls.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119466187A_ABST
    Figure CN119466187A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of buildings, in particular to a reusable integrated partition wall system which comprises a core plate capable of being vertically fixed between a ceiling and the ground, and a wall plate veneer is fixedly attached to the core plate. At least one side edge of the core plate in the horizontal direction is provided with a frame, and a door leaf can be installed or stopped on the frame. The partition wall can be better formed, the stability of the whole partition wall is better, the appearance is more attractive, after materials are transported to a site, only size measurement and cutting and assembling of the materials need to be conducted, long-time planning is better avoided, and the partition wall is more convenient to install.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction, in particular to a reusable integrated partition wall system. Background Art

[0002] With the continuous development of modern office concepts, the design of office space pays more and more attention to flexibility and diversity. The division of different functional areas such as open office space, independent offices, conference rooms, etc. requires efficient and flexible partition technology to meet the ever-changing office layout needs of enterprises.

[0003] Previously, partition walls were generally formed by complex on-site construction using light steel keels. The entire process was very cumbersome. In order to further improve the convenience of building partition walls, an integrated partition wall technology has emerged. Integrated partition walls are generally prefabricated in factories, and only cutting and assembly are required on site, which can greatly shorten the construction period. In terms of sound insulation, the use of special sound insulation materials and structural designs, such as double-glazing, sound insulation felt, etc., can effectively reduce noise interference between offices and ensure a quiet working environment. The materials of integrated partition walls are environmentally friendly materials, and they cause less pollution to the environment during production and use.

[0004] However, currently integrated partition walls are all customized and installed according to on-site installation requirements, and there is no more universal and more stable installation method, which requires more time to plan when installing integrated partition walls. Summary of the invention

[0005] In view of the above problems existing in the prior art, the present invention provides a reusable integrated partition wall system.

[0006] In order to solve the above technical problems, the present invention is solved by the following technical solutions:

[0007] A reusable integrated partition wall system comprises a core board which can be fixed vertically between the ceiling and the ground, and a wall panel facing is attached and fixed to the core board; a frame is provided on at least one side of the core board in the horizontal direction, and a door leaf can be installed or docked on the frame.

[0008] Preferably, a transverse frame is provided on the ceiling and / or the floor, a groove is provided on the transverse frame, and the core board extends into and is fixed in the groove.

[0009] Preferably, a leveler is provided on a side of the core panel facing the wall panel facing, and the leveler is used to pull the wall panel facing.

[0010] Preferably, when the core plate is extended into and fixed in the groove, the core plate and the groove form a wiring space for accommodating cables.

[0011] Preferably, a buckle strip is fixedly connected to the transverse frame, and a clamping groove is formed between the buckle strip and the transverse frame;

[0012] When the buckle strip is clipped onto the transverse frame, the buckle strip can press the side edge of the wall panel facing along the vertical direction into the clipping groove.

[0013] Preferably, a wire placing frame is provided in the wire placing space, and the cable is arranged in the wire placing frame.

[0014] Preferably, the door leaf is a glass door, a wooden door or an aluminum alloy door.

[0015] Preferably, a vertical frame is sandwiched between the frame and the wall panel facing, and the vertical frame is used to cover the side edges of the wall panel facing in the horizontal direction.

[0016] Preferably, the core board is a magnesium oxysulfide color steel composite board.

[0017] Preferably, the core panel and / or the wall panel facing are formed by splicing.

[0018] The present invention has at least the following beneficial effects:

[0019] The present application can better form a partition wall and the overall partition wall has better stability and a more beautiful appearance. After the materials are transported to the site, only the size measurement, cutting and assembly of the materials are required, which can better avoid long-term planning and make the installation of the partition wall more convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A vertical cross-sectional view of a partition wall in some embodiments of the present application is shown;

[0021] Figure 2 Shows Figure 1 A partial enlarged view of the middle A;

[0022] Figure 3 Shows Figure 1 A partial enlarged view of point B in the middle;

[0023] Figure 4 A partial cross-sectional view of a partition wall in a horizontal direction in some embodiments of the present application is shown, wherein the door leaf is a double-layer glass door;

[0024] Figure 5 A partial cross-sectional view of a partition wall in a horizontal direction in some embodiments of the present application is shown, wherein the door leaf is a single-layer glass door;

[0025] Figure 6A partial cross-sectional view in the horizontal direction of a partition wall in some embodiments of the present application is shown, wherein the door leaf is a wooden door.

