Power transmission and transformation project electronic settlement platform and method

Through the electronic settlement platform of power transmission and transformation engineering, the microservice architecture and algorithm model system are used to solve problems such as long settlement cycles and large manual workloads in the existing technology, and the generation of automated settlement and full-scope settlement reports are realized, and settlement efficiency and accuracy are improved.

CN119515309APending Publication Date: 2025-02-25STATE GRID HEBEI ELECTRIC POWER CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411662165.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-20
Publication Date
2025-02-25

AI Technical Summary

Technical Problem

The existing power transmission and transformation project settlement has problems such as lack of process control on the project cost, long settlement cycle, untimely feedback, large manual workload, and inconsistent preparation basis.

Method used

An electronic settlement platform for power transmission and transformation engineering is adopted to realize process cost management, automatic construction settlement and automatic completion settlement through a microservice architecture. The platform includes a business standard system, a data interface system and an algorithm model system, which is used to standardize data management, build a multi-source data resource library, perform logical operations and model analysis, and automatically prepare settlement reports.

Benefits of technology

It shortens the settlement cycle, automatically summarizes settlement data, and generates full-scope settlement reports, saves manual workload and improves the accuracy and rationality of settlement data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119515309A_ABST
    Figure CN119515309A_ABST
Patent Text Reader

Abstract

The invention discloses a power transmission and transformation project electronic settlement platform and method, and the platform comprises a project settlement module which achieves the process cost management, automatic construction settlement and automatic completion settlement through a micro-service architecture; the settlement management module comprises a business standard system, a data interface system and an algorithm model system and is used for carrying out settlement plan management and settlement comparative analysis. The method depends on an overall capital construction process comprehensive datamation management platform. The platform formulates a full-aperture cost data management standard, and standardization of settlement basis is realized; a multi-source technical and economic data resource library is constructed, and a cost cleaning algorithm is applied, so that the cost settlement of the power transmission and transformation project is real-time; an intelligent nuclear engineering settlement model and an implementation settlement analysis model are adopted to realize settlement compilation automation; an engineering settlement collection matrix and a cost deviation early warning model are constructed, and contrastive analysis intellectualization is achieved; and the result is timely fed back to the front end through automatic comparison of engineering process settlement, so that closed-loop feedback is timely.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a settlement platform and method, and in particular to an electronic settlement platform and method for power transmission and transformation projects. Background Art

[0002] The settlement of power transmission and transformation projects is the activity of agreeing on the contract price of the project and calculating the project advance payment, project progress payment and project completion price according to the contract agreement; the scope of project settlement includes construction project costs, installation project costs, equipment purchase costs and other costs in the entire process of project construction.

[0003] The existing settlement of power transmission and transformation projects is based on the final or partial settlement of construction costs after the project is fully or partially completed, and the materials supplied by Party A and other fees are settled after the project is completed. It has the disadvantages of lack of process control over project cost, long settlement cycle, untimely feedback, large workload of manual compilation, and inconsistent compilation basis. Summary of the invention

[0004] In order to solve the deficiencies of the above technologies, the present invention provides an electronic settlement platform and method for power transmission and transformation projects.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: an electronic settlement platform for power transmission and transformation projects, including a project settlement module, which is used to realize process cost management, automatic construction settlement and automatic completion settlement through a microservice architecture; the project settlement module includes a business standard system, a data interface system and an algorithm model system; the business standard system is used to standardize management data and project coding systems to support settlement calculations; the data interface system is used to build a multi-source technical and economic data resource library to realize real-time settlement; the algorithm model system is used to perform logical operations and model analysis on the cost data of the entire power transmission and transformation project based on a cost cleaning algorithm, a project settlement collection matrix, a cost deviation early warning model and a real-time settlement analysis model, automatically prepare settlements, and generate full-caliber settlement reports;

[0006] The settlement management module is used to carry out settlement plan management and settlement comparative analysis; the settlement management module includes an application function system and a display monitoring system; the application function system is used to timely track the settlement of projects under construction and conduct comparative analysis to issue abnormal warnings, thereby improving the accuracy and rationality of cost data at each stage; the display monitoring system is used to automatically compare the project estimate, budget and process settlement, and project settlement, guide subsequent settlements, and provide reference for the preparation of subsequent estimates and budget documents for similar projects.

[0007] Furthermore, the electronic settlement platform for power transmission and transformation projects implements multi-role access control based on SpringBoot+Vue+Element-UI technology. The multiple roles include project managers of construction units, personnel of design units, personnel of settlement and audit units, personnel of engineering supervision units, project managers of owner project departments, technical and economic specialists of construction management units, and technical and economic specialists of provincial companies.

[0008] Furthermore, when the project manager of the construction unit visits, the project settlement module includes a process construction settlement module, which is used to carry out the process settlement of the completed project volume and the settlement of the currently issued construction assessment sheet at any time during the construction process, and push it to the project supervision unit, the owner's project department and the construction management unit for approval in turn;

[0009] The site construction fee settlement module is used to upload the site requisition and cleanup fees paid by the construction unit during the construction process, and push them to the project supervision unit, the owner's project department and the construction management unit for approval in turn;

[0010] The bidding fee settlement module is used to apply for bidding fee settlement for invoices with clear bidding fees, fill in the settlement bidding fee amount and upload the voucher, and push it to the engineering supervision unit, the owner's project department and the construction management unit for approval in sequence;

[0011] The labor, material and machine adjustment module is used to adjust the market prices of labor, materials and machine hours during the construction period, namely the labor, material and machine adjustment fees, after the completion of the project. The construction unit shall apply for the price adjustment part according to the contract agreement, and push it to the project supervision unit, the owner's project department and the construction management unit for approval in turn.

[0012] Furthermore, when the personnel of the design unit visit, the engineering calculation module includes a survey and design calculation module for calculating the survey and design fee.

[0013] Furthermore, when the personnel of the settlement audit unit visit, the project settlement module includes a construction cost adjustment module, which is used to adjust the unloading storage fees and taxes of the equipment and materials supplied by the contractor, namely the construction adjustment fees, after the completion of the project, to ensure the accuracy of the settlement costs;

[0014] The construction cost review module is used to review the construction costs, which include construction process fees, site construction fees, bidding fees, personnel and equipment adjustment fees, and construction adjustment fees.

[0015] Other cost review module is used to review other costs to be settled; according to the source of costs, other costs are divided into costs based on the full-caliber budget, costs automatically generated by ERP, and costs applied by each participating company; costs based on the full-caliber budget include design document review fees, survey and design fees and their bidding fees, construction process cost consulting and engineering settlement review fees and their bidding fees, engineering supervision fees and pre-work fees; costs automatically generated by ERP include project legal person management fees, equipment and material supervision fees, engineering insurance fees, intellectual property transfer and research and testing fees, post-project evaluation fees, engineering construction testing fees, power engineering technical and economic standards compilation fees, production preparation fees, large-scale transportation measures fees, professional blasting service fees and construction period loan interest; costs included in the final settlement after being reviewed and confirmed by the technical and economic specialists of the construction management unit include the owner's self-compensation for site construction fees;

[0016] The cost consulting and settlement module is used for project cost management, that is, to extract the cost consulting and completion settlement review fees from the estimated cost consulting and completion settlement review fees, and the full-scope budget consulting and completion settlement review fees, and automatically include them in the final settlement.

[0017] Furthermore, when the personnel of the engineering supervision unit visit, the engineering settlement module includes an engineering supervision settlement module for settling the fees for engineering supervision.

[0018] Furthermore, when the project manager of the owner's project department visits, the project settlement module includes a settlement plan module, which is used to modify and improve the settlement plan formulated by the technical and economic specialists of the construction management unit;

[0019] The site construction fee settlement module is used to review the relevant site construction fee information uploaded by the construction unit and include it in the construction fee settlement after review;

[0020] The construction cost review module is used to review the construction costs of the construction unit;

[0021] The A-supplied materials settlement module is used to import the A-supplied materials settlement data after the completion of the project and the A-supplied materials return and profit process;

[0022] The project settlement application module is used to apply for settlement of site construction fees, construction costs and party-supplied material costs.

