Fabricated maintenance device for foundation pit concrete inner supporting beam and construction method of fabricated maintenance device
By installing prefabricated maintenance devices on the inner support beams of the foundation pit concrete, including gantry, water pipe and water retention cloth, the problem of high labor cost of concrete maintenance at the construction site is solved, efficient and convenient maintenance operations are achieved, project quality is improved and high economic benefits are high.
Patent Information
- Application Number
- CN202411735417.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-29
- Publication Date
- 2025-02-28
AI Technical Summary
The labor cost of existing concrete curing methods at construction sites is high, and the prior art is difficult to effectively reduce labor investment.
A prefabricated maintenance device for support beams in foundation pit concrete is provided, including a plurality of gantry frames, water pipes and water retention cloths. The door frame is arranged at intervals along the length direction of the inner support beam, the water supply pipe is arranged in the pipe sleeve of the door frame, the nozzle is arranged to face the inner support beam, and the water retention cloth is wrapped on the inner support beam to prevent moisture from evaporating.
Through the use of prefabricated maintenance devices, manpower and material resources can be greatly saved, efficient and convenient to operate, suitable for the maintenance of large-volume concrete, improving the quality of the project and having extremely high economic benefits.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building construction, and in particular to an assembled maintenance device for a support beam in foundation pit concrete and a construction method thereof. Background Art
[0002] During the construction process, for deep foundation pit projects surrounded by tall buildings on all four sides, the safety factor of the design parameters of the foundation pit support should be increased accordingly. When the support form of the deep foundation pit adopts concrete internal support, the cross-sectional size of the concrete internal support beam is greater than 1000mm×1000mm, which belongs to large-volume concrete. In order to ensure the safety during the foundation pit excavation process, there are higher requirements for the pouring and maintenance of the concrete internal support beam.
[0003] Concrete curing methods at construction sites include watering curing and continuous watering. Among them, watering curing is to cover the concrete surface with a layer of straw mats or sacks, and then frequently spray clean water on the surface to keep it moist. This method is suitable for environments with high temperatures and strong winds. The continuous watering method is to keep the concrete surface moist by continuously watering it. It is suitable for the curing of small areas and shallow layers of concrete. It is necessary to keep the water flow uniform to avoid scouring damage caused by local over-humidity or excessive water flow. The labor cost of existing construction site concrete curing is high. Summary of the invention
[0004] In order to overcome the defects of the prior art, an assembled maintenance device for supporting beams in foundation pit concrete and a construction method thereof are provided to solve the problem of high labor cost of concrete maintenance at existing construction sites.
[0005] In order to achieve the above-mentioned purpose, an assembled maintenance device for supporting beams in foundation pit concrete is provided, comprising:
[0006] A plurality of gantries, the plurality of gantries are arranged at intervals along the length direction of the inner support beam in the foundation pit, the gantries are sleeved on the inner support beam, a plurality of pipe sleeves are installed on the inner side of the gantries, and the plurality of pipe sleeves are arranged at intervals along the circumferential direction of the gantries;
[0007] A plurality of water pipes, the water pipes are detachably inserted into pipe sleeves corresponding to positions on the plurality of door frames, the water pipes are equipped with a plurality of nozzles, and the nozzles are arranged toward the inner support beam;
[0008] The water-retaining cloth is wrapped around the inner support beam and installed on the outer sides of the plurality of door frames.
[0009] Furthermore, it also includes two ground rails, which are respectively arranged on opposite sides of the inner support beam, and the two end sealing edges of the door frame are slidably arranged on the two ground rails.
[0010] Furthermore, the ground rail is formed with a slide groove, and rollers are installed at both ends of the door frame, and the rollers are slidably arranged in the slide groove.
[0011] Furthermore, the water-retaining fabric is a non-woven fabric.
[0012] Furthermore, the door frame comprises:
[0013] Two height-adjustable columns, the two columns are respectively arranged on opposite sides of the inner support beam;
[0014] A crossbar assembly with adjustable length is provided, the crossbar assembly spans over the inner support beam, and the two ends of the crossbar assembly are detachably connected to the upper ends of the two columns.
[0015] The present invention provides a construction method of an assembled maintenance device for a support beam in a foundation pit concrete, comprising the following steps:
[0016] Arrange multiple door frames at intervals along the length direction of the inner support beam in the foundation pit, wherein the door frames are sleeved on the inner support beam;
[0017] Respectively and detachably inserting a plurality of water pipes into corresponding pipe sleeves on the plurality of door frames, so that a plurality of nozzles on the water pipes are arranged toward the inner support beam;
[0018] Installing water-retaining cloth on the outer sides of the plurality of door frames to cover the inner support beams;
[0019] The plurality of nozzles are opened at regular intervals to spray clean water on the inner support beam for maintenance.