[0026] The parts indicated by the numbers in the accompanying drawings are as follows:

[0027] 10. Ceiling; 20. Floor; 30. First wiring space; 40. Second wiring space; 41. Second wiring frame; 100. Core board; 110. Leveler; 200. Wall panel facing; 300. Frame; 310. Door leaf; 400. First horizontal frame; 410. First groove; 420. First buckle strip; 430. First snap-in groove; 500. Second horizontal frame; 510. Second groove; 520. Second buckle strip; 530. Second snap-in groove; 600. Vertical frame. DETAILED DESCRIPTION

[0028] In order to further understand the content of the present invention, the present invention is described in detail in conjunction with the accompanying drawings and embodiments. It should be understood that the embodiments are only for explaining the present invention and are not intended to limit it.

[0029] like Figure 1-6 As shown, the present embodiment provides a reusable integrated partition system, which includes a core panel 100, a wall panel finish 200 and a frame 300; wherein, the core panel 100 is connected to the ceiling 10 at the top in the vertical direction, and the core panel 100 is connected to the ground 20 at the bottom in the vertical direction, so that the core panel 100 can form a stable wall and can separate the space; the wall panel finish 200 is attached and fixed to the core panel 100, so that the surface of the core panel 100 exposed to the outside can achieve an aesthetic effect through the decoration of the wall panel finish 200; the core panel 100 is provided with a frame 300 on one or both sides in the horizontal direction, and the frame 300 can be used for the installation or docking of the door leaf 310.

[0030] It should be noted that in the actual installation process, the core panel 100 and the wall panel facing 200 are measured, cut and assembled according to the size requirements on site to form a whole. Through the mutual assembly of the core panel 100, the wall panel facing 200 and the frame 300, a partition wall can be better formed to meet the division of different functional areas.

[0031] Through the above-mentioned installation structure, the partition wall can be formed better and the overall partition wall has better stability and more beautiful appearance. After the materials are transported to the site, only the size measurement, cutting and assembly of the materials are required, which can better avoid long-term planning and make the installation of the partition wall more convenient.

[0032] It is understandable that the frame 300 provided on the side of the core board 100 in the horizontal direction can be used to install the door leaf 310 or dock the door leaf 310. For example, the door leaf 310 can be hingedly mounted on the frame 300, or the door leaf 310 can be hingedly mounted on other components. When the door leaf 310 is hingedly mounted on other components, when the door leaf 310 rotates to be parallel to the core board 100, the frame 300 can resist the door leaf 310, so that the frame 300 can meet the docking of the door leaf 310 to achieve the closing of the door leaf 310.

[0033] In some embodiments, a transverse frame is fixedly installed on the ceiling 10 by bolts, which is referred to as the first transverse frame 400 herein. A first groove 410 is provided on the side of the first transverse frame 400 facing the ground 20, and the first groove 410 is used for the core board 100 to extend into. A transverse frame is fixedly installed on the ground 20 by bolts, which is referred to as the second transverse frame 500 herein. A second groove 510 is provided on the side of the second transverse frame 500 facing the ceiling 10, and the second groove 510 is also used for the core board 100 to extend into.

[0034] During installation, the top of the core panel 100 is extended in the vertical direction into the first groove 410 of the first horizontal frame 400, and then the first horizontal frame 400 and the core panel 100 are extended into the top of the first groove 410 by bolts for fixation, thereby achieving a fixed connection between the top of the core panel 100 and the ceiling 10; then the bottom of the core panel 100 is extended in the vertical direction into the second groove 510 of the second horizontal frame 500, and the second horizontal frame 500 and the core panel 100 are extended into the bottom of the second groove 510 by bolts for fixation, thereby achieving a fixed connection between the bottom of the core panel 100 and the ground 20.

[0035] It should be noted that, by setting the first transverse frame 400 and the second transverse frame 500, the core board 100 and the ceiling 10 and the core board 100 and the ground 20 can be fixedly installed, so that the core board 100 can vertically divide the space. Of course, since the first transverse frame 400 and the ceiling 10 are bolted, the second transverse frame 500 and the ground 20 are bolted, and the core board 100 and the first transverse frame 400 and the second transverse frame 500 are bolted, the assembly and disassembly are relatively convenient, and the partition wall can be reused better.

