Large multi-layer roof pipe truss construction method
By using a special construction frame and a liftable installation platform in the construction of roof pipe truss, combined with the design of shock absorbing tables and elastic parts, the problem of large lifting vibration in traditional construction methods is solved, and efficient and stable construction quality and structural stability are achieved.
Patent Information
- Application Number
- CN202411519247.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-29
- Publication Date
- 2025-03-14
AI Technical Summary
Traditional roof pipe truss construction methods cannot effectively reduce the vibration to the structure during the lifting process, affecting the construction quality and structural stability.
A special construction frame and a liftable installation platform are used to support and fix the lower pipe truss through the construction frame, and the vibration energy is absorbed by the shock absorbing platform and elastic parts on the installation platform to reduce the vibration impact on the installed pipe trusses.
It effectively reduces vibration during lifting, improves construction quality and structural stability, and realizes efficient and stable construction of large multi-layer roof pipe trusses.
Smart Images

Figure CN119616219A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of tube truss construction, and in particular to a method for constructing a large-scale multi-layer roof tube truss. Background Art
[0002] Roof tube trusses are generally made of steel materials and are one of the main types of building structures. The tube truss structure is mainly composed of steel beams, steel columns, steel trusses and other components made of steel and steel plates, and uses silanization, pure manganese phosphating, water washing and drying, galvanizing and other rust removal and rust prevention processes. Welds, bolts or rivets are usually used to connect the components or parts. Because the tube truss structure is light in weight and simple to construct, it is widely used in large factories, venues, super high-rise buildings and other fields.
[0003] At present, the traditional construction method of roof tube trusses usually uses hoisting equipment to hoist the tube trusses. However, the traditional construction method often cannot effectively reduce the vibration of the tube truss structure during the hoisting process, which not only affects the construction quality, but also may cause potential damage to the structure, thereby affecting the stability of the overall structure of the tube truss. Therefore, how to effectively reduce the vibration during the hoisting process and improve the construction quality and structural stability has become a problem that needs to be solved urgently. Summary of the invention
[0004] In view of the problems existing in the prior art, the present application provides a large-scale multi-layer roof tube truss construction method.
[0005] The present application provides a large-scale multi-layer roof tube truss construction method, which adopts the following technical solution: A large-scale multi-layer roof tube truss construction method comprises the following steps: Step 1: Divide the construction area into multiple construction units; Step 2: Install a special construction frame at the construction unit location, on which a liftable installation platform is provided; Step 3: Complete the installation of the bottom roof pipe truss at the divided construction units, and fix the installed bottom roof pipe truss on the construction frame; Step 4: Hoist the pipe truss of the upper roof onto the installation platform, move the pipe truss of the upper roof to the installation position by lifting and lowering the installation platform, and complete the installation and fixing; Step 5: Re-adjust the position of the construction frame, fix the installed upper layer of roof pipe truss to the construction frame, and then hoist the upper layer of roof pipe truss onto the installation platform to install the upper layer of roof pipe truss; Step 6: Repeat step 5 above until the construction and installation of the roof pipe trusses on each floor are completed.
[0006] Optionally, when installing the pipe trusses on the roof of each layer, the overall structure of the pipe trusses is first assembled at the construction site, and then the assembled pipe trusses are hoisted as a whole.
[0007] Optionally, after the installation of the pipe trusses on each roof is completed, the installation platform is separated from the installed pipe trusses, and quality inspection is performed on each connection node of the pipe trusses. If there are deviations or unqualified parts, timely adjustments and repairs are made.
[0008] Optionally, a plurality of support rods are slidably arranged on the construction frame in a vertical direction, and a driving member for driving each support rod to slide is respectively arranged on the construction frame, and each support rod is provided with a support block for supporting the pipe truss.
[0009] Optionally, a support sleeve is slidably sleeved on the support rod along the length direction of the support rod, a rotating sleeve is rotatably sleeved on the support sleeve, the support block is fixedly arranged on the rotating sleeve, and a limit piece for preventing the support sleeve from sliding is arranged on the support rod.
