Power failure control method and system
By creating power outage operations, generating tasks and performing multiple execution judgments in the power outage control method, the problem of equipment failure caused by lack of monitoring in the prior art is solved, and the smooth completion of power outage tasks and safe and efficient power grid operation are achieved.
Patent Information
- Application Number
- CN202411832399.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-12
- Publication Date
- 2025-03-14
AI Technical Summary
The existing power outage control methods lack overall monitoring, which is prone to failure of equipment due to human factors, causing electric shock events or affecting the efficiency of the power grid.
By creating a power outage operation, obtain the power outage type, scheduled time and equipment information entered by the power outage applicant, generate a power outage task, and make the first and second execution judgments. The tasks allowed to be executed are issued to the task recipient or task guardian for execution, and the power outage information will be feedback after completion.
Real-time monitoring of power outage operations is realized, ensuring the smooth completion of each power outage task, and improving the safety and efficiency of power grid operation.
Smart Images

Figure CN119627900A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power system control, and in particular to a power outage control method and system. Background Art
[0002] As the scale of the power grid continues to expand, ensuring the safe operation of the power grid is the responsibility of the grid dispatching and operating personnel. However, no matter how diligent the dispatching personnel are, misoperation due to carelessness will still occur during the dispatching process.
[0003] Power outage operations are an important part of ensuring the operation of the power grid. The current power outage method is that the superior department issues a power outage notice in advance, and the relevant personnel carry out the power outage after the specified time. However, there is no overall monitoring of the entire process, and human factors often result in the equipment that should be shut down not being shut down, causing subsequent electric shock incidents and even affecting the efficiency of the entire power grid operation.
[0004] The above contents are only used to assist in understanding the technical solution of the present invention and do not constitute an admission that the above contents are prior art. Summary of the invention
[0005] The main purpose of the present invention is to provide a power outage control method and system, which aims to solve the current power outage method in which the superior department issues a power outage notice in advance, and the relevant personnel carry out the power outage after the specified time, but the whole process is not monitored as a whole, and often due to human factors, the equipment that should be powered off is not powered off, thereby causing subsequent electric shock incidents and even affecting the efficiency of the entire power grid operation. Technical problems.
[0006] To achieve the above object, the present invention provides a power outage control method, which comprises the following steps:
[0007] Creating a power outage job, obtaining the power outage type, power outage plan time, and equipment to be powered off input by the power outage applicant, and inputting the power outage type, the power outage plan time, and the equipment to be powered off into the power outage job to generate a power outage task;
[0008] Performing a first execution judgment on the power outage task, if the first execution judgment result is that execution is allowed, sending the power outage task to the task recipient according to the operation area corresponding to the power outage task;
[0009] Receiving the second execution judgment result of the power outage task fed back by the task recipient, if the second execution judgment result is that execution is allowed, sending the power outage task to the task guardian associated with the task recipient, so that the power outage task is executed by the task guardian;
[0010] After the power outage task is completed, the power outage information is fed back to the power outage applicant so that the power outage applicant can start executing the post-power outage operation process.
[0011] In some embodiments, the method further comprises:
[0012] If the first execution judgment result is that execution is prohibited, the power outage task is rejected and a rejection reason is generated. The rejection reason and the rejection notification information of the power outage task are sent to the mobile terminal corresponding to the power outage applicant, so that the power outage applicant can view the rejected power outage task through the mobile terminal.
[0013] In some embodiments, performing a first execution judgment on the power outage task includes:
[0014] Extracting a power outage type and equipment to be powered off from the power outage task, wherein the power outage type includes a high-voltage power outage and a low-voltage power outage;
[0015] Determine whether the power outage type matches the equipment type of the device to be powered off. If they match, determine that the power outage task is allowed to be executed; if they do not match, determine that the power outage task is prohibited from being executed, wherein the equipment type includes high-voltage equipment and low-voltage equipment, and the corresponding rejection reason for prohibiting execution is that the power outage type does not match the equipment type of the device to be powered off.
[0016] In some embodiments, the method further comprises:
[0017] If the second execution judgment result is that execution is prohibited, the power outage task is rejected, and the rejection reason fed back by the task recipient is obtained, and the rejection reason and the rejection notification information of the power outage task are sent to the mobile terminal corresponding to the power outage applicant, so that the power outage applicant can view the rejected power outage task through the mobile terminal, and the rejection reason is that the power outage plan time of the power outage task does not meet the requirements.
[0018] In some embodiments, the sending of the power outage task to the task guardian associated with the task collection so that the power outage task is executed by the task guardian includes:
[0019] Determining a task type of the power outage task;
[0020] If the task type is an automatic power-off task, obtaining the task guardian's click operation in the mobile terminal, and executing remote power-off of the device to be powered off when the button corresponding to the click operation is an automatic power-off button;
[0021] If the task type is a manual power-off task, the power distribution room is remotely opened through the access control system so that the task guardian can manually power off the power-off equipment.