[0020] The beneficial effect of the present invention is that the assembled maintenance device for the inner support beam of the foundation pit concrete of the present invention first installs the door frame on the inner support beam, then installs the water pipe and the water-retaining cloth, and finally connects the water source to regularly maintain the inner support beam. The assembled maintenance device for the inner support beam of the foundation pit concrete of the present invention is light and convenient, easy to install and disassemble, can greatly save manpower and material resources, is efficient and convenient to operate, can be used permanently, has good on-site use effect, can greatly improve the quality of the project, has extremely high economic benefits and is worthy of promotion. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings:
[0022] Figure 1 The present invention is a schematic structural diagram of an assembled maintenance device for supporting beams in foundation pit concrete according to an embodiment of the present invention.
[0023] Figure 2The present invention is a schematic diagram of the internal structure of an assembled maintenance device for supporting beams in foundation pit concrete according to an embodiment of the present invention.
[0024] Figure 3 The present invention is a schematic structural diagram of one end of an assembled maintenance device for supporting beams in foundation pit concrete according to an embodiment of the present invention.
[0025] Figure 4 The present invention is a schematic diagram of the use status of the assembled maintenance device for the inner support beam of the foundation pit concrete according to an embodiment of the present invention. DETAILED DESCRIPTION
[0026] The present application will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the relevant inventions, rather than to limit the inventions. It should also be noted that, for ease of description, only the parts related to the invention are shown in the accompanying drawings.
[0027] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0028] Reference Figures 1 to 4 As shown, the present invention provides an assembled maintenance device for supporting beams in foundation pit concrete, comprising: a door frame 1, a water pipe 2, and a water-retaining cloth 3.
[0029] In this embodiment, there are multiple door frames 1. The door frames are in the shape of a door. Multiple door frames 1 are arranged at intervals along the length direction of the inner support beam 4 in the foundation pit. The door frame 1 is sleeved on the inner support beam 4. Multiple pipe sleeves 13 are installed on the inner side of the door frame 1. Multiple pipe sleeves 13 are arranged at intervals along the circumferential direction of the door frame 1, that is, multiple pipe sleeves are arranged along the circumferential direction of the inner support beam.
[0030] There are multiple water pipes 2. The water pipes 2 are detachably inserted into the corresponding pipe sleeves 13 on the multiple door frames 1. The water pipes 2 are equipped with multiple nozzles. The nozzles are arranged toward the inner support beam 4.
[0031] The water-retaining cloth 3 is installed on the outer sides of the plurality of door frames 1. The water-retaining cloth 3 is wrapped around the inner support beam 4 to prevent the water from evaporating quickly.
[0032] As a preferred embodiment, the water-retaining cloth 3 is a non-woven fabric.
[0033] The assembled maintenance device for the inner support beam of the foundation pit concrete of the present invention also includes two ground rails. The two ground rails are respectively arranged on opposite sides of the inner support beam 4. The edge sealing at both ends of the door frame 1 is slidably arranged on the two ground rails.
[0034] In this embodiment, the ground rail is formed with a slide groove. Rollers are installed at both ends of the door frame 1. The rollers are slidably arranged in the slide groove.
[0035] As a preferred embodiment, the door frame 1 includes: a column 11 and a crossbar assembly 12.
[0036] The height of the column 11 is adjustable. There are two columns 11. The two columns 11 are respectively arranged on opposite sides of the inner support beam 4.
[0037] The length of the crossbar assembly 12 is adjustable. The crossbar assembly 12 spans above the inner support beam 4. Both ends of the crossbar assembly 12 are detachably connected to the upper ends of the two columns 11.
[0038] In this embodiment, the column includes a vertical sleeve and a screw. The upper end of the vertical sleeve is formed with an internal thread. The lower end of the vertical sleeve is equipped with a roller. The lower end of the screw is screwed into the upper end of the vertical sleeve.
[0039] The crossbar assembly includes two threaded sleeves and a screw rod arranged in the horizontal direction. The two threaded sleeves are coaxially arranged. The two ends of the screw rod are screwed into the two threaded sleeves. A through hole is provided at one end of the threaded sleeve away from the screw rod. The upper end of the screw rod of the column can be movably inserted into the through hole of the threaded sleeve. Two screw parts are screwed into the upper end of the screw rod of the column. The two screw parts are respectively arranged on opposite sides of the threaded sleeve. One screw part is supported on the threaded sleeve, and the other screw part is pressed against the upper part of the threaded sleeve. A non-woven fabric is installed on the crossbar assembly of multiple door frames, and a non-woven fabric is installed on the columns of multiple door frames. The two adjacent non-woven fabrics are connected together by a zipper. Each non-woven fabric is connected to multiple rope loops. The rope loops are set on the crossbar assembly or the column.
