Energy-saving type highway bridge pile foundation water drill hole forming device
By designing an energy-saving highway bridge pile foundation water drilling hole formation device including drill rod adjustment mechanism, the problem of the lack of looseness of pile foundation holes and steel plates in the prior art is solved, and the dimensional stability of pile foundation holes and mud sealing effect is achieved, and the construction efficiency and quality are improved.
Patent Information
- Application Number
- CN202510072040.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-16
- Publication Date
- 2025-03-14
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing pile foundation drilling technology cannot adapt to the pile foundation hole needs of different diameters by adjusting the extension length of the steel plate under the drill rod. The lack of a fixing mechanism causes the steel plate to loosen, affecting the dimensional stability of the pile foundation hole, and mud is prone to enter the storage tank and causing accumulation.
An energy-saving highway bridge pile-based drilling hole formation device including a drill rod adjustment mechanism is designed. By providing adjustment components and positioning components inside the cylinder, the position of the steel plate is adjusted by using wedge blocks and push rods, and the gap between the steel plate and the receiving groove is sealed in combination with the sealing component to ensure the stability of the steel plate and the slurry closure.
It has achieved the need to adapt to the pile foundation holes of different diameters, avoided the need to replace large diameter drill bits, ensured the dimensional stability of pile foundation holes, avoided mud accumulation, and improved construction efficiency and quality.
Smart Images

Figure CN119616373A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of pile foundation drilling, and more specifically, to an energy-saving highway bridge pile foundation water drilling device. Background Art
[0002] In the process of highway bridge construction, pile foundation drilling is a crucial construction link. It is directly related to the stability and safety of the bridge structure, and also affects the construction efficiency and quality. The existing pile foundation drilling equipment usually determines the drilling position, pre-buries the positioning casing, and then introduces the prepared mud for rotary drilling. However, the traditional pile foundation drilling technology has the following problems in actual operation:
[0003] Firstly, in the process of pile foundation drilling, when it is necessary to drill a pile foundation hole larger than the diameter of the drill bit, the traditional practice is to replace the drill bit with a larger diameter, which not only increases the construction cost but also prolongs the construction period, and cannot adapt to the needs of pile foundation holes of different diameters by adjusting the extension length of the steel plates on both sides under the drill rod. Secondly, after the adjustment is completed, if there is no corresponding limiting mechanism to fix the steel plate, then during the rotary drilling process, the steel plate may become loose due to vibration, resulting in deviation in the size of the pile foundation hole, thereby affecting the stability of the bridge structure. Finally, after the adjustment is completed, if the gap between the steel plate and the receiving groove is not effectively closed, then the mud generated during the drilling process may enter the receiving groove through these gaps to cause mud accumulation. The accumulation of mud will not only affect the reset of each adjustment component. In order to solve the above problems, an energy-saving highway bridge pile foundation water drilling device is proposed. Summary of the invention
[0004] 1. Technical issues to be resolved
[0005] In view of the problems existing in the prior art, the present invention provides an energy-saving highway bridge pile foundation water drilling device to solve the problem mentioned in the background technology that it is impossible to adapt to the requirements of pile foundation holes of different diameters by adjusting the protruding lengths of the steel plates on both sides under the drill rod; secondly, after the adjustment is completed, if there is no corresponding limiting mechanism to fix the steel plate, then during the rotary drilling process, the steel plate may become loose due to vibration, resulting in deviations in the size of the pile foundation hole, thereby affecting the stability of the bridge structure; finally, after the adjustment is completed, if the gap between the steel plate and the receiving groove is not effectively closed, then the mud generated during the drilling process may enter the receiving groove through these gaps to cause mud accumulation, and the accumulation of mud will not only affect the reset of each adjustment component.
[0006] (II) Technical solution
[0007] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: an energy-saving highway bridge pile foundation water drilling device, comprising a drill rod adjustment mechanism, which includes a guide rail and a drill rod arranged on one side of the guide rail for drilling holes in the pile foundation, a cylinder is welded below the drill rod, an adjustment component for adjusting the diameter of the pile foundation hole is arranged inside the cylinder, and a positioning component arranged above the cylinder for auxiliary positioning of the adjustment component, and a driving part arranged above the drill rod, steel plates are arranged on both sides of the cylinder, and an adjustment auxiliary mechanism is arranged on the side of the cylinder close to the steel plate, the adjustment auxiliary mechanism includes a clamping component arranged inside the cylinder for auxiliary clamping of the steel plate, and a sealing component arranged inside the cylinder for sealing mud.
