Dump humping-inverted dumping process method under complex site condition

By setting up chutes and bottom yards under complex site conditions, using the gravity of the discharge materials themselves to release and perform reverse operation, the problems of high slope height of the drainage yard and safety of downhill transportation of heavy vehicles under complex site conditions are solved, and the effect of reducing slope height and reducing downhill transportation of heavy vehicles is achieved.

CN119551384APending Publication Date: 2025-03-04SHEN KAN QINHUANGDAO GENERAL ENG DESIGN & RES INST CORP MCC
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202510029328.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-08
Publication Date
2025-03-04

AI Technical Summary

Technical Problem

Under complex site conditions, the slope height of the mine drainage site is high, resulting in frequent safety accidents in downhill transportation of heavy vehicles, and the prior art is difficult to effectively reduce the slope height and reduce downhill transportation of heavy vehicles.

Method used

The soil discharge yard is rolled-inverted and discharged under complex site conditions. By setting up a chute and a bottom yard, the material is discharged by gravity, and the inverted operation is carried out at the bottom of the chute to reduce the initial drain slope height.

Benefits of technology

It effectively reduces the initial slope height of the soil discharge site under complex site conditions, reduces downhill transportation of heavy vehicles, reduces infrastructure project volume and production costs, and improves the safety and environmental benefits of the soil discharge site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119551384A_ABST
    Figure CN119551384A_ABST
Patent Text Reader

Abstract

The invention relates to a dumping dump humping-inverted dumping process method under complex site conditions. The dumping dump humping-inverted dumping process method comprises the following steps that the number of chutes is determined according to the total amount of discharged materials and the humping specifications of the chutes; the number and size of the bottom storage yard are determined according to the number of the chutes and the type of the abandoned materials; the number of unloading platforms and the plane size of the unloading platform are determined according to the number of the chutes and the type of the transport vehicle; according to the plane size of the unloading platform and the size of the bottom storage yard, the set minimum interval of the chutes is determined; and building a connection road and a chute, and then carrying out humping and inverted discharging operation. Compared with the prior art, the dumping site humping-inverted dumping process method under the complex site condition is provided, chutes of different areas and different heights can be arranged according to the favorable terrain of the site and in combination with the properties of dumping materials, the dumping amount and the like, and flexible dumping is achieved; and meanwhile, a front loading machine is arranged at the bottom for dumping in a chute bottom storage yard, so that the initial dumping slope height is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of hillside open-pit mine dumping, and in particular relates to a dumping and back-draining dumping process under complex site conditions. Background Art

[0002] With the strengthening of safety supervision in the mining industry and the improvement of mine production safety awareness and management concepts, more and more attention has been paid to the production management of mine spoil dumps. Due to complex site conditions, the single-step slope of the spoil dump is prone to be high, the road layout is difficult under complex terrain conditions, the project volume is huge, and safety accidents caused by heavy rock transport vehicles going downhill often occur.

[0003] In view of this, the present invention is proposed. Summary of the invention

[0004] The technical problem to be solved by the present invention is to overcome the existing defects and provide a method for draining and dumping spoil in a spoil dump under complex site conditions, so as to solve the technical problem of reducing the height of the spoil dump slope and reducing the mining production demand of heavy vehicles going downhill under complex site conditions.

[0005] To achieve the above object, the present invention provides the following technical solutions:

[0006] A method for dumping soil in a dump under complex site conditions by draining and dumping soil in reverse, comprising the following steps:

[0007] S100, determining the number of chutes according to the total amount of discarded materials and the discharge specifications of the chutes;

[0008] S200, determining the number and size of the bottom storage yard according to the number of chutes and the types of abandoned materials;

[0009] S300, determining the number of unloading stations and the plane size of the unloading platform according to the number of chutes and the type of transport vehicles;

[0010] S400, determining the minimum spacing of the chutes according to the plane size of the unloading platform and the size of the bottom yard;

[0011] S500, build connecting roads and chutes, and then carry out sluicing and reverse discharge operations.