[0023] Furthermore, when the technical and economic specialists of the construction management unit conduct visits, the project settlement module includes a settlement plan module, which is used to formulate a settlement plan and put the settlement work in advance to remind personnel to carry out settlement-related work in advance;

[0024] Project engineering information module, used to collect project engineering information;

[0025] The construction bid information management module is used to upload the bidding quotation files of the project engineering, parse and store the bidding quotation files, and facilitate the viewing of the detailed contents of the bidding quotation;

[0026] The change visa management module is used to synchronize the design changes and on-site visa data of the technical and economic perception micro-application for construction settlement, so that the construction management unit can view the details of the design changes and on-site visas through change visa management;

[0027] The contract adjustment management module is used to synchronize the project assessment data approved by the technical and economic perception micro-application. The project assessment data refers to the project assessment fees, which include the assessment fees of the construction unit, the assessment fees of the design unit, and the assessment fees of the construction management unit.

[0028] The construction cost settlement module is used to approve the construction costs in the audited construction settlement report. Based on the construction cost type, the construction costs are divided into site construction costs, bidding costs for sub-items and parts of the project, and personnel and mechanism differences. The amount of construction costs is pushed to the progress payment application module in real time for the construction unit to apply for progress payment of the project.

[0029] Other expense settlement module, used to settle other expenses;

[0030] The A-supply material settlement module is used to review the quantity of materials in the A-supply material settlement application, enter the specific reviewed quantity, and after review, the A-supply material will be included in the final settlement;

[0031] The project settlement application module is used to collect the construction costs, materials supplied by the client and other costs after completion, and output the full-caliber settlement report and settlement review form in the format of the full-caliber settlement report to complete the full-caliber settlement.

[0032] Furthermore, when the technical and economic specialists of the construction management unit conduct a visit, the settlement management module includes a settlement statistics module, which is used to uniformly display the project execution status, project completion status and the assessment status of each participating unit. The participating units include the construction unit, design unit, project supervision unit, regulatory unit and settlement review unit;

[0033] The settlement analysis module is used for engineering quantity analysis, comprehensive unit price analysis and three-calculation comparative analysis.

[0034] Furthermore, when the provincial company's technical and economic specialist visits, the project settlement module includes a settlement review module, which is used to review and approve the final full-caliber settlement report and settlement approval form;

[0035] The settlement management module includes a settlement statistics module and a settlement analysis module to view the settlement statistics results and settlement analysis results respectively.

[0036] An electronic calculation method for power transmission and transformation engineering includes the following steps:

[0037] Step S1: automatically generate a settlement plan according to the construction schedule, the settlement plan includes plan nodes, settlement plan start time, and settlement plan completion time;

[0038] Step S2: The project manager of the owner's project department modifies and improves the settlement plan;

[0039] Step S3: Based on the comprehensive digital management platform for the entire infrastructure process, during the construction process, the construction unit will settle all construction costs in real time through the automatic construction settlement function and upload them, which will be approved by the chief supervision engineer of the engineering supervision unit, the project manager of the owner's project department, and the technical and economic specialist of the construction management unit in turn. After approval, they will be included in the construction cost settlement module when the technical and economic specialist of the construction management unit visits; after the construction is completed, all the settlement engineering quantities of the construction process will be automatically summarized, and the construction process settlement will be associated with the progress payment to control the price of the construction unit in real time;

[0040] Step S4: Each construction unit settles and uploads the other expenses incurred by each unit, which are reviewed and approved by the technical and economic specialist of the construction management unit. After review, they are included in the other expense settlement module during the visit of the technical and economic specialist of the construction management unit;

[0041] Step S5: The project manager of the owner's project department settles the materials supplied by Party A and initiates a settlement application for materials supplied by Party A, which is reviewed and approved by the technical and economic specialist of the construction management unit. After review, it is included in the settlement module of materials supplied by Party A during the visit of the technical and economic specialist of the construction management unit.

[0042] Step S6: The technical and economic specialist of the construction management unit shall collect and summarize the approved construction costs, other costs and the costs of materials supplied by Party A in the project settlement application module, and automatically output the full-caliber settlement report and settlement approval form through the automatic completion settlement function in accordance with the State Grid's requirements for the preparation of the settlement report for power transmission and transformation projects;

[0043] Step S7: Submit the full-caliber settlement report and settlement approval form, which will be approved by the director of the construction department of the construction management unit, the manager in charge of the construction management unit, the technical and economic specialist of the provincial economic research institute, the technical and economic department of the provincial construction department, and the director in charge of the provincial construction department in turn;

[0044] Step S8: The approved full-caliber settlement report and settlement approval form are automatically pushed to the e-Infrastructure 2.0 platform for archiving and storage.

[0045] Furthermore, in step S3, the construction unit performs the process settlement of the construction costs, including the following steps:

[0046] Step A1: The construction company selects the completed work volume, change approval, equipment supplied by Party B and the adjustable parts of the contract;

[0047] Step A2: Automatically generate construction settlement report;

[0048] Step A3: Submit the construction settlement report to the project manager of the owner's project department for review;

[0049] Step A4: The audit shall be reviewed and approved by the owner's project department, the settlement audit unit, and the technical and economic specialists of the construction management unit in turn.

[0050] Furthermore, in step S5, the project manager of the owner's project department settles the materials supplied by Party A, including the following steps:

[0051] Step B1: The project manager of the project department of the owner of the project automatically extracts the data of the materials supplied by Party A exported from ERP through the data center, and imports the data of the materials supplied by Party A into the electronic settlement platform of the power transmission and transformation project based on the import function, or imports the Excel spreadsheet of the data of the materials supplied by Party A into the electronic settlement platform of the power transmission and transformation project according to the key fields;

[0052] Step B2: Check the material items approved by the construction management unit and submit the data in the material items to the technical and economic specialist of the construction management unit for approval.

[0053] The present invention discloses an electronic settlement platform and method for power transmission and transformation projects. Relying on a comprehensive data management platform for the entire infrastructure process, the report cost documents and various expense forms are standardized, and the data structure and the review process are changed online during the process; by connecting to a data middle platform, the settlement data of other expenses and party-supplied material expenses are automatically obtained, and the automatic completion settlement function added through the settlement plan and microservice architecture has a short settlement cycle, and the settlement data is automatically summarized to complete the automatic generation of full-caliber settlement reports, thereby saving manual workload. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] Figure 1 This is a business architecture diagram of the present invention.

[0055] Figure 2 This is the process construction settlement approval flow chart of the present invention.

[0056] Figure 3 This is a flowchart for the approval of the bidding agency service fee in the present invention.

[0057] Figure 4 This is a flow chart for the approval of construction site fee settlement in the present invention.

[0058] Figure 5 This is a flow chart for approval of other construction costs in the present invention.

[0059] Figure 6 This is the personnel and equipment adjustment approval flow chart in the present invention.

[0060] Figure 7 This is a flowchart for construction cost adjustment approval in the present invention.

[0061] Figure 8 This is the approval flow chart of materials supplied by Party A in the present invention.

