Oil unloading system

By installing sea-to-shore oil unloading equipment and integrated anchoring base plate on civilian ships, a high-sea conditions oil unloading system is built, which solves the problems of oil transport and unloading under port-free terminal conditions, and achieves efficient and economical oil guarantees.

CN119611633APending Publication Date: 2025-03-14CHINA HARZONE IND CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411734082.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-29
Publication Date
2025-03-14

AI Technical Summary

Technical Problem

In the absence of port terminals, the prior art is difficult to effectively ensure the transportation and unloading of oil, especially in high sea conditions, the sea condition adaptability and offshore distance performance indicators of the oil unloading system are limited.

Method used

By using civilian ships to build a high-sea oil unloading system, including barges and multi-purpose work ships, the barges are equipped with sea-to-shore oil unloading equipment for building subsea oil unloading channels. The multi-purpose work ship acts as a tug with integrated anchoring base plate to realize single-point mooring of the oil tanker.

Benefits of technology

The system can be quickly deployed and used in high sea conditions, reducing the manufacturing and maintenance costs of oil unloading equipment, and improving the ability and economic value of oil guarantee.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119611633A_ABST
    Figure CN119611633A_ABST
Patent Text Reader

Abstract

The invention discloses an oil unloading system, and belongs to the technical field of offshore transportation. The oil unloading system comprises a barge for constructing sea-to-shore oil unloading equipment suitable for subsea oil unloading channels in high sea conditions; the multi-purpose working ship is used for constructing an oil tanker single-point mooring system and is provided with an integrated anchoring base plate; the integrated anchoring basal disc comprises a box body, an outfitting accessory, a ballasting system and a floating system. By means of the oil unloading system, the operation requirement of a single-point mooring system of an oil tanker under the high sea condition can be met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of offshore transportation technology, and in particular to an oil unloading system. Background Art

[0002] In cross-sea island landing operations, fuel supply is an important part of the logistics support for cross-sea island capture operations. In wartime, the enemy will certainly implement port closure and port destruction operations, and our army is very likely to face an unfavorable situation where there are no ports or docks available. Under the condition that there are no ports or docks on the enemy shore, organizing the transfer of fuel from the shore to the sea without docks is an essential means for the combat logistics oil and gas forces to implement shore and beach fuel supply. However, there is currently a lack of sufficient means to ensure effective means of ensuring fuel supply under the condition of no ports or docks. Summary of the invention

[0003] The purpose of the present application is to construct an oil unloading system that can realize single-point mooring in high sea conditions and can realize sea-to-shore oil unloading on the seabed.

[0004] The solution of this application example is implemented in the following manner.

[0005] The embodiment of the present application provides an oil unloading system, comprising:

[0006] Barges for sea-to-shore oil offloading facilities with subsea oil offloading access suitable for high sea conditions; and

[0007] A multi-purpose work boat that cooperates with the integrated anchor base plate to build a single-point mooring system for oil tankers;

[0008] The integrated anchoring base includes: box, outfitting accessories, ballast system, and buoyancy system.

[0009] According to some examples of the present application, the sea-to-shore oil unloading equipment includes: a submarine pipeline, and the submarine pipeline is used to construct a submarine oil unloading channel.

[0010] According to some examples of the present application, the sea-to-shore oil unloading equipment further includes: a pipeline configuration equipment group, which is used to retract and release the submarine pipeline.

[0011] According to some examples of the present application, the pipeline configuration equipment group includes:

[0012] Pallet, and the retractable and unretractable guide device assembly fixed to the towing pallet, the auxiliary operation boat assembly, the amphibious operation vehicle assembly, and the shore and beach securing device assembly;

[0013] The pipeline configuration equipment group also includes a power distribution and accessory container fixed to the barge deck.

[0014] According to some examples of the present application, the retractable guide device assembly includes:

[0015] Reel device, wall mount device, drive device, pipe laying device, conduit device, brake device, hydraulic system, and electrical control system;

[0016] The electrical system is used to control the hydraulic system to provide power to drive the hydraulic motors of the drum device and the pipe laying device to rotate synchronously.

[0017] According to some examples of the present application, the auxiliary work boat assembly includes:

[0018] Workboats, used to assist multi-purpose workboats in offshore operations and to ensure patrols; and

[0019] A deployment and recovery device used to deploy and recover a workboat on a barge.

[0020] According to some examples of the present application, an amphibious work vehicle assembly includes:

[0021] Amphibious work vehicles, used to transport beach mooring anchors, beach work equipment and beach work personnel ashore; and

[0022] Deployment and recovery device, used for the deployment and recovery of amphibious work vehicles on barges.