[0012] Preferably, in step S100:

[0013] The chute discharge specifications include the depth of the chute, the width of the bottom of the chute and the slope of the chute.

[0014] Preferably, in step S200:

[0015] The number of the chutes is the same as the number of the bottom yards.

[0016] Preferably, in step S300:

[0017] The number of unloading stations is the product of the number of chutes and the number of types of transport vehicles.

[0018] Preferably, in step S300:

[0019] There are two types of transport vehicles, and every two unloading stations correspond to a set of chutes.

[0020] Preferably, in step S300:

[0021] The chute is located in the middle of the two corresponding unloading stations.

[0022] Preferably, in step S400:

[0023] A heavy vehicle route and an empty vehicle route are arranged on the unloading platform, which are used for fully loaded and empty vehicle routes respectively.

[0024] Compared with the prior art, the present invention provides a method for chute-reverse discharge of soil in a spoil dump under complex site conditions. Chutes in different areas and at different heights can be set according to favorable on-site terrain and in combination with the properties of the spoil materials and the amount of spoil, so as to achieve flexible and maneuverable soil discharge. At the same time, a front-loading machine is equipped at the bottom to carry out reverse discharge in the yard at the bottom of the chute, thereby reducing the height of the initial spoil slope.

[0025] It is especially suitable for hillside dumping sites and valley dumping sites with steep terrain in the initial dumping stage. During the construction process, the minimum spacing of the chute can be determined by calculating the chute capacity, the number of unloading platforms, the rock rolling distance, etc. The limited site space can be fully utilized for dumping operations, so that the lower steps can be formed in the initial dumping stage, and the general "high soil high dumping, low soil low dumping" method of pressing the slope foot is transformed into a covering method.

[0026] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0028] Figure 1 The present invention is a flowchart of a method for dumping and dumping soil in a waste dump under complex site conditions proposed by an embodiment of the present invention.

[0029] Figure 2 The present invention provides a simplified diagram of initial soil discharge and advancement of a soil discharge method for a soil dump under complex site conditions, which is proposed in an embodiment of the present invention.

[0030] Figure 3 A cross-sectional view of a chute in a method for dumping and dumping soil in a spoil dump under complex site conditions proposed in an embodiment of the present invention.

[0031] Figure 4 The present invention is a layout diagram of an unloading platform in a method for dumping soil in a dump under complex site conditions proposed by an embodiment of the present invention.

[0032] The diagram is as follows:

[0033] 1. Chute; 2. Bottom yard; 3. Unloading platform; 4. Unloading station; 5. Soil discharge platform; 6. Heavy vehicle route; 7. Empty vehicle route. DETAILED DESCRIPTION

[0034] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents the selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present invention.

[0035] The embodiment of the present invention provides a method for dumping soil in a dump under complex site conditions, comprising the following steps:

[0036] S100, determining the number of chutes 1 according to the total amount of discarded materials and the discharge specifications of chute 1;

[0037] Among them, Figure 3 As shown, in the above steps, the discharge specifications of the chute 1 include the depth of the chute 1 , the width of the bottom surface of the chute 1 , and the slope of the inclined surface of the chute 1 .

[0038] S200, determining the number and size of the bottom stockpile 2 according to the number of chutes 1 and the types of abandoned materials;

[0039] Among them, Figure 1 As shown, in the above steps, the number of chutes 1 is the same as the number of the bottom yards 2 .

[0040] S300, determining the number of unloading stations 4 and the plane size of the unloading platform 3 according to the number of chutes 1 and the type of transport vehicles;

[0041] Among them, Figure 1 As shown, in the above steps, the number of unloading stations 4 is the product of the number of chutes 1 and the number of transport vehicle types. Generally, there are two types of transport vehicles, which is equivalent to the number of unloading stations 4 being twice the number of chutes 1, so that every two unloading stations 4 correspond to a group of chutes 1.

[0042] like Figure 1 As shown, in a preferred embodiment of the present invention, the chute 1 is located in the middle of two corresponding unloading stations 4.

