Mixed operation method for controlling batches based on formula
By adopting a mixed operation method based on formula control batch control in production, and combining multiple control types to achieve flexible switching of production modes, the problem of lack of multi-dimensional monitoring and flexible switching mechanisms in the existing technology is solved, and the response capability of production is improved and efficiency.
Patent Information
- Application Number
- CN202411494618.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-24
- Publication Date
- 2025-02-18
AI Technical Summary
The lack of multi-dimensional monitoring and flexible switching mechanisms in the prior art has led to a lack of sufficient basis for production managers when making decisions and reducing overall production efficiency.
A mixed operation method based on formula control batch control is adopted. By combining multiple control types of wafer quantity, time period and furnace batch counting, the conditions that are first met are preferred to implement first-satisfactory, so as to achieve flexible switching of production modes.
It improves the rapid response ability of production and the orderly and controllable process, improves the adaptability of formula adjustment and product production efficiency, and avoids production delays or inefficiency caused by fixed order or single factors.
Smart Images

Figure CN119472530A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of production formula control, and in particular to a mixed operation method based on formula control batches. Background Art
[0002] In today's complex and ever-changing industrial production environment, there are many types of products and customer needs are becoming increasingly personalized. Traditional production methods are difficult to meet diverse needs. At the same time, the market changes rapidly and is full of uncertainty. Enterprises need to respond quickly to adjust production. In addition, production must ensure quality while pursuing efficiency. Balancing the two has become a challenge. With the advancement of science and technology, the degree of automation of production equipment has been continuously improved, and information technology has also provided strong support for the collection and analysis of production data, that is, formula control is needed to schedule production.
[0003] However, current technologies lack multi-dimensional monitoring and flexible switching mechanisms, and production managers lack sufficient basis when making decisions, leading to reduced overall production efficiency. Summary of the invention
[0004] In order to make up for the above shortcomings, the present invention provides a mixed operation method based on recipe control batches, aiming to improve the problem of lack of multi-dimensional monitoring and flexible switching mechanism, and reduce overall production efficiency.
[0005] In a first aspect, the present invention provides the following technical solution, a mixed operation method based on a recipe control batch, comprising the following steps:
[0006] S1. Obtain the current batch product configuration from the database to generate a production recipe and determine the number of parameters corresponding to various control types that trigger mixed operation;
[0007] S2. Start production operation: Start the production operation phase, in which the input operation of each batch execution task in the production operation mode is waited;
[0008] S3. Wafer quantity monitoring and decision-making: When the batches under production operation complete the requirements of task input, the number of wafers begins to be accumulated. If the task input is cancelled, the corresponding number of wafers is subtracted. When the number of wafers is ≥ the minimum number of wafers, the decision is made to continue the production operation or switch to mixed operation. When the maximum number of wafers is reached, the recipe under mixed operation is switched to dispatch workers to arrange production tasks.
[0009] S4. Time monitoring and decision-making: If the time cycle control method is adopted, when the batch in the production operation mode completes the task input, the timing starts. When the minimum time limit is reached, the mixed operation mode is selected and switched. When the maximum time limit is reached, the mixed operation mode must be switched;
[0010] S5. Comprehensive judgment: If both wafer quantity and time period triggering methods are used at the same time, the condition that is satisfied first will be executed first;
[0011] S6. Furnace batch count monitoring and decision-making: If the furnace batch count control method is adopted, the furnace batch count is continuously monitored. When the number of batches assigned to the intermediate operation reaches the preset maximum value, it is necessary to switch the production mode from the intermediate operation to the mixed operation. After switching to the mixed operation, the production operation is carried out again, and the batch count of the assigned work will be reset.
[0012] Preferably, the mixed operation in S1 includes a wafer quantity control type, a time period control type, a wafer quantity and time period combined control type and a furnace batch count control type, wherein the corresponding parameters of the wafer quantity control type include a minimum wafer quantity and a maximum wafer quantity, the corresponding parameters of the time period control type include a minimum time limit and a maximum time limit, and the corresponding parameters of the furnace batch count control type include a maximum value of an intermediate operation.