[0036] In some embodiments, a leveler 110 is provided on the side of the core board 100 facing the wallboard facing 200, and the leveler 110 is fixedly installed on the core board 100 by bolts. Since the wallboard facing 200 is formed by cutting and assembling, it has a plurality of block structures. After the leveler 110 is fixedly installed on the core board 100, the wallboard facing 200 is attached to the core board 100, so that the leveler 110 can cooperate with the wallboard facing 200, and the leveler 110 can pull the wallboard facing 200, so that the structure of the wallboard facing 200 is more stable and does not shake, so that the wallboard facing 200 can achieve a decorative effect.

[0037] It is understandable that there is a compatible snap-in structure between the leveler 110 and the wall panel finish 200, so that the leveler 110 can be snap-connected with the wall panel finish 200, and the leveler 110 can pull the wall panel finish 200 to improve the stability of the wall panel finish 200.

[0038] In some embodiments, when the top of the core plate 100 along the vertical direction extends into the first groove 410 and is fixed by bolts, the top of the core plate 100 does not completely fill the first groove 410, and a first wiring space 30 can be formed between the top side wall of the core plate 100 and the inner side wall of the first groove 410, so that some cables can be routed through the first wiring space 30, thereby better avoiding exposure of the cables to the outside world, making the overall space tidier. At the same time, arranging the cables in the first wiring space 30 can also better improve the stability and safety of cable use.

[0039] Furthermore, when the bottom of the core plate 100 along the vertical direction extends into the second groove 510 and is fixed by bolts, the bottom of the core plate 100 does not completely fill the second groove 510, and a second wiring space 40 can be formed between the bottom side wall of the core plate 100 and the inner side wall of the second groove 510, so that some cables can be routed through the second wiring space 40, thereby better avoiding exposure of the cables to the outside, making the overall space tidier, and at the same time, arranging the cables in the second wiring space 40 can also better improve the stability and safety of cable use.

[0040] In some embodiments, a first buckle strip 420 is snap-fastened to the first transverse frame 400 . When the first buckle strip 420 is snap-fastened to the first transverse frame 400 , a first snap-fit ​​groove 430 can be formed between the first buckle strip 420 and the side of the first transverse frame 400 facing the ground 20 .

[0041] During the actual installation process, after the core panel 100 is fixedly installed between the ceiling 10 and the ground 20 through the first horizontal frame 400 and the second horizontal frame 500, the wall panel finish 200 is installed on the core panel 100, and then the first buckle strip 420 is clamped on the first horizontal frame 400. During this process, the first buckle strip 420 can press the top side edge of the wall panel finish 200 along the vertical direction into the first clamping groove 430, thereby, on the one hand, achieving the shielding of the first horizontal frame 400 and the side edge of the wall panel finish 200 by the first buckle strip 420 to achieve a beautification effect, and on the other hand, achieving the auxiliary fixation of the wall panel finish 200 by the cooperation of the first buckle strip 420 and the first horizontal frame 400, making the overall structure more stable.

[0042] Furthermore, a second buckle strip 520 is snap-fastened to the second transverse frame 500 . When the second buckle strip 520 is snap-fastened to the second transverse frame 500 , a second snap-fastening groove 530 can be formed between the second buckle strip 520 and the side of the second transverse frame 500 facing the ceiling 10 .

[0043] During the actual installation process, after the core panel 100 is fixedly installed between the ceiling 10 and the ground 20 through the first horizontal frame 400 and the second horizontal frame 500, the wall panel finish 200 is installed on the core panel 100, and then the second buckle strip 520 is clamped on the second horizontal frame 500. During this process, the second buckle strip 520 can press the bottom side of the wall panel finish 200 along the vertical direction into the second clamping groove 530, thereby, on the one hand, achieving the shielding of the second horizontal frame 500 and the side of the wall panel finish 200 by the second buckle strip 520 to achieve a beautification effect, and on the other hand, achieving the auxiliary fixation of the wall panel finish 200 by the cooperation of the second buckle strip 520 and the second horizontal frame 500, making the overall structure more stable.

[0044] In some embodiments, a first wire placement frame (not shown in the figure) is provided in the first wire placement space 30, and the cables are specifically placed in the first wire placement frame.

[0045] It is understandable that, due to the cutting according to the requirements of the on-site size, the top of the core board 100 in the vertical direction will have more burrs. When the cable is set in the first wiring space 30 by pulling and dragging, the burrs on the core board 100 will have a certain cutting effect on the cable, which is easy to damage the surface of the cable and affect the service life of the cable. In this embodiment, before the top of the core board 100 is extended into the first groove 410, a first wire frame is set in the first groove 410 in advance, so that after the first wiring space 30 is formed, the first wire frame can be in the first wiring space 30, and then the cable can be set in the first wire frame by pulling and dragging. Since there is no burr in the first wire frame, the surface of the cable will not be damaged, thereby making the use of the cable more stable and the service life longer.