[0062] Fig. 9 This is the completion settlement approval flow chart in the present invention. DETAILED DESCRIPTION

[0063] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0064] An electronic settlement platform for power transmission and transformation projects includes a project settlement module for realizing process cost management, automatic construction settlement and automatic completion settlement through a microservice architecture; the project settlement module includes a business standard system, a data interface system and an algorithm model system; the business standard system is used to standardize management data and project coding systems to support settlement calculations; the data interface system is used to build a multi-source technical and economic data resource library to realize real-time settlement; the algorithm model system is used to perform logical operations and calculations on the cost data of the entire power transmission and transformation project based on a cost cleaning algorithm, a project settlement collection matrix, a cost deviation early warning model and a real-time settlement analysis model Model analysis, automatic settlement preparation, and generation of full-caliber settlement reports; analysis of the company's organizational structure, job responsibility management requirements, data collection, and settlement document preparation methods for power transmission and transformation project settlement management, clarification of the management transformation direction and cost data requirements for the power transmission and transformation project from completion settlement to real-time settlement, and based on the digital management concept, a full-process digital management mechanism covering the full-caliber costs of power transmission and transformation projects, including occurrence, upload, extraction, and settlement, is proposed to optimize the business process of power transmission and transformation project settlement management, clarify the key nodes and specific work content of real-time project settlement, and realize real-time settlement of full-caliber costs of power transmission and transformation projects.

[0065] The settlement management module is used to carry out settlement plan management and settlement comparative analysis; the settlement management module includes an application function system and a display monitoring system; the application function system is used to timely track the settlement of projects under construction and conduct comparative analysis to issue abnormal warnings, thereby improving the accuracy and rationality of cost data at each stage; the display monitoring system is used to automatically compare the project estimate, budget and process settlement, and project settlement, guide subsequent settlements, and provide reference for the preparation of subsequent estimates and budget documents for similar projects.

[0066] Specifically, the electronic settlement platform for power transmission and transformation projects implements multi-role access control based on SpringBoot+Vue+Element-UI technology. The multiple roles include project managers of construction units, personnel of design units, personnel of settlement review units, personnel of engineering supervision units, project managers of owner project departments, technical and economic specialists of construction management units, and technical and economic specialists of provincial companies.

[0067] When the project manager of the construction unit visits, the project settlement module includes the process construction settlement module, which is used to carry out the process settlement of the completed project volume and the construction assessment form that has been issued at any time during the construction process, and push it to the project supervision unit, the owner's project department and the construction management unit for approval in turn;

[0068] The site construction fee settlement module is used to upload the site requisition and cleanup fees paid by the construction unit during the construction process, and push them to the project supervision unit, the owner's project department and the construction management unit for approval in turn;

[0069] The bidding fee settlement module is used to apply for bidding fee settlement for invoices with clear bidding fees, fill in the settlement bidding fee amount and upload the voucher, and push it to the engineering supervision unit, the owner's project department and the construction management unit for approval in sequence;

[0070] The labor, material and machine adjustment module is used to adjust the market prices of labor, materials and machine hours during the construction period, namely the labor, material and machine adjustment fees, after the completion of the project. The construction unit shall apply for the price adjustment part according to the contract agreement, and push it to the project supervision unit, the owner's project department and the construction management unit for approval in turn.

[0071] When the personnel of the design unit visit, the engineering calculation module includes a survey and design calculation module, which is used to calculate the survey and design fees.

[0072] When the personnel of the settlement audit unit visit, the project settlement module includes a construction cost adjustment module, which is used to adjust the unloading storage fees and taxes of the equipment and materials supplied by the contractor after the completion of the project, that is, the construction adjustment fee, to ensure the accuracy of the settlement costs;

[0073] The construction cost review module is used to review the construction costs, which include construction process fees, site construction fees, bidding fees, personnel and equipment adjustment fees, and construction adjustment fees.

[0074] Other cost review module is used to review other costs to be settled; according to the source of costs, other costs are divided into costs based on the full-caliber budget, costs automatically generated by ERP, and costs applied by each participating company; costs based on the full-caliber budget include design document review fees, survey and design fees and their bidding fees, construction process cost consulting and engineering settlement review fees and their bidding fees, engineering supervision fees and pre-work fees; costs automatically generated by ERP include project legal person management fees, equipment and material supervision fees, engineering insurance fees, intellectual property transfer and research and testing fees, post-project evaluation fees, engineering construction testing fees, power engineering technical and economic standards compilation fees, production preparation fees, large-scale transportation measures fees, professional blasting service fees and construction period loan interest; costs included in the final settlement after being reviewed and confirmed by the technical and economic specialists of the construction management unit include the owner's self-compensation for site construction fees;

[0075] The cost consulting and settlement module is used for project cost management, that is, to extract the cost consulting and completion settlement review fees from the estimated cost consulting and completion settlement review fees, and the full-scope budget consulting and completion settlement review fees, and automatically include them in the final settlement.

[0076] When the personnel of the engineering supervision unit visit, the engineering settlement module includes an engineering supervision settlement module, which is used to settle the expenses of engineering supervision.

[0077] When the project manager of the owner's project department visits, the project settlement module includes a settlement plan module, which is used to modify and improve the settlement plan formulated by the technical and economic specialists of the construction management unit;

[0078] The site construction fee settlement module is used to review the relevant site construction fee information uploaded by the construction unit and include it in the construction fee settlement after review;

[0079] The construction cost review module is used to review the construction costs of the construction unit;

[0080] The A-supplied materials settlement module is used to import the A-supplied materials settlement data after the completion of the project and the A-supplied materials return and profit process;

[0081] The project settlement application module is used to apply for settlement of site construction fees, construction costs and party-supplied material costs.

[0082] When the technical and economic specialists of the construction management unit conduct a visit, the project settlement module includes a settlement plan module, which is used to formulate a settlement plan and put the settlement work in advance to remind personnel to carry out settlement-related work in advance;

[0083] Project engineering information module, used to collect project engineering information;

[0084] The construction bid information management module is used to upload the bidding quotation files of the project engineering, parse and store the bidding quotation files, and facilitate the viewing of the detailed contents of the bidding quotation;

[0085] The change visa management module is used to synchronize the design changes and on-site visa data of the technical and economic perception micro-application for construction settlement, so that the construction management unit can view the details of the design changes and on-site visas through change visa management;

[0086] The contract adjustment management module is used to synchronize the project assessment data approved by the technical and economic perception micro-application. The project assessment data refers to the project assessment fees, which include the assessment fees of the construction unit, the assessment fees of the design unit, and the assessment fees of the construction management unit.

[0087] The construction cost settlement module is used to approve the construction costs in the audited construction settlement report. Based on the construction cost type, the construction costs are divided into site construction costs, bidding costs for sub-items and parts of the project, and personnel and mechanism differences. The amount of the construction costs is pushed to the progress payment application module in real time based on JDK for the construction unit to apply for the progress payment of the project;

[0088] Other expense settlement module, used to settle other expenses;

[0089] The A-supply material settlement module is used to review the quantity of materials in the A-supply material settlement application, enter the specific reviewed quantity, and after review, the A-supply material will be included in the final settlement;

[0090] The project settlement application module is used to collect the construction costs, materials supplied by the client and other costs after completion, and output the full-caliber settlement report and settlement review form in the format of the full-caliber settlement report to complete the full-caliber settlement.

[0091] When the technical and economic specialists of the construction management unit visit, the settlement management module includes a settlement statistics module, which is used to uniformly display the project execution status, project completion status and the assessment status of each participating unit. The participating units include the construction unit, design unit, engineering supervision unit, regulatory unit and settlement review unit;

[0092] The settlement analysis module is used for engineering quantity analysis, comprehensive unit price analysis and three-calculation comparative analysis.

[0093] When the provincial company's technical and economic specialist visits, the project settlement module includes a settlement review module, which is used to review and approve the final full-caliber settlement report and settlement approval form;

[0094] The settlement management module includes a settlement statistics module and a settlement analysis module to view the settlement statistics results and settlement analysis results respectively.