[0013] Preferably, each batch in S2 needs to provide specific information of its production task before formally entering the production process, and the specific information includes product specifications, processing requirements and quantity.
[0014] Preferably, the process of accumulating the number of wafers in S3 is real-time. As production progresses, the system will increase the wafer count accordingly for each wafer produced. When the maximum number of wafers is reached, switching to mixed operation is mandatory.
[0015] Preferably, during the timing process in S4, the system continuously monitors the time in real time, compares the current accumulated time with the set minimum time limit and maximum time limit, and switches the operation mode.
[0016] Preferably, a real-time monitoring system for the number of wafers and the time period is established in S5 at the same time, and if any one of the conditions reaches its corresponding trigger threshold first, the corresponding operation is triggered immediately without waiting for the other condition to be satisfied.
[0017] Preferably, the furnace batch count monitoring in S6 is closely linked to the production plan, the dispatching system and the furnace operation, and the operation mode is switched by comparing the batch number of the intermediate operation with the maximum value.
[0018] In a second aspect, the present invention provides the following technical solution, a mixed operation system based on a recipe control batch, the system comprising:
[0019] A parameter determination module, used to determine the parameters corresponding to various control types that trigger the hybrid operation;
[0020] The production operation start module is used to formally start the production operation phase, put the production system in a normal operating state, and wait for the input operation of each batch execution task in the production operation mode;
[0021] The wafer quantity monitoring and decision-making module is used to accumulate and count the number of wafers in real time after the batch completion task input under the production operation, and compare the accumulated number of wafers with the set minimum number of wafers and maximum number of wafers to decide to switch the operation mode;
[0022] The time monitoring and decision-making module is used to compare the timing result with the set minimum and maximum time limits to switch the operation mode;
[0023] Comprehensive judgment module, used to continuously monitor the number of wafers and time cycle in real time, and prioritize the decision conditions that are met first according to the monitoring situation;
[0024] The furnace batch count monitoring and decision-making module is used for real-time monitoring of the furnace batch count. When the number of batches that need to be dispatched to the intermediate operation reaches the preset maximum value, it decides to switch the production mode from the intermediate operation to the mixed operation.
[0025] In the third aspect, the invention provides the following technical solution: a computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned mixed operation method based on formula-controlled batches when executing the computer program.
[0026] In a fourth aspect, the present invention provides the following technical solution: a readable storage medium having a computer program stored thereon, and the computer program, when executed by a processor, implements the above-mentioned mixed operation method based on formula-controlled batches.
[0027] The present invention has the following beneficial effects:
[0028] 1. In the present invention, multiple control types such as wafer quantity, time cycle and furnace batch count are combined to trigger production mode switching, and the conditions that are met first are executed first, and there are precise switching rules. Multiple controls monitor production from different angles, and flexible mechanisms enable production to respond quickly to changes, making the process more orderly and controllable, and improving the adaptability of formula adjustment and product production efficiency.
[0029] 2. In the present invention, comprehensive judgment is made to prioritize the conditions that are met first, quickly make decisions and adjust the production mode, so as to more flexibly respond to various changes in the production process, avoid production delays or inefficiencies caused by fixed sequences or limitations of a single factor, thereby speeding up the production of products, shortening the production cycle, and increasing the output per unit time.
[0030] 3. In the present invention, by forcing the switch to mixed operation through the maximum number of wafers or a clear upper limit of the time period, it is possible to prevent the equipment from over-operating in a single mode, avoid equipment failure due to long-term high-load operation, extend the service life of the equipment, ensure the stable operation of the production equipment, reduce production interruptions caused by equipment maintenance, and ensure the continuity and stability of production. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 A method flow chart of the mixed operation method based on recipe control batches proposed by the present invention;
[0032] Figure 2 xx flow chart of the mixed operation method based on recipe control batch proposed by the present invention; DETAILED DESCRIPTION
[0033] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] Embodiment 1
[0035] Reference Figure 1 In a first embodiment of the present invention, the present invention provides a mixed operation method based on a recipe control batch, comprising the following steps:
[0036] S1. Obtain the current batch product configuration from the database to generate a production recipe and determine the number of parameters corresponding to various control types that trigger mixed operation;
[0037] S2. Start production operation: Start the production operation phase, in which the input operation of each batch execution task in the production operation mode is waited;
[0038] S3. Wafer quantity monitoring and decision-making: When the batches under production operation complete the requirements of task input, the number of wafers begins to be accumulated. If the task input is cancelled, the corresponding number of wafers is subtracted. When the number of wafers is ≥ the minimum number of wafers, the decision is made to continue the production operation or switch to mixed operation. When the maximum number of wafers is reached, the recipe under mixed operation is switched to dispatch workers to arrange production tasks.
