Port radiation capability evaluation method and system based on geographic information data

By combining throughput models, fixed amount models, and system models with geographic information data, the multi-factor problem of port radiation capacity assessment in existing technologies has been solved, and the effective assessment and promotion of economic ties between ports and inland hinterlands has been achieved.

CN119494465AInactive Publication Date: 2025-02-21CHINA WATERBORNE TRANSPORT RES INST
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411516001.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-29
Publication Date
2025-02-21
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing technologies cannot provide a multi-factor combined method for assessing port radiation capacity, which makes it impossible to achieve reasonable economic connections and development between ports and inland hinterlands.

Method used

By combining throughput models, fixed amount models, and system models with geographic information data, we can obtain the port's past annual container throughput and the value of goods traded in the inland hinterland, and conduct a multi-factor assessment of the port's radiation capacity.

Benefits of technology

It enables multi-factor assessment of port radiation capacity, reduces the complexity of data acquisition, improves the efficiency and accuracy of assessment, and promotes economic ties and development between the port and the inland hinterland.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119494465A_ABST
    Figure CN119494465A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of information technology suitable for supervision, in particular to a port radiation capability assessment method and system based on geographic information data, and the method comprises the steps: obtaining the previous annual container throughput of a target port, and obtaining an annual container throughput set; obtaining the cargo exchange amount of the previous inland abdominal land of the target port, and obtaining an amount statistical set; executing data cleaning on the annual container throughput set and the amount statistics set; performing quantity analysis on the cleaned annual container throughput set, and performing computational analysis on the cleaned amount statistical set; obtaining a preliminary evaluation result of future radiation capability of the target port; and performing final radiation capability evaluation of the target port on the preliminary evaluation result. According to the invention, multi-factor evaluation of the radiation capability of the port is realized; meanwhile, according to the method, port radiation capability evaluation can be carried out only by acquiring data information with quarters as units, and the method is different from multi-step and multi-time-point data acquisition in the prior art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of information technology suitable for supervision purposes, and in particular to a method for evaluating the radiation capacity of a port based on geographic information data, and also to a system. Background Art

[0002] The hinterland radiation capacity of a port has three levels of meaning: first, for port operators and planners, they can understand the hinterland radiation capacity of different cargo types based on the current port freight structure, thereby providing strong support for the adjustment of the port's collection and distribution system and port construction planning; second, for port operators, by integrating the hinterland radiation capacity of the port and the advantages of the hinterland industry, they can explore the potential cooperation space between the port and the hinterland, while considering the land transportation system between the port and the hinterland, further strengthening the cooperation space and value between the port and the hinterland; third, for the hinterland of the port, they can fully understand the comprehensive service level of the port, develop potential advantageous industries in a targeted manner, and promote the economic development of the hinterland.

[0003] Based on this, if the radiation capacity of the port is reasonably estimated, effective connection between the port and the inland hinterland can be achieved, promoting the economic development of the inland hinterland. Summary of the invention

[0004] The inventors found through research that the radiation range of the port hinterland and the port's attractiveness to the hinterland's cargo sources determine the radiation capacity of the port. Studies have shown that the higher the radiation capacity and the larger the radiation range, the more important the economic connection role for the inland hinterland. However, since existing research ideas focus on the influence of one-way factors, it is impossible to achieve a reasonable evaluation of the port's radiation capacity.

[0005] The purpose of this application is to provide a method and system for evaluating the radiation capacity of a port based on geographic information data, and to solve the technical problem that the prior art cannot provide a method and system for evaluating the radiation capacity of a port by combining multiple factors through a throughput model, a rated amount model and a system model.

