Efficient internal mixer with self-cleaning function
By designing a self-cleaning function mixing device and cleaning device in the mixer, the problem of difficulty in thorough cleaning of the mixer is solved, efficient cleaning and long life of the equipment are achieved, and the stability of product quality is ensured.
Patent Information
- Application Number
- CN202411582838.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-07
- Publication Date
- 2025-02-21
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing trunking machine is difficult to thoroughly clean after use, resulting in poor hygiene in the equipment and may pose potential risks to the quality of subsequent products.
A dense mixer with self-cleaning function is designed, including a base, a mixing device, a cleaning device and a pneumatic discharge device. The mixing device has a built-in cleaning device, which unloads and cleanses the materials by driving the pneumatic unloading device to ensure the continuous cleaning and efficient operation of the equipment.
The self-cleaning function of the intensive mixer is realized, the service life of the equipment and the mixing effect are improved, the stability of product quality is ensured, and the cumbersomeness and time-consuming cleaning work are reduced.
Smart Images

Figure CN119489513A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of material processing, in particular to a high-efficiency internal mixer with a self-cleaning function. Background Art
[0002] Internal mixer, full name is closed rubber mixer, is a key equipment widely used in the rubber industry. Its background technology can be traced back to the early 19th century, when the rubber industry began to use open mixers to process rubber. However, open mixers have disadvantages such as high labor intensity, low efficiency, and large dust, which seriously affect the health of workers and production efficiency. In order to solve these problems, people began to consider covering this processing equipment with a cover, and gradually developed it into an internal mixer. The working principle of the internal mixer is to plasticize and mix polymer materials intermittently under a closed state with adjustable temperature and pressure through a pair of rotors with specific shapes and relative rotation. The surface of the rotor has spiral ridges, which can clamp the material and bring it into the roller gap, where it is squeezed and sheared by the rotor, thereby achieving mixing and plasticization of the material.
[0003] Existing internal mixers are often difficult to clean thoroughly after use. Due to the complexity of their internal structure and the characteristics of material residues, cleaning becomes cumbersome and time-consuming. This not only affects the hygiene of the equipment, but also may pose a potential risk to the quality of subsequent products. Summary of the invention
[0004] The invention aims to solve the technical problem of how to clean an internal mixer, and proposes an efficient internal mixer with a self-cleaning function. The technical solution of the invention is as follows: A high-efficiency internal mixer with a self-cleaning function comprises: a base, a mixing device, a cleaning device, and a pneumatic unloading device. The mixing device is arranged above the base and fixedly connected to the base. The cleaning device is arranged inside the mixing device and connected to the mixing device. The pneumatic unloading device is arranged inside the mixing device and connected to the cleaning device.
[0005] At the beginning of work, the staff puts the material into the mixing device, and then the staff turns on the mixing device and the cleaning device. The mixing device mixes the material. After that, the mixing device drives the cleaning device to clean the mixing device to ensure the cleanliness of the mixing device and increase the service life of the mixing device. At the same time, the cleaning device can increase the pressure in the mixing device, thereby improving the mixing effect. When the pressure in the mixing device reaches a certain level, the cleaning device drives the pneumatic unloading device to unload the material in the mixing device.
[0006] Furthermore, the mixing device includes: an installation box, a support plate, a motor, a partition, a driving shaft, a passive shaft, a driving gear, a passive gear, two spiral blades, and a feed pipe. The installation box is arranged above the base, and the installation box is fixedly connected to the base. The support plate is arranged horizontally above the base, arranged on the side of the installation box, and the support plate is fixedly connected to the installation box. The motor shaft is arranged horizontally, the motor is arranged above the support plate, and the motor is fixedly connected to the support plate. The partition is arranged horizontally, arranged in the installation box, and the partition is fixedly connected to the installation box. The axis of the driving shaft coincides with the axis of the motor shaft, the driving shaft passes through the side of the installation box close to the motor, is arranged above the partition, and is arranged on the side of the motor close to the installation box, the driving shaft is fixedly connected to the motor shaft, and is rotatably connected to the installation box, and its rotation axis is arranged horizontally. The passive shaft is parallel to the driving shaft, is arranged on the side of the driving shaft, passes through the side of the installation box, and is arranged above the partition. The passive shaft is rotatably connected to the installation box, and its rotation axis is parallel to the rotation axis of the driving shaft. The driving gear is sleeved on the driving shaft and arranged between the motor and the installation box, and the driving gear is fixedly connected to the driving shaft. The passive gear is sleeved on the passive shaft and arranged on the side of the installation box close to the motor and on the side of the driving gear. The passive gear is fixedly connected to the passive shaft and meshes with the driving gear. Two spiral blades are arranged in the installation box, sleeved on the driving shaft and the passive shaft respectively, and arranged above the partition. The two spiral blades are fixedly connected to the driving shaft and the passive shaft respectively. The feed pipe passes through the top surface of the upper part of the installation box, and the feed pipe is connected to the inside of the installation box.
[0007] At the beginning of the work, the staff puts the material into the installation box through the feed pipe, and then turns on the motor. The rotation of the motor drives the driving shaft to rotate, the rotation of the driving shaft drives the driving gear to rotate, the rotation of the driving gear drives the driven gear to rotate, and the rotation of the driving shaft and the driven shaft drives the spiral blades to rotate, thereby mixing the materials and pushing the materials toward the discharge port.
[0008] Furthermore, a sealing cover is provided above the feed pipe.
[0009] The sealing cover on the feed pipe can ensure that the inside of the installation box is in a sealed state.
[0010] Furthermore, the partition is fixedly connected to the installation box by seamless welding.
[0011] The partition is fixedly connected to the installation box through seamless welding to ensure that the mixing space in the installation box is in a sealed state.