[0010] Optionally, a shock absorbing platform is slidably arranged on the mounting platform in a vertical direction, an elastic member for supporting the shock absorbing platform is arranged on the mounting platform, and a supporting mechanism for preventing the shock absorbing platform from sliding is arranged on the mounting platform.
[0011] Optionally, the supporting mechanism includes a supporting frame slidably disposed on the mounting platform, and a driving assembly for driving the supporting frame to slide, wherein the supporting frame is disposed at the bottom of the shock absorbing platform and is used to abut against the bottom wall of the shock absorbing platform.
[0012] Optionally, the driving assembly includes a motor and a transmission screw, the transmission screw is rotatably arranged on the mounting platform, and the transmission screw is threadably matched with the top support frame, and the motor is used to drive the transmission screw to rotate.
[0013] Optionally, a plurality of roller brackets are provided at the bottom of the construction frame, and each of the roller brackets is equipped with a universal wheel.
[0014] Optionally, a plurality of outrigger cylinders are also provided at the bottom of the construction frame.
[0015] In summary, the present application includes at least one of the following beneficial technical effects: 1. This application uses a special construction frame and a liftable installation platform to support and fix the lower layer of pipe trusses. When the pipe trusses are hoisted, the pipe trusses are hoisted on the installation platform, and the construction frame bears the impact of the pipe trusses during hoisting, thereby reducing the vibration impact on the installed pipe trusses in the lower layer, ensuring the construction quality and structural stability. And by reasonably dividing the construction area and constructing in stages, the construction process is made more orderly and efficient, realizing the efficient and stable construction of large multi-story roof pipe trusses.
[0016] 2. The present application provides a plurality of support rods on a construction frame by sliding, and drives each support rod to slide so that the support blocks on each support rod are pressed against the bottom wall of the installed pipe truss, thereby supporting and fixing the pipe truss.
[0017] 3. The present application sets a support sleeve by sliding on the support rod, adjusts the position of the support sleeve on the support rod by a limit piece, and rotatably sets the support block on the support sleeve, so that the position of the support block on the support rod can be flexibly adjusted within a certain range, so that the support block can be accurately moved to the bottom of the pipe truss to be supported and provide support, thereby improving convenience of use.
[0018] 4. In the present application, a shock-absorbing platform is arranged on the installation platform, and an elastic member is arranged between the shock-absorbing platform and the installation platform. When the pipe truss is hoisted onto the installation platform, the elastic member can absorb and buffer the vibration energy, thereby protecting the pipe truss structure from damage. At the same time, a top support mechanism for preventing the shock-absorbing platform from sliding is also arranged on the installation platform, ensuring that the pipe truss is not prone to shaking or shifting when it is installed and fixed, thereby facilitating the positioning of the pipe truss. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 is a process flow chart of an embodiment of the present application; Figure 2 It is a schematic diagram of the structure of the construction frame used in the embodiment of the present application; Figure 3 It is a schematic diagram of the structure of the support rod used in the embodiment of the present application; Figure 4 It is a structural side view used to express the construction frame in the embodiment of the present application; Figure 5 It is a structural schematic diagram used to express the installation platform in an embodiment of the present application.
[0020] Explanation of the accompanying drawings: 1. Construction frame; 11. Universal wheel; 12. Outrigger cylinder; 13. Driving part; 14. Lead screw; 15. Servo motor; 2. Support rod; 21. Support sleeve; 22. Rotating sleeve; 23. Support block; 24. Limit screw; 25. Fixed block; 3. Installation platform; 31. Shock-absorbing platform; 32. Shock-absorbing spring; 33. Top support frame; 34. Motor; 35. Transmission screw. DETAILED DESCRIPTION
[0021] The following is combined with Figure 1-5 This application is described in further detail.