[0006] According to one aspect of the present application, a method for evaluating port radiation capacity based on geographic information data is provided, the method being executed by a processor and comprising:

[0007] Obtain the target port's annual container throughput in previous years and obtain an annual container throughput set;

[0008] Obtain the cargo transaction amount of the target port's inland hinterland in the past period and obtain the amount statistics set;

[0009] Perform data cleaning on the annual container throughput set and amount statistics set;

[0010] Performing a quantitative analysis based on the throughput model on the cleaned annual container throughput set, and performing a computational analysis based on the rated amount model on the cleaned amount statistics set;

[0011] Based on the results of quantitative analysis and computational analysis, obtain preliminary evaluation results of the future radiation capacity of the target port;

[0012] Based on the system model, the final radiation capacity assessment of the target port is carried out according to the preliminary assessment results.

[0013] In some embodiments, the target port's annual container throughput in previous periods includes the number of transshipment containers at the target port, the number of fixed unloaded containers at the target port, and the number of unloaded containers transferred from other ports to the target port.

[0014] In some embodiments, the amount of cargo transactions between the target port and the inland hinterland includes: the total value of cargo imported and exported from the port to the inland hinterland, the port cargo transportation cost, and the total value of cargo lost in the transportation of cargo from the hinterland to the port.

[0015] In some embodiments, the quantitative analysis based on the throughput model is performed on the cleaned annual container throughput set, specifically:

[0016] Classify the annual container throughput set into the first quarter throughput set ρ1, the second quarter throughput set ρ2, and the third quarter throughput set ρ3;

[0017] Input the throughput model to ρ1, ρ2, and ρ3, and calculate the throughput ratio.

[0018] In some embodiments, the throughput model is:

[0019]

[0020] Where ψ is the throughput ratio; ρ x is the throughput of the port in the corresponding quarter, x = 1, 2, 3; ρ 标 Preset standard throughput for ports.

[0021] In some embodiments, the calculation and analysis based on the rated amount model is performed on the cleaned amount statistics set, specifically:

[0022] Classify the amount statistics set into the first quarter amount set C 1· , the second quarter amount set C2 and the third quarter amount set C3;

[0023] C 1· , C2 and C3 input the rated amount model and calculate the amount achievement rate.

[0024] In some embodiments, the rated amount model is:

[0025]

[0026] Among them, φ is the compliance rate; C n is the amount set of the port in the corresponding quarter, n = 1, 2, 3; C e The preset rated amount.

[0027] In some embodiments, the preliminary evaluation result of the target port's future radiation capacity is obtained as follows: the target port's estimated radiation capacity based on past data each quarter.

[0028] In some embodiments, the system model specifically includes a first analysis layer, a second estimation layer, and a third output layer, wherein:

[0029] The first analysis layer performs deviation analysis and removal on the estimated radiation capacity of the target port in combination with the previous radiation standard values ​​in the port radiation database;

[0030] The second estimation layer acquires the data from the first analysis layer and performs radiation capacity analysis of the future target port;

[0031] The third output layer receives the analysis data from the second estimation layer and performs a final estimation output.

[0032] According to another aspect of the present application, a port radiation capacity assessment system based on geographic information data is provided, comprising:

[0033] A first acquisition module, the first acquisition module is used to acquire the target port's past annual container throughput to obtain an annual container throughput set;

[0034] A second acquisition module, the second acquisition module is used to obtain the amount of cargo transactions between the target port and the inland hinterland in the past period, and obtain an amount statistics set;

[0035] A preprocessing module, the preprocessing module is used to perform data cleaning on an annual container throughput set and a value statistics set;

[0036] An analysis module, the analysis module is used to perform a quantity analysis based on a throughput model on the cleaned annual container throughput set, and to perform a calculation analysis based on a rated amount model on the cleaned amount statistics set;

[0037] A preliminary estimation module, which is used to obtain a preliminary evaluation result of the future radiation capacity of the target port based on the quantitative analysis and the calculation analysis results;

[0038] The final evaluation module is used to perform a final radiation capacity evaluation of the target port based on the preliminary evaluation results and the system model.

