Heat preservation equipment for power transmission tower foundation in seasonal frozen soil area and construction method of heat preservation equipment

By installing ground source heat pump heat exchange pipes and water collection pool systems on the basis of the transmission tower in the seasonal frozen soil area, automatic water replenishment is achieved, and the impact of freezing, thawing and sinking on the foundation is solved, the service life of the transmission tower is extended and the frequency of manual operation is reduced.

CN119553713AInactive Publication Date: 2025-03-04SUZHOU UNIV OF SCI & TECH +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510051902.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-14
Publication Date
2025-03-04
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the seasonal frozen soil area, the foundation of the transmission tower is affected by the phenomenon of freezing, thawing, and sinking, resulting in damage to the infrastructure structure and uneven stress deformation, which in turn causes the power line to collapse.

Method used

An insulation device including ground source heat pump heat exchange pipe, water collection pool, water replenishment pipe, air vent pipe, water blocking parts, filter nets and support parts is adopted. The ground source heat pump heat exchange pipe is set around the foundation pile of the transmission tower. The water collecting pool is used to collect rainwater and replenish it into the ground source heat pump heat exchange pipe through the water replenishment pipe, and automatic water replenishment operation is carried out to avoid the impact of freezing, thawing and sinking on the foundation.

Benefits of technology

It effectively avoids the influence of freezing, thawing and sinking of the transmission tower foundation, reduces the damage of the infrastructure and uneven stress deformation, extends the service life of the transmission tower, and reduces the frequency of manual operation through automatic water replenishment function.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119553713A_ABST
    Figure CN119553713A_ABST
Patent Text Reader

Abstract

The invention discloses a seasonal frozen soil area power transmission tower foundation heat preservation device and a construction method thereof.The seasonal frozen soil area power transmission tower foundation heat preservation device comprises a heat preservation assembly which comprises a power transmission tower foundation pile, a ground source heat pump heat exchange pipe, a water collecting pool, a water supplementing pipe, a gas discharging pipe, a water plugging piece, a filter screen and a bearing piece, and the ground source heat pump heat exchange pipe is arranged on the periphery of the power transmission tower foundation pile; the water collecting tank is located on one side of the ground source heat pump heat exchange pipe, the two ends of the water supplementing pipe are communicated with the ground source heat pump heat exchange pipe and the water collecting tank respectively, one end of the air discharging pipe is communicated with the ground source heat pump heat exchange pipe, the other end of the air discharging pipe extends to one side of the water collecting tank, and the water plugging piece is arranged in the water supplementing pipe. Heat preservation can be conducted on a power transmission tower foundation and a pile foundation through the heat preservation assembly, it is avoided that the power transmission tower foundation and the pile foundation are affected by frost heaving and thaw collapse, and the service life of the power transmission tower foundation and the pile foundation is shortened, meanwhile, through cooperation of the fastening assembly and the switching assembly, the water supplementing operation of the heat exchange pipe can be controlled, rainwater is collected for supplementing, and frequent manual water supplementing operation is not needed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of transmission tower foundation insulation, in particular to a transmission tower foundation insulation device in a seasonally frozen soil region and a construction method thereof. Background Art

[0002] In recent years, the extreme climate faced by infrastructure construction has gradually increased. In seasonally frozen soil areas, the frozen soil will melt in warm summers, causing the building foundation to sink and deform. In cold winters, the water in the soil will freeze, causing the building foundation to rise. The uneven distribution of water bodies and the uneven geological characteristics may cause uneven settlement of the building foundation. Transmission towers are the key link in energy transmission in the central and western regions. The stability of the foundation is more stringent and the impact of damage is more serious. Therefore, the construction of transmission tower foundations in seasonally frozen soil areas is an extremely challenging task.