[0022] The present application embodiment discloses a large-scale multi-layer roof tube truss construction method. Figure 1 , including the following steps: Step 1: According to the actual situation of the construction site, the construction area is reasonably divided into multiple construction units to facilitate construction in different areas and stages; Step 2: Install a special construction frame 1 at each construction unit location. The construction frame 1 is provided with a liftable installation platform 3. The design of the construction frame 1 needs to take into account stability and load-bearing capacity to ensure safety during the construction process; Step 3: First, complete the installation of the bottom roof pipe truss at the divided construction unit. When installing the pipe truss, first complete the assembly of the overall structure of the pipe truss at the construction site, then hoist the assembled pipe truss to the installation position and fix it to the main structure of the building; after completing the installation of the bottom roof pipe truss, adjust the position of the construction frame 1, and firmly fix the installed bottom roof pipe truss on the construction frame 1 to prevent damage to the connection nodes of the pipe truss due to construction vibration during the subsequent construction process; Step 4: After the pipe trusses of the upper roof are assembled at the construction site, they are hoisted onto the installation platform 3. By driving the installation platform 3 up and down, the pipe trusses of the upper roof are accurately moved to the predetermined installation position, and the installation and fixing work is completed; When the corresponding roof tube truss structure layer is completed, the installation platform 3 is first separated from the tube truss structure layer, and the quality of each connection node of the tube truss is inspected. If there are deviations or unqualified parts, they are adjusted and repaired in time to ensure construction quality and safety.
[0023] Step 5: After installing the upper layer of roof tube trusses, first cancel the support and fixation of the construction frame 1 on the lower layer of roof tube trusses, and readjust the position of the construction frame 1. Then, fix the installed uppermost layer of roof tube trusses to the construction frame 1. Then, assemble the upper layer of roof tube trusses and hoist them onto the installation platform 3 to install the upper layer of roof tube trusses.
[0024] Step 6: Repeat the above step 5 until the construction and installation of the roof pipe trusses of each layer are completed; during the construction process, the position and stability of the construction frame 1 need to be continuously checked and adjusted to ensure the construction quality and safety.
[0025] The special construction frame 1 and the lifting installation platform 3 are used to support and fix the lower layer of pipe trusses. When the pipe trusses are hoisted, the pipe trusses are hoisted on the installation platform 3. The construction frame 1 bears the impact force of the pipe trusses during hoisting, thereby reducing the vibration impact on the installed pipe trusses at the lower layer, ensuring the construction quality and structural stability. And by reasonably dividing the construction area and constructing in stages, the construction process is made more orderly and efficient, realizing the efficient and stable construction of large multi-story roof pipe trusses.
[0026] Reference Figure 2 A plurality of roller brackets are provided at the bottom of the construction frame 1, and a universal wheel 11 is installed on each roller bracket. The universal wheel 11 at the bottom of the construction frame 1 can facilitate the movement of the construction frame 1; at the same time, in order to ensure stability during the construction process, a plurality of outrigger cylinders 12 are also provided at the bottom of the construction frame 1; when the construction frame 1 is moved to a predetermined position, the outrigger cylinders 12 can be used to prop up the construction frame 1, so that the universal wheels 11 are not subjected to force, thereby stably placing the construction frame 1 on the ground to prevent it from moving.
[0027] Reference Figure 2 A plurality of support rods 2 are slidably arranged on the construction frame 1 in the vertical direction. The length direction of the support rods 2 is vertical. A driving member 13 for driving each support rod 2 to slide is respectively arranged on the construction frame 1. The driving member 13 includes a hydraulic cylinder, which is fixedly arranged on the frame. The piston rod of the hydraulic cylinder is fixedly connected to the corresponding support rod 2.
[0028] Reference Figure 2 , 3 A support sleeve 21 is slidably mounted on each support rod 2 along the length direction of the support rod 2, a guide bar is fixedly mounted on the side wall of the support rod 2, and the length direction of the guide bar is vertical, a guide groove is opened on the inner side wall of the support sleeve 21 along the length direction of the support sleeve 21, and the guide bar is slidably mounted in the guide groove, a rotating sleeve 22 is coaxially rotatably mounted on the support sleeve 21, and a support block 23 is fixedly mounted on the side wall of the rotating sleeve 22.