[0012] Furthermore, the cleaning device includes: a first threaded rod, a first incomplete gear, a circular gear, two first racks, a first connecting rod, a second rack, a second threaded rod, a connecting box, a connecting block, a threaded sleeve, a second incomplete gear, a third rack, a second connecting rod, a fourth rack, a nozzle, an air compressor, and a first connecting pipe. The first threaded rod is parallel to the passive shaft, passes through the side of the installation box, and is arranged above the two spiral blades. The first threaded rod is rotatably connected to the installation box, and its rotation axis is parallel to the rotation axis of the active shaft. The first incomplete gear is sleeved on the passive shaft and is arranged on the side of the installation box away from the motor. The first incomplete gear is fixedly connected to the passive shaft. The circular gear is sleeved on the first threaded rod and is arranged on the side of the installation box away from the motor, and is arranged above the first incomplete gear. The circular gear is fixedly connected to the first threaded rod. The two first racks are arranged vertically, and the two first racks are arranged symmetrically. The two first racks are arranged on the side of the installation box away from the motor, and are respectively arranged on both sides of the first incomplete gear. The two first racks are slidably connected to the side of the installation box away from the motor in the vertical direction, and the two first racks are meshed with the first incomplete gear. The first connecting rod is arranged above the two first racks, and the first connecting rod is fixedly connected to the upper ends of the two first racks. The second rack is arranged vertically, and is arranged above the first connecting rod, and the lower end of the second rack is fixedly connected to the first connecting rod, and the second rack is meshed with the circular gear. The second threaded rod is parallel to the first threaded rod, and is arranged inside the installation, and is arranged on the side of the first threaded rod, and is arranged above the two spiral blades. The second threaded rod is fixedly connected to the installation box. The connecting box is sleeved on the first threaded rod and the second threaded rod, and is arranged above the two spiral blades. The connecting box is threadedly connected to the first threaded rod, and the connecting box and the second threaded rod are slidably connected along a horizontal square. The connecting block passes through the bottom surface of the upper part of the connecting box, is arranged above the two spiral blades, and is arranged below the first threaded rod and the second threaded rod. The connecting block is connected to the connecting box in a sliding manner in the horizontal direction. The threaded sleeve is arranged inside the connecting box, sleeved on the second threaded rod, and the threaded sleeve is threadedly connected to the second threaded rod, and is rotatably connected to the connecting box, and its rotation axis coincides with the axis of the second threaded rod. The second incomplete gear is sleeved on the threaded sleeve, and the second incomplete gear is fixedly connected to the threaded sleeve. The third rack is arranged horizontally, arranged inside the connecting box, arranged above the connecting block, and arranged below the second incomplete gear. The second rack is fixedly connected to the connecting block and meshed with the second incomplete gear. The second connecting rod is arranged vertically, arranged above the third rack, and arranged between the first threaded rod and the second threaded rod. The lower end of the second connecting rod is fixedly connected to the third rack. The fourth rack is symmetrically arranged with the third rack, arranged above the second connecting rod, and arranged above the second incomplete gear. The fourth rack is fixedly connected to the upper end of the second connecting rod and meshed with the second incomplete gear. The nozzle is arranged below the connection block and above the two spiral blades, and the nozzle is fixedly connected to the connection block. The air compressor is arranged inside the installation box and below the partition, and the air compressor is fixedly connected to the bottom surface inside the installation box.The first connecting pipe is vertically arranged and passes through the installation box. The upper end of the first connecting pipe is communicated with the nozzle, and the lower end of the first connecting pipe is communicated with the air compressor.
[0013] When the passive shaft rotates, the passive shaft drives the first incomplete gear to rotate, the rotation of the first incomplete gear drives the two first racks to move up and down, the two first racks move up and down to drive the first connecting rod to move up and down, the first connecting rod moves up and down to drive the second rack to move up and down, the second rack moves up and down to drive the circular gear to rotate, the circular gear rotates to drive the first threaded rod to rotate, the first threaded rod rotates to drive the first connecting rod to move left and right, the first connecting rod moves left and right to drive the connecting block to move left and right, the connecting block moves left and right to drive the nozzle to move left and right, and the high-pressure gas in the nozzle cleans the spiral blades, thereby keeping the spiral blades clean and improving the service life of the spiral blades. When the connecting box moves left and right, the connecting box drives the threaded sleeve to move left and right, the threaded sleeve rotates with the cooperation of the second threaded rod, the threaded sleeve rotates to drive the second incomplete gear to rotate, the second incomplete gear rotates to drive the third rack and the fourth rack to move forward and backward, thereby driving the connecting block to move forward and backward, thereby increasing the cleaning area of the nozzle, ensuring that there is no cleaning dead corner, and at the same time, the high-pressure gas will increase the pressure in the working box and increase the mixing effect of the material.
[0014] Furthermore, the two first racks are slidably connected to the installation box via a sliding groove.
[0015] The first rack is slidably connected to the mounting box via the slide groove, which can limit the horizontal position of the first rack and prevent the first rack from being separated from the first incomplete gear, thereby affecting the transmission efficiency.
[0016] Furthermore, a groove is provided at the place where the connection block is connected to the connection box.
[0017] The grooves provided at the place where the connection block is connected to the connection box limit the vertical displacement of the connection block and enable the connection block to move horizontally.
[0018] Furthermore, the nozzle is a high-pressure nozzle.
[0019] High pressure nozzles can increase the cleaning efficiency of spiral blades.