[0023] According to some examples of the present application, a shore mooring device assembly includes: an operating boom, a large holding force anchor, a wire rope, a shore mooring connector, and a shore operating device;

[0024] The shore mooring device assembly is used to fix the submarine pipeline after landing, so as to form a complete oil transportation channel from sea to shore and prevent the submarine pipeline from being dragged to the sea surface by the ocean current.

[0025] According to some examples of the present application, the power distribution and accessories container includes:

[0026] Standard container;

[0027] An accessory box for storing spare accessories; and

[0028] The distribution box is used for distributing electricity to the submarine pipeline retracting and guiding device, the operating boat deploying and recovering device, the amphibious operating vehicle deploying and recovering device and the operating boom.

[0029] According to some examples of the present application, the integrated anchoring base plate is further integrated with an underwater hose, a jumper hose, a swivel joint, a mooring buoy and a mooring anchor chain.

[0030] Compared with the prior art, the above solution of the present application can at least achieve the following advantages:

[0031] (1) It solves the problem of rapid modification and deployment of oil pipelines in high sea conditions.

[0032] (2) Civilian ships can be used to unload oil, which greatly reduces the manufacturing cost and maintenance cost of oil unloading equipment and has extremely high economic value.

[0033] (3) The use of submarine oil pipelines and single-point mooring of oil tankers allows the entire system to be used in high sea conditions; it is significantly superior to the performance indicators of the oil unloading system in the existing technology in terms of sea condition adaptability, offshore distance, etc. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the specific implementation of the present application or the technical solutions in the prior art, the drawings required for use in the specific implementation or the description of the prior art will be briefly introduced below.

[0035] Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without any creative work.

[0036] Figure 1 This is a schematic diagram of the top view of the structure of a barge for a high sea condition oil unloading system constructed using a civilian ship in an embodiment of the present application;

[0037] Figure 2 It is a front view structural schematic diagram of the integrated anchoring base plate in the embodiment of the present application;

[0038] Figure 3 This is an expanded view of a high sea condition oil unloading system constructed using a civilian ship in an embodiment of the present application.

[0039] Reference numerals:

[0040] Barge - 1;

[0041] Retractable and deployable guide device assembly-3; auxiliary operation boat assembly-4; amphibious operation vehicle assembly-5; shore mooring device assembly-6; power distribution and accessory container-7. DETAILED DESCRIPTION

[0042] Undoubtedly, in cross-sea island landing operations, fuel supply is an important part of the logistics support for cross-sea island capture operations. In wartime, the enemy will certainly implement port closure and port destruction operations, and our army is very likely to face an unfavorable situation where there are no ports or docks available. Under the condition that there are no ports or docks on the enemy shore, organizing the transfer of fuel from the shore to the sea without docks is an essential means for the logistics oil and gas forces of the campaign to implement shore and beach fuel supply.

[0043] Civilian oil tankers are very abundant, and they can make up for the lack of standard oil tankers. Therefore, it is necessary to modify them appropriately to meet the requirements of oil unloading in high sea conditions without available port terminals.

[0044] In this application, the applicant believes that it can be modified to build a high sea condition oil unloading system. In this way, the unloading system can fill the gap of insufficient standard equipment, greatly improve the oil support capability for large-scale landing operations, and greatly reduce the manufacturing cost and maintenance cost of oil unloading equipment, thus having extremely high economic and military value.

[0045] Therefore, it is of great significance to use civilian ships to build a sea-to-shore oil unloading channel that can adapt to high sea conditions, has good maneuverability and large transportation flow, so as to provide uninterrupted oil replenishment for the logistics and oil forces of the cross-sea island-capturing combat cluster.

[0046] There are some attempts in the prior art, such as rapid construction of a modular oil delivery system using a barge carrier.

[0047] The system is mainly composed of a self-propelled deck barge and a product oil tanker. However, the mooring method of the product oil tanker is four-point mooring. Therefore, it is difficult to apply it to civilian oil tankers. Because civilian oil tankers themselves do not have the mooring equipment required for four-point mooring. Moreover, even if the civilian oil tankers are modified with mooring equipment, due to their own poor operating performance, it will take a long time to throw the four-point mooring.

[0048] In addition, the four-point mooring has limited adaptability to sea conditions. If you want to moor an oil tanker in high sea conditions, you need to increase the size of the anchor chain, cable and anchor in the mooring system, which is not conducive to wartime operations.

[0049] In addition, another problem with the above solutions is that the oil unloading technology from sea to shore all adopts a floating pipeline system. That is, the oil pipeline floats on the sea surface, so the oil pipeline is greatly affected by wave currents. In addition, the working pressure and tensile strength of the oil hose are limited, so the ability of the entire system to adapt to sea conditions and oil transportation distance is very limited.