[0008] The present invention is further configured as follows: the adjustment component includes a first accommodating groove arranged on both sides of the cylinder, the steel plate is arranged in the first accommodating groove, a first slide groove is opened at the lower end of the first accommodating groove, a first slider is fixedly installed at the lower end of the steel plate, the size of the first slider is adapted to the size of the first slide groove, and the first slider is slidably connected to the first slide groove, a first strip groove is opened on the side of the first accommodating groove close to the drill rod, a push rod is arranged inside the first strip groove, a wedge block is arranged at the lower end of the push rod, and the side of the steel plate close to the wedge block is arranged as an inclined surface.
[0009] The present invention is further configured as follows: a second slider is welded to the upper end of the push rod, an adjusting disk is arranged above the push rod, an annular slide groove is provided at the lower end of the adjusting disk, the second slider is slidably connected to the annular slide groove, a thread groove is provided on the inner wall of the adjusting disk, an external thread is provided on the outer wall of the drill rod, and the external thread is arranged above the cylinder, and the external thread is spirally connected to the thread groove.
[0010] The present invention is further configured such that the driving part includes a power head arranged above the drill rod, the power head is slidably connected to the guide rail, a winch is arranged on the side of the upper end of the guide rail away from the drill rod, the winch is fixedly connected to the top of the power head through a steel rope, the guide rail is arranged on one side of the drilling rig body, and a drill bit is arranged below the drill rod.
[0011] The present invention is further configured such that the positioning assembly includes a positioning plate arranged above the cylinder body, the diameter of the positioning plate is larger than the diameter of the adjusting plate, a plurality of spline teeth are arranged on the inner side of the positioning plate, and the spline teeth are distributed in a ring shape, a plurality of spline grooves are opened on the outer side of the adjusting plate, the spline teeth correspond to the spline grooves one by one, and the spline grooves are meshed with the spline teeth, a screw sleeve is arranged in the middle part of the front end of the positioning plate, a screw is arranged on the front side of the upper end of the cylinder body, and the screw is threadedly connected to the screw sleeve.
[0012] The present invention is further configured such that the clamping assembly includes a fixing rod arranged below the positioning plate, a round rod is welded to the lower end of the fixing rod, second accommodating grooves are provided on both sides of the inner cavity of the first accommodating groove, a sealing strip is provided inside the second accommodating groove, a wedge-shaped strip is provided on the side of the sealing strip close to the round rod, a second strip groove is provided at the upper end of the second accommodating groove, the fixing rod is arranged in the second strip groove, a second sliding groove is provided on the inner wall at the lower end of the second accommodating groove, and a sliding rod is provided in the inner cavity of the second sliding groove.
[0013] The present invention is further configured such that the side of the sliding rod close to the sealing strip is fixedly connected to the wedge strip, a return spring is fixedly installed in the inner cavity of the second sliding groove, the other end of the return spring is fixedly connected to the sliding rod, a plurality of first serrated grooves are provided on both sides of the steel plate, a second serrated groove is provided on the side of the sealing strip close to the steel plate, and the first serrated groove is meshed with the second serrated groove.
[0014] The present invention is further configured such that the sealing assembly includes a first rubber frame arranged outside the push rod, a second rubber frame is arranged inside the first strip groove, the length of the second rubber frame is greater than the length of the first rubber frame, the first rubber frame is movably connected to the second rubber frame, and the size of the first rubber frame is adapted to the size of the second rubber frame;
[0015] A third rubber frame is arranged on the outer side of the fixing rod, and a fourth rubber frame is arranged inside the second strip groove. The third rubber frame is movably connected with the fourth rubber frame, and the size of the third rubber frame is adapted to the size of the fourth rubber frame. The fourth rubber frame is arranged at the lower end edge of the second strip groove, and the length of the fourth rubber frame is greater than that of the third rubber frame.
[0016] (III) Beneficial effects
[0017] Compared with the prior art, the present invention provides an energy-saving highway bridge pile foundation water drilling device, which has the following beneficial effects: the present invention can enable the wedge block to push the inclined surface of the steel plate when moving upward, so that the steel plate moves outward, and then adjust the position of the steel plate in the first accommodating groove, thereby adjusting the protruding length of the steel plate, and then adapt to the requirements of pile foundation holes of different diameters, thereby avoiding the replacement of a large-diameter drill bit and increasing construction costs, and thus facilitating the drilling of pile foundation holes larger than the drill bit diameter.
[0018] After the adjustment is completed, the spline teeth on the positioning disk can be inserted into the spline grooves on the edge of the adjusting disk, thereby limiting the rotational position of the adjusting disk, avoiding the loosening of the threaded adjusting disk due to vibration during the drilling process, thereby affecting the adjustment of the steel plate and further avoiding deviations in the size of the pile foundation hole.