[0039] Compared with the prior art, the present application has the following advantages and beneficial effects: the method of the present application realizes a multi-factor evaluation of the port radiation capacity by combining the throughput model, the rated amount model and the system model; at the same time, the method of the present application only needs to obtain data information in quarterly units to evaluate the port radiation capacity, which greatly reduces the complexity of data acquisition and effectively distinguishes the multi-step and multi-time point data acquisition of the prior art. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0041] Figure 1 It is a flow chart of the radiation capability assessment method of the present application.

[0042] Figure 2 It is a structural diagram of the radiation capability assessment system of this application. DETAILED DESCRIPTION

[0043] The following will be combined with the attached examples of the present application Figure 1-2 The technical solutions in the embodiments of the present application are clearly and completely described together. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments.

[0044] Application Overview

[0045] Most of my country's ports are hinterland ports, which are designed to meet the transportation needs of hinterland economic development. In the international market, there is a certain gap in the radiation capacity of my country's ports and the industrial radiation capacity based on the coordinated development of ports, industries and cities and the integration of port supply chains. The level of hinterland radiation capacity of ports determines the speed of economic development in inland hinterlands. Reasonable economic connection between inland and ports can effectively support port construction.

[0046] Among them, for port operators and planners, they can understand the radiation capacity of different cargo types to the hinterland based on the current port freight structure, thereby providing strong support for the adjustment of the port's collection and distribution system and port construction planning; for port operators, by integrating the port's hinterland radiation capacity and the hinterland's industrial advantages, they can explore the potential cooperation space between the port and the hinterland, while considering the land transportation system between the port and the hinterland, and further strengthen the cooperation space and value between the port and the hinterland; for the port hinterland, they can fully understand the comprehensive service level of the port, develop potential advantageous industries in a targeted manner, and promote the development of the hinterland economy. This application combines the throughput model, the rated amount model, and the system model to achieve an effective assessment of the radiation capacity of the port to the inland hinterland, and effectively carry out the targeted construction and development of subsequent ports.

[0047] Exemplary Methods

[0048] A method for evaluating the radiation capacity of a port based on geographic information data is executed by a processor. It is understandable that the processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or the processor may be any conventional processor, etc.

[0049] Methods include:

[0050] Obtain the target port's annual container throughput in the past, and obtain the annual container throughput set; obtain the target port's past inland hinterland cargo transaction amount, and obtain the amount statistics set; perform data cleaning on the annual container throughput set and the amount statistics set; perform a quantity analysis based on the throughput model on the cleaned annual container throughput set, and perform a calculation analysis based on the rated amount model on the cleaned amount statistics set; based on the quantity analysis and the calculation analysis results, obtain the preliminary evaluation results of the target port's future radiation capacity; perform the final radiation capacity evaluation of the target port based on the preliminary evaluation results and the system model. The method of this embodiment realizes the reasonable use of the above data based on the container throughput of the previous port and the amount of transactions between the hinterland and the port, combined with the throughput model, the rated amount model and the system model, and can realize the effective evaluation of the port's radiation capacity, complete the connection between the inland hinterland and the port economy, and promote the rapid development of the port economy. It can be understood that the connection between the port and the inland hinterland is completely based on the geographical environment of the target port and the corresponding inland hinterland. Therefore, the radiation capacity of the port will be different under different geographical environments, but it does not deviate from the exemplary method in this embodiment.

[0051] The following is a detailed description of each of the above steps:

[0052] In some embodiments, the target port's annual container throughput in previous periods includes: the number of transshipment containers at the target port, the number of fixed unloaded containers at the target port, and the number of unloaded containers transferred from other ports to the target port.

[0053] In some embodiments, the amount of cargo transactions between the target port and the inland hinterland includes: the total value of cargo imported and exported from the port to the inland hinterland, the port cargo transportation cost, and the total value of cargo lost in the transportation of cargo from the hinterland to the port.