[0003] At present, traditional transmission towers in seasonally frozen areas are generally constructed by deep excavation of foundations, but this method has shortcomings in the following aspects: 1) Frost heave and thaw settlement will always have an impact: Under extreme weather conditions, the depth of the seasonal frozen area will increase, and the thermal conductivity of the pile foundation is higher than that of the soil, which will also cause the temperature of the surrounding soil to drop rapidly, making the pile foundation always affected by the frost heave and thaw settlement phenomenon; 2) Frost heave damage: The soil around the pile foundation will frost and heave, which will produce an extrusion capacity on the foundation structure. On the one hand, it will cause the foundation structure to be damaged, and on the other hand, it may cause non-uniform stress deformation of the foundation, which will lead to uneven horizontal deformation of the pile foundation, and then cause the collapse of the transmission line. Summary of the invention

[0004] Purpose of the invention: The problem to be solved by the present invention is how to solve the problem of frost heave and thaw settlement affecting the foundation of power transmission towers in seasonally frozen soil areas.

[0005] Technical solution: The present invention discloses a transmission tower foundation insulation device for a seasonally frozen soil region, which comprises an insulation component, including a transmission tower foundation pile, a ground source heat pump heat exchange pipe, a water collecting tank, a water supply pipe, a vent pipe, a water blocking component, a filter screen and a receiving component. The ground source heat pump heat exchange pipe is arranged around the transmission tower foundation pile, the water collecting tank is located on one side of the ground source heat pump heat exchange pipe, the two ends of the water supply pipe are respectively connected to the ground source heat pump heat exchange pipe and the water collecting tank, one end of the vent pipe is connected to the ground source heat pump heat exchange pipe, and the other end extends to one side of the water collecting tank, the water blocking component is arranged in the water supply pipe, the filter screen is arranged in the water collecting tank, and the receiving component is arranged on the inner wall of the water collecting tank; a fastening component is arranged on The water collecting pool includes a side door, a movable rod, a limit member, a fastening plate and a guide member. An inspection port is opened on one side of the water collecting pool, and the side door is arranged in the inspection port. The movable rod slides on both sides of the inner wall of the water collecting pool, the limit member is arranged on the movable rod, the fastening plate slides on both sides of the inner wall of the water collecting pool, and the guide member is arranged on the top of the fastening plate; and a switching component is arranged in the water supply pipe, including a trigger rod, a trigger member, a limit frame and a driving member. The trigger rod slides on both sides of the inner wall of the water supply pipe and cooperates with the water blocking member. The trigger member is arranged on the trigger rod, the limit frame slides in the water supply pipe, and the driving member is fixed to the top of the limit frame.

[0006] Furthermore, the water blocking component of the thermal insulation equipment includes a mounting plate, a connecting rod, a blocking block, a fixing plate and a protrusion. The mounting plate is fixed in the water supply pipe, a water supply hole is opened in the middle thereof, the connecting rod slides in the water supply hole, the blocking block is fixed to one end of the connecting rod, the fixing plate is fixed to the other end of the connecting rod, and the protrusion is fixed to the four inner corners of the fixing plate.

[0007] Furthermore, the water blocking member of the heat preservation device also includes a guide rod and a first spring. The guide rod is fixed to one side of the fixed plate, and the two ends of the first spring are respectively fixed to the fixed plate and the mounting plate.

[0008] Furthermore, the receiving part of the heat preservation equipment includes a receiving plate, a drainage plate and a protective plate. The receiving plate is fixed around the inner wall of the water collection pool, the filter net is located on the receiving plate, the drainage plate is placed on the bottom wall of the water collection pool, and the protective plate is fixed on the top of the filter net.

[0009] Furthermore, the limiting component of the heat preservation equipment includes a fixed frame, an inclined plate and a second spring. The fixed frame is fixed on both sides of the inner wall of the water collection pool, the movable rod slides in the fixed frame, the inclined plate is fixed to the end of the movable rod and cooperates with the fastening plate, and the two ends of the second spring are respectively fixed to the inclined plate and the fixed frame.

[0010] Furthermore, the guide member of the heat preservation equipment includes a fixed block, a fixed rod and a third spring. The fixed block is fixed to the inner wall of the water collection pool and is located above the fastening plate. The fixed rod is fixed to the bottom of the fixed block. The two ends of the third spring are respectively fixed to the fixed block and the fastening plate.

[0011] Furthermore, the trigger component of the heat preservation device includes a slider, a limit block, a first magnet and a second magnet. The slider is fixed to the inner bottom of the trigger rod. Both sides of the connecting rod are provided with oblique grooves that cooperate with the slider. The limit block is fixed to the surface of the trigger rod and is located in the water supply pipe. The first magnet is fixed to the top of the trigger rod and is located on the top of the receiving plate. The second magnet is fixed to the bottom of the filter.