[0019] The wedge-shaped strip can also drive the sealing strip to press against both sides of the steel plate. When the round rod is converted from the inclined surface of the wedge-shaped strip to the vertical surface of the wedge-shaped strip, the fixed rod that continues to move downward will no longer push the wedge-shaped strip, thereby ensuring that the second serrated groove on the sealing strip is stuck in the first serrated groove of the steel plate, so that the sealing strips on both sides of the steel plate can press and limit the steel plate, thereby limiting the horizontal position of the steel plate, avoiding the loosening of the steel plate due to vibration, resulting in deviation in the size of the pile foundation hole, and then affecting the stability of the bridge structure, ensuring the smooth drilling of the pile foundation.
[0020] The first strip groove and the second strip groove can also be sealed. At the same time, since the sealing strip is against both sides of the steel plate, the sealing strip can seal the gap between the first receiving groove and the steel plate, and the outer side of the sealing strip fits with the inner wall of the second receiving groove, thereby preventing the mud generated during the drilling process from entering the receiving groove through the gap and causing mud accumulation, thereby facilitating the resetting of each adjustment component. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the overall structure of an energy-saving highway bridge pile foundation water drilling device.
[0022] Figure 2 It is a schematic diagram of the three-dimensional structure of the cylinder and drill rod of an energy-saving highway bridge pile foundation water drilling device.
[0023] Figure 3 This is a schematic diagram of the main structure of the cylinder and drill rod of an energy-saving highway bridge pile foundation water drilling device.
[0024] Figure 4 This is a schematic diagram of the structure of the adjustment component and the positioning component of an energy-saving highway bridge pile foundation water drilling device.
[0025] Figure 5 It is a schematic diagram of the cylinder structure of an energy-saving highway bridge pile foundation water drilling device.
[0026] Figure 6 It is a schematic diagram of the cross-sectional structure of the cylinder of an energy-saving highway bridge pile foundation water drilling device.
[0027] Figure 7 This is a schematic diagram of the steel plate and wedge block structure of an energy-saving highway bridge pile foundation water drilling device.
[0028] Figure 8 This is a schematic diagram of the internal sealing component structure of the cylinder of an energy-saving highway bridge pile foundation water drilling device.
[0029] Fig. 9 This is a schematic diagram of the positioning component structure of an energy-saving highway bridge pile foundation water drilling device.
[0030] Fig.10This is a schematic diagram of the adjustment disk and push rod structure of an energy-saving highway bridge pile foundation water drilling device.
[0031] Fig.11 This is a schematic diagram of the structure of the clamping assembly of an energy-saving highway bridge pile foundation water drilling device.
[0032] Fig.12 This is a schematic diagram of the structure of the adjustment components of an energy-saving highway bridge pile foundation water drilling device.
[0033] Fig.13 This is a schematic diagram of the overhead structure of the steel plate and sealing strip of the energy-saving highway bridge pile foundation water drilling device.
[0034] In the figure: 100, drill rod adjustment mechanism; 101, drilling rig body; 102, guide rail; 103, drill rod; 104, drill bit; 105, power head; 106, winch; 107, cylinder; 108, first receiving groove; 109, steel plate; 110, first slide groove; 111, first slider; 112, push rod; 113, wedge block; 114, first strip groove; 115, second slider; 116, adjustment plate; 117, annular slide groove; 118, thread groove; 119, spline groove; 120, external thread; 121, positioning plate; 122, spline teeth; 123, screw rod; 124, screw rod sleeve; 200, adjustment auxiliary mechanism; 201, fixing rod; 202, round rod; 203, blocking strip; 204, wedge strip; 205, second accommodating groove; 206, second strip groove; 207, second slide groove; 208, slide rod; 209, return spring; 210, first serrated groove; 211, second serrated groove; 212, first rubber frame; 213, second rubber frame; 214, third rubber frame; 215, fourth rubber frame. DETAILED DESCRIPTION
[0035] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application may be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0036] It should be noted that, unless otherwise specified, all technical and scientific terms used in this application have the same meanings as commonly understood by ordinary technicians in the technical field to which this application belongs.
[0037] In the present invention, unless otherwise specified, the directions used, such as "up" and "down", usually refer to the directions shown in the drawings, or to the vertical, perpendicular or gravity directions; similarly, for ease of understanding and description, "left" and "right" usually refer to the left and right shown in the drawings; "inside" and "outside" refer to the inside and outside relative to the outline of each component itself, but the above-mentioned directions are not used to limit the present invention.