[0054] In some implementations, a throughput model-based quantitative analysis is performed on the cleaned annual container throughput set, specifically:

[0055] The annual container throughput set is classified into the first quarter throughput set ρ1, the second quarter throughput set ρ2 and the third quarter throughput set ρ3; ρ1, ρ2 and ρ3 are input into the throughput model to calculate the throughput share. It should be noted that the first quarter throughput set ρ1, the second quarter throughput set ρ2 and the third quarter throughput set ρ3 all include the number of transshipment containers at the target port, the number of fixed unloading containers at the target port and the number of unloading containers transferred from other ports to the target port.

[0056] Specifically, the throughput model is:

[0057]

[0058] Where ψ is the throughput ratio; ρ x is the throughput of the port in the corresponding quarter, x = 1, 2, 3; ρ 标 Preset standard throughput for ports.

[0059] In some implementations, a calculation analysis based on a rated amount model is performed on the cleaned amount statistics set, specifically:

[0060] Classify the amount statistics set into the first quarter amount set C 1· , the second quarter amount set C2 and the third quarter amount set C3; 1· , C2 and C3 input the rated amount model and calculate the amount achievement rate.

[0061] It should be noted that the amount of the first quarter is set C 1· , the second quarter amount set C2, and the third quarter amount set C3 both include the total value of goods imported and exported from the inland hinterland to the port, the port cargo transportation cost, and the total value of lost goods in the transportation from the hinterland to the port.

[0062] Specifically, the rated amount model is:

[0063]

[0064] Among them, φ is the compliance rate; C n is the amount set of the port in the corresponding quarter, n = 1, 2, 3; C e The preset rated amount.

[0065] In some embodiments, the preliminary evaluation result of the future radiation capacity of the target port is obtained as follows: the estimated radiation capacity of the target port every quarter combined with past data. It is understandable that the preliminary evaluation result is obtained based on past data. In other words, the evaluation result at this time is not real-time. In order to make the evaluation result more real-time or predictable, the method of this embodiment also involves a system model, specifically, including a first analysis layer, a second estimation layer and a third output layer. Among them: the first analysis layer performs deviation analysis and removal on the estimated radiation capacity of the target port in combination with the past radiation standard values ​​in the port radiation library; the second estimation layer obtains the data from the first analysis layer and performs radiation capacity analysis of the future target port; the third output layer receives the analysis data from the second estimation layer and performs the final estimated output. It is understandable that the evaluation data output by the system model is real-time, and the data is representative after being analyzed and processed by the first and second layers.

[0066] In order to better understand the method of the present application, the present application also provides a port radiation capacity assessment system. Exemplarily, the aforementioned method can be understood as a computer program, which can be divided into one or more modules, one or more modules are stored in a memory, and executed by a processor to complete the present application. One or more modules can be a series of computer program instruction segments that can complete specific functions, and the instruction segments are used to describe the execution process of the computer program in any terminal device. For example, a computer program can be divided into at least a first acquisition module, a second acquisition module, a preprocessing module, an analysis module, a preliminary estimation module and a final evaluation module, and the specific functions of each module are as follows: the first acquisition module is used to obtain the target port's past annual container throughput and obtain an annual container throughput set; the second acquisition module is used to obtain the target port's past inland hinterland cargo transaction amount and obtain an amount statistics set; the preprocessing module is used to perform data cleaning on the annual container throughput set and the amount statistics set; the analysis module is used to perform quantitative analysis based on the throughput model on the cleaned annual container throughput set, and perform computational analysis based on the rated amount model on the cleaned amount statistics set; the preliminary estimation module is used to obtain a preliminary evaluation result of the target port's future radiation capacity based on the quantitative analysis and computational analysis results; the final evaluation module is used to perform a final radiation capacity evaluation of the target port based on the preliminary evaluation result based on the system model.

[0067] The above shows and describes the basic principles and main features of the present application and the advantages of the present application. For those skilled in the art, it is obvious that the present application is not limited to the details of the above exemplary embodiments, and the present application can be implemented in other specific forms without departing from the spirit or basic features of the present application. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present application is defined by the attached claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present application. Any figure mark in the claims should not be regarded as limiting the claims involved.