[0046] Furthermore, a second wire placement frame 41 is provided in the second wire placement space 40 , and the cables are specifically located in the second wire placement frame 41 .

[0047] It is understandable that, due to the cutting according to the requirements of the on-site size, the bottom of the core board 100 in the vertical direction will have more burrs. When the cable is set in the second wiring space 40 by pulling and dragging, the burrs on the core board 100 will have a certain cutting effect on the cable, which is easy to damage the cable skin and affect the service life of the cable. In this embodiment, before the bottom of the core board 100 is extended into the second groove 510, the second wire frame 41 is set in the second groove 510 in advance, so that after the second wire space 40 is formed, the second wire frame 41 can be in the second wire space 40, and then the cable can be set in the second wire frame 41 by pulling and dragging. Since there is no burr in the second wire frame 41, the cable skin will not be damaged, thereby making the use of the cable more stable and the service life longer.

[0048] Combination Figure 4 , Figure 5 and Figure 6 As shown, in some embodiments, the door leaf 310 is a glass door, a wooden door, or an aluminum alloy door, which can be selected according to actual needs. Figure 4 and Figure 5 As shown, when the door leaf 310 is a glass door, the glass door can be single-layer glass or double-layer glass, and there is no special limitation on this.

[0049] In some embodiments, when the frame 300 is fixedly installed on the side of the core panel 100 along the horizontal direction by bolts, a vertical frame 600 is sandwiched between the frame 300 and the wall panel finish 200. The vertical frame 600 can wrap and shield the side of the wall panel finish 200 along the horizontal direction, thereby improving the beauty of the overall partition wall. At the same time, it can also better protect the side of the wall panel finish 200.

[0050] Furthermore, the vertical frame 600 and the side of the wall panel facing 200 can be fixed by bonding to improve the stability of the vertical frame 600 clamped by the frame 300 and the wall panel facing 200, which can better prevent the vertical frame 600 from falling off.

[0051] In some embodiments, the core panel 100 is made of magnesium oxysulfide color steel composite board, so that the core panel 100 can have better flatness and strength, making the overall partition wall more stable.

[0052] In conclusion, the above is only a preferred embodiment of the present invention, and all equivalent changes and modifications made according to the scope of the patent application of the present invention should fall within the scope of the patent of the present invention.

Claims

1. A reusable integrated partition wall system, characterized in that: It comprises a core board which can be fixed vertically between the ceiling and the ground, and a wall panel facing is attached and fixed on the core board; a frame is provided on at least one side of the core board in the horizontal direction, and a door leaf can be installed or docked on the frame.

2. The reusable integrated partition wall system according to claim 1, characterized in that: A transverse frame is arranged on the ceiling and / or the ground, a groove is arranged on the transverse frame, and the core board extends into and is fixed in the groove.

3. The reusable integrated partition wall system according to claim 1, characterized in that: A leveler is arranged on the side of the core board facing the wallboard facing, and the leveler is used for pulling the wallboard facing.

4. The reusable integrated partition wall system according to claim 2, characterized in that: When the core plate is extended into and fixed in the groove, the core plate and the groove form a wire placement space, and the wire placement space is used to accommodate cables.

5. The reusable integrated partition wall system according to claim 2, characterized in that: A buckle strip is clamped and fixed on the transverse frame, and a clamping groove is formed between the buckle strip and the transverse frame; When the buckle strip is clipped onto the transverse frame, the buckle strip can press the side edge of the wall panel facing along the vertical direction into the clipping groove.

6. The reusable integrated partition wall system according to claim 4, characterized in that: A wire placement frame is arranged in the wire placement space, and the cable is arranged in the wire placement frame.

7. The reusable integrated partition wall system according to claim 1, characterized in that: The door leaf is a glass door, a wooden door or an aluminum alloy door.

8. The reusable integrated partition wall system according to claim 1, characterized in that: A vertical frame is sandwiched between the frame and the wall panel facing, and the vertical frame is used to cover the side edges of the wall panel facing in the horizontal direction.

9. The reusable integrated partition wall system according to claim 1, characterized in that: The core board is a magnesium oxide sulfate colored steel composite board.

10. The reusable integrated partition wall system according to claim 1, characterized in that: The core panel and / or the wall panel facing are formed by splicing.