[0029] Reference Figure 3 A limit piece is provided on the support rod 2 to prevent the support sleeve 21 from sliding, and the limit piece includes a limit screw 24. A fixing block 25 is fixedly provided on the side wall of the support rod 2. The limit screw 24 is passed through the fixing block 25 and is threadedly matched with the fixing block 25. The axial direction of the limit screw 24 is parallel to the length direction of the support rod 2, and the limit screw 24 is rotatably connected to the support sleeve 21 on the corresponding support rod 2.
[0030] By slidingly setting a plurality of support rods 2 on the construction frame 1, and driving each support rod 2 to slide, the support block 23 on each support rod 2 is pressed against the bottom wall of the installed pipe truss, so that the pipe truss can be supported and fixed; and by slidingly setting a support sleeve 21 on the support rod 2, adjusting the position of the support sleeve 21 on the support rod 2 by rotating the limit screw 24, and rotatably setting the support block 23 on the support sleeve 21, the position of the support block 23 on the support rod 2 can be flexibly adjusted within a certain range, so that the support block 23 can be accurately moved to the bottom of the pipe truss to be supported and support it, thereby improving the convenience of use.
[0031] Reference Figure 4 The mounting platform 3 is slidably arranged on the construction frame 1 along the vertical direction. A lead screw 14 is rotatably arranged on the construction frame 1. The axial direction of the lead screw 14 is vertical, and the lead screw 14 is threadedly matched with the mounting platform 3. A servo motor 15 is fixedly arranged on the construction frame 1, and the output shaft of the servo motor 15 is coaxially fixedly connected with the lead screw 14.
[0032] Reference Figure 5 A shock absorbing platform 31 is provided on the top wall of the mounting platform 3 for sliding in the vertical direction. An elastic member for supporting the shock absorbing platform 31 is provided on the mounting platform 3. The elastic member includes a shock absorbing spring 32. A plurality of shock absorbing springs 32 are provided, and each shock absorbing spring 32 is located between the mounting platform 3 and the shock absorbing platform 31. Both ends of the shock absorbing spring 32 are respectively connected to the mounting platform 3 and the shock absorbing platform 31. When the pipe truss is hoisted onto the mounting platform 3, the shock absorbing springs 32 can absorb and buffer the vibration energy, thereby protecting the pipe truss structure from damage.
[0033] Reference Figure 5 The mounting platform 3 is provided with a top support mechanism for preventing the shock-absorbing platform 31 from sliding. The top support mechanism includes a top support frame 33 slidably arranged on the mounting platform 3 in a vertical direction, and a driving component for driving the top support frame 33 to slide. The top support frame 33 is located at the bottom of the shock-absorbing platform 31 and is used to abut against the bottom wall of the shock-absorbing platform 31. The driving component includes a motor 34 and a transmission screw 35. The transmission screw 35 is rotatably arranged on the mounting platform 3, and the axial direction of the transmission screw 35 is vertical. The transmission screw 35 is threadedly matched with the top support frame 33. The motor 34 is fixedly arranged on the mounting platform 3, and the output shaft of the motor 34 is coaxially fixedly connected with the transmission screw 35. When the pipe truss is hoisted to the mounting platform 3, the transmission screw 35 is driven by the motor 34 to rotate, driving the top support frame 33 to slide and abut against the bottom wall of the shock-absorbing platform 31, ensuring that the pipe truss is not easy to shake or shift when it is installed and fixed, so as to facilitate the positioning of the pipe truss.
[0034] The implementation principle of the large-scale multi-layer roof tube truss construction method of the present application embodiment is as follows: the lower layer tube truss is supported and fixed by the construction frame 1. When the tube truss is hoisted, the tube truss is hoisted on the installation platform 3, and the impact force of the tube truss hoisting is carried by the construction frame 1, thereby reducing the vibration effect on the installed tube truss of the lower layer, ensuring the construction quality and structural stability. And by reasonably dividing the construction area and constructing in stages, the construction process is made more orderly and efficient, and the efficient and stable construction of large-scale multi-layer roof tube trusses is achieved.