[0038] For examples, see Figures 1 to 13 An energy-saving highway bridge pile foundation water drilling device includes a drill rod adjustment mechanism 100, which includes a guide rail 102, and also includes a drill rod 103 arranged on one side of the guide rail 102 for drilling holes in the pile foundation. A cylinder 107 is welded below the drill rod 103, and an adjustment component for adjusting the diameter of the pile foundation hole is arranged inside the cylinder 107, and a positioning component arranged above the cylinder 107 for auxiliary positioning of the adjustment component, and a driving part arranged above the drill rod 103. Steel plates 109 are arranged on both sides of the cylinder 107, and an adjustment auxiliary mechanism 200 is arranged on one side of the cylinder 107 close to the steel plate 109. The adjustment auxiliary mechanism 200 includes a pressing component arranged inside the cylinder 107 for auxiliary pressing of the steel plate 109, and a sealing component arranged inside the cylinder 107 for sealing mud.
[0039] In this embodiment, the extension length of the steel plate 109 is adjusted by adjusting the adjustment component in the cylinder 107 below the drill rod 103 to meet the needs of pile foundation holes of different diameters, thereby avoiding the situation of replacing a large-diameter drill bit 104 and increasing the construction cost, thereby facilitating the drilling of pile foundation holes larger than the diameter of the drill bit 104. After the adjustment is completed, the positioning component is controlled to move downward so that the positioning component limits the position of the adjustment component, thereby avoiding the loosening of the adjustment component during the rotary drilling process, affecting the adjustment of the steel plate 109, and causing the size of the pile foundation hole to deviate. At the same time, during the downward movement of the positioning component , which will drive the clamping assembly to clamp and limit the two sides of the steel plate 109, preventing the steel plate 109 from loosening due to vibration, resulting in deviations in the size of the pile foundation hole, and further affecting the stability of the bridge structure, thereby further improving the stability of the steel plate 109 and ensuring the smooth drilling of the pile foundation. When the positioning assembly and the clamping assembly are in place, the sealing assemblies on the positioning assembly and the clamping assembly cooperate with each other to seal the gap between the steel plate 109 and the receiving groove, thereby preventing the mud generated during the drilling process from entering the receiving groove through the gap and causing mud accumulation, thereby facilitating the resetting of each adjustment assembly.
[0040] Specifically, the adjustment component includes a first receiving groove 108 arranged on both sides of the cylinder 107, a steel plate 109 is arranged in the first receiving groove 108, a first slide groove 110 is opened at the lower end of the first receiving groove 108, a first slider 111 is fixedly installed at the lower end of the steel plate 109, the size of the first slider 111 is adapted to the size of the first slide groove 110, and the first slider 111 is slidably connected to the first slide groove 110, a first strip groove 114 is opened on one side of the first receiving groove 108 close to the drill rod 103, a push rod 112 is arranged inside the first strip groove 114, and the push rod A wedge block 113 is provided at the lower end of 112, and the side of the steel plate 109 close to the wedge block 113 is set as an inclined surface. A second slider 115 is welded to the upper end of the push rod 112, and an adjusting disk 116 is provided above the push rod 112. An annular groove 117 is provided at the lower end of the adjusting disk 116, and the second slider 115 is slidably connected to the annular groove 117. A thread groove 118 is provided on the inner wall of the adjusting disk 116, and an external thread 120 is provided on the outer wall of the drill rod 103, and the external thread 120 is provided above the cylinder 107, and the external thread 120 is spirally connected to the thread groove 118.
[0041] In this embodiment, the wedge block 113 is fixedly connected to the push rod 112 by welding, and the edge of the steel plate 109 is set to an arc shape. The arc design of the edge of the steel plate 109 can ensure that the steel plate 109 fits the hole wall better, which helps to reduce resistance and wear during drilling and improve drilling efficiency. In addition, the curved steel plate 109 can provide better stability during drilling, which helps to maintain the straightness and directionality of the drill rod 103, thereby ensuring the quality of the pile foundation hole. In the initial state, the edge of the steel plate 109 is flush with the edge of the drill bit 104. When it is necessary to drill a pile foundation hole larger than the diameter of the drill bit 104, the adjusting disk 116 is rotated by an auxiliary tool, and the adjusting disk 116 moves upward along the external thread 120. During the upward movement of the adjusting disk 116, since the upper end of the push rod 112 is slidably connected to the adjusting disk 116, the adjusting disk 116 does not drive the push rod 112 to rotate, but drives the push rod 112 to move upward. The wedge block 113 will be driven to move along. When the wedge block 113 moves upward, it will push the inclined surface of the steel plate 109, so that the steel plate 109 moves outward, thereby adjusting the position of the steel plate 109 in the first receiving groove 108, thereby adjusting the extension length of the steel plate 109, thereby adapting to the needs of pile foundation holes of different diameters, thereby avoiding the situation of replacing a large-diameter drill bit 104 and increasing the construction cost, thereby facilitating the drilling of pile foundation holes larger than the diameter of the drill bit 104. The first slider 111 cooperates with the first slide groove 110 to ensure the stability of the horizontal movement of the steel plate 109 in the first receiving groove 108, and the external thread 120 cooperates with the thread groove 118 to control the number of adjustment circles of the adjustment disk 116, thereby ensuring the accuracy of adjusting the extension length of the steel plate 109. The second slider 115 cooperates with the annular slide groove 117 to ensure that during the rotation of the adjustment disk 116, the push rod 112 will not be driven to rotate, and the push rod 112 can only be driven to move upward or downward.