[0039] S4. Time monitoring and decision-making: If the time cycle control method is adopted, when the batch in the production operation mode completes the task input, the timing starts. When the minimum time limit is reached, the mixed operation mode is selected and switched. When the maximum time limit is reached, the mixed operation mode must be switched;
[0040] S5. Comprehensive judgment: If both wafer quantity and time period triggering methods are used at the same time, the condition that is satisfied first will be executed first;
[0041] S6. Furnace batch count monitoring and decision-making: If the furnace batch count control method is adopted, the furnace batch count is continuously monitored. When the number of batches assigned to the intermediate operation reaches the preset maximum value, it is necessary to switch the production mode from the intermediate operation to the mixed operation. After switching to the mixed operation, the production operation is carried out again, and the batch count of the assigned work will be reset.
[0042] Specifically, the parameters in S1 provide clear quantitative standards for various decisions in the subsequent production process, and are the key basis for judging whether the production mode needs to be switched. When the actual data in the production process reaches or exceeds these set parameters, the production management personnel can decide whether to switch the production mode according to the established rules, thereby ensuring the orderly progress of the production process;
[0043] Starting production operation in S2 can lay the foundation for subsequent orderly production activities, clarify the starting point of production, and make all departments and production links aware that production has entered the formal operation stage, so as to carry out work according to the predetermined process and responsibilities, which is helpful to establish a standardized production order and avoid chaos and disorder in the production process. Waiting for the batch execution task input operation can ensure that the production management system obtains detailed and accurate production task information for each batch;
[0044] In S3, by accumulating the number of wafers, the progress of the production operation stage can be grasped in real time, and the amount of work completed can be intuitively understood and compared with the production plan, so as to determine whether the production is progressing according to the scheduled schedule, so as to timely discover possible delays or early completion, and provide accurate data support for production scheduling. The number of wafers is a key factor in determining the switching of production modes. When the number of wafers reaches or exceeds the set minimum number of wafers and the maximum number of wafers, it is used as a basis to decide whether to switch to the mixed operation mode or continue to maintain the production operation mode. It provides clear and quantitative standards for production decisions, making decisions more scientific and reasonable, and avoiding human subjective judgment errors. The setting of the maximum number of wafers sets a clear upper limit for the production operation stage. Once this number is reached, it must switch to the mixed operation mode, which can effectively avoid the continuous production of too many wafers in the production operation mode, and prevent the equipment from running at high load for a long time due to excessive production, thereby reducing the risk of equipment wear and failure, extending the service life of the equipment, and improving the overall use efficiency of the equipment.
[0045] In S4, the timing starts from the input of the batch completion task in the production operation mode. By setting the minimum time limit and the maximum time limit, a clear time frame is provided for the production process to ensure that production activities are carried out within a reasonable time rhythm. This helps to avoid the production process being too slow or too hasty, so that each production link can be connected in an orderly manner, and the stability and orderliness of the entire production system are maintained. When the minimum time limit is reached, the production management personnel are prompted to consider switching to the mixed operation mode. At this time, they can comprehensively evaluate the current various production factors, such as equipment status, order urgency, raw material supply, etc., to decide whether to switch, making the decision more scientific, reasonable and flexible. The setting of the maximum time limit sets a clear time limit for the production operation stage. When this time limit is reached, it is forced to switch to the mixed operation mode, which can effectively avoid the production process from being delayed indefinitely in the production operation mode, thereby ensuring that the production of each batch can be completed within the predetermined time range;
[0046] In the actual production process of S5, the changes in the two factors of wafer quantity and time cycle may be different. By giving priority to the conditions that are met first, the production system can make decisions quickly and adjust the production mode according to the factors that first reach the trigger threshold in the actual production progress, so as to respond to various changes in the production process more flexibly, avoid production delays or inefficiencies due to fixed sequence or single factor limitations, thereby speeding up product production, shortening the production cycle, and increasing output per unit time.