[0035] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A large-scale multi-layer roof tube truss construction method, characterized in that: The following steps are involved: Step 1: Divide the construction area into multiple construction units; Step 2: Install a special construction frame (1) at the construction unit location, and a liftable installation platform (3) is provided on the construction frame (1); Step 3, completing the installation of the bottom roof pipe truss at the divided construction units, and fixing the installed bottom roof pipe truss on the construction frame (1); Step 4: hoist the pipe truss of the upper roof onto the installation platform (3); move the pipe truss of the upper roof to the installation position by lifting and lowering the installation platform (3); and complete the installation and fixing; Step 5, readjust the position of the construction frame (1), fix the already installed upper layer of roof pipe trusses to the construction frame (1), and then hoist the upper layer of roof pipe trusses onto the installation platform (3) to install the upper layer of roof pipe trusses; Step 6: Repeat step 5 above until the construction and installation of the roof pipe trusses on each floor are completed.
2. A large-scale multi-layer roof tube truss construction method according to claim 1, characterized in that: When installing the pipe trusses on the roof of each floor, first assemble the overall structure of the pipe trusses at the construction site, and then hoist the assembled pipe trusses as a whole.
3. A large-scale multi-layer roof tube truss construction method according to claim 1, characterized in that: When the pipe trusses of each roof are installed, the installation platform (3) is separated from the installed pipe trusses, and the quality of each connection node of the pipe trusses is inspected. If there are deviations or unqualified parts, they are adjusted and repaired in time.
4. A large-scale multi-layer roof tube truss construction method according to claim 1, characterized in that: A plurality of support rods (2) are slidably arranged on the construction frame (1) in a vertical direction, and a driving member (13) for driving each support rod (2) to slide is respectively arranged on the construction frame (1), and each support rod (2) is provided with a support block (23) for supporting a pipe truss.
5. A large-scale multi-layer roof tube truss construction method according to claim 4, characterized in that: A support sleeve (21) is slidably sleeved on the support rod (2) along the length direction of the support rod (2), a rotating sleeve (22) is rotatably sleeved on the support sleeve (21), the support block (23) is fixedly arranged on the rotating sleeve (22), and a stopper for preventing the support sleeve (21) from sliding is arranged on the support rod (2).
6. A large-scale multi-layer roof tube truss construction method according to claim 1, characterized in that: A shock absorbing platform (31) is slidably arranged on the installation platform (3) in a vertical direction, an elastic member for supporting the shock absorbing platform (31) is arranged on the installation platform (3), and a supporting mechanism for preventing the shock absorbing platform (31) from sliding is arranged on the installation platform (3).
7. A large-scale multi-layer roof tube truss construction method according to claim 6, characterized in that: The supporting mechanism comprises a supporting frame (33) slidably arranged on the mounting platform (3), and a driving assembly for driving the supporting frame (33) to slide; the supporting frame (33) is arranged at the bottom of the shock absorbing platform (31) and is used to abut against the bottom wall of the shock absorbing platform (31).
8. A large-scale multi-layer roof tube truss construction method according to claim 7, characterized in that: The driving assembly comprises a motor (34) and a transmission screw (35); the transmission screw (35) is rotatably arranged on the mounting platform (3), and the transmission screw (35) is threadably matched with the top support frame (33); the motor (34) is used to drive the transmission screw (35) to rotate.
9. A large-scale multi-layer roof tube truss construction method according to claim 1, characterized in that: A plurality of roller brackets are arranged at the bottom of the construction frame (1), and a universal wheel (11) is installed on each of the roller brackets.
10. A large-scale multi-layer roof tube truss construction method according to claim 9, characterized in that: A plurality of outrigger oil cylinders (12) are also provided at the bottom of the construction frame (1).