[0012] Furthermore, the trigger member of the heat preservation device also includes a connecting plate and a fourth spring. The connecting plate is fixed to the surface of the trigger rod, and two ends of the fourth spring are respectively fixed to the receiving plate and the connecting plate.

[0013] Furthermore, the driving component of the insulation equipment includes a support rod, a fifth spring and a fixed plate, the support rod is fixed to the top of the limit frame, the two ends of the fifth spring are respectively fixed to the inner wall of the water supply pipe and the limit frame, and the fixed plate is fixed to the surface of the support rod.

[0014] Furthermore, the construction method of the seasonal frozen soil area transmission tower foundation insulation equipment includes the following construction steps:

[0015] Evenly install the ground source heat pump heat exchange pipes around the transmission tower foundation piles;

[0016] Connect the water supply pipe to the highest point of the ground source heat pump heat exchange pipe to continuously supply water to it, and connect the vent pipe to discharge the air inside it;

[0017] Rainwater is collected in a sump and the filtered rainwater is fed into the heat exchange tube of the ground source heat pump through a water supply pipe.

[0018] Beneficial effects: Compared with the prior art, the significant advantages of the present invention are: the foundation and pile foundation of the transmission tower can be insulated by the insulation component to avoid them being affected by frost heave and thaw settlement and reducing their service life; at the same time, through the cooperation of the fastening component and the switching component, the water replenishment operation of the heat exchange tube can be controlled, and the water can be replenished by collecting rainwater, without the need for frequent manual water replenishment operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 The overall structural diagram of the insulation equipment for the foundation of power transmission towers in seasonally frozen soil areas and its construction method;

[0020] Figure 2A top view of the ground source heat pump heat exchange pipe of the transmission tower foundation insulation equipment and its construction method in seasonal frozen soil areas;

[0021] Figure 3 The water collection tank structure diagram for the insulation equipment and construction method of the transmission tower foundation in seasonally frozen soil areas;

[0022] Figure 4 A cross-sectional view of the insulation assembly of the transmission tower foundation insulation equipment and the construction method thereof in seasonally frozen soil areas;

[0023] Figure 5 Thermal insulation equipment and construction method for transmission tower foundation in seasonally frozen soil areas Figure 4 Enlarged view of inner part A;

[0024] Figure 6 The structure diagram of the driving parts of the foundation insulation equipment of the power transmission tower in seasonally frozen soil areas and its construction method;

[0025] Figure 7 The structural diagram of the water blocking parts of the foundation insulation equipment and construction method of the transmission tower in seasonally frozen soil areas;

[0026] Figure 8 A cross-sectional view of a limiter for a foundation insulation device for a power transmission tower in a seasonally frozen soil region and a construction method thereof;

[0027] Fig. 9 Thermal insulation equipment and construction method for transmission tower foundation in seasonally frozen soil areas Figure 8 Enlarged view of inner part B;

[0028] Fig.10 Thermal insulation equipment and construction method for transmission tower foundation in seasonally frozen soil areas Figure 8 Enlarged view of the inner C part;

[0029] Fig.11 Another perspective view of the water blocking parts of the transmission tower foundation insulation equipment and its construction method in seasonally frozen soil areas. DETAILED DESCRIPTION

[0030] The technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings.

[0031] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0032] Example 1

[0033] Reference Figure 1-Figure 6, which is the first embodiment of the present invention, and this embodiment provides a seasonal frozen soil area transmission tower foundation insulation equipment and a construction method thereof. The seasonal frozen soil area transmission tower foundation insulation equipment and a construction method thereof include an insulation component 100, a fastening component 200 and a switching component 300. The insulation component 100 is used to insulate the transmission tower foundation, and the fastening component 200 is used to fix the filter net to improve the filtering effect of rainwater. The switching component 300 can control the rainwater to be added into the heat exchange tube.