[0020] Furthermore, the pneumatic unloading device includes: a first discharge pipe, a second discharge pipe, a first sealing cylinder, a first piston, a first push rod, a push plate, a fixed block, a third threaded rod, an active bevel gear, a passive bevel gear, a moving block, a second sealing cylinder, a second piston, a second push rod, a second connecting pipe, and a pressure valve. The axis of the first discharge pipe is vertically arranged, the first discharge pipe is arranged inside the installation box, the first discharge pipe passes through the partition, and the first discharge pipe is fixedly connected to the partition. The second discharge pipe is horizontally arranged, passes through the side of the installation box away from the motor, is arranged below the partition, is arranged below the first discharge pipe, is arranged on the side of the air compressor, and the second discharge pipe is fixedly connected to the bottom surface of the installation box and communicates with the first discharge pipe. The first sealing cylinder is horizontally arranged, arranged inside the installation box, arranged below the partition, arranged between the second discharge pipe and the air compressor, and the first sealing cylinder is fixedly connected to the bottom surface of the installation box. The first piston is vertically arranged, arranged in the first sealing cylinder, and the first piston is slidably connected to the first sealing cylinder in the horizontal direction. The first push rod is arranged horizontally, and the first push rod passes through the side of the first sealing tube close to the second discharge pipe, and the first push rod is connected to the side of the first sealing tube in a sliding manner in the horizontal direction. The push plate is arranged vertically, arranged in the second discharge pipe, and arranged on the side of the first push rod away from the first sealing tube. The push plate is connected to the second discharge pipe in a sliding manner in the horizontal direction and is fixedly connected to the first push rod. The fixed block is arranged on the side of the installation box close to the motor, and is arranged below the first threaded rod. The fixed block is fixedly connected to the installation box. The third threaded rod is arranged vertically, passes through the fixed block, and is arranged below the first threaded rod. The third threaded rod is connected to the fixed block in a sliding manner in the vertical direction. The active bevel gear is sleeved on the first threaded rod, and is arranged on the side of the installation box close to the motor, and is arranged above the third threaded rod. The active bevel gear is fixedly connected to the first threaded rod. The passive bevel gear is sleeved on the third threaded rod, and is arranged below the active bevel gear and above the fixed block. The passive bevel gear is fixedly connected to the third threaded rod and meshes with the active bevel gear. The moving block is sleeved on the third threaded rod, arranged below the fixed block, and arranged above the base, and the moving block is threadedly connected to the third threaded rod. The second sealing cylinder is vertically arranged, arranged on the side of the installation box close to the motor, arranged above the base, and arranged below the moving block, and the second sealing cylinder is fixedly connected to the base. The second piston is horizontally arranged, arranged in the second sealing cylinder, and the second piston is slidably connected to the second sealing cylinder along the vertical direction. The second push rod passes through the upper surface of the second sealing cylinder, is arranged above the second piston, and is arranged below the moving block. The upper end of the second push rod is fixedly connected to the moving block, and the lower end of the second push rod is fixedly connected to the second piston. The second connecting pipe passes through the side of the installation box close to the second sealing cylinder, one end of the second connecting pipe is connected to the first sealing cylinder, and the other end of the second connecting pipe is connected to the second sealing cylinder. The pressure valve is arranged in the first discharge pipe, and the pressure valve is fixedly connected to the first discharge pipe.
[0021] When the nozzle moves to the rightmost end, the pressure in the installation box increases to the maximum, thereby opening the pneumatic valve, and the material enters the second feed pipe through the first discharge pipe. When the first threaded rod rotates, the first threaded rod rotates to drive the active bevel gear to rotate, the active bevel gear rotates to drive the passive bevel gear to rotate, the passive bevel gear rotates to drive the third threaded rod to rotate, the third threaded rod rotates to drive the moving block, the moving block moves up and down to drive the second push rod to move up and down, the second push rod moves up and down to drive the second piston to move up and down, the second piston moves up and down to push the compressed air from the second sealing cylinder through the second connecting pipe into the first sealing cylinder, and after the compressed air enters the second sealing cylinder, it pushes the first piston to move left and right, the first piston moves left and right to drive the first push rod to move left and right, and the first push rod moves left and right to drive the push plate to push the material entering the second discharge pipe, thereby completing the unloading of the material.
[0022] Furthermore, the third threaded rod is rotatably connected to the fixed block via a bearing.
[0023] The third threaded rod is rotatably connected with the fixing block through the fixing block, which can improve the transmission efficiency of the third threaded rod.
[0024] Beneficial effects of the present invention: 1. The passive shaft drives the first incomplete gear to drive the first connecting rod and the second rack to move up and down. The second rack moves up and down to drive the circular gear to rotate back and forth. The rotation of the circular gear drives the first threaded rod to rotate. The rotation of the first threaded rod drives the connecting box, the connecting block and the nozzle to move left and right to clean the spiral blades and improve the mixing quality.
[0025] 2. The threaded sleeve is driven to rotate by the second threaded rod, and the rotation of the threaded sleeve drives the second incomplete gear to rotate, and the rotation of the second incomplete gear drives the third and fourth racks to move forward and backward, thereby driving the connecting block to move forward and backward to increase the cleaning area.
[0026] 3. The high-pressure gas generated during the cleaning process increases the pressure in the working box, so that the raw materials can be mixed more fully. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0028] Figure 1 It is a front cross-sectional view of the present invention; Figure 2 It is a right side cross-sectional view of the present invention; Figure 3 It is a right side view of the present invention; Figure 4 It is a left view of the present invention.
[0029] Description of the accompanying drawings: 1. base; 201. installation box; 202. support plate; 203. motor; 204. partition; 205. driving shaft; 206. driven shaft; 207. driving gear; 208. driven gear; 209. spiral blade; 210. feeding pipe; 301. first threaded rod; 302. first incomplete gear; 303. circular gear; 304. first rack; 305. first connecting rod; 306. second rack; 307. second threaded rod; 308. connecting box; 309. connecting block; 310. threaded sleeve; 311. second incomplete gear; 312. 2. The third rack; 313. The second connecting rod; 314. The fourth rack; 315. The nozzle; 316. The air compressor; 317. The first connecting pipe; 401. The first discharge pipe; 402. The second discharge pipe; 403. The first sealing cylinder; 404. The first piston; 405. The first push rod; 406. The push plate; 407. The fixed block; 408. The third threaded rod; 409. The active bevel gear; 410. The passive bevel gear; 411. The moving block; 412. The second sealing cylinder; 413. The second piston; 414. The second push rod; 415. The second connecting pipe; 416. The pressure valve. DETAILED DESCRIPTION
[0030] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] See also Figure 1-Figure 4 The present invention provides a high-efficiency internal mixer with a self-cleaning function, comprising: a base 1, a mixing device, a cleaning device, and a pneumatic unloading device. The mixing device is arranged above the base 1 and is fixedly connected to the base 1. The cleaning device is arranged inside the mixing device, and the cleaning device is connected to the mixing device. The pneumatic unloading device is arranged inside the mixing device and is connected to the cleaning device.