[0047] S6 can accurately control the production scale in the intermediate operation stage by continuously monitoring the furnace batch count and setting the maximum number of intermediate operation batches. This can prevent over-assignment during this stage, avoid the furnace and other equipment from being overloaded due to processing too many batches, ensure the stable operation of the equipment, extend the service life of the equipment, and also help maintain the stability of product quality, because at a reasonable production scale, the equipment and process parameters are easier to control in the best state.
[0048] The mixed operation in S1 includes wafer quantity control type, time cycle control type, wafer quantity and time cycle combined control type and furnace batch count control type. The corresponding parameters of the wafer quantity control type include the minimum wafer quantity and the maximum wafer quantity, the corresponding parameters of the time cycle control type include the minimum time limit and the maximum time limit, and the corresponding parameters of the furnace batch count control type include the maximum value of the intermediate operation.
[0049] Specifically, the minimum number of wafers and the maximum number of wafers set clear lower and upper limits for the number of wafers in the production operation stage, which helps to standardize the production scale, avoid insufficient resource utilization due to insufficient production, or excessive production beyond the carrying capacity of equipment and manpower, thereby ensuring the rationality and stability of the production process. In the production process, by comparing the actual number of wafers with these two parameters, a clear decision-making reference is provided for production managers. At the same time, the minimum time limit and the maximum time limit set a time frame for the production operation stage, and control the production process from a time dimension. This can ensure that production activities will not be too slow or rushed, so that each production link can proceed in an orderly manner according to the predetermined rhythm, maintaining the stability and coordination of the entire production system, and the furnace batch count control type accurately controls the batch number of the furnace, a specific production link, and sets the maximum value of the intermediate operation as a key parameter. This helps to ensure that the processing capacity of the furnace in the intermediate operation stage matches the production plan, avoids furnace overload due to excessive dispatching, affects equipment life and product quality, and also ensures the efficient operation of the furnace and improves the production efficiency of this link.
[0050] Before each batch in S2 officially enters the production process, it is necessary to provide specific information of its production task, including product specifications, processing requirements and quantity.
[0051] Specifically, specific information provides a basis for the formulation and arrangement of production plans, optimizes production plans and improves operational efficiency, achieving efficient, stable and sustainable production operations.
[0052] The process of accumulating the number of wafers in S3 is real-time. As production progresses, the system will increase the wafer count accordingly for each wafer produced. When the maximum number of wafers is reached, switching to mixed operation is mandatory.
[0053] Specifically, the real-time cumulative number of wafers allows production managers to accurately and timely understand the production progress. By comparing with the wafer quantity target in the production plan, it is clear whether the current production progress is ahead or behind, thereby providing accurate data support for production decisions, so as to adjust the production strategy in time to ensure that the production tasks are completed on time. When the maximum number of wafers is reached, it is forced to switch to mixed operation. This rule has a strict control effect on the production rhythm. It prevents the production process from being excessively continuous in the production operation mode, avoids problems such as excessive equipment loss and deviation of process parameters from the optimal state due to long-term single-mode production, ensures that the production process switches in an orderly manner between different stages, and maintains the stability and sustainability of production.
[0054] During the timing process in S4, the system continuously monitors the time in real time, compares the current accumulated time with the set minimum and maximum time limits, and switches the operating mode.
[0055] Specifically, the setting of minimum and maximum time limits provides a clear and flexible decision-making basis for the switching of production modes. When the accumulated time reaches the minimum time limit, the system prompts that you can consider switching to the mixed operation mode. At this time, the production management personnel can comprehensively evaluate the current production situation, such as the urgency of the order, the operating status of the equipment, the supply of raw materials and other factors, to decide whether to switch. This flexibility enables production decisions to better adapt to changes in actual production conditions and improve the scientificity and rationality of decisions.