[0034] Specifically, the insulation component 100 includes a transmission tower foundation pile 101, a ground source heat pump heat exchange pipe 102, a water collecting pool 103, a water supply pipe 104, a vent pipe 105, a water blocking piece 106, a filter 107 and a receiving piece 108. The ground source heat pump heat exchange pipe 102 is arranged around the transmission tower foundation pile 101, and the water collecting pool 103 is located on one side of the ground source heat pump heat exchange pipe 102. Both ends of the water supply pipe 104 are connected to the ground source heat pump heat exchange pipe 102 and the water collecting pool 103 respectively. One end of the vent pipe 105 is connected to the ground source heat pump heat exchange pipe 102, and the other end extends to one side of the water collecting pool 103. The water blocking piece 106 is arranged in the water supply pipe 104, the filter 107 is arranged in the water collecting pool 103, and the receiving piece 108 is arranged on the inner wall of the water collecting pool 103.

[0035] There are multiple ground source heat pump heat exchange pipes 102, which are pre-buried around the transmission tower foundation pile 101, and the ground source heat pump heat exchange pipes 102 on each side are arranged in a U shape to form an insulation belt, so that the transmission tower foundation pile 101 can reach a normal temperature effect around. One end of the ground source heat pump heat exchange pipe 102 is connected to the ground source heat pump. The present invention provides energy to the ground source heat pump through the transmission tower's own energy to enable it to continuously maintain the heat exchange effect. The working principle of this part is the existing technology and will not be repeated here.

[0036] An open collecting plate is fixed on the top of the water collecting tank 103 to collect rainwater therein. The water supply pipe 104 is at the highest point of the geothermal heat pump heat exchange tube 102. When the air inside the geothermal heat pump heat exchange tube 102 moves upward to the highest point, the water pressure on both sides of the water supply pipe 104 will change, and the water in the water collecting tank 103 will enter the geothermal heat pump heat exchange tube 102 through the water supply pipe 104 to perform water supply operation. At the same time, the vent pipe 105 will discharge the air due to the pressure difference. The water blocking part 106 is set to prevent the water in the geothermal heat pump heat exchange tube 102 from entering the water collecting tank 103. The filter net 107 is used to filter the water in the water collecting tank 103 to prevent impurities from entering the water supply pipe 104 and the geothermal heat pump heat exchange tube 102, which brings great inconvenience to its use. The receiving part 108 is used to place the filter net 107.

[0037] The fastening assembly 200 is arranged in the water collecting pool 103, and includes a side door 201, a movable rod 202, a limit member 203, a fastening plate 204 and a guide member 205. An inspection port S is opened on one side of the water collecting pool 103, the side door 201 is arranged in the inspection port S, the movable rod 202 slides on both sides of the inner wall of the water collecting pool 103, the limit member 203 is arranged on the movable rod 202, the fastening plate 204 slides on both sides of the inner wall of the water collecting pool 103, and the guide member 205 is arranged on the top of the fastening plate 204.

[0038] The side door 201 is rectangular and can be installed in the inspection port S by means of screws, buckles or hinges. When the filter 107 needs to be cleaned or replaced, the side door 201 can be opened to manually take out the filter 107. Two movable rods 202 are provided, and one side of the fastening plate 204 is inclined. The movable rod 202 cooperates with the limit member 203 to push the fastening plate 204 downward. The filter 107 is squeezed and fixed by the fastening plate 204, which can prevent the filter 107 from being misplaced due to the buoyancy of water or the shaking of foreign objects during use, thereby affecting its filtering effect.

[0039] The switching assembly 300 is arranged in the water supply pipe 104, and includes a trigger rod 301, a trigger member 302, a limit frame 303 and a driving member 304. The trigger rod 301 slides on both sides of the inner wall of the water supply pipe 104, and cooperates with the water blocking member 106. The trigger member 302 is arranged on the trigger rod 301, the limit frame 303 slides in the water supply pipe 104, and the driving member 304 is fixed to the top of the limit frame 303.

[0040] Two trigger rods 301 are provided, and the cooperation between the trigger rods 301 and the trigger member 302 can limit the water blocking member 106. When the filter 107 is removed, the water blocking member 106 is reset to a closed state by the trigger rods 301 and the trigger member 302. At the same time, the water blocking member 106 is fixed by the limit frame 303 and the drive member 304 to prevent impurities from entering the water supply pipe 104 and the ground source heat pump heat exchange pipe 102 when cleaning the filter and the water collection tank 103.

