Three-dimensional iteration type assembling method of full bolt connection spherical shell

Through the three-dimensional iterative assembly method, the spherical shell is divided into several flat steel frames, combining plane and three-dimensional assembly, and using the "two-one iterative" method of the three-bar steel frame, the problem of high requirements in the traditional assembly process is solved, and efficient and accurate spherical shell structure construction is achieved.

CN119507555APending Publication Date: 2025-02-25ZHEJIANG SOUTHEAST SPACE FRAME CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411779333.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-05
Publication Date
2025-02-25

AI Technical Summary

Technical Problem

The traditional ball shell assembly process requires a large number of sites, which is difficult to meet the assembly needs of large ball shell structures, and has high requirements for site conditions and is difficult.

Method used

The three-dimensional iterative assembly method is adopted, and the spherical shell is divided into several flat steel frames according to the warp lines. Through the ground and low-altitude assembly, the plane assembly and three-dimensional assembly are combined, and the "two-one iterative" method of the three-bar steel frame is used to realize the full-circle closed-loop assembly.

Benefits of technology

It realizes efficient, precise and flexible construction of the spherical shell structure, reduces the requirements of the assembly site, improves the assembly efficiency, and ensures the overall assembly accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119507555A_ABST
    Figure CN119507555A_ABST
Patent Text Reader

Abstract

The invention relates to a three-dimensional iterative splicing method for a full-bolted connection spherical shell, which belongs to the technical field of constructional engineering and comprises the following operation steps of: 1, dividing the spherical shell into a plurality of plane steel frames along the longitude of the spherical shell; secondly, the truss steel frame is assembled according to the positioning line of the truss steel frame, and the mounting bolts are screwed in; and thirdly, a positioning jig frame for assembling is erected. And fourthly, pre-assembly of the truss steel frame is completed on the positioning jig frame. And fifthly, the first truss steel frame is dismantled, and the rear truss steel frames are sequentially moved forwards by the distance position of one truss steel frame. And sixthly, the steel frame is assembled at the position of the last original steel frame according to the second step. And seventhly, a newly-assembled steel frame is pre-assembled at the position of the last original steel frame on the assembling jig frame. 8, according to the technological process from the step 5 to the step 7, pre-assembling of the remaining steel frames is completed, and the whole-circle closed-loop pre-assembled full-bolt-connection spherical shell structure is achieved. The device has the advantages of being convenient to assemble, saving the field and guaranteeing the precision.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building engineering, and in particular to a three-dimensional iterative assembly method of a spherical shell connected with all bolts. Background Art

[0002] Spherical shell structures are widely used in scientific research and landscape. Due to scientific research or aesthetic needs, some spherical shell structures are not allowed to be welded and can only be connected by full bolts, which places high demands on the processing accuracy of components. Pre-assembly in the factory is the key to ensuring component accuracy and full bolt connection. With the increase in the size of the spherical shell and the complexity of the structure, the site requirements required by the traditional assembly process are difficult to meet. Summary of the invention

[0003] The present invention mainly solves the deficiencies in the prior art and provides a three-dimensional iterative assembly method for a spherical shell connected with all bolts, which has the advantages of convenient assembly, space saving and guaranteed accuracy. It solves the problem of how to achieve full-circle closed-loop assembly of the overall spherical shell. It reduces the requirements for site conditions for pre-assembly and realizes efficient, accurate and flexible spherical shell structure construction.

[0004] The above technical problems of the present invention are mainly solved by the following technical solutions: A three-dimensional iterative assembly method for a fully bolted spherical shell includes the following steps: Step 1: Divide the spherical shell into several planar steel frames along the meridian of the spherical shell.

[0005] Step 2: Lay out the positioning line of the flat steel frame at a 1:1 ratio on the ground, assemble the flat steel frame, and screw in the mounting bolts.

[0006] Step 3: Lay out the plane projection of the three steel frames corresponding to their spatial positions at a 1:1 ratio on another ground, and erect the positioning frame for assembly based on the plane projection.

[0007] Step 4: Complete the pre-assembly of three steel frames on the positioning frame.

[0008] Step 5: After the pre-assembly of the three steel frames is completed, dismantle the first steel frame and move the following flat steel frames forward one by one.

[0009] Step 6: Assemble the flat steel frame according to step 2.

[0010] Step 7: Pre-assemble the newly assembled flat steel frame at the position of the original last steel frame on the assembly frame.

[0011] Step 8: According to the process from step 5 to step 7, complete the pre-assembly of the remaining steel frames to realize the full-circle closed-loop pre-assembly of the fully bolted spherical shell structure.

[0012] Preferably, the initial number of planar steel frames is 3, and the assembly of the first steel frame, the second steel frame and the third steel frame is completed first.

[0013] Preferably, when pre-assembly reaches the last steel frame, the first steel frame is placed at the position of the third steel frame in the fourth step to complete the full-circle closed-loop pre-assembly.