[0095] Through the settlement management module, settlement plan management and settlement comparative analysis are carried out, the settlement management and cost control requirements of power transmission and transformation projects are analyzed, and a digital comparative analysis indicator system for power transmission and transformation project settlement is designed from the perspectives of cost rationality, unit price rationality, and progress rationality. A database of settlement and estimated costs of the same type of preliminary design, under construction, and completed projects is constructed, and different comparison dimensions are selected to automatically generate key indicator data for comparative analysis. The working mode of offline sorting of settlement comparative analysis data of power transmission and transformation projects under the existing model is changed. In addition, the Delphi method, entropy weight method and other subjective and objective weighting methods are combined to carry out automatic evaluation of the rationality of power transmission and transformation project settlement, so as to realize intelligent comparative analysis of various costs and costs of power transmission and transformation project settlement.

[0096] An electronic calculation method for power transmission and transformation engineering includes the following steps:

[0097] Step S1: automatically generate a settlement plan according to the construction schedule, the settlement plan includes plan nodes, settlement plan start time, and settlement plan completion time;

[0098] Step S2: The project manager of the owner's project department modifies and improves the settlement plan;

[0099] Step S3: Based on the comprehensive digital management platform for the entire infrastructure process, during the construction process, the construction unit will settle and upload all construction costs through the automatic construction settlement function based on JDK real-time settlement, and then be approved by the chief supervision engineer of the engineering supervision unit, the project manager of the owner's project department, and the technical and economic specialist of the construction management unit in turn. After approval, it will be included in the construction cost settlement module when the technical and economic specialist of the construction management unit visits; after the construction is completed, all the settlement engineering quantities of the construction process will be automatically summarized, and the construction process settlement will be associated with the progress payment to control the price of the construction unit in real time;

[0100] Step S4: Each construction unit settles and uploads the other expenses incurred by each unit, which are reviewed and approved by the technical and economic specialist of the construction management unit. After review, they are included in the other expense settlement module during the visit of the technical and economic specialist of the construction management unit;

[0101] Step S5: The project manager of the owner's project department settles the materials supplied by Party A and initiates a settlement application for materials supplied by Party A, which is reviewed and approved by the technical and economic specialist of the construction management unit. After review, it is included in the settlement module of materials supplied by Party A during the visit of the technical and economic specialist of the construction management unit.

[0102] Step S6: The technical and economic specialist of the construction management unit shall collect and summarize the approved construction costs, other costs and the costs of materials supplied by Party A in the project settlement application module, and automatically output the full-caliber settlement report and settlement approval form through the automatic completion settlement function in accordance with the State Grid's requirements for the preparation of the settlement report for power transmission and transformation projects;

[0103] Step S7: Submit the full-caliber settlement report and settlement approval form, which will be approved by the director of the construction department of the construction management unit, the manager in charge of the construction management unit, the technical and economic specialist of the provincial economic research institute, the technical and economic department of the provincial construction department, and the director in charge of the provincial construction department in turn;

[0104] Step S8: The approved full-caliber settlement report and settlement approval form are automatically pushed to the e-Infrastructure 2.0 platform for archiving and storage.

[0105] Specifically, in step S3, the construction unit performs the process settlement of the construction costs, including the following steps:

[0106] Step A1: The construction company selects the completed work volume, change approval, equipment supplied by Party B and the adjustable parts of the contract;

[0107] Step A2: Automatically generate construction settlement report;

[0108] Step A3: Submit the construction settlement report to the project manager of the owner's project department for review;

[0109] Step A4: The audit shall be reviewed and approved by the owner's project department, the settlement audit unit, and the technical and economic specialists of the construction management unit in turn.

[0110] In step S5, the project manager of the owner's project department settles the materials supplied by Party A, including the following steps:

[0111] Step B1: The project manager of the owner's project department automatically extracts the data of materials supplied by Party A exported from ERP through the data center, and imports the data of materials supplied by Party A into the electronic settlement platform for power transmission and transformation projects based on the import function, or imports the Excel spreadsheet of the data of materials supplied by Party A into the electronic settlement platform for power transmission and transformation projects according to key fields;

[0112] Step B2: Check the material items approved by the construction management unit and submit the data in the material items to the technical and economic specialist of the construction management unit for approval.

[0113] Implementation example Figure 1As shown in the business architecture diagram of an electronic settlement platform for power transmission and transformation projects, based on the comprehensive digital management platform for the entire process of infrastructure construction, the microservice architecture is used to realize the process cost data management function, data report standard management function, automatic construction settlement function and automatic completion settlement function. The microservice architecture includes computer and mobile APP ends, that is, the process cost management, construction fee settlement, automatic settlement of other fees, real-time automatic extraction of Party A materials and automatic settlement of project completion are realized through the microservice architecture; the comprehensive digital management platform for the entire process of infrastructure construction, including the software support and integration system for the management of the entire process of cost; the management of the entire process of cost includes feasibility study estimation, preliminary design review, construction drawing budget, bidding, on-site cost, project settlement and completion settlement, and the business coverage includes the headquarters infrastructure construction, provincial company construction department, construction management unit and design unit, construction unit, etc.; software support includes budget software and settlement software; system integration includes ERP system and ECP system, the ERP system is used to extract material settlement data and other cost settlement data, and the ECP system acts on the bidding bill of quantities, bidding control price, winning bill of quantities and bid quotation. Microservice architecture is an architectural pattern that splits an application into multiple small, autonomous services, each of which runs independently and can be deployed and expanded. The business applications provided by the microservice architecture for the electronic settlement platform of power transmission and transformation projects include feasibility study estimation management, preliminary design review management, construction drawing budget management, bid winning information management, on-site cost management and project settlement management; process cost data management includes estimation, budget and budget control price, contract price and material price, project division settlement, construction settlement, completion settlement, etc.; data report standard management includes change visa data report, division settlement report, construction settlement data report, completion settlement data report; automatic construction calculation function includes change visa management, division settlement management and construction settlement management; automatic completion calculation function includes settlement cost acquisition, automatic completion settlement, completion settlement report and settlement data analysis.

[0114] The steps to achieve process cost management, automatic construction settlement and automatic completion settlement functions include:

[0115] Step C1: Create a submodule; create a new module, namely the model project module, under the existing module ruoyi-module, and name it ruoyi-test;

[0116] Step C2: Configure the pom.xml file of the modeule project module; copy the contents of the ruoyi-system module into the pom.xml file of the modeule project module and modify the elements to reflect the name and description of the new module;

[0117] Step C3: Configuration file management: edit the bootstrap.yml file to edit the configuration file of the new service module and ensure that the configurations of service registration and discovery are correct.

[0118] Step C4: Add new configuration in the configuration center; use Nacos as the configuration center and add corresponding configuration files in the Nacos interface, such as ruoyi-test-dev.yml;

[0119] Step C5: Edit the gateway configuration file to configure the gateway; in the configuration file of the Nacos gateway module, such as ruoyi-gateway-dev.yml, add a new forwarding rule so that the request can be routed to the newly added service module;

[0120] Step C6: Create a startup class; create a startup class for the new module to start the microservice, such as RuoYiTestApplication;

[0121] Step C7: Start and register the microservice; Start the newly created microservice and ensure that it can be successfully registered with the service registration center. For example, the appearance of ruoyi-test in Nacos indicates that the service registration is successful.

[0122] Step C8: Create menu items; create corresponding menu items according to the functions of the newly created microservice to ensure that the front-end can access the functions provided by the microservice; if a code generator is used in the process, the code generator needs to be used to generate the front-end and back-end codes corresponding to the microservice;

[0123] Step C9: Perform relevant configuration of the database; the relevant configuration of the database includes information such as data source configuration and database connection to ensure that the database configuration of the new service is correct;

[0124] Step C10: Manage the dependencies of the microservice through build tools such as Maven or Gradle to ensure that the required libraries, process cost management module, data report specification management function module, automatic construction settlement function module and automatic completion settlement function module can be correctly introduced.