[0032] At the beginning of work, the staff puts the material into the mixing device, and then the staff turns on the mixing device and the cleaning device. The mixing device mixes the material. After that, the mixing device drives the cleaning device to clean the mixing device to ensure the cleanliness of the mixing device and increase the service life of the mixing device. At the same time, the cleaning device can increase the pressure in the mixing device, thereby improving the mixing effect. When the pressure in the mixing device reaches a certain level, the cleaning device drives the pneumatic unloading device to unload the material in the mixing device.
[0033] The mixing device includes: an installation box 201, a support plate 202, a motor 203, a partition 204, a driving shaft 205, a driven shaft 206, a driving gear 207, a driven gear 208, two spiral blades 209, and a feed pipe 210. The installation box 201 is arranged above the base 1, and the installation box 201 is fixedly connected to the base 1. The support plate 202 is horizontally arranged above the base 1 and arranged on the side of the installation box 201, and the support plate 202 is fixedly connected to the installation box 201. The rotating shaft of the motor 203 is arranged horizontally, the motor 203 is arranged above the support plate 202, and the motor 203 is fixedly connected to the support plate 202. The partition 204 is arranged horizontally, arranged in the installation box 201, and the partition 204 is fixedly connected to the installation box 201. The axis of the driving shaft 205 coincides with the axis of the motor 203 shaft. The driving shaft 205 runs through the side of the installation box 201 close to the motor 203, is arranged above the partition 204, and is arranged on the side of the motor 203 close to the installation box 201. The driving shaft 205 is fixedly connected to the motor 203 shaft, and is rotatably connected to the installation box 201, and its rotation axis is arranged horizontally. The passive shaft 206 is parallel to the driving shaft 205, is arranged on the side of the driving shaft 205, runs through the side of the installation box 201, and is arranged above the partition 204. The passive shaft 206 is rotatably connected to the installation box 201, and its rotation axis is parallel to the rotation axis of the driving shaft 205. The driving gear 207 is sleeved on the driving shaft 205, and is arranged between the motor 203 and the installation box 201. The driving gear 207 is fixedly connected to the driving shaft 205. The passive gear 208 is sleeved on the passive shaft 206, arranged on the side of the installation box 201 near the motor 203, and arranged on the side of the active gear 207. The passive gear 208 is fixedly connected to the passive shaft 206 and meshes with the active gear 207. Two spiral blades 209 are arranged in the installation box 201, sleeved on the active shaft 205 and the passive shaft 206 respectively, and arranged above the partition 204. The two spiral blades 209 are respectively fixedly connected to the active shaft 205 and the passive shaft 206. The feed pipe 210 passes through the top surface of the upper part of the installation box 201, and the feed pipe 210 is connected to the inside of the installation box 201.
[0034] At the beginning of the work, the staff puts the material into the installation box 201 through the feed pipe 210, and then the staff turns on the motor 203. The rotation of the motor 203 drives the driving shaft 205 to rotate, the rotation of the driving shaft 205 drives the driving gear 207 to rotate, the rotation of the driving gear 207 drives the driven gear 208 to rotate, and the rotation of the driving shaft 205 and the driven shaft 206 drives the spiral blade 209 to rotate, thereby mixing the materials.
[0035] A sealing cover is provided above the feed pipe 210 .
[0036] The sealing cover on the feed pipe 210 can ensure that the interior of the installation box 201 is in a sealed state.
[0037] The partition plate 204 is fixedly connected to the installation box 201 by seamless welding.
[0038] The partition plate 204 is fixedly connected to the installation box 201 by seamless welding, so as to ensure that the stirring space in the installation box 201 is in a sealed state.
[0039] The cleaning device includes: a first threaded rod 301, a first incomplete gear 302, a circular gear 303, two first racks 304, a first connecting rod 305, a second rack 306, a second threaded rod 307, a connecting box 308, a connecting block 309, a threaded sleeve 310, a second incomplete gear 311, a third rack 312, a second connecting rod 313, a fourth rack 314, a nozzle 315, an air compressor 316, and a first connecting pipe 317. The first threaded rod 301 is parallel to the passive shaft 206, passes through the side of the installation box 201, and is arranged above the two spiral blades 209. The first threaded rod 301 is rotatably connected to the installation box 201, and its rotation axis is parallel to the rotation axis of the active shaft 205. The first incomplete gear 302 is sleeved on the passive shaft 206 and is arranged on the side of the installation box 201 away from the motor 203. The first incomplete gear 302 is fixedly connected to the passive shaft 206. The circular gear 303 is sleeved on the first threaded rod 301, arranged on the side of the installation box 201 away from the motor 203, and arranged above the first incomplete gear 302. The circular gear 303 is fixedly connected to the first threaded rod 301. Two first racks 304 are arranged vertically, and the two first racks 304 are arranged symmetrically. The two first racks 304 are arranged on the side of the installation box 201 away from the motor 203, and are respectively arranged on both sides of the first incomplete gear 302. The two first racks 304 are slidably connected to the side of the installation box 201 away from the motor 203 in the vertical direction, and the two first racks 304 are meshed with the first incomplete gear 302. The first connecting rod 305 is arranged above the two first racks 304, and the first connecting rod 305 is fixedly connected to the upper ends of the two first racks 304. The second rack 306 is vertically arranged, arranged above the first connecting rod 305, and arranged on the side of the circular gear 303. The lower end of the second rack 306 is fixedly connected to the first connecting rod 305, and the second rack 306 is meshed with the circular gear 303. The second threaded rod 307 is parallel to the first threaded rod 301, arranged inside the installation, arranged on the side of the first threaded rod 301, and arranged above the two spiral blades 209. The second threaded rod 307 is fixedly connected to the installation box 201. The connection box 308 is sleeved on the first threaded rod 301 and the second threaded rod 307, and is arranged above the two spiral blades 209. The connection box 308 is threadedly connected to the first threaded rod 301, and the connection box 308 is slidably connected to the second threaded rod 307 along a horizontal square. The connection block 309 runs through the upper bottom surface of the connection box 308, is arranged above the two spiral blades 209, and is arranged below the first threaded rod 301 and the second threaded rod 307. The connection block 309 is slidably connected to the connection box 308 in the horizontal direction. The threaded sleeve 310 is disposed inside the connection box 308 and sleeved on the second threaded rod 307 . The threaded sleeve 310 is threadedly connected to the second threaded rod 307 and is rotationally connected to the connection box 308 , and its rotation axis coincides with the axis of the second threaded rod 307 .The second incomplete gear 311 is sleeved on the threaded sleeve 310, and the second incomplete gear 311 is fixedly connected to the threaded sleeve 310. The third rack 312 is horizontally arranged, arranged inside the connection box 308, arranged above the connection block 309, and arranged below the second incomplete gear 311. The second rack 306 is fixedly connected to the connection block 309 and meshed with the second incomplete gear 311. The second connecting rod 313 is vertically arranged, arranged above the third rack 312, and arranged between the first threaded rod 301 and the second threaded rod 307. The lower end of the second connecting rod 313 is fixedly connected to the third rack 312. The fourth rack 314 is symmetrically arranged with the third rack 312, arranged above the second connecting rod 313, and arranged above the second incomplete gear 311. The fourth rack 314 is fixedly connected to the upper end of the second connecting rod 313 and meshed with the second incomplete gear 311. The nozzle 315 is arranged below the connection block 309 and above the two spiral blades 209, and the nozzle 315 is fixedly connected to the connection block 309. The air compressor 316 is arranged inside the installation box 201 and below the partition 204, and the air compressor 316 is fixedly connected to the bottom surface of the installation box 201. The first connecting pipe 317 is arranged vertically, and the first connecting pipe 317 runs through the installation box 201. The upper end of the first connecting pipe 317 is connected to the nozzle 315, and the lower end is connected to the air compressor 316.