[0042] Among them, the driving part includes a power head 105 arranged above the drill rod 103, the power head 105 is slidably connected to the guide rail 102, a winch 106 is arranged on the side of the upper end of the guide rail 102 away from the drill rod 103, the winch 106 is fixedly connected to the top of the power head 105 through a steel rope, the guide rail 102 is arranged on one side of the drilling rig body 101, and a drill bit 104 is arranged below the drill rod 103.
[0043] In this embodiment, during drilling construction, the hydraulic motor in the power head 105 drives the drill rod 103 and the drill bit 104 to drill, and then the steel rope on the winch 106 cooperates with the guide rail 102 to pull the power head 105, the drill rod 103 and the drill bit 104 up and down.
[0044] Preferably, the positioning assembly includes a positioning plate 121 arranged above the cylinder 107, the diameter of the positioning plate 121 is larger than the diameter of the adjusting plate 116, a plurality of spline teeth 122 are arranged on the inner side of the positioning plate 121, and the spline teeth 122 are distributed in a ring shape, a plurality of spline grooves 119 are opened on the outer side of the adjusting plate 116, the spline teeth 122 correspond to the spline grooves 119 one by one, and the spline grooves 119 are meshed with the spline teeth 122, a screw sleeve 124 is arranged in the middle of the front end of the positioning plate 121, a screw 123 is arranged on the front side of the upper end of the cylinder 107, and the screw 123 is threadedly connected to the screw sleeve 124.
[0045] In this embodiment, after the adjustment is completed, the screw rod 123 is rotated clockwise, and the screw rod 123 cooperates with the screw rod sleeve 124 to drive the positioning disk 121 to move downward, so that the spline teeth 122 on the positioning disk 121 are stuck in the spline groove 119 on the edge of the adjusting disk 116. The spline teeth 122 cooperate with the spline groove 119 to limit the rotation position of the adjusting disk 116, thereby avoiding the vibration during the drilling process of the drill bit 104 to cause loosening of the threaded adjustment disk 116, thereby affecting the adjustment of the steel plate 109, and further avoiding the deviation of the pile foundation hole size. The screw rod 123 cooperates with the screw rod sleeve 124 to drive the positioning disk 121 to move up and down, and then when the adjusting disk 116 needs to be rotated, the positioning disk 121 can be separated from the adjusting disk 116, thereby facilitating the rotation of the adjusting disk 116.
[0046] Preferably, the clamping assembly includes a fixing rod 201 disposed below the positioning plate 121, a round rod 202 is welded to the lower end of the fixing rod 201, second receiving grooves 205 are provided on both sides of the inner cavity of the first receiving groove 108, a blocking strip 203 is provided inside the second receiving groove 205, a wedge strip 204 is provided on the side of the blocking strip 203 close to the round rod 202, a second strip groove 206 is provided at the upper end of the second receiving groove 205, the fixing rod 201 is disposed in the second strip groove 206, and the lower end of the second receiving groove 205 is provided with a sealing strip 203. A second slide groove 207 is provided on the wall, and a slide rod 208 is provided in the inner cavity of the second slide groove 207. The side of the slide rod 208 close to the blocking strip 203 is fixedly connected to the wedge strip 204. A return spring 209 is fixedly installed in the inner cavity of the second slide groove 207, and the other end of the return spring 209 is fixedly connected to the slide rod 208. A plurality of first serrated grooves 210 are provided on both sides of the steel plate 109. A second serrated groove 211 is provided on the side of the blocking strip 203 close to the steel plate 109, and the first serrated groove 210 is meshed with the second serrated groove 211.