[0125] The automatic construction settlement function is to combine the difference data between the construction drawing budget and the bidding quotation based on the structured data of the construction unit's bidding quotation to form the benchmark quantity for construction fee settlement. It includes the following steps:

[0126] Step D1: Establish the reporting, review and approval process for process settlement; during the construction process, the construction unit can apply for settlement of completed project quantities at any time, and after approval, it will serve as the basis for applying for progress payment;

[0127] Step D2: After the construction is completed, the system automatically summarizes all the settlement quantities of the construction process, and the design changes, on-site visas and construction contract assessment data of the existing technical and economic perception micro-applications; by associating the construction process settlement with the progress payment, the payment of the construction unit is controlled in real time.

[0128] Step D3: Automatically generate a construction settlement report through the built-in power transmission and transformation project list pricing specification report template to achieve one-click settlement of construction costs.

[0129] Automatic final settlement includes the following steps:

[0130] Step E1: Configure the settlement approval form and full-caliber settlement report template that meet the requirements for the preparation of the State Grid's power transmission and transformation project settlement report;

[0131] Step E2: After the completion of the project, after unit conversion, data collection, data classification and cost sharing principles, the main project characteristics, construction costs, party-supplied material costs and other cost settlement data are automatically summarized, and a project overview table, a project completion settlement summary table, a building installation project construction cost settlement list, a list of other costs, a summary table of major equipment and materials, and a power transmission and transformation project settlement approval table are generated, thereby replacing the offline manual preparation of settlement approval tables and full-caliber settlement reports, realizing project completion settlement, and effectively reducing the settlement time of the project after completion.

[0132] The settlement process of the electronic settlement platform for power transmission and transformation projects includes:

[0133] Step 1: Based on the comprehensive digital management platform for the entire infrastructure process, the construction unit will settle and upload all construction costs through the automatic construction settlement function; the construction cost mainly realizes the online circulation and approval of the process settlement and completion settlement application of the construction cost. The construction cost includes the construction and installation engineering cost, other construction costs and adjustable construction costs. The process settlement automatically generates the process construction settlement report according to the selected settlement costs, and the completion settlement automatically generates the completion settlement book according to the requirements of the State Grid Engineering Quantity List Pricing Specifications based on the construction costs that have been submitted for review. After the construction project department fills in the construction settlement costs, it will be pushed to the supervision project department, the owner's project department, and the construction management unit for approval in turn, realizing the online circulation of construction cost settlement. After the construction settlement costs are approved, the settlement amount is immediately pushed to the progress payment application module for the construction unit to apply for the progress payment of the project; the progress payment conditions are set. After completing the process settlement approval, the progress payment of this stage can be applied, which promotes the timely confirmation of the completed project volume, standardizes the timely collection of process acceptance materials, and realizes the management goal of clearing the completed volume and price.

[0134] like Figure 2As shown in the approval flow chart of process construction settlement in an electronic settlement platform for power transmission and transformation projects, the process construction settlement uses intelligent algorithm models to achieve efficient management. The construction project department combines the on-site simulation image progress and carries out process settlement of completed engineering quantities at any time in accordance with the measurement cycle requirements that do not exceed the construction contract. The completed equipment supplied by the second party, design changes and on-site visas, as well as the issued construction assessment forms are settled in real time. The advanced intelligent core engineering settlement model is used to automatically generate process construction settlement reports. The reports are submitted to the supervision project department, the owner's project department and the construction management unit for approval, and the approval opinions are filled in to realize the online operation of process construction settlement. According to the settlement plan, the settlement of construction costs is process-oriented, and the relevant construction cost settlement materials are circulated online to improve the timeliness of construction cost settlement. Through intelligent algorithm models, the online circulation and approval of the process construction settlement and final settlement applications of construction costs are realized, and the advanced Zhihe Engineering Settlement Model is used, combined with the cost cleaning algorithm, to automatically generate the process construction settlement report and the final settlement statement; after the construction project department fills in the construction costs, with the help of online process engine technology, it is pushed to the supervision project department, the owner's project department and the construction management unit for approval in turn, realizing the full process of construction cost settlement online operation; once the construction costs are approved, the settlement amount will be immediately pushed to the progress payment application module, for the construction unit to apply for the corresponding progress payment of the project.

[0135] like Figure 3 As shown in the approval flow chart of bidding agency service fees in an electronic settlement platform for power transmission and transformation projects, the settlement of construction bidding agency service fees, i.e. the bidding fees, is managed efficiently through an intelligent algorithm model. After the construction bidding of the project is completed, the bidding agency service fees are clearly invoiced, and the construction unit can automatically apply for bidding fee settlement and connect to business data in real time; the system will fill in the settlement amount and upload the cost voucher, and submit it to the supervision project department, the owner's project department and the construction management unit for approval in turn, and fill in the approval opinions; after approval, the hierarchical clustering algorithm is used, and the settlement amount will be automatically included in the construction cost settlement, realizing the online operation of construction cost settlement.

[0136] like Figure 4As shown in the approval flow chart of construction site fee settlement in an electronic settlement platform for power transmission and transformation projects, the settlement of construction site fees includes a fixed total price and a provisional amount, that is, during the construction process, when land expropriation, house demolition and other construction site requisition and clearance costs occur, if the costs are borne by the construction unit, the construction unit will digitize the actual settlement amount and related cost vouchers and upload them to the system; use deep learning algorithms to intelligently review the submitted materials, and automatically route the review process to the supervision project department, the owner's project department and the construction management unit; each relevant department fills in the electronic approval opinion through the intelligent approval interface. Once the approval is confirmed, the system automatically integrates the approved settlement amount into the total construction cost to ensure that the entire stage process is efficient, transparent and traceable.

[0137] like Figure 5 As shown in the approval flow chart of other construction fees in an electronic settlement platform for power transmission and transformation projects, the settlement of other construction fees is for the construction unit to fill in other provisional amounts and provisionally estimated cost items in the bidding documents that actually occurred, including the settlement amount and voucher of the site construction fee. AI technology is used to automatically extract verification information and generate an approval process, and then it is electronically approved by the supervision project department, the owner's project department and the construction management unit in turn, which intelligently ensures that the data is accurate and compliant. The final approved fees are automatically included in the total construction fee settlement, which significantly improves settlement efficiency and transparency.

[0138] like Figure 6 As shown in the approval flow chart of personnel, material and equipment adjustment in an electronic settlement platform for power transmission and transformation projects, the personnel, material and equipment adjustment is dynamically managed through intelligent algorithms. After the completion of the project, the construction unit applies for price adjustment based on the contract, and the AI ​​review automatically compares the market changes and evaluates the rationality. After the review is passed, an approval process is generated and submitted to the supervision project department, the owner's project department and the construction management unit for electronic approval in turn, which intelligently ensures that the data is accurate and compliant. The final approved costs will be automatically included in the construction cost settlement, realizing efficient and accurate management.

[0139] like Figure 7 As shown in the construction cost adjustment approval flow chart in an electronic settlement platform for power transmission and transformation projects, the construction cost is adjusted after the completion of the project. If part of the project volume has not been constructed and there is no change visa, the construction project department or the owner's project department needs to upload the cost calculation sheet of the reduced part, and use the deep learning algorithm to automatically review and adjust the contractor's supply of equipment and supply of materials unloading storage fees and taxes. After the construction management unit uses AI analysis and approval, the adjustment is automatically included in the construction cost settlement to ensure the accuracy of the data and improve the efficiency and transparency of the settlement process.

[0140] Step 2: Each construction unit will settle and upload the other expenses incurred by each of them. The other fee settlement part uses the intelligent algorithm model to realize the online entry and declaration of other fees specified in the preliminary regulations. The data of other fees are applied by the design project department, supervision project department, owner project department and other parties in turn, or automatically synchronized from the full-caliber budget and ERP system, and then reviewed or confirmed by the technical and economic specialists of the construction management unit using AI technology. Other fees that pass the review will be automatically included in the completion stage. Through the automatic docking or batch import of the system, the workload of manual repeated entry is reduced; and the cost division is clear, the supporting materials are complete and standardized, and the settlement data is accurate and traceable.