[0040] The present invention provides a construction method of an assembled maintenance device for a support beam in a foundation pit concrete, comprising the following steps:
[0041] S1. Arrange multiple gantries 1 at intervals along the length direction of the inner support beam 4 in the foundation pit, and the gantries 1 are sleeved on the inner support beam 4.
[0042] S2. Multiple water pipes 2 are detachably inserted into the pipe sleeves 13 corresponding to the positions on multiple door frames 1, so that multiple nozzles on the water pipes 2 are arranged toward the inner support beam 4.
[0043] S3, installing the water-retaining cloth 3 on the outer sides of the plurality of door frames 1 to cover the inner support beam 4.
[0044] S4. Timely open multiple nozzles to spray clean water on the inner support beam 4 for maintenance.
[0045] In this embodiment, by adjusting the height of the upright column and the length of the crossbar assembly, the size of the door frame is slightly larger than the cross-sectional size of the inner support beam. The door frame is suitable for the inner support beam with a cross-sectional size of 1000mm×900mm.
[0046] The pipe sleeve on the door frame is used to fix the water pipe. After the water pipe is connected to the water source, water is sprayed in all directions without dead angles. The water-retaining cloth is used to prevent a large amount of water loss and evaporation. The water pipe is set on the inner side of the door frame, while the water-retaining cloth is set on the outer side of the door frame.
[0047] The construction method of the assembled maintenance device for the inner support beam of foundation pit concrete of the present invention comprises the following steps: firstly installing a door frame on the inner support beam, then installing a water pipe and a water retaining cloth, and finally connecting a water source to regularly maintain the inner support beam.
[0048] The assembled maintenance device for supporting beams in foundation pit concrete of the present invention is light and convenient, easy to install and disassemble, can greatly save manpower and material resources, is efficient and convenient to operate, can be used permanently, has good on-site use effects, can greatly improve the quality of the project, has extremely high economic benefits and is worthy of promotion.
[0049] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the inventive concept. For example, the above features are replaced with (but not limited to) technical features with similar functions disclosed in the present application.
Claims
1. An assembled maintenance device for supporting beams in foundation pit concrete, characterized in that: include: A plurality of gantries, the plurality of gantries are arranged at intervals along the length direction of the inner support beam in the foundation pit, the gantries are sleeved on the inner support beam, a plurality of pipe sleeves are installed on the inner side of the gantries, and the plurality of pipe sleeves are arranged at intervals along the circumferential direction of the gantries; A plurality of water pipes, the water pipes are detachably inserted into pipe sleeves corresponding to positions on the plurality of door frames, the water pipes are equipped with a plurality of nozzles, and the nozzles are arranged toward the inner support beam; The water-retaining cloth is wrapped around the inner support beam and installed on the outer sides of the plurality of door frames.
2. The assembled maintenance device for the inner support beam of foundation pit concrete according to claim 1 is characterized in that: It also includes two ground rails, which are respectively arranged on the opposite sides of the inner support beam, and the two end sealing edges of the door frame are slidably arranged on the two ground rails.
3. The assembled maintenance device for the inner support beam of foundation pit concrete according to claim 2 is characterized in that: The ground rail is formed with a slide groove, and rollers are installed at both ends of the door frame, and the rollers are slidably arranged in the slide groove.
4. The assembled maintenance device for the inner support beam of foundation pit concrete according to claim 1 is characterized in that: The water-retaining cloth is a non-woven fabric.
5. The assembled maintenance device for the inner support beam of foundation pit concrete according to claim 1 is characterized in that: The door frame comprises: Two height-adjustable columns, the two columns are respectively arranged on opposite sides of the inner support beam; A crossbar assembly with adjustable length is provided, the crossbar assembly spans over the inner support beam, and the two ends of the crossbar assembly are detachably connected to the upper ends of the two columns.
6. A construction method for the assembled curing device for the inner support beam of foundation pit concrete according to any one of claims 1 to 5, characterized in that: The following steps are involved: Arrange multiple door frames at intervals along the length direction of the inner support beam in the foundation pit, wherein the door frames are sleeved on the inner support beam; Respectively and detachably inserting a plurality of water pipes into corresponding pipe sleeves on the plurality of door frames, so that a plurality of nozzles on the water pipes are arranged toward the inner support beam; Installing water-retaining cloth on the outer sides of the plurality of door frames to cover the inner support beams; The plurality of nozzles are opened at regular intervals to spray clean water on the inner support beam for maintenance.