[0040] When the passive shaft 206 rotates, the passive shaft 206 drives the first incomplete gear 302 to rotate, the rotation of the first incomplete gear 302 drives the two first racks 304 to move up and down, the up and down movement of the two first racks 304 drives the first connecting rod 305 to move up and down, the up and down movement of the first connecting rod 305 drives the second rack 306 to move up and down, the up and down movement of the second rack 306 drives the circular gear 303 to rotate, the rotation of the circular gear 303 drives the first threaded rod 301 to rotate, the rotation of the first threaded rod 301 drives the first connecting rod 305 to move left and right, the left and right movement of the first connecting rod 305 drives the connecting block 309 to move left and right, the left and right movement of the connecting block 309 drives the nozzle 315 to move left and right, the high-pressure gas in the nozzle 315 cleans the spiral blade 209, thereby keeping the spiral blade 209 clean and increasing the service life of the spiral blade 209. When the connecting box 308 moves left and right, the connecting box 308 drives the threaded sleeve 310 to move left and right. The threaded sleeve 310 rotates with the cooperation of the second threaded rod 307. The rotation of the threaded sleeve 310 drives the second incomplete gear 311 to rotate. The rotation of the second incomplete gear 311 drives the third rack 312 and the fourth rack 314 to move forward and backward, thereby driving the connecting block 309 to move forward and backward, thereby increasing the cleaning area of the nozzle 315 and ensuring that there is no cleaning dead corner. At the same time, the high-pressure gas will increase the pressure in the working box and increase the mixing effect of the materials.
[0041] The two first racks 304 are slidably connected to the installation box 201 through sliding grooves.
[0042] The first rack 304 is slidably connected to the installation box 201 through the sliding groove, which can limit the horizontal position of the first rack 304 and prevent the first rack 304 from being separated from the first incomplete gear 302, thereby affecting the transmission efficiency.
[0043] A groove is provided at the place where the connection block 309 is connected to the connection box 308 .
[0044] The grooves provided at the place where the connection block 309 is connected to the connection box 308 limit the vertical displacement of the connection block 309 while enabling the connection block 309 to move horizontally.
[0045] The nozzle 315 is a high-pressure nozzle 315 .
[0046] The high-pressure nozzle 315 can increase the cleaning efficiency of the spiral blade 209 .
[0047] The pneumatic unloading device includes: a first discharge pipe 401, a second discharge pipe 402, a first sealing cylinder 403, a first piston 404, a first push rod 405, a push plate 406, a fixed block 407, a third threaded rod 408, an active bevel gear 409, a passive bevel gear 410, a moving block 411, a second sealing cylinder 412, a second piston 413, a second push rod 414, a second connecting pipe 415, and a pressure valve 416. The first discharge pipe 401 is vertically arranged, and the first discharge pipe 401 is arranged inside the installation box 201, and the first discharge pipe 401 passes through the partition 204, and the first discharge pipe 401 is fixedly connected to the partition 204. The second discharge pipe 402 is arranged horizontally, passes through the side of the installation box 201 away from the motor 203, is arranged below the partition 204, is arranged below the first discharge pipe 401, and is arranged on the side of the air compressor 316. The second discharge pipe 402 is fixedly connected to the bottom surface of the interior of the installation box 201 and communicates with the first discharge pipe 401. The first sealing cylinder 403 is arranged horizontally, is arranged inside the installation box 201, is arranged below the partition 204, is arranged between the second discharge pipe 402 and the air compressor 316, and is fixedly connected to the bottom surface of the interior of the installation box 201. The first piston 404 is arranged vertically, and is arranged in the first sealing cylinder 403. The first piston 404 is connected to the first sealing cylinder 403 in a sliding manner in the horizontal direction. The first push rod 405 is arranged horizontally, and the first push rod 405 passes through the side of the first sealing cylinder 403 close to the second discharge pipe 402. The first push rod 405 is connected to the side of the first sealing cylinder 403 in a sliding manner in the horizontal direction. The push plate 406 is vertically arranged, arranged in the second discharge pipe 402, and arranged on the side of the first push rod 405 away from the first sealing cylinder 403. The push plate 406 is slidably connected with the second discharge pipe 402 in the horizontal direction, and is fixedly connected with the first push rod 405. The fixed block 407 is arranged on the side of the installation box 201 close to the motor 203, and is arranged below the first threaded rod 301. The fixed block 407 is fixedly connected with the installation box 201. The third threaded rod 408 is vertically arranged, passes through the fixed block 407, and is arranged below the first threaded rod 301. The third threaded rod 408 is slidably connected with the fixed block 407 in the vertical direction. The active bevel gear 409 is sleeved on the first threaded rod 301, and is arranged on the side of the installation box 201 close to the motor 203, and is arranged above the third threaded rod 408. The active bevel gear 409 is fixedly connected with the first threaded rod 301. The passive bevel gear 410 is sleeved on the third threaded rod 408, disposed below the active bevel gear 409, and disposed above the fixed block 407. The passive bevel gear 410 is fixedly connected to the third threaded rod 408 and meshes with the active bevel gear 409. The moving block 411 is sleeved on the third threaded rod 408, disposed below the fixed block 407, and disposed above the base 1. The moving block 411 is threadedly connected to the third threaded rod 408.The second sealing cylinder 412 is vertically arranged, arranged on the side of the installation box 201 close to the motor 203, arranged above the base 1, and arranged below the moving block 411, and the second sealing cylinder 412 is fixedly connected to the base 1. The second piston 413 is horizontally arranged, arranged in the second sealing cylinder 412, and the second piston 413 is slidably connected to the second sealing cylinder 412 along the vertical direction. The second push rod 414 passes through the upper surface of the second sealing cylinder 412, is arranged above the second piston 413, and is arranged below the moving block 411, the upper end of the second push rod 414 is fixedly connected to the moving block 411, and the lower end of the second push rod 414 is fixedly connected to the second piston 413. The second connecting pipe 415 passes through the side of the installation box 201 close to the second sealing cylinder 412, one end of the second connecting pipe 415 is connected to the first sealing cylinder 403, and the other end of the second connecting pipe 415 is connected to the second sealing cylinder 412. The pressure valve 416 is disposed in the first discharge pipe 401 , and the pressure valve 416 is fixedly connected to the first discharge pipe 401 .