[0141] The owner's voluntary compensation for site construction fees is the cost of requisitioning and clearing the construction site, such as land expropriation, which is automatically compensated by the owner during the construction process. After the cost occurs, the owner's project department needs to upload the cost voucher and other content to the system in a digital way, and use AI technology to automatically review and generate the approval process. After approval by the technical and economic specialists of the construction management unit, the fee will be automatically included in the settlement of other fees to ensure the accuracy and compliance of the settlement process.

[0142] After the review of the settlement documents of the construction drawings is completed, the approved version of the full-caliber budget is uploaded to the e-Infrastructure 2.0 platform, and the contract amount of each fee is automatically extracted using a deep learning algorithm, and the settlement adjustment coefficient is determined in combination with big data analysis; the project assessment fees of each unit are collected, and the settlement fees are automatically calculated using AI technology. The design project department, the owner project department, and the supervision project department confirm the fees for the survey and design fees and their bidding fees, the construction process cost consulting and project settlement review fees and their bidding fees, and the project supervision fees are respectively confirmed by the design project department, the owner project department, and the supervision project department, and the contract or other voucher attachments are uploaded. The system will automatically submit them to the construction management unit for electronic approval, and the fees will be included in the settlement of other fees after approval. .

[0143] The preliminary work fee is automatically extracted from the full-caliber budget file of the e-Infrastructure 2.0 platform using an intelligent algorithm, which does not include the detailed expenses of the preliminary work management fee. At the same time, the preliminary work management fee is synchronized or imported through the ERP system. The owner's project department is responsible for confirming and uploading the contract and other attachments. The system then automatically submits it to the construction management unit for electronic approval. After approval, the fee will be automatically included in the settlement of other fees.

[0144] Project legal person management fees, equipment and material supervision fees, engineering insurance premiums, intellectual property transfer and research and testing fees, post-project evaluation fees, engineering construction testing fees, power engineering technical and economic standards compilation fees, production preparation fees, large-scale transportation measures fees, professional blasting service fees and construction period loan interest are synchronized from the ERP system or manually imported. The system uses intelligent algorithms to automatically link the fees to the corresponding individual projects and expense items according to the WBS code; at the same time, the system automatically calculates the service fees as the settlement amount; the construction management unit is responsible for confirming the fees, uploading contracts, expense vouchers or other supporting materials, and completing the entire approval process.

[0145] Step 3: If Figure 8 As shown in the approval flow chart of the materials supplied by Party A in the electronic settlement platform of a power transmission and transformation project, the settlement part of the materials supplied by Party A mainly realizes the automated management of the settlement application process of the materials supplied by Party A after completion through the intelligent algorithm model. After the owner's project manager completes the process of returning and benefiting the materials supplied by Party A, the system automatically obtains the settlement data of the materials supplied by Party A from the materials ERP or the data imported in batches from Excel. Then the owner's project manager initiates the settlement application for the materials supplied by Party A. The system uses AI technology to automatically connect to the level of the budget project according to the WBS code in the ERP, and submits it to the construction management unit for review. After the review is passed, the system will automatically complete the settlement process. The settlement of the materials supplied by Party A obtains the quantity and amount of the outbound delivery by importing the ERP material procurement status table, which promotes the timeliness of the procedures for the outbound delivery, return and balance benefit of materials. At the same time, the full-caliber construction drawing engineering quantity review and the review of the materials supplied by Party A are carried out simultaneously to further standardize the material management.

[0146] Step 4: Fig. 9 As shown in the completion settlement approval flow chart of an electronic settlement platform for power transmission and transformation projects, the completion settlement part mainly uses advanced intelligent algorithm models to realize the automatic collection and aggregation of construction costs, other costs, and approved costs of materials supplied by Party A after completion;

[0147] The system automatically generates full-caliber settlement reports for single dimensions and settlement approval forms for transmission and transformation projects. The technical and economic specialists of the construction management unit are responsible for submitting the reports, which are then approved in turn by the director of the construction department of the construction management unit, the manager in charge, the technical and economic specialist of the Provincial Economic Research Institute, the technical and economic department of the Provincial Construction Department, and the director in charge of the Provincial Construction Department. The system supports filling in approval opinions and electronic signatures during the approval process. After approval, the full-caliber settlement reports and settlement approval forms will be automatically pushed to the e-Infrastructure 2.0 platform for archiving and storage, realizing the intelligence and efficiency of the settlement process.

[0148] Table 1 is the data flow of each settlement data, and Table 1 is as follows:

[0149]

[0150] Table 1

[0151] Step 5: The platform can query the settlement execution and settlement completion of statistical projects through dimensions such as construction management units, settlement time, and voltage level; approve the full-caliber settlement report, and conduct engineering quantity review after the full-caliber construction drawing review is completed, further deepen and improve the construction drawings, form the quantity difference between the construction drawings and the bidding quotation, perform quantity difference change approval, clarify the planned construction quantity, and eliminate the drawbacks of arbitrarily changing drawings and not constructing according to the drawings during the construction process; at the same time, statistical analysis can be performed on the engineering quantity and comprehensive unit price. It is convenient for provincial companies and construction management units to control the settlement progress and quality of the project. Change visas, construction costs, and process settlement approvals are all circulated online, eliminating the drawbacks of offline approval appointments and waiting for people, ensuring that various approvals are timely and efficient. It improves the timeliness of approval work, shortens the time difference of funds, and stimulates the enthusiasm of construction units to invest in human, financial, and material resources. And there is no need to prepare full-caliber settlement reports offline. The automation of settlement preparation is realized.

[0152] The design concept of building an electronic settlement platform for power transmission and transformation projects is to expand the functions of the technical and economic management modules of the digital management platform for the entire infrastructure process, meet the requirements of the State Grid's information architecture, and design the overall architecture, which includes business architecture, application architecture, data architecture, technical architecture, security architecture, and deployment architecture.

[0153] The overall architecture is to build on the basis of the comprehensive digital management platform of the entire infrastructure process, carry out infrastructure platform development work based on the technical architecture of microservices and micro-applications, follow the unified technical route and specification requirements of the State Grid Corporation as a whole, and make full use of the basic support platform resources of the State Grid Corporation. The electronic settlement platform for power transmission and transformation projects includes business standard system, data interface system, algorithm model system, application function system and display monitoring system;

[0154] The business standard system is a full-caliber cost data management standard and project coding system for power transmission and transformation projects, which realizes the standardization of settlement basis and supports settlement calculation applications;

[0155] The data interface system is to build a multi-source technical and economic data resource library, establish a real-time settlement management mode for power transmission and transformation projects based on the digital concept, and realize real-time settlement of power transmission and transformation project costs;

[0156] The algorithm model system uses cost cleaning algorithm, engineering settlement collection matrix, intelligent core engineering settlement model, cost deviation early warning model and real-time settlement analysis model to perform logical operations and model analysis on the cost data of the entire power transmission and transformation process;

[0157] Application function system, used for R&D engineering settlement preparation, engineering settlement and settlement management, management of all-caliber settlement-related materials and settlement plans, application of the "contract + change / visa" digital management model, automation of settlement preparation, and analysis of settlement rationality from the perspectives of cost rationality, unit price rationality, and progress rationality;

[0158] The display monitoring system can automatically compare the project process settlement and feed back the results to the front end in time, so as to realize the timely closed-loop feedback, automatically compare the project estimate, budget and process settlement, and project stage, and generate comparative analysis results of the completed settlement part of the project to guide the subsequent settlement work of the project.

[0159] The business architecture is a business function system that can meet existing needs based on various business needs, which is formed through organization, analysis and design, and is a business model formed in combination with the needs of production business development.