[0041] Example 2

[0042] Reference Figure 2 to Figure 11 , which is the second embodiment of the present invention, and this embodiment is based on the previous embodiment.

[0043] Specifically, the water blocking component 106 includes a mounting plate 106a, a connecting rod 106b, a blocking block 106c, a fixing plate 106d and a protrusion 106e. The mounting plate 106a is fixed in the water supply pipe 104, and a water supply hole P is opened in the middle thereof. The connecting rod 106b slides in the water supply hole P, the blocking block 106c is fixed to one end of the connecting rod 106b, the fixing plate 106d is fixed to the other end of the connecting rod 106b, and the protrusion 106e is fixed to the four inner corners of the fixing plate 106d.

[0044] The mounting plate 106a is rectangular, and a rubber ring is fixed on one side of the sealing block 106c close to the water supply hole P, which has a sealing effect. The protrusion 106e ensures that there is always a certain distance between the fixing plate 106d and the water supply hole P, which can prevent the water in the water collection pool 103 from being blocked when entering from the water supply hole P.

[0045] The water blocking member 106 further includes a guide rod 106f and a first spring 106g. The guide rod 106f is fixed to one side of the fixing plate 106d. Both ends of the first spring 106g are respectively fixed to the fixing plate 106d and the mounting plate 106a.

[0046] A sealing treatment is performed between the guide rod 106f and the mounting plate 106a, and the first spring 106g applies a force to the fixing plate 106d in the direction away from the mounting plate 106a, so that when the water pressure on both sides is balanced, that is, when there is no air in the ground source heat pump heat exchange tube 102, the water supply hole P can be blocked by the fixing plate 106d, the mounting plate 106a and the blocking block 106c. When there is air in the ground source heat pump heat exchange tube 102, the water pressure on one side of the fixing plate 106d pushes it toward the mounting plate 106a, thereby opening the water supply hole P and performing the water supply operation.

[0047] The receiving member 108 includes a receiving plate 108a, a drainage plate 108b and a protective plate 108c. The receiving plate 108a is fixed around the inner wall of the water collecting pool 103. The filter screen 107 is located on the receiving plate 108a. The drainage plate 108b is placed on the inner bottom wall of the water collecting pool 103. The protective plate 108c is fixed to the top of the filter screen 107.

[0048] There are multiple receiving plates 108a, which are fixed around the inner wall of the water collecting pool 103 by screws. The cross-section of the drainage plate 108b is inclined, and is used to guide the water at the bottom of the water collecting pool 103 to the water supply pipe 104. There are multiple sedimentation tanks on the top of the drainage plate 108b to collect and precipitate fine impurities that are not completely filtered out by the filter screen 107. At the same time, the drainage plate 108b is detachable and can be removed by the staff for cleaning. The guard plate 108c is used to block the impurities accumulated on the top of the filter screen 107 to avoid excessive impurities from entering the water collecting pool 103 during removal, which causes inconvenience to cleaning.

[0049] The limiting member 203 includes a fixed frame 203a, an inclined plate 203b and a second spring 203c. The fixed frame 203a is fixed on both sides of the inner wall of the water collecting pool 103. The movable rod 202 slides in the fixed frame 203a. The inclined plate 203b is fixed to the end of the movable rod 202 and cooperates with the fastening plate 204. The two ends of the second spring 203c are respectively fixed to the inclined plate 203b and the fixed frame 203a.

[0050] The fixing frame 203a is used to fix the movable rod 202, and the inclined plate 203b is located above the fastening plate 204. The second spring 203c applies a force to the movable rod 202 to move in the direction of the inspection port S, making it more convenient to reset.

[0051] The guide member 205 includes a fixed block 205a, a fixed rod 205b and a third spring 205c. The fixed block 205a is fixed to the inner wall of the water collection pool 103 and is located above the fastening plate 204. The fixed rod 205b is fixed to the bottom of the fixed block 205a. The two ends of the third spring 205c are respectively fixed to the fixed block 205a and the fastening plate 204.