[0048] When the nozzle 315 moves to the rightmost end, the pressure in the installation box 201 increases to the maximum, thereby opening the pneumatic valve, and the material enters the second feed pipe 210 through the first discharge pipe 401. When the first threaded rod 301 rotates, the first threaded rod 301 rotates to drive the active bevel gear 409 to rotate, the active bevel gear 409 rotates to drive the passive bevel gear 410 to rotate, the passive bevel gear 410 rotates to drive the third threaded rod 408 to rotate, the third threaded rod 408 rotates to drive the moving block 411, the moving block 411 moves up and down to drive the second push rod 414 to move up and down, the second push rod 414 moves up and down to drive the second piston 413 to move up and down, the second piston 413 moves up and down to push the compressed air from the second sealing cylinder 412 through the second connecting pipe 415 into the first sealing cylinder 403, the compressed air enters the second sealing cylinder 412 and pushes the first piston 404 to move left and right after entering, the first piston 404 moves left and right to drive the first push rod 405 to move left and right, the first push rod 405 moves left and right to drive the push plate 406 to push the material entered into the second discharge pipe 402, thereby completing the unloading of the material.
[0049] The third threaded rod 408 is rotatably connected to the fixed block 407 via a bearing.
[0050] The third threaded rod 408 is rotatably connected to the fixing block 407 via the fixing block 407 , so that the transmission efficiency of the third threaded rod 408 can be improved.
[0051] Working principle: At the beginning of work, the staff puts the material into the installation box 201 through the feed pipe 210, and then the staff turns on the motor 203. The rotation of the motor 203 drives the driving shaft 205 to rotate, the rotation of the driving shaft 205 drives the driving gear 207 to rotate, the rotation of the driving gear 207 drives the driven gear 208 to rotate, the rotation of the driving shaft 205 and the driven shaft 206 drives the spiral blade 209 to rotate, thereby mixing the materials.
[0052] When the passive shaft 206 rotates, the passive shaft 206 drives the first incomplete gear 302 to rotate, the rotation of the first incomplete gear 302 drives the two first racks 304 to move up and down, the up and down movement of the two first racks 304 drives the first connecting rod 305 to move up and down, the up and down movement of the first connecting rod 305 drives the second rack 306 to move up and down, the up and down movement of the second rack 306 drives the circular gear 303 to rotate, the rotation of the circular gear 303 drives the first threaded rod 301 to rotate, the rotation of the first threaded rod 301 drives the first connecting rod 305 to move left and right, the left and right movement of the first connecting rod 305 drives the connecting block 309 to move left and right, the left and right movement of the connecting block 309 drives the nozzle 315 to move left and right, the high-pressure gas in the nozzle 315 cleans the spiral blade 209, thereby keeping the spiral blade 209 clean and increasing the service life of the spiral blade 209. When the connecting box 308 moves left and right, the connecting box 308 drives the threaded sleeve 310 to move left and right. The threaded sleeve 310 rotates with the cooperation of the second threaded rod 307. The rotation of the threaded sleeve 310 drives the second incomplete gear 311 to rotate. The rotation of the second incomplete gear 311 drives the third rack 312 and the fourth rack 314 to move forward and backward, thereby driving the connecting block 309 to move forward and backward, thereby increasing the cleaning area of the nozzle 315 and ensuring that there is no cleaning dead corner. At the same time, the high-pressure gas will increase the pressure in the working box and increase the mixing effect of the materials.
[0053] When the nozzle 315 moves to the rightmost end, the pressure in the installation box 201 increases to the maximum, thereby opening the pneumatic valve, and the material enters the second feed pipe 210 through the first discharge pipe 401.
[0054] When the first threaded rod 301 rotates, the first threaded rod 301 rotates to drive the active bevel gear 409 to rotate, the active bevel gear 409 rotates to drive the passive bevel gear 410 to rotate, the passive bevel gear 410 rotates to drive the third threaded rod 408 to rotate, the third threaded rod 408 rotates to drive the moving block 411, the moving block 411 moves up and down to drive the second push rod 414 to move up and down, the second push rod 414 moves up and down to drive the second piston 413 to move up and down, the second piston 413 moves up and down to push the compressed air from the second sealing cylinder 412 through the second connecting pipe 415 into the first sealing cylinder 403, the compressed air enters the second sealing cylinder 412 and pushes the first piston 404 to move left and right after entering, the first piston 404 moves left and right to drive the first push rod 405 to move left and right, the first push rod 405 moves left and right to drive the push plate 406 to push the material entered into the second discharge pipe 402, thereby completing the unloading of the material.