[0160] The application architecture is to achieve full coverage of planning business objectives by application functions; it is designed and developed on the basis of the technical and economic professional of the comprehensive digital management platform for the entire process of infrastructure, and adds functions such as process cost management, automatic construction settlement and automatic completion settlement. The application architecture of the present invention includes the original feasibility study estimation management, construction drawing budget management, preliminary design review management, bid winning information management, on-site cost management, project settlement management and general functions; process cost management applications are added to on-site cost management; automatic construction settlement and automatic completion settlement applications are added to project settlement management.

[0161] The data architecture is to establish a unified and shared data view, meet the platform's requirements for data uniformity, standardization and extensibility, and improve the efficiency of cross-system business data storage and shared integration. The present invention is based on a unified authority platform and a data middle platform to build self-incrementing structured data including construction settlement data and completion settlement data; unstructured data includes settlement approval forms, change visa forms and cached data. The data architecture follows the SG-CIM5.0 data model and provides a unified plan for structured data and unstructured data; the intranet deploys a database to store basic support data, settlement business data and statistical analysis data, and unstructured data exists in internal and external 0BS; structured data and unstructured data generated on the external network are stored in the intranet database and internal and external OSS through a security isolation device.

[0162] Adopting microservice architecture, the technical architecture is designed into display layer, business logic layer, public service layer, platform layer, data storage layer and resource layer;

[0163] The presentation layer builds a visual operation interface through VUE+Element-Ui technology, providing users with unified display and management functions of data applications; it interacts with the business logic layer, which is responsible for processing user requests and providing the presentation layer with necessary data and functional support to ensure that users can smoothly develop, display and apply data applications.

[0164] When executing various core capabilities, the business logic layer needs to call the service components provided by the public service layer; the public service layer provides stable and reliable service support for the business logic layer, ensuring the sequential execution of business logic.

[0165] As the development foundation of the entire system, the platform layer provides technical frameworks and tools such as SpringBoot+SpringMVC+MyBatis; the business logic layer is developed based on the platform, and uses the various functions and features provided by the technical framework and tools to achieve specific business needs. The platform layer provides strong technical support and a flexible development environment for the business logic layer, making the implementation of business logic more efficient and convenient.

[0166] The data storage layer is responsible for storing the system's structured data and unstructured files; the business logic layer needs to frequently interact with the data storage layer when performing various operations, including reading, writing, updating, and deleting data.

[0167] The resource layer provides the necessary computing resources, storage resources, security equipment, network resources, and backup resources for the entire system. When performing various operations at the business logic layer, it is necessary to rely on the various resources of the resource layer to ensure the normal operation and performance of the system.

[0168] According to the headquarters' requirements, the security protection level of electronic settlement and technology-based micro-applications is level 2. The steps to build a security architecture include:

[0169] Step F1: The system implements identity authentication and authorization through a unified permission platform, and uses data encryption, integrity verification and other methods to achieve security protection for applications and data;

[0170] Step F2: Use the basic security provided by the cloud platform based on the system deployment location and method;

[0171] Step F3: Implement data security protection mechanisms for the horizontal and vertical boundaries of the information intranet and system applications through security isolation, and adopt unified physical environment, network and host security protection measures as required.

[0172] The security architecture includes a storage security module, a permission control module, a data encryption module, and a security audit module; the storage security module is used for redundant storage replication, data disaster backup, and continuous data protection. The permission control module is used for data access permission control and task execution permission control; data access permission control includes relational data operation permission control, non-relational data operation permission control, and distributed file operation permission control; task execution permission control includes stream computing execution permission control, parallel computing execution permission control, query computer execution permission control, and memory computer execution permission control. The data encryption module is used to encrypt user passwords. The security audit module is used for log recording, audit analysis, and assessment and evaluation.

[0173] The deployment architecture is set up, and the application services and databases of electronic settlement are planned and deployed in the intranet environment of the cloud platform. The application services are configured in the management information area to optimize the data processing process, while the database is placed in the Internet area to improve data access efficiency. The two key components are securely isolated by deploying a strong logical isolation device, ensuring data security and application stability.

[0174] Within the cloud platform, the intranet environment of electronic settlement is deployed in a container-on-cloud mode, which improves resource utilization and increases deployment flexibility and scalability. The external network uses virtual machine deployment to enhance the security and reliability of external access. To further support the operation of the electronic settlement system, the powerful data processing capabilities of the data center and the centralized identity authentication and authorization mechanism provided by the unified authority management platform constitute the basic support platform for the entire architecture.

[0175] The above implementation modes are not limitations of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the scope of the technical solution of the present invention also belong to the protection scope of the present invention.

Claims

1. An electronic settlement platform for power transmission and transformation projects, characterized in that: It includes a project settlement module, which is used to realize process cost management, automatic construction settlement and automatic completion settlement through microservice architecture; the project settlement module includes a business standard system, a data interface system and an algorithm model system; the business standard system is used to standardize management data and project coding system to support settlement calculation; The data interface system is used to build a multi-source technical and economic data resource library to realize real-time settlement. The algorithm model system is used to perform logical operations and model analysis on the cost data of the entire power transmission and transformation project based on the cost cleaning algorithm, project settlement collection matrix, cost deviation early warning model and real-time settlement analysis model, automatically prepare settlements, and generate full-caliber settlement reports. The settlement management module is used to carry out settlement plan management and settlement comparative analysis; the settlement management module includes an application function system and a display monitoring system; The application function system is used to timely track the settlement of projects under construction and conduct comparative analysis to issue abnormal warnings, thereby improving the accuracy and rationality of cost data at each stage; the display monitoring system is used to automatically compare the project estimate, budget and process settlement, and project settlement, guide subsequent settlements, and provide reference for the preparation of subsequent estimates and budget documents for similar projects.

2. The electronic settlement platform for power transmission and transformation projects according to claim 1 is characterized by: The electronic settlement platform for power transmission and transformation projects implements multi-role access control based on SpringBoot+Vue+Element-UI technology. The multiple roles include project managers of construction units, personnel of design units, personnel of settlement and audit units, personnel of engineering supervision units, project managers of owner project departments, technical and economic specialists of construction management units, and technical and economic specialists of provincial companies.

3. The electronic settlement platform for power transmission and transformation projects according to claim 2 is characterized by: When the project manager of the construction unit visits, the project settlement module includes a process construction settlement module, which is used to carry out the process settlement of the completed project volume and the construction assessment form issued at any time during the construction process, and push it to the project supervision unit, the owner's project department and the construction management unit for approval in turn; The site construction fee settlement module is used to upload the site requisition and cleanup fees paid by the construction unit during the construction process, and push them to the project supervision unit, the owner's project department and the construction management unit for approval in turn; The bidding fee settlement module is used to apply for bidding fee settlement for invoices with clear bidding fees, fill in the settlement bidding fee amount and upload the voucher, and push it to the engineering supervision unit, the owner's project department and the construction management unit for approval in sequence; The labor, material and machine adjustment module is used to adjust the market prices of labor, materials and machine hours during the construction period, namely the labor, material and machine adjustment fees, after the completion of the project. The construction unit shall apply for the price adjustment part according to the contract agreement, and push it to the project supervision unit, the owner's project department and the construction management unit for approval in turn.

4. The electronic settlement platform for power transmission and transformation projects according to claim 3 is characterized by: When the personnel of the design unit visit, the engineering calculation module includes a survey and design calculation module for calculating the survey and design fee.