[0050] In order to overcome the above defects and make full use of civilian ships to transport oil from sea to shore under high sea conditions, in this embodiment, the applicant uses civilian ships to construct a high sea condition oil unloading system.

[0051] The system mainly uses a barge and a multi-purpose workboat.

[0052] The barge has been modified to install sea-to-shore oil unloading equipment to build a submarine oil unloading channel that can adapt to high sea conditions.

[0053] The multi-purpose workboat does not need to be modified. It can be used as a tugboat for the integrated anchor base of the oil tanker single-point mooring system. When the oil unloading system is deployed in high sea conditions, it can assist in the deployment of the integrated anchor base to complete the single-point mooring of the oil tanker.

[0054] The details are described below.

[0055] In the embodiment, the high sea condition oil unloading system constructed by using civilian ships includes a self-propelled barge 1 and a multi-purpose work boat.

[0056] The equipment modified on the barge 1 includes a submarine pipeline (submarine oil hose), a retractable guide device assembly 3, an auxiliary operation boat assembly 4, an amphibious operation vehicle assembly 5, a shore mooring device assembly 6 and a power distribution and accessory container 7.

[0057] Among the above components, the submarine pipeline, the retracting and guiding device 3, the auxiliary operation boat assembly 4, the amphibious operation vehicle assembly 5, and the shore mooring device assembly 6 are all fixed on the pallet 9, and the power distribution and accessory container 7 is fixed on the barge deck by welding.

[0058] The retractable guide device assembly 3 is composed of a reel device, a wall frame device, a drive device, a pipe arrangement device, a conduit device, a brake device, a hydraulic system, an electrical control system, etc. It is mainly used for the reeling and retracting of submarine oil hoses.

[0059] The electrical system controls the hydraulic pump station to provide power source, driving the hydraulic motors of the drum device and the pipe laying device to rotate simultaneously. The hydraulic motor of the drum device is decelerated by the reducer and then meshes with the large and small gears to drive the drum to rotate together. At the same time, the hydraulic motor of the pipe laying device drives the bidirectional screw to rotate through the reducer, so that the bell mouth reciprocates back and forth on the guide rod, and the rubber hose is wound neatly and orderly during the unfolding and retracting process.

[0060] The auxiliary work boat assembly 4 consists of a work boat and its deployment and recovery device. The deployment and recovery device is used for deploying and retrieving the work boat on the barge. The work boat is used to assist the multi-purpose work boat in offshore operations and ensure patrols.

[0061] The amphibious operation vehicle assembly 5 consists of an amphibious operation vehicle and its deployment and recovery device. The deployment and recovery device is used for the deployment and recovery of the amphibious operation vehicle on the barge. The amphibious operation vehicle is used to transport shore mooring anchors, shore operation equipment and shore operation personnel ashore.

[0062] The shore mooring device assembly 6 consists of an operating boom, a large holding anchor, a wire rope, a shore mooring joint and a shore operating device, etc. It is used to fix the submarine oil hose after it is brought ashore, forming a complete oil transfer channel from sea to shore to avoid being dragged out to sea by ocean currents.

[0063] The power distribution and accessory container 7 consists of a 20-foot standard container, a power distribution box and an accessory box. The power distribution box is used for distributing electricity to the submarine pipeline retracting and guiding device, the operating boat deploying and recovering device, the amphibious operating vehicle deploying and recovering device and the operating boom, and the accessory box is used for storing spare accessories.

[0064] Multi-purpose workboat 2 is responsible for towing and laying the integrated anchoring base.

[0065] The integrated anchor base is a large steel box-type barge; it consists of a box, outfitting accessories, ballast system, and floating system. It can also further integrate underwater hoses, jumper hoses, swivel joints, mooring buoys, mooring chains and other equipment, so as to meet the needs of single-point mooring system operations for oil tankers in high sea conditions.

[0066] The following will explain the oil unloading system in conjunction with its working process.

[0067] Barge 1 sails to the designated sea area by itself, and deploys its own mooring device to complete stable mooring.

[0068] The auxiliary operation boat 4 is hoisted and launched by the deployment and recovery device to assist the multi-purpose work boat 2 in deploying the single-point mooring system for the oil tanker, while patrolling and keeping watch.

[0069] The amphibious work vehicle 5 is hoisted into the water by the deployment and recovery device, and transports the shore workers and the equipment of the shore mooring device assembly 6 to the shore work point; the shore workers mark the shore terminal deployment point and complete the fixation of the free end of the shore mooring on the shore.

[0070] After the multi-purpose work boat 2 reaches the marked position, the ballasting operation of the integrated anchor base plate 8 is completed and the single-point mooring system of the oil tanker is deployed.