[0055] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A high-efficiency internal mixer with self-cleaning function, characterized in that: include: Base (1), mixing device, cleaning device, pneumatic unloading device; The mixing device is arranged above the base (1) and is fixedly connected to the base (1); the cleaning device is arranged inside the mixing device and is connected to the mixing device; the pneumatic unloading device is arranged inside the mixing device and is connected to the cleaning device.
2. A high-efficiency internal mixer with self-cleaning function according to claim 1, characterized in that: The mixing device comprises: an installation box (201), a support plate (202), a motor (203), a partition plate (204), a driving shaft (205), a driven shaft (206), a driving gear (207), a driven gear (208), two spiral blades (209), and a feed pipe (210); the installation box (201) is arranged above the base (1), and the installation box (201) is fixedly connected to the base (1); the support plate (202) is horizontally arranged above the base (1) and arranged on the side of the installation box (201), and the support plate (202) is fixedly connected to the installation box (201); the motor (203) has a rotating shaft arranged horizontally, and the motor (203) is arranged on the base (1). The motor (203) is fixedly connected to the support plate (202) above the support plate (202); the partition plate (204) is horizontally arranged and arranged in the installation box (201); the partition plate (204) is fixedly connected to the installation box (201); the axis of the driving shaft (205) coincides with the axis of the rotating shaft of the motor (203); the driving shaft (205) passes through the side of the installation box (201) close to the motor (203), is arranged above the partition plate (204), and is arranged on the side of the motor (203) close to the installation box (201); the driving shaft (205) is fixedly connected to the rotating shaft of the motor (203) and is rotatably connected to the installation box (201); Its rotation axis is arranged horizontally; the passive shaft (206) is parallel to the active shaft (205), arranged on the side of the active shaft (205), passes through the side of the installation box (201), and is arranged above the partition (204); the passive shaft (206) is rotatably connected to the installation box (201), and its rotation axis is parallel to the rotation axis of the active shaft (205); the active gear (207) is sleeved on the active shaft (205), and is arranged between the motor (203) and the installation box (201); the active gear (207) is fixedly connected to the active shaft (205); the passive gear (208) is sleeved on the passive shaft (206), and is arranged on the installation box (201); The box (201) is close to the side of the motor (203) and is arranged on the side of the driving gear (207). The driven gear (208) is fixedly connected to the driven shaft (206) and meshes with the driving gear (207). The two spiral blades (209) are arranged in the installation box (201), respectively sleeved on the driving shaft (205) and the driven shaft (206), and arranged above the partition (204). The two spiral blades (209) are respectively fixedly connected to the driving shaft (205) and the driven shaft (206). The feed pipe (210) passes through the top surface of the upper part of the installation box (201), and the feed pipe (210) is communicated with the inside of the installation box (201).
3. A high-efficiency internal mixer with self-cleaning function according to claim 2, characterized in that: A sealing cover is provided above the feed pipe (210).
4. A high-efficiency internal mixer with self-cleaning function according to claim 2, characterized in that: The partition plate (204) is fixedly connected to the installation box (201) by seamless welding.
5. The high-efficiency internal mixer with self-cleaning function according to claim 2, characterized in that: The cleaning device comprises: a first threaded rod (301), a first incomplete gear (302), a circular gear (303), two first racks (304), a first connecting rod (305), a second rack (306), a second threaded rod (307), a connecting box (308), a connecting block (309), a threaded sleeve (310), a second incomplete gear (311), a third rack (312), a second connecting rod (313), a fourth rack (314), a nozzle (315), an air compressor (316), and a first connecting pipe (317); the first threaded rod (301) is parallel to the passive shaft (206), passes through the side of the installation box (201), and is arranged on both sides. The first threaded rod (301) is rotatably connected to the installation box (201) and its rotation axis is parallel to the rotation axis of the driving shaft (205); the first incomplete gear (302) is sleeved on the driven shaft (206) and is arranged on the side of the installation box (201) away from the motor (203); the first incomplete gear (302) is fixedly connected to the driven shaft (206); the circular gear (303) is sleeved on the first threaded rod (301) and is arranged on the side of the installation box (201) away from the motor (203), and is arranged above the first incomplete gear (302); the circular gear ( The first threaded rod (301) is fixedly connected to the first threaded rod (303); the two first racks (304) are vertically arranged, the two first racks (304) are symmetrically arranged, the two first racks (304) are arranged on the side of the installation box (201) away from the motor (203), and are respectively arranged on both sides of the first incomplete gear (302); the two first racks (304) are slidably connected to the side of the installation box (201) away from the motor (203) in the vertical direction, and the two first racks (304) are meshed with the first incomplete gear (302); the first connecting rod (305) is arranged above the two first racks (304), and the first connecting rod (305) is arranged on the side of the installation box (201) away from the motor (203). 05) is fixedly connected to the upper ends of the two first racks (304); the second rack (306) is vertically arranged, arranged above the first connecting rod (305), and arranged on the side of the circular gear (303); the lower end of the second rack (306) is fixedly connected to the first connecting rod (305), and the second rack (306) is meshed with the circular gear (303); the second threaded rod (307) is parallel to the first threaded rod (301), arranged inside the installation, arranged on the side of the first threaded rod (301), and arranged above the two spiral blades (209); the second threaded rod (307) is fixedly connected to the installation box (201);The connection box (308) is sleeved on the first threaded rod (301) and the second threaded rod (307), and is arranged above the two spiral blades (209). The connection box (308) is threadedly connected to the first threaded rod (301), and the connection box (308) is slidably connected to the second threaded rod (307) along a horizontal square. The connection block (309) passes through the upper bottom surface of the connection box (308), and is arranged above the two spiral blades (209), and below the first threaded rod (301) and the second threaded rod (307). The connection block (309) is slidably connected to the connection box (308) along a horizontal direction. The threaded sleeve (310) is provided The second incomplete gear (311) is placed inside the connection box (308) and sleeved on the second threaded rod (307). The threaded sleeve (310) is threadedly connected to the second threaded rod (307) and is rotatably connected to the connection box (308). Its rotation axis coincides with the axis of the second threaded rod (307). The second incomplete gear (311) is sleeved on the threaded sleeve (310). The second incomplete gear (311) is fixedly connected to the threaded sleeve (310). The third rack (312) is horizontally arranged, arranged inside the connection box (308), arranged above the connection block (309) and arranged below the second incomplete gear (311). The second rack (30 6) is fixedly connected to the connecting block (309) and meshed with the second incomplete gear (311); the second connecting rod (313) is vertically arranged, arranged above the third rack (312), and arranged between the first threaded rod (301) and the second threaded rod (307); the lower end of the second connecting rod (313) is fixedly connected to the third rack (312); the fourth rack (314) is symmetrically arranged with the third rack (312), arranged above the second connecting rod (313), and arranged above the second incomplete gear (311); the fourth rack (314) is fixedly connected to the upper end of the second connecting rod (313) and meshed with the second incomplete gear (311); 311) meshed; the nozzle (315) is arranged below the connecting block (309) and above the two spiral blades (209), and the nozzle (315) is fixedly connected to the connecting block (309); the air compressor (316) is arranged inside the installation box (201) and below the partition (204), and the air compressor (316) is fixedly connected to the bottom surface of the installation box (201); the first connecting pipe (317) is arranged vertically, and the first connecting pipe (317) passes through the installation box (201), and the upper end of the first connecting pipe (317) is connected to the nozzle (315), and the lower end is connected to the air compressor (316). ; 6. A high-efficiency internal mixer with self-cleaning function according to claim 5, characterized in that: The two first racks (304) are slidably connected to the installation box (201) via a sliding groove.