5. The electronic settlement platform for power transmission and transformation projects according to claim 4 is characterized by: When the personnel of the settlement audit unit visit, the project settlement module includes a construction cost adjustment module, which is used to adjust the unloading storage fees and taxes of the equipment and materials supplied by the contractor after the completion of the project, that is, the construction adjustment fee, to ensure the accuracy of the settlement costs; The construction cost review module is used to review the construction costs, which include construction process fees, site construction fees, bidding fees, personnel and equipment adjustment fees, and construction adjustment fees. Other expenses review module is used to review other expenses to be settled; according to the source of the expenses, other expenses are divided into expenses based on the full-caliber budget, expenses automatically generated by ERP, and expenses applied by each participating company; The fees obtained based on the full-caliber budget include design document review fees, survey and design fees and their bidding fees, construction process cost consulting and project settlement review fees and their bidding fees, project supervision fees and pre-work fees; the fees automatically generated by ERP include project legal person management fees, equipment and material supervision fees, project insurance fees, intellectual property transfer and research and testing fees, post-project evaluation fees, project construction testing fees, power engineering technical and economic standards compilation fees, production preparation fees, large-scale transportation measures fees, professional blasting service fees and construction period loan interest; the fees included in the final settlement after the technical and economic specialist review and confirmation of the construction management unit include the owner's self-compensation for site construction fees; The cost consulting and settlement module is used for project cost management, that is, to extract the cost consulting and completion settlement review fees from the estimated cost consulting and completion settlement review fees, and the full-scope budget consulting and completion settlement review fees, and automatically include them in the final settlement.

6. The electronic settlement platform for power transmission and transformation projects according to claim 5 is characterized by: When the personnel of the engineering supervision unit visit, the engineering settlement module includes an engineering supervision settlement module for settling the fees for engineering supervision.

7. The electronic settlement platform for power transmission and transformation projects according to claim 6 is characterized by: When the project manager of the owner's project department visits, the project settlement module includes a settlement plan module, which is used to modify and improve the settlement plan formulated by the technical and economic specialists of the construction management unit; The site construction fee settlement module is used to review the relevant site construction fee information uploaded by the construction unit and include it in the construction fee settlement after review; The construction cost review module is used to review the construction costs of the construction unit; The A-supplied materials settlement module is used to import the A-supplied materials settlement data after the completion of the project and the A-supplied materials return and profit process; The project settlement application module is used to apply for settlement of site construction fees, construction costs and party-supplied material costs.

8. The electronic settlement platform for power transmission and transformation projects according to claim 7 is characterized by: When the technical and economic specialist of the construction management unit visits, the project settlement module includes a settlement plan module for making a settlement plan and reminding personnel to carry out settlement-related work in advance; Project engineering information module, used to collect project engineering information; The construction bid information management module is used to upload the bidding quotation files of the project engineering, parse and store the bidding quotation files, and facilitate the viewing of the detailed contents of the bidding quotation; The change visa management module is used to synchronize the design changes and on-site visa data of the technical and economic perception micro-application for construction settlement, so that the construction management unit can view the details of the design changes and on-site visas through change visa management; The contract adjustment management module is used to synchronize the project assessment data approved by the technical and economic perception micro-application. The project assessment data refers to the project assessment fees, which include the assessment fees of the construction unit, the assessment fees of the design unit, and the assessment fees of the construction management unit. The construction cost settlement module is used to approve the construction costs in the audited construction settlement report. Based on the construction cost type, the construction costs are divided into site construction costs, bidding costs for sub-items and parts of the project, and personnel and mechanism differences. The amount of construction costs is pushed to the progress payment application module in real time for the construction unit to apply for progress payment of the project. Other expense settlement module, used to settle other expenses; The A-supply material settlement module is used to review the quantity of materials in the A-supply material settlement application, enter the specific reviewed quantity, and after review, the A-supply material will be included in the final settlement; The project settlement application module is used to collect the construction costs, materials supplied by the client and other costs after completion, and output the full-caliber settlement report and settlement review form in the format of the full-caliber settlement report to complete the full-caliber settlement.

9. The electronic settlement platform for power transmission and transformation projects according to claim 8 is characterized by: When the technical and economic specialist of the construction management unit visits, the settlement management module includes a settlement statistics module, which is used to uniformly display the project execution status, project completion status and the assessment status of each participating unit. The participating units include the construction unit, design unit, project supervision unit, regulatory unit and settlement review unit; The settlement analysis module is used for engineering quantity analysis, comprehensive unit price analysis and three-calculation comparative analysis.

10. The electronic settlement platform for power transmission and transformation projects according to claim 9 is characterized by: When the provincial company's technical and economic specialist visits, the project settlement module includes a settlement review module, which is used to review and approve the final full-caliber settlement report and settlement approval form; The settlement management module includes a settlement statistics module and a settlement analysis module to view the settlement statistics results and settlement analysis results respectively.

11. An electronic settlement method for power transmission and transformation projects, applied to a system having a project settlement module and a settlement management module, characterized in that: The following steps are involved: Step S1: automatically generate a settlement plan according to the construction schedule, the settlement plan including the plan nodes, the settlement plan start time, and the settlement plan completion time; Step S2: The project manager of the owner's project department modifies and improves the settlement plan; Step S3: Based on the comprehensive digital management platform for the entire infrastructure process, during the construction process, the construction unit will settle all construction costs in real time through the automatic construction settlement function and upload them, which will be approved by the chief supervision engineer of the engineering supervision unit, the project manager of the owner's project department, and the technical and economic specialist of the construction management unit in turn. After approval, they will be included in the construction cost settlement module when the technical and economic specialist of the construction management unit visits; after the construction is completed, all the settlement engineering quantities of the construction process will be automatically summarized, and the construction process settlement will be associated with the progress payment to control the price of the construction unit in real time; Step S4: Each construction unit settles and uploads the other expenses incurred by each unit, which are reviewed and approved by the technical and economic specialist of the construction management unit. After review, they are included in the other expense settlement module during the visit of the technical and economic specialist of the construction management unit; Step S5: The project manager of the owner's project department settles the materials supplied by Party A and initiates a settlement application for materials supplied by Party A, which is reviewed and approved by the technical and economic specialist of the construction management unit. After review, it is included in the settlement module of materials supplied by Party A during the visit of the technical and economic specialist of the construction management unit. Step S6: The technical and economic specialist of the construction management unit shall collect and summarize the approved construction costs, other costs and the costs of materials supplied by Party A in the project settlement application module, and automatically output the full-caliber settlement report and settlement approval form through the automatic completion settlement function in accordance with the State Grid's requirements for the preparation of the settlement report for power transmission and transformation projects; Step S7: Submit the full-caliber settlement report and settlement approval form, which will be approved by the director of the construction department of the construction management unit, the manager in charge of the construction management unit, the technical and economic specialist of the provincial economic research institute, the technical and economic department of the provincial construction department, and the director in charge of the provincial construction department in turn; Step S8: The approved full-caliber settlement report and settlement approval form are automatically pushed to the e-Infrastructure 2.0 platform for archiving and storage.

12. The electronic settlement method for power transmission and transformation engineering according to claim 11, characterized in that: In step S3, the construction unit performs the process settlement of the construction costs, including the following steps: Step A1: The construction company selects the completed work volume, change approval, equipment supplied by Party B and the adjustable parts of the contract; Step A2: Automatically generate construction settlement report; Step A3: Submit the construction settlement report to the project manager of the owner's project department for review; Step A4: The audit shall be reviewed and approved by the owner's project department, the settlement audit unit, and the technical and economic specialists of the construction management unit in turn.

13. The electronic settlement method for power transmission and transformation engineering according to claim 11, characterized in that: In step S5, the project manager of the owner's project department settles the materials supplied by Party A, including the following steps: Step B1: The project manager of the owner's project department automatically extracts the data of materials supplied by Party A exported from ERP through the data center, and imports the data of materials supplied by Party A into the electronic settlement platform for power transmission and transformation projects based on the import function, or imports the Excel spreadsheet of the data of materials supplied by Party A into the electronic settlement platform for power transmission and transformation projects according to key fields; Step B2: Check the material items approved by the construction management unit and submit the data in the material items to the technical and economic specialist of the construction management unit for approval.