[0068] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A method for evaluating the radiation capacity of a port based on geographic information data, the method being executed by a processor, characterized in that: include: Obtain the target port's annual container throughput in previous years and obtain an annual container throughput set; Obtain the cargo transaction amount of the target port's inland hinterland in the past period and obtain the amount statistics set; Perform data cleaning on the annual container throughput set and amount statistics set; Performing a quantitative analysis based on the throughput model on the cleaned annual container throughput set, and performing a computational analysis based on the rated amount model on the cleaned amount statistics set; Based on the results of quantitative analysis and computational analysis, obtain preliminary evaluation results of the future radiation capacity of the target port; Based on the system model, the final radiation capacity assessment of the target port is carried out according to the preliminary assessment results.

2. The method according to claim 1, characterized in that The target port’s previous annual container throughput includes the number of transshipment containers at the target port, the number of fixed unloaded containers at the target port, and the number of containers unloaded from other ports to the target port.

3. The method according to claim 1, characterized in that: The amount of cargo transactions between the target port and the inland hinterland in the past period includes: the total value of cargo imported and exported from the port to the inland hinterland, the port cargo transportation cost and the total value of cargo lost in the transportation from the hinterland to the port.

4. The method according to claim 1, characterized in that: The quantitative analysis based on the throughput model is performed on the cleaned annual container throughput set, specifically: Classify the annual container throughput set into the first quarter throughput set ρ1, the second quarter throughput set ρ2, and the third quarter throughput set ρ3; Input the throughput model to ρ1, ρ2, and ρ3, and calculate the throughput ratio.

5. The method according to claim 4, characterized in that The throughput model is: Where ψ is the throughput ratio; ρ x is the throughput of the port in the corresponding quarter, x = 1, 2, 3; ρ 标 Preset standard throughput for ports.

6. The method according to claim 1, characterized in that The calculation and analysis based on the rated amount model is performed on the cleaned amount statistical set, specifically: Classify the amount statistics set into the first quarter amount set C 1· , the second quarter amount set C2 and the third quarter amount set C3; C 1· , C2 and C3 input the rated amount model and calculate the amount achievement rate.

7. The method according to claim 6, characterized in that The rated amount model is: Among them, φ is the compliance rate; C n is the amount set of the port in the corresponding quarter, n = 1, 2, 3; C e The preset rated amount.

8. The method according to claim 1, characterized in that The preliminary evaluation result of the target port's future radiation capacity is: the target port's estimated radiation capacity each quarter based on past data.

9. The method according to claim 8, characterized in that The system model specifically includes a first analysis layer, a second estimation layer and a third output layer, wherein: The first analysis layer performs deviation analysis and removal on the estimated radiation capacity of the target port in combination with the previous radiation standard values ​​in the port radiation database; The second estimation layer acquires the data from the first analysis layer and performs radiation capacity analysis of the future target port; The third output layer receives the analysis data from the second estimation layer and performs a final estimation output.

10. A port radiation capacity assessment system based on geographic information data, characterized in that: include: A first acquisition module, the first acquisition module is used to acquire the target port's past annual container throughput to obtain an annual container throughput set; A second acquisition module, the second acquisition module is used to obtain the amount of cargo transactions between the target port and the inland hinterland in the past period, and obtain an amount statistics set; A preprocessing module, the preprocessing module is used to perform data cleaning on an annual container throughput set and a value statistics set; An analysis module, the analysis module is used to perform a quantity analysis based on a throughput model on the cleaned annual container throughput set, and to perform a calculation analysis based on a rated amount model on the cleaned amount statistics set; A preliminary estimation module, which is used to obtain a preliminary evaluation result of the future radiation capacity of the target port based on the quantitative analysis and the calculation analysis results; The final evaluation module is used to perform a final radiation capacity evaluation of the target port based on the preliminary evaluation results and the system model.

Citation Information

Patent Citations

  • Calculation method for predicting port cargo throughput, electronic equipment and storage medium

    CN117391239A

  • Power system low-carbon transformation efficiency evaluation method, medium and system

    CN117828827A