7. The high-efficiency internal mixer with self-cleaning function according to claim 5, characterized in that: A groove is provided at the location where the connection block (309) is connected to the connection box (308).
8. The high-efficiency internal mixer with self-cleaning function according to claim 5, characterized in that: The nozzle (315) is a high-pressure nozzle (315).
9. The high-efficiency internal mixer with self-cleaning function according to claim 5, characterized in that: The pneumatic unloading device comprises: a first discharge pipe (401), a second discharge pipe (402), a first sealing tube (403), a first piston (404), a first push rod (405), a push plate (406), a fixed block (407), a third threaded rod (408), an active bevel gear (409), a passive bevel gear (410), a moving block (411), a second sealing tube (412), a second piston (413), a second push rod (414), a second connecting pipe (415), and a pressure valve (416); the axis of the first discharge pipe (401) is vertically arranged, the first discharge pipe (401) is arranged inside the installation box (201), and the first discharge pipe (401) passes through the partition ( 204), the first discharge pipe (401) is fixedly connected to the partition (204); the second discharge pipe (402) is horizontally arranged, passes through the side of the installation box (201) away from the motor (203), is arranged below the partition (204), is arranged below the first discharge pipe (401), is arranged on the side of the air compressor (316), the second discharge pipe (402) is fixedly connected to the bottom surface of the installation box (201), and is communicated with the first discharge pipe (401); the first sealing tube (403) is horizontally arranged, is arranged inside the installation box (201), is arranged below the partition (204), is arranged between the second discharge pipe (402) and the air compressor (316), The first sealing cylinder (403) is fixedly connected to the inner bottom surface of the installation box (201) between the air compressor (316); the first piston (404) is vertically arranged and arranged in the first sealing cylinder (403); the first piston (404) is connected to the first sealing cylinder (403) in a sliding manner in the horizontal direction; the first push rod (405) is horizontally arranged and the first push rod (405) passes through the side of the first sealing cylinder (403) close to the second discharge pipe (402); the first push rod (405) is connected to the side of the first sealing cylinder (403) in a sliding manner in the horizontal direction; the push plate (406) is vertically arranged and arranged in the second discharge pipe (402); On the side of the first push rod (405) away from the first sealing cylinder (403), the push plate (406) is slidably connected to the second discharge pipe (402) in the horizontal direction and is fixedly connected to the first push rod (405); the fixed block (407) is arranged on the side of the installation box (201) close to the motor (203) and is arranged below the first threaded rod (301), and the fixed block (407) is fixedly connected to the installation box (201); the third threaded rod (408) is vertically arranged, passes through the fixed block (407), and is arranged below the first threaded rod (301), and the third threaded rod (408) is slidably connected to the fixed block (407) in the vertical direction;The active bevel gear (409) is sleeved on the first threaded rod (301), arranged on the side of the installation box (201) close to the motor (203), and arranged above the third threaded rod (408). The active bevel gear (409) is fixedly connected to the first threaded rod (301). The passive bevel gear (410) is sleeved on the third threaded rod (408), arranged below the active bevel gear (409), and arranged above the fixed block (407). The passive bevel gear (410) is fixedly connected to the third threaded rod (408). The third threaded rod (408) is fixedly connected and meshes with the active bevel gear (409); the moving block (411) is sleeved on the third threaded rod (408), arranged below the fixed block (407) and above the base (1); the moving block (411) is threadedly connected to the third threaded rod (408); the second sealing cylinder (412) is vertically arranged, arranged on the side of the installation box (201) close to the motor (203), arranged above the base (1), and arranged on the moving block (411). At the bottom, the second sealing cylinder (412) is fixedly connected to the base (1); the second piston (413) is arranged horizontally and is arranged in the second sealing cylinder (412); the second piston (413) and the second sealing cylinder (412) are slidably connected in the vertical direction; the second push rod (414) passes through the upper surface of the second sealing cylinder (412), is arranged above the second piston (413), and is arranged below the moving block (411); the upper end of the second push rod (414) is fixedly connected to the moving block (411). The lower end of the second push rod (414) is fixedly connected to the second piston (413); the second connecting pipe (415) passes through the side of the installation box (201) close to the second sealing cylinder (412); one end of the second connecting pipe (415) is connected to the first sealing cylinder (403), and the other end of the second connecting pipe (415) is connected to the second sealing cylinder (412); the pressure valve (416) is arranged in the first discharge pipe (401), and the pressure valve (416) is fixedly connected to the first discharge pipe (401). ; 10. The high-efficiency internal mixer with self-cleaning function according to claim 9, characterized in that: The third threaded rod (408) is rotatably connected to the fixed block (407) via a bearing.