[0047] In this embodiment, the wedge strip 204 is fixedly connected to the blocking strip 203 by welding. When the positioning plate 121 moves downward, the positioning plate 121 will drive the fixing rod 201 to move accordingly, and the round rod 202 on the fixing rod 201 will first contact the inclined surface of the wedge strip 204. When the fixing rod 201 continues to move downward, the wedge strip 204 is pushed, and the return spring 209 is stretched at the same time, so that the wedge strip 204 drives the blocking strip 203 to press against the two sides of the steel plate 109. When the round rod 202 is converted from the inclined surface of the wedge strip 204 to the vertical surface of the wedge strip 204, the fixing rod 201 that continues to move downward will no longer push the wedge strip 204, thereby ensuring that the second serrated groove 211 on the blocking strip 203 is stuck in the first serrated groove 210 of the steel plate 109, so that the steel plate The sealing strips 203 on both sides of 109 press and limit the steel plate 109, thereby limiting the horizontal position of the steel plate 109, avoiding the loosening of the steel plate 109 due to vibration, resulting in deviation in the size of the pile foundation hole, and further affecting the stability of the bridge structure, ensuring the smooth drilling of the pile foundation, and through the setting of the sliding rod 208 and the second sliding groove 207, the stability of the movement of the sealing strip 203 in the second accommodating groove 205 can be guaranteed, and then through the cooperation of the second return spring 209 in the second sliding groove 207, after the adjustment wedge strip 204 loses the downward pressure, the sealing strip 203 can be driven to separate from the steel plate 109, thereby facilitating the position adjustment operation of the steel plate 109, and through the cooperation of the fixing rod 201 and the second strip groove 206, the stability of the upward and downward movement of the positioning plate 121 can be guaranteed.
[0048] Specifically, the sealing assembly includes a first rubber frame 212 arranged on the outside of the push rod 112, a second rubber frame 213 is arranged inside the first strip groove 114, the length of the second rubber frame 213 is greater than the length of the first rubber frame 212, the first rubber frame 212 is movably connected to the second rubber frame 213, and the size of the first rubber frame 212 is adapted to the size of the second rubber frame 213, a third rubber frame 214 is arranged on the outside of the fixed rod 201, a fourth rubber frame 215 is arranged inside the second strip groove 206, the third rubber frame 214 is movably connected to the fourth rubber frame 215, and the size of the third rubber frame 214 is adapted to the size of the fourth rubber frame 215, the fourth rubber frame 215 is arranged at the lower end edge of the second strip groove 206, and the length of the fourth rubber frame 215 is greater than the length of the third rubber frame 214.
[0049] In this embodiment, when the positioning assembly and the pressing assembly are in place, the first rubber frame 212 on the pushing rod 112 will be stuck in the second rubber frame 213 inside the first strip groove 114, and the third rubber frame 214 on the fixing rod 201 will be stuck in the fourth rubber frame 215 inside the second strip groove 206, so as to achieve the blocking of the first strip groove 114 and the second strip groove 206. At the same time, because the blocking strip 203 is against both sides of the steel plate 109, the blocking strip 203 blocks the gap between the first receiving groove 108 and the steel plate 109, and the outer side of the blocking strip 203 fits with the inner wall of the second receiving groove 205, so as to avoid the mud generated during the drilling process from entering the receiving groove through the gap to cause mud accumulation, thereby facilitating the resetting of each adjusting assembly. Through the long size design of the second rubber frame 213 and the fourth rubber frame 215, it can be ensured that the pushing rod 112 and the fixing rod 201 can ensure the sticking and blocking effect at any position of the vertical movement.