[0043] S400, determining the minimum spacing of the chutes 1 according to the plane size of the unloading platform 3 and the size of the bottom yard 2;

[0044] Among them, Figure 2 As shown, in the above steps, a heavy vehicle line 6 and an empty vehicle line 7 are set on the unloading platform 3, which are used for the fully loaded and unloaded vehicle routes respectively. In this way, the empty vehicle and the fully loaded vehicle travel according to their own routes respectively, which further promotes the soil discharge efficiency.

[0045] S500, constructing the connecting road and chute 1, and then carrying out the sliding and reverse discharge operations.

[0046] In the above embodiment provided by the present invention, the discarded materials are discharged through the chute 1, and the discarded materials are discharged by their own gravity, so there is no need to build a production and transportation road along the hillside, and only a connecting road is needed, which reduces the amount of infrastructure engineering and saves investment. At the same time, it reduces the long-distance downhill transportation of heavy vehicles in the hillside terrain.

[0047] In addition, the dumping and dumping process method provided by the present invention under complex site conditions also has the following advantages:

[0048] 1. Effectively reduce the high slope formed by the foot-pressing soil discharge in the initial soil discharge stage;

[0049] 2. By utilizing the gravity of the discarded materials, there is no need to build production and transportation roads along the hillside, only connecting roads are needed, which reduces the amount of infrastructure construction and saves investment. At the same time, it reduces the long-distance downhill transportation of heavy vehicles in the hillside terrain;

[0050] 3. Effectively reduce the width of the dumping site safety platform and increase the dumping volume. The change in dumping methods allows the dumping site safety platform to only meet the requirements of the overall slope stability of the dumping site and the requirements of later greening, without considering the requirements of the site required for the transportation vehicle to turn around;

[0051] 4. From the perspective of production, transportation and safety management, the use of the slip-reverse process can effectively reduce the distance of automobile transportation, reduce energy consumption, save production costs, and achieve significant economic benefits;

[0052] 5. The volume of soil dumping is increased, which reduces the area of ​​the soil dumping site under the same soil dumping demand conditions, effectively saves and intensively uses land, and has obvious social and environmental benefits.

[0053] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the product of the invention is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0054] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0055] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0056] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention. It should be noted that similar numbers and letters represent similar items in the following drawings. Therefore, once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings.

Claims

1. A method for dumping soil in a dump under complex site conditions, characterized in that: The steps include: S100, determining the number of chutes according to the total amount of discarded materials and the discharge specifications of the chutes; S200, determining the number and size of the bottom storage yard according to the number of chutes and the types of abandoned materials; S300, determining the number of unloading stations and the plane size of the unloading platform according to the number of chutes and the type of transport vehicles; S400, determining the minimum spacing of the chutes according to the plane size of the unloading platform and the size of the bottom yard; S500, build connecting roads and chutes, and then carry out sluicing and reverse discharge operations.

2. The method for dumping soil in a dump under complex site conditions according to claim 1 is characterized in that: In step S100: The chute discharge specifications include the depth of the chute, the width of the bottom of the chute and the slope of the chute.

3. The method for dumping soil in a dump under complex site conditions according to claim 1 is characterized in that: In step S200: The number of the chutes is the same as the number of the bottom yards.

4. The method for dumping soil in a dump under complex site conditions according to claim 1 is characterized in that: In step S300: The number of unloading stations is the product of the number of chutes and the number of types of transport vehicles.

5. The method for dumping soil in a dump under complex site conditions according to claim 4 is characterized in that: In step S300: There are two types of transport vehicles, and every two unloading stations correspond to a set of chutes.

6. The method for dumping soil in a dump under complex site conditions according to claim 5 is characterized in that: In step S300: The chute is located in the middle of the two corresponding unloading stations.

7. The method for dumping soil in a dump under complex site conditions according to claim 1 is characterized in that: In step S400: A heavy vehicle route and an empty vehicle route are arranged on the unloading platform, which are used for fully loaded and empty vehicle routes respectively.

Citation Information

Patent Citations

  • Chute for storing ore in opencast quarry and mining method of opencast quarry

    CN107503751A

  • Surface mine chute transshipment transportation system

    CN111285142A