[0014] The present invention can achieve the following effects: The present invention provides a three-dimensional iterative assembly method for a spherical shell connected with all bolts. Compared with the prior art, the method has the advantages of convenient assembly, space saving and guaranteed accuracy. The method solves the problem of how to realize a closed-loop assembly of the entire spherical shell. The method of combining plane assembly with three-dimensional assembly and the ground and low-altitude assembly methods are adopted to solve the restrictions of the assembly site and improve the assembly efficiency. The three-dimensional assembly of three steel frames is adopted, and the "two-one iteration" method is used to realize the closed-loop assembly of the entire spherical shell, which solves the problems of high requirements and difficulty of the assembly site and ensures the overall assembly accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of a plane steel frame divided according to the meridians of the present invention.

[0016] Figure 2 It is a planar assembly positioning frame sample diagram of a single steel frame of the present invention.

[0017] Figure 3 It is a planar assembly schematic diagram of a single steel frame of the present invention.

[0018] Figure 4 It is a three-dimensional assembly positioning frame sample diagram of three steel frames of the present invention.

[0019] Figure 5 It is a three-dimensional assembly schematic diagram of three steel frames of the present invention. DETAILED DESCRIPTION

[0020] The technical solution of the invention is further specifically described below through embodiments and in conjunction with the accompanying drawings.

[0021] Example: Figure 1-5 As shown, a three-dimensional iterative assembly method of a spherical shell connected with all bolts includes the following steps: Step 1: Divide the spherical shell into several plane steel frames according to the meridians.

[0022] Step 2: Lay out the positioning line of the first steel frame on the ground and assemble the first steel frame.

[0023] Step 3: Assemble the second and third steel frames according to the above steps.

[0024] Step 4: Lay out the plane projection of the three steel frames corresponding to their spatial positions on another ground, and set up the positioning frame for assembly based on the projection.

[0025] Step 5: Complete the pre-assembly of the first to third steel frames on the positioning frame.

[0026] Step 6: After the pre-assembly of the three steel frames is completed, dismantle the first steel frame, and move the second and third steel frames to the positioning frames of the original first and second steel frames respectively.

[0027] Step 7: Assemble the fourth steel frame according to the steps in step 2.

[0028] Step 8: Pre-assemble the fourth steel frame at the position of the original third steel frame on the assembly frame.

[0029] Step 9: Complete the pre-assembly of the remaining steel frames in sequence according to the above steps 6 to 8.

[0030] Step 10: When pre-assembly reaches the last steel frame, place the first steel frame at the position of the third steel frame in step 5 to complete the pre-assembly of the entire closed loop.

[0031] In summary, the three-dimensional iterative assembly method of the fully bolted spherical shell has the advantages of convenient assembly, space saving and guaranteed accuracy. It solves the problem of how to achieve a closed-loop assembly of the entire spherical shell. The method of combining plane assembly with three-dimensional assembly and ground and low-altitude assembly is adopted to solve the restrictions of the assembly site and improve the assembly efficiency. Three steel frames are used for three-dimensional assembly, and the "two-one iteration" method is used to achieve a closed-loop assembly of the entire spherical shell, which solves the problem of high requirements and difficulty of the assembly site and ensures the overall assembly accuracy.

[0032] The above description is only a specific embodiment of the present invention, but the structural features of the present invention are not limited thereto. Any changes or modifications made by any technician in the field of the present invention are included in the patent scope of the present invention.

Claims

1. A three-dimensional iterative assembly method for a fully bolted spherical shell, characterized in that The steps are as follows: Step 1: Divide the spherical shell into several plane steel frames along the meridian of the spherical shell; Step 2: Lay out the positioning line of the plane steel frame at a 1:1 ratio on the ground, assemble the plane steel frame, and screw in the mounting bolts; Step 3: Lay out the plane projection of the corresponding spatial positions of the three steel frames on another ground at a ratio of 1:1, and set up the positioning frame for assembly according to the plane projection; Step 4: Complete the pre-assembly of three steel frames on the positioning frame; Step 5: After the pre-assembly of the three steel frames is completed, the first steel frame is dismantled, and the plane steel frames behind are moved forward one by one by the spacing position of the plane steel frames; Step 6: Continue to assemble the flat steel frame according to step 2; Step 7: pre-assemble the newly assembled flat steel frame at the position of the original last steel frame on the assembly frame; Step 8: According to the process from step 5 to step 7, complete the pre-assembly of the remaining steel frames to realize the full-circle closed-loop pre-assembly of the fully bolted spherical shell structure.

2. The three-dimensional iterative assembly method of a fully bolted spherical shell according to claim 1 is characterized in that: The initial number of flat steel frames is 3. First complete the assembly of the first steel frame, the second steel frame and the third steel frame.

3. The three-dimensional iterative assembly method of the fully bolted spherical shell according to claim 2 is characterized in that: When the pre-assembly reaches the last steel frame, place the first steel frame at the position of the third steel frame in the fourth step to complete the full-circle closed-loop pre-assembly.