[0050] When in use, in the initial state, the edge of the steel plate 109 is flush with the edge of the drill bit 104. When it is necessary to drill a pile foundation hole larger than the diameter of the drill bit 104, the adjusting disk 116 is rotated by an auxiliary tool, and the adjusting disk 116 moves upward along the external thread 120. During the upward movement of the adjusting disk 116, since the upper end of the push rod 112 is slidably connected to the adjusting disk 116, the adjusting disk 116 does not drive the push rod 112 to rotate, but drives the push rod 112 to move upward. During the upward movement of the push rod 112, the wedge block 113 will follow the movement. When the wedge block 113 moves upward, it will push the inclined surface of the steel plate 109, so that the steel plate 109 moves outward, thereby adjusting the steel plate 109 in the first receiving groove 108. The position inside the hole is adjusted to adjust the extended length of the steel plate 109, thereby adapting to the needs of pile foundation holes of different diameters, thereby avoiding the situation of replacing a large-diameter drill bit 104 and increasing the construction cost, thereby facilitating the drilling of pile foundation holes with a diameter larger than the drill bit 104. After the adjustment is completed, the screw rod 123 is rotated clockwise, and the screw rod 123 cooperates with the screw rod 123 sleeve to drive the positioning plate 121 to move downward, so that the spline teeth 122 on the positioning plate 121 are stuck in the spline groove 119 on the edge of the adjusting plate 116, thereby limiting the rotation position of the adjusting plate 116, avoiding the vibration during the drilling process of the drill bit 104 to cause loosening of the threaded adjustment plate 116, thereby affecting the adjustment of the steel plate 109, and further avoiding the size of the pile foundation hole. When the positioning plate 121 moves downward, the positioning plate 121 will drive the fixing rod 201 to move along, and the round rod 202 on the fixing rod 201 will first contact the inclined surface of the wedge strip 204. When the fixing rod 201 continues to move downward, the wedge strip 204 is pushed, and the return spring 209 is stretched at the same time, so that the wedge strip 204 drives the blocking strip 203 to press against the two sides of the steel plate 109. When the round rod 202 is converted from the inclined surface of the wedge strip 204 to the vertical surface of the wedge strip 204, the fixing rod 201 that continues to move downward will no longer push the wedge strip 204, thereby ensuring that the second serrated groove 211 on the blocking strip 203 is stuck in the first serrated groove 210 of the steel plate 109, so that the two sides of the steel plate 109 The sealing strip 203 is used to compress and limit the steel plate 109, thereby limiting the horizontal position of the steel plate 109, preventing the steel plate 109 from loosening due to vibration, resulting in deviation in the size of the pile foundation hole, and further affecting the stability of the bridge structure, ensuring the smooth drilling of the pile foundation. When the positioning assembly and the pressing assembly are in place, the first rubber frame 212 on the push rod 112 will be stuck in the second rubber frame 213 inside the first strip groove 114, and the third rubber frame 214 on the fixing rod 201 will also be stuck in the fourth rubber frame 215 inside the second strip groove 206, thereby achieving the blocking of the first strip groove 114 and the second strip groove 206. At the same time, because the sealing strip 203 is against both sides of the steel plate 109,Then, the sealing strip 203 seals the gap between the first receiving groove 108 and the steel plate 109, and the outer side of the sealing strip 203 fits with the inner wall of the second receiving groove 205, thereby preventing the mud generated during the drilling process from entering the receiving groove through the gap to cause mud accumulation, thereby facilitating the resetting of each adjustment component. During the drilling construction, the pile foundation drilling position is first determined, and then the pre-buried positioning casing is used to pass the prepared mud into the pile foundation drilling hole, and then the hydraulic motor in the power head 105 drives the drill rod 103 and the drill bit 104 to drill, and then the winch 106 cooperates with the guide rail 102 to pull the power head 105, the drill rod 103 and the drill bit 104 up and down, and then the circulating mud is discharged.
[0051] In all the schemes mentioned above, the connection between two parts can be selected according to actual conditions by welding, bolt and nut matching connection, bolt or screw connection or other well-known connection methods, which are not described one by one here. In the above, welding is preferred for all fixed connections. Although the embodiments of the present invention have been shown and described, it can be understood by ordinary technicians in this field that various changes, modifications, substitutions and deformations can be made to these embodiments without departing from the principle and spirit of the present invention. The scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. An energy-saving highway bridge pile foundation water drilling device, characterized by: include, A drill rod adjustment mechanism (100), comprising a guide rail (102), and a drill rod (103) arranged on one side of the guide rail (102) for drilling a pile foundation, a cylinder (107) welded below the drill rod (103), an adjustment component for adjusting the diameter of the pile foundation hole arranged inside the cylinder (107), a positioning component arranged above the cylinder (107) for assisting in positioning the adjustment component, and a driving unit arranged above the drill rod (103), steel plates (109) being arranged on both sides of the cylinder (107), and an adjustment auxiliary mechanism (200) being arranged on one side of the cylinder (107) close to the steel plate (109); The auxiliary adjustment mechanism (200) comprises a pressing component arranged inside the cylinder (107) for assisting in pressing the steel plate (109), and a sealing component arranged inside the cylinder (107) for sealing the mud.
2. The energy-saving highway bridge pile foundation water drilling device according to claim 1 is characterized by: The adjustment component comprises a first receiving groove (108) arranged on both sides of the cylinder (107), the steel plate (109) is arranged in the first receiving groove (108), the lower end of the first receiving groove (108) is provided with a first slide groove (110), the lower end of the steel plate (109) is fixedly installed with a first slider (111), the size of the first slider (111) is adapted to the size of the first slide groove (110), and the first slider (111) is slidably connected to the first slide groove (110), a first strip groove (114) is arranged on a side of the first receiving groove (108) close to the drill rod (103), a push rod (112) is arranged inside the first strip groove (114), a wedge block (113) is arranged at the lower end of the push rod (112), and a side of the steel plate (109) close to the wedge block (113) is arranged as an inclined surface.