[0052] The fastening plate 204 is guided and limited by the fixing block 205a and the fixing rod 205b to prevent it from deflecting during the up and down movement. The third spring 205c applies an upward pulling force to the fastening plate 204, so that when the inclined plate 203b is separated from the fastening plate 204, the fastening plate 204 can move up and separate from the filter screen 107, thereby releasing the fixing effect on it.

[0053] When the filter 107 needs to be removed, the side door 201 is removed. At this time, the second spring 203c drives the movable rod 202 to move toward the inspection port S, so that the inclined plate 203b is separated from the fastening plate 204, and the fastening plate 204 can move up and separate from the filter 107, releasing the fixing effect on it. When installing, the side door 201 is fixed in the inspection port S, and the movable rod 202 is pushed inward by the side door 201. At this time, the inclined plate 203b slides on the inclined surface of the fastening plate 204, thereby driving the fastening plate 204 to move downward, applying pressure on the filter 107 to fix it.

[0054] The trigger member 302 includes a slider 302a, a limit block 302b, a first magnet 302c and a second magnet 302d. The slider 302a is fixed to the inner bottom of the trigger rod 301. Both sides of the connecting rod 106b are provided with inclined grooves K that cooperate with the slider 302a. The limit block 302b is fixed to the surface of the trigger rod 301 and is located in the water supply pipe 104. The first magnet 302c is fixed to the top of the trigger rod 301 and is located on the top of the receiving plate 108a. The second magnet 302d is fixed to the bottom of the filter screen 107.

[0055] When the slider 302a and the trigger rod 301 move upward, the slider 302a moves in the inclined groove K, thereby driving the connecting rod 106b to reset to the state where the blocking block 106c blocks the water supply hole P. The limit block 302b is used to limit the trigger rod 301 to prevent it from moving too much upward, causing the slider 302a to move above the inclined groove K and affecting its reset operation.

[0056] The first magnet 302c and the second magnet 302d attract each other. When the filter 107 is removed and moved upward, the second magnet 302d drives the first magnet 302c and the trigger rod 301 to move upward, so that the blocking block 106c is reset, preventing rainwater from carrying too many impurities into the water supply hole P before being filtered by the filter 107.

[0057] The trigger member 302 further includes a connecting plate 302e and a fourth spring 302f. The connecting plate 302e is fixed to the surface of the trigger rod 301. Two ends of the fourth spring 302f are respectively fixed to the receiving plate 108a and the connecting plate 302e.

[0058] An upward pulling force is applied to the trigger rod 301 through the connecting plate 302e and the fourth spring 302f to prevent the magnetism of the magnet from decreasing during long-term use and affecting the use of the device. The staff can inspect the magnet and the fourth spring 302f on time to ensure that at least one of the two can function.

[0059] The driving member 304 includes a support rod 304a, a fifth spring 304b and a fixed plate 304c. The support rod 304a is fixed to the top of the limit frame 303. Both ends of the fifth spring 304b are respectively fixed to the inner wall of the water supply pipe 104 and the limit frame 303. The fixed plate 304c is fixed to the surface of the support rod 304a.

[0060] The top end of the support rod 304a is located on one side of the receiving plate 108a. The setting of the fixing plate 304c can prevent the support rod 304a from moving too much upwards to affect its limiting effect on the fixing plate 106d.

[0061] When the filter 107 is removed, the limit frame 303 and the support rod 304a are driven to move upward by the fifth spring 304b. Because the slider 302a and the trigger rod 301 are resetting the connecting rod 106b and the fixed plate 106d during this process, when the fixed plate 106d is reset to the initial state, the limit frame 303 also moves upward and is clamped on the outer side of the fixed plate 106d, so as to fix the fixed plate 106d, and further prevent the water replenishment hole P from being accidentally opened. When the filter 107 is cleaned and installed on the receiving plate 108a, the trigger rod 301 and the support rod 304a are pushed downward by the gravity of the filter 107, so as to release the limiting effect on the fixed plate 106d, so that the water replenishment operation can be performed normally.

[0062] Example 3

[0063] Reference Figures 1 to 11 , which is the third embodiment of the present invention, and is based on the first two embodiments.