[0071] With the cooperation of the auxiliary operation boat 4 and the amphibious operation vehicle 5, the barge 1 lays the submarine oil pipeline from the terminal position on the shore to the integrated anchor base position of the single-point mooring system, and completes the connection between the submarine hose and the jumper hose after arriving at the designated position.

[0072] After the barge 1 and the multipurpose work boat 2 complete the laying of the submarine oil pipeline and the single-point mooring system for the oil tanker, the oil tanker arrives at the operating location, and the multipurpose work boat 2 assists in completing the single-point mooring of the oil tanker, and connects the floating hose integrated in the integrated anchor base to the oil outlet of the oil tanker, forming an oil pipeline channel from sea to shore.

[0073] After checking that there are no leaks, oil transfer operations can be carried out.

[0074] The embodiments described above with reference to the accompanying drawings are exemplary and are only used to explain the present application, but should not be construed as limiting the present application.

[0075] To make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the foregoing describes one or more embodiments with reference to the accompanying drawings. Wherein, similar reference numerals throughout the text are used to refer to similar components. In the above description, for the purpose of explanation, many specific details are set forth in order to provide a more thorough understanding of one or more embodiments. However, it is obvious that in various cases, one or more embodiments can be practiced without these specific details, and each embodiment can be combined with each other and referenced to each other without contradiction.

[0076] In addition, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover non-exclusive inclusions. For example, a process, method, system, product, or apparatus that includes a series of steps or elements is not necessarily limited to those steps or elements explicitly listed, but may include other steps or elements not explicitly listed or inherent to such process, method, product, or apparatus.

[0077] The above describes in detail the structure, features and effects of the present application based on the embodiments shown in the drawings. The above are only preferred embodiments of the present application, but the present application does not limit the scope of implementation to what is shown in the drawings. Any changes made in accordance with the concept of the present application, or modifications to equivalent embodiments with equivalent changes, which still do not exceed the spirit covered by the description and drawings, should be within the protection scope of the present application.

Claims

1. An oil unloading system, characterized in that: include: Barges, used to construct sea-to-shore oil unloading equipment suitable for submarine oil unloading channels in high sea conditions; and A multi-purpose work boat that cooperates with the integrated anchor base plate to build a single-point mooring system for oil tankers; The integrated anchoring base plate includes: a box body, outfitting accessories, a ballast system, and a buoyancy system.

2. The oil unloading system according to claim 1, characterized in that: The sea-to-shore oil unloading equipment comprises: a submarine pipeline, and the submarine pipeline is used to construct the submarine oil unloading channel.

3. The oil unloading system according to claim 2, characterized in that: The sea-to-shore oil unloading equipment further comprises: a pipeline configuration equipment group, which is used for retracting and releasing the submarine pipeline.

4. The oil unloading system according to claim 3, characterized in that: The pipeline configuration equipment group includes: A pallet, and a retractable guide device assembly, an auxiliary operation boat assembly, an amphibious operation vehicle assembly, and a shore fastening device assembly fixed to the pallet; The pipeline configuration equipment group also includes a power distribution and accessory container fixed to the barge deck.

5. The oil unloading system according to claim 4, characterized in that: The retractable guide device assembly comprises: Reel device, wall mount device, drive device, pipe laying device, conduit device, brake device, hydraulic system, and electrical control system; The electrical system is used to control the hydraulic system to provide power to drive the hydraulic motors of the drum device and the pipe laying device to rotate synchronously.

6. The oil unloading system according to claim 5, characterized in that: The auxiliary work boat assembly includes: A workboat, used to assist the multi-purpose workboat in operating at sea and ensuring patrol; and A deployment and recovery device used to deploy and recover a workboat on a barge.

7. The oil unloading system according to claim 5, characterized in that: The amphibious work vehicle assembly includes: Amphibious work vehicles, used to transport beach mooring anchors, beach work equipment and beach work personnel ashore; and Deployment and recovery device, used for the deployment and recovery of amphibious work vehicles on barges.

8. The oil unloading system according to claim 5, characterized in that: The shore mooring device assembly includes: operating boom, large holding anchor, wire rope, shore mooring joint and shore operating device; The shore mooring device assembly is used to fix the submarine pipeline after landing, so as to form a complete oil transportation channel from sea to shore and prevent the submarine pipeline from being dragged to the sea surface by the ocean current.

9. The oil unloading system according to claim 5, characterized in that: The power distribution and accessories container includes: Standard container; An accessory box for storing spare accessories; and The distribution box is used for distributing electricity to the submarine pipeline retracting and guiding device, the operating boat deploying and recovering device, the amphibious operating vehicle deploying and recovering device and the operating boom.

10. The oil unloading system according to claim 1, characterized in that: The integrated anchoring base also integrates underwater hoses, jumper hoses, swivel joints, mooring buoys and mooring anchor chains.