3. The energy-saving highway bridge pile foundation water drilling device according to claim 2 is characterized by: A second slider (115) is welded to the upper end of the push rod (112); an adjusting disk (116) is arranged above the push rod (112); an annular sliding groove (117) is provided at the lower end of the adjusting disk (116); the second slider (115) is slidably connected to the annular sliding groove (117); a thread groove (118) is provided on the inner wall of the adjusting disk (116); an external thread (120) is provided on the outer wall of the drill rod (103); and the external thread (120) is arranged above the cylinder (107); the external thread (120) is spirally connected to the thread groove (118).
4. The energy-saving highway bridge pile foundation water drilling device according to claim 3 is characterized by: The driving unit comprises a power head (105) arranged above the drill rod (103), the power head (105) being slidably connected to the guide rail (102), a winch (106) being arranged on the side of the upper end of the guide rail (102) away from the drill rod (103), the winch (106) being fixedly connected to the upper part of the power head (105) via a steel rope, the guide rail (102) being arranged on one side of the drilling rig body (101), and a drill bit (104) being arranged below the drill rod (103).
5. The energy-saving highway bridge pile foundation water drilling device according to claim 4 is characterized by: The positioning assembly comprises a positioning plate (121) arranged above the cylinder (107), the diameter of the positioning plate (121) being larger than the diameter of the adjusting plate (116), a plurality of spline teeth (122) being arranged on the inner side of the positioning plate (121), and the spline teeth (122) being distributed in an annular shape, a plurality of spline grooves (119) being arranged on the outer side of the adjusting plate (116), the spline teeth (122) corresponding to the spline grooves (119) one by one, and the spline grooves (119) meshing with the spline teeth (122), a screw sleeve (124) being arranged at the middle part of the front end of the positioning plate (121), a screw rod (123) being arranged at the front side of the upper end of the cylinder (107), and the screw rod (123) being threadedly connected to the screw sleeve (124).
6. The energy-saving highway bridge pile foundation water drilling device according to claim 5 is characterized by: The clamping assembly comprises a fixing rod (201) arranged below the positioning plate (121), a round rod (202) being welded to the lower end of the fixing rod (201), second receiving grooves (205) being provided on both sides of the inner cavity of the first receiving groove (108), a blocking strip (203) being provided inside the second receiving groove (205), a wedge-shaped strip (204) being provided on the side of the blocking strip (203) close to the round rod (202), a second strip groove (206) being provided at the upper end of the second receiving groove (205), the fixing rod (201) being arranged in the second strip groove (206), a second slide groove (207) being provided on the inner wall at the lower end of the second receiving groove (205), and a slide rod (208) being provided in the inner cavity of the second slide groove (207).
7. The energy-saving highway bridge pile foundation water drilling device according to claim 6 is characterized by: The sliding rod (208) is fixedly connected to the wedge strip (204) on one side close to the sealing strip (203); a return spring (209) is fixedly installed in the inner cavity of the second sliding groove (207); the other end of the return spring (209) is fixedly connected to the sliding rod (208); a plurality of first sawtooth grooves (210) are arranged on both sides of the steel plate (109); a second sawtooth groove (211) is provided on one side of the sealing strip (203) close to the steel plate (109); the first sawtooth groove (210) is meshed with the second sawtooth groove (211).
8. The energy-saving highway bridge pile foundation water drilling device according to claim 7 is characterized by: The sealing assembly comprises a first rubber frame (212) arranged on the outside of the push rod (112); a second rubber frame (213) is arranged inside the first strip groove (114); the length of the second rubber frame (213) is greater than the length of the first rubber frame (212); the first rubber frame (212) and the second rubber frame (213) are movably connected, and the size of the first rubber frame (212) matches the size of the second rubber frame (213); A third rubber frame (214) is arranged on the outer side of the fixing rod (201), and a fourth rubber frame (215) is arranged inside the second strip groove (206). The third rubber frame (214) and the fourth rubber frame (215) are movably connected, and the size of the third rubber frame (214) is adapted to the size of the fourth rubber frame (215). The fourth rubber frame (215) is arranged at the lower end edge of the second strip groove (206), and the length of the fourth rubber frame (215) is greater than the length of the third rubber frame (214).