[0064] Specifically, the ground source heat pump heat exchange pipes 102 are evenly installed around the transmission tower foundation piles 101;

[0065] The highest point of the ground source heat pump heat exchange pipe 102 is connected to the water supply pipe 104 to continuously supply water to the inside thereof, and at the same time, the air discharge pipe 105 is connected to discharge the air inside thereof;

[0066] Rainwater is collected through the water collection tank 103, and the filtered rainwater is replenished into the ground source heat pump heat exchange pipe 102 through the water replenishment pipe 104;

[0067] When the filter 107 needs to be removed, the side door 201 is removed. At this time, the second spring 203c drives the movable rod 202 to move toward the inspection opening S, so that the inclined plate 203b is separated from the fastening plate 204, and the fastening plate 204 can move upward to separate from the filter 107, releasing the fixing effect on it. When installing, the side door 201 is fixed in the inspection opening S, and the movable rod 202 is pushed inward by the side door 201. At this time, the inclined plate 203b slides on the inclined surface of the fastening plate 204, thereby driving the fastening plate 204 to move downward, exerting pressure on the filter 107 to fix it;

[0068] At the same time, when the filter 107 is removed, the limit frame 303 and the support rod 304a are driven to move upward by the fifth spring 304b. Because the slider 302a and the trigger rod 301 are resetting the connecting rod 106b and the fixed plate 106d during this process, when the fixed plate 106d is reset to the initial state, the limit frame 303 also moves upward and is clamped on the outer side of the fixed plate 106d, so as to fix the fixed plate 106d, and further prevent the water replenishment hole P from being accidentally opened. When the filter 107 is cleaned and installed on the receiving plate 108a, the trigger rod 301 and the support rod 304a are pushed downward by the gravity of the filter 107, so as to release the limiting effect on the fixed plate 106d, so that it can perform the water replenishment operation normally.

Claims

1. A seasonally frozen soil area transmission tower foundation insulation equipment, characterized in that: include, The heat preservation component (100) comprises a transmission tower foundation pile (101), a ground source heat pump heat exchange pipe (102), a water collecting tank (103), a water supply pipe (104), a venting pipe (105), a water blocking member (106), a filter screen (107) and a receiving member (108), wherein the ground source heat pump heat exchange pipe (102) is arranged around the transmission tower foundation pile (101), the water collecting tank (103) is located on one side of the ground source heat pump heat exchange pipe (102), and the water supply pipe (104) is provided on the ground source heat pump heat exchange pipe (104). 04) are respectively connected to the ground source heat pump heat exchange pipe (102) and the water collecting pool (103); one end of the vent pipe (105) is connected to the ground source heat pump heat exchange pipe (102), and the other end extends to one side of the water collecting pool (103); the water blocking member (106) is arranged in the water supply pipe (104); the filter screen (107) is arranged in the water collecting pool (103); and the receiving member (108) is arranged on the inner wall of the water collecting pool (103); A fastening assembly (200) is arranged in the water collecting pool (103), comprising a side door (201), a movable rod (202), a stopper (203), a fastening plate (204) and a guide member (205); an inspection opening (S) is opened on one side of the water collecting pool (103); the side door (201) is arranged in the inspection opening (S); the movable rod (202) slides on both sides of the inner wall of the water collecting pool (103); the stopper (203) is arranged on the movable rod (202); the fastening plate (204) slides on both sides of the inner wall of the water collecting pool (103); and the guide member (205) is arranged on the top of the fastening plate (204); and The switching assembly (300) is arranged in the water supply pipe (104), and comprises a trigger rod (301), a trigger member (302), a limit frame (303) and a driving member (304); the trigger rod (301) slides on both sides of the inner wall of the water supply pipe (104) and cooperates with the water blocking member (106); the trigger member (302) is arranged on the trigger rod (301); the limit frame (303) slides in the water supply pipe (104); and the driving member (304) is fixed to the top of the limit frame (303).

2. The seasonally frozen soil area transmission tower foundation insulation equipment according to claim 1, characterized in that: The water blocking component (106) includes a mounting plate (106a), a connecting rod (106b), a blocking block (106c), a fixing plate (106d) and a protrusion (106e); the mounting plate (106a) is fixed in the water supply pipe (104), and a water supply hole (P) is opened in the middle thereof; the connecting rod (106b) slides in the water supply hole (P); the blocking block (106c) is fixed to one end of the connecting rod (106b); the fixing plate (106d) is fixed to the other end of the connecting rod (106b); and the protrusion (106e) is fixed to the four inner corners of the fixing plate (106d).