[0056] In the S5, a real-time monitoring system for the number of wafers and the time period is established simultaneously, and if any one of the conditions reaches its corresponding trigger threshold first, the corresponding operation is triggered immediately without waiting for the other condition to be satisfied.
[0057] Specifically, by simultaneously monitoring the number of wafers and the time cycle in real time, once any one of the conditions reaches the trigger threshold first, the corresponding operation is triggered immediately without waiting for the other condition to be met. This greatly improves the timeliness of production decisions, enables the production system to respond quickly to changes in the production process, avoids production delays that may be caused by waiting for both conditions to be met, and ensures the continuity and efficiency of production. In actual production, the changes in the number of wafers and the time cycle may vary and be affected by multiple factors. This mechanism enables the production process to adapt to these changes more flexibly, avoids production delays, and improves the production system's ability to respond to various complex situations.
[0058] The furnace batch count monitoring in S6 is closely linked to the production plan, dispatching system and furnace operation, and the operation mode is switched by comparing the batch count of the intermediate operation with the maximum value.
[0059] Specifically, by monitoring the furnace batch count and comparing the number of batches in the intermediate operation with the maximum value, the production scale of the furnace in the intermediate operation stage can be accurately controlled. This can avoid over-assignment during this stage, prevent the furnace from being overloaded due to processing too many batches, ensure the stable operation of the furnace equipment, extend the service life of the equipment, and also help maintain the stability of product quality, because at a reasonable production scale, the process parameters of the furnace are easier to control at the best state.
[0060] Embodiment 2:
[0061] Reference Figure 2 In a second embodiment of the present invention, the present invention provides a mixed operation system based on recipe control batches, the system comprising:
[0062] A parameter determination module, used to determine the parameters corresponding to various control types that trigger the hybrid operation;
[0063] The production operation start module is used to formally start the production operation phase, put the production system in a normal operating state, and wait for the input operation of each batch execution task in the production operation mode;
[0064] The wafer quantity monitoring and decision-making module is used to accumulate and count the number of wafers in real time after the batch completion task input under the production operation, and compare the accumulated number of wafers with the set minimum number of wafers and maximum number of wafers to decide to switch the operation mode;
[0065] The time monitoring and decision-making module is used to compare the timing result with the set minimum and maximum time limits to switch the operation mode;
[0066] Comprehensive judgment module, used to continuously monitor the number of wafers and time cycle in real time, and prioritize the decision conditions that are met first according to the monitoring situation;
[0067] The furnace batch count monitoring and decision-making module is used for real-time monitoring of the furnace batch count. When the number of batches that need to be dispatched to the intermediate operation reaches the preset maximum value, it decides to switch the production mode from the intermediate operation to the mixed operation.
[0068] Embodiment 3
[0069] The third embodiment of the present invention is based on the same inventive concept. The present invention proposes a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, it implements the steps of the mixed operation method based on formula control batches of the above embodiment.
[0070] Embodiment 4
[0071] The fourth embodiment of the present invention is based on the same inventive concept. The present invention proposes a terminal, which includes: a processor and a memory; the processor and the memory communicate with each other; the memory is used to store instructions; the processor is used to execute the instructions in the memory, and execute the mixed operation method based on the formula control batch of the above embodiment.