3. The seasonally frozen soil area transmission tower foundation insulation equipment according to claim 2, characterized in that: The water blocking member (106) further comprises a guide rod (106f) and a first spring (106g), wherein the guide rod (106f) is fixed to one side of the fixing plate (106d), and the two ends of the first spring (106g) are respectively fixed to the fixing plate (106d) and the mounting plate (106a).

4. The seasonally frozen soil area transmission tower foundation insulation equipment according to claim 3, characterized in that: The receiving member (108) comprises a receiving plate (108a), a guide plate (108b) and a protective plate (108c); the receiving plate (108a) is fixed around the inner wall of the water collecting pool (103); the filter screen (107) is located on the receiving plate (108a); the guide plate (108b) is placed on the inner bottom wall of the water collecting pool (103); and the protective plate (108c) is fixed on the top of the filter screen (107).

5. The seasonally frozen soil area transmission tower foundation insulation equipment according to claim 4, characterized in that: The limiting member (203) comprises a fixed frame (203a), an inclined plate (203b) and a second spring (203c); the fixed frame (203a) is fixed to both sides of the inner wall of the water collecting tank (103); the movable rod (202) slides in the fixed frame (203a); the inclined plate (203b) is fixed to the end of the movable rod (202) and cooperates with the fastening plate (204); and the two ends of the second spring (203c) are respectively fixed to the inclined plate (203b) and the fixed frame (203a).

6. The seasonally frozen soil area transmission tower foundation insulation equipment according to claim 5, characterized in that: The guide member (205) comprises a fixed block (205a), a fixed rod (205b) and a third spring (205c); the fixed block (205a) is fixed to the inner wall of the water collecting tank (103) and is located above the fastening plate (204); the fixed rod (205b) is fixed to the bottom of the fixed block (205a); and two ends of the third spring (205c) are respectively fixed to the fixed block (205a) and the fastening plate (204).

7. The seasonally frozen soil area transmission tower foundation insulation equipment according to claim 6, characterized in that: The trigger member (302) comprises a slider (302a), a limit block (302b), a first magnet (302c) and a second magnet (302d); the slider (302a) is fixed to the inner bottom of the trigger rod (301); both sides of the connecting rod (106b) are provided with inclined grooves (K) that cooperate with the slider (302a); the limit block (302b) is fixed to the surface of the trigger rod (301) and is located in the water supply pipe (104); the first magnet (302c) is fixed to the top of the trigger rod (301) and is located on the top of the receiving plate (108a); and the second magnet (302d) is fixed to the bottom of the filter screen (107).

8. The seasonally frozen soil area transmission tower foundation insulation equipment according to claim 7, characterized in that: The trigger member (302) further comprises a connecting plate (302e) and a fourth spring (302f), wherein the connecting plate (302e) is fixed to the surface of the trigger rod (301), and two ends of the fourth spring (302f) are respectively fixed to the receiving plate (108a) and the connecting plate (302e).

9. The seasonally frozen soil area transmission tower foundation insulation equipment according to claim 8, characterized in that: The driving member (304) comprises a support rod (304a), a fifth spring (304b) and a fixed plate (304c); the support rod (304a) is fixed to the top of the limit frame (303); two ends of the fifth spring (304b) are respectively fixed to the inner wall of the water supply pipe (104) and the limit frame (303); and the fixed plate (304c) is fixed to the surface of the support rod (304a).

10. A construction method for a transmission tower foundation insulation device in a seasonally frozen soil region, characterized in that: The transmission tower foundation insulation device according to any one of claims 1 to 9 further comprises the following construction steps: Evenly installing the ground source heat pump heat exchange pipes (102) around the transmission tower foundation piles (101); The highest point of the ground source heat pump heat exchange pipe (102) is connected to a water supply pipe (104) to continuously supply water therein, and at the same time, the air discharge pipe (105) is connected thereto to discharge the air therein; Rainwater is collected by a water collection tank (103), and the filtered rainwater is replenished into the ground source heat pump heat exchange pipe (102) through a water replenishment pipe (104).