[0072] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0073] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A mixed operation method based on recipe control batches, characterized in that: The following steps are involved: S1. Preliminary preparation: Obtain the current batch product configuration from the database to generate the production recipe, and determine the parameters corresponding to various control types that trigger the mixed operation; S2. Start production operation: Start the production operation phase, in which the input operation of each batch execution task in the production operation mode is waited; S3. Wafer quantity monitoring and decision-making: When the batches under production operation complete the requirements of task input, the number of wafers begins to be accumulated. If the task input is cancelled, the corresponding number of wafers is subtracted. When the number of wafers is ≥ the minimum number of wafers, the decision is made to continue the production operation or switch to mixed operation. When the maximum number of wafers is reached, the recipe under mixed operation is switched to dispatch workers to arrange production tasks. S4, time monitoring and decision-making: If the time cycle control method is adopted, when the batch in the production operation mode completes the task input, the timing starts. When the minimum time limit is reached, the mixed operation mode is selected and switched to. When the maximum time limit is reached, the mixed operation mode is directly switched; S5. Comprehensive judgment: If both wafer quantity and time period triggering methods are used at the same time, the condition that is satisfied first will be executed first; S6. Furnace batch count monitoring and decision-making: If the furnace batch count control method is adopted, the furnace batch count is continuously monitored. When the number of batches assigned to the intermediate operation reaches the preset maximum value, it is necessary to switch the production mode from the intermediate operation to the mixed operation. After switching to the mixed operation, the production operation is carried out again, and the batch count of the assigned work will be reset.
2. The mixed operation method based on recipe control batch according to claim 1 is characterized in that: The mixed operation in S1 includes wafer quantity control type, time period control type, wafer quantity and time period combined control type and furnace batch count control type. The corresponding parameters of the wafer quantity control type include the minimum wafer quantity and the maximum wafer quantity, the corresponding parameters of the time period control type include the minimum time limit and the maximum time limit, and the corresponding parameters of the furnace batch count control type include the maximum value of the intermediate operation.
3. The mixed operation method based on recipe control batch according to claim 1 is characterized in that: Before each batch in S2 formally enters the production process, it is necessary to provide specific information of its production task, which includes product specifications, processing requirements and quantity.
4. The mixed operation method based on recipe control batch according to claim 1 is characterized in that: The process of accumulating the number of wafers in S3 is real-time. As production progresses, the system will increase the wafer count accordingly for each wafer produced. When the maximum number of wafers is reached, switching to mixed operation is mandatory.
5. The mixed operation method based on recipe control batch according to claim 1 is characterized in that: During the timing process in S4, the system continuously monitors the time in real time, compares the current accumulated time with the set minimum time limit and maximum time limit, and switches the operation mode.
6. The mixed operation method based on recipe control batch according to claim 1 is characterized in that: In the S5, a real-time monitoring system for the number of wafers and the time period is established simultaneously, and if any one of the conditions reaches its corresponding trigger threshold first, the corresponding operation is triggered immediately without waiting for the other condition to be satisfied.
7. The mixed operation method based on recipe control batch according to claim 1 is characterized in that: The furnace batch count monitoring in S6 is closely linked to the production plan, the dispatching system and the furnace operation, and the operation mode is switched by comparing the batch number of the intermediate operation with the maximum value.
8. A mixed operation system based on recipe control batches, characterized in that: The mixed operation method based on recipe control batches according to any one of claims 1 to 7, the system comprising: A parameter determination module, used to determine the parameters corresponding to various control types that trigger the hybrid operation; The production operation start module is used to formally start the production operation phase, put the production system in a normal operating state, and wait for the input operation of each batch execution task in the production operation mode; The wafer quantity monitoring and decision-making module is used to accumulate and count the number of wafers in real time after the batch completion task input under the production operation, and compare the accumulated number of wafers with the set minimum number of wafers and maximum number of wafers to decide to switch the operation mode; The time monitoring and decision-making module is used to compare the timing result with the set minimum and maximum time limits to switch the operation mode; Comprehensive judgment module, used to continuously monitor the number of wafers and time cycle in real time, and prioritize the decision conditions that are met first according to the monitoring situation; The furnace batch count monitoring and decision-making module is used for real-time monitoring of the furnace batch count. When the number of batches dispatched to the intermediate operation reaches the preset maximum value, it decides to switch the production mode from the intermediate operation to the mixed operation.
9. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the mixed operation method based on recipe-controlled batches is implemented as described in any one of claims 1 to 7.
10. A readable storage medium, characterized in that: The readable storage medium stores a computer program, and when the computer program is executed by a processor, the mixed operation method based on recipe control batches as described in any one of claims 1 to 7 is implemented.