[0022] In some embodiments, the method further comprises:
[0023] If the task type is a manual power outage, a first power outage completion judgment result fed back by the multimedia terminal of the power distribution room and a second power outage completion judgment result fed back by the task recipient are obtained, and whether the power outage task is completed is judged based on the first power outage completion judgment result and the second power outage completion judgment result;
[0024] If the task type is automatic power outage, the third power outage completion judgment result fed back by the task recipient is obtained, and whether the power outage task is completed is judged based on the third power outage completion judgment result.
[0025] In some embodiments, the method further comprises:
[0026] If the automatic power outage is not completed, the task type of the power outage task is converted to manual power outage, and the status of the power outage task after the task type conversion is adjusted from the received status to the unreceived status, and added to the list of power outage tasks to be received.
[0027] In addition, to achieve the above object, the present invention also provides a power outage control system, the power outage control system comprising:
[0028] A creation module is used to create a power outage job, obtain the power outage type, power outage plan time and the equipment to be powered off input by the power outage applicant, and input the power outage type, the power outage plan time and the equipment to be powered off into the power outage job to generate a power outage task;
[0029] A sending module is used to make a first execution judgment on the power outage task, and if the first execution judgment result is that the execution is allowed, the power outage task is sent to the task recipient according to the operation area corresponding to the power outage task;
[0030] The sending module is used to receive the second execution judgment result of the power outage task fed back by the task recipient, and if the second execution judgment result is that the execution is allowed, the power outage task is sent to the task guardian associated with the task receipt, so that the power outage task is executed by the task guardian;
[0031] The feedback module is used to feed back the power outage information to the power outage applicant after the power outage task is completed, so that the power outage applicant can start executing the post-power outage operation process.
[0032] In some embodiments, the sending module is used to reject the power outage task and generate a rejection reason if the first execution judgment result is prohibited execution, and send the rejection reason and the rejection notification information of the power outage task to the mobile terminal corresponding to the power outage applicant, so that the power outage applicant can view the rejected power outage task through the mobile terminal.
[0033] In some embodiments, the sending module is used to extract the power outage type and the equipment to be powered off from the power outage task, and the power outage type includes high-voltage power outage and low-voltage power outage;
[0034] Determine whether the power outage type matches the equipment type of the device to be powered off. If they match, determine that the power outage task is allowed to be executed; if they do not match, determine that the power outage task is prohibited from being executed, wherein the equipment type includes high-voltage equipment and low-voltage equipment, and the corresponding rejection reason for prohibiting execution is that the power outage type does not match the equipment type of the device to be powered off.
[0035] The present invention creates a power outage operation, obtains the power outage type, power outage plan time and equipment to be powered off input by the power outage applicant, inputs the power outage type, the power outage plan time and the equipment to be powered off into the power outage operation to generate a power outage task; performs a first execution judgment on the power outage task, and if the first execution judgment result is that execution is allowed, the power outage task is sent to the task recipient according to the operation area corresponding to the power outage task; receives a second execution judgment result of the power outage task fed back by the task recipient, and if the second execution judgment result is that execution is allowed, the power outage task is sent to the task guardian associated with the task recipient, so that the power outage task is executed by the task guardian; after the power outage task is completed, the power outage information is fed back to the power outage applicant, so that the power outage applicant starts the operation process after the power outage. In the above manner, the entire power outage operation process can be monitored in real time to ensure that each power outage task can be successfully completed, thereby ensuring the safety and efficiency of power grid operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is a flowchart of a first embodiment of a power outage control method of the present invention;
[0037] Figure 2 It is a structural block diagram of the first embodiment of the power outage control system of the present invention.
[0038] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0039] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0040] The embodiment of the present invention provides a power outage control method, referring to Figure 1 , Figure 1 The figure is a flow chart of a first embodiment of a power outage control method of the present invention.
[0041] In this embodiment, the power outage control method includes the following steps:
[0042] Step S10: Create a power outage job, obtain the power outage type, power outage plan time and equipment to be powered off input by the power outage applicant, and input the power outage type, the power outage plan time and the equipment to be powered off into the power outage job to generate a power outage task.
[0043] In this embodiment, the executor of this embodiment is a power outage control device, wherein the power outage control device has functions such as data processing, data communication and program running. The power outage control device can be a computer terminal device or other network device, and of course it can also be other devices with similar functions, and this embodiment does not limit this.
[0044] It should be noted that power outage operations are an important part of ensuring the operation of the power grid. The current power outage method is that the superior department issues a power outage notice in advance, and the relevant personnel carry out the power outage after the specified time. However, there is no overall monitoring of the entire process, and often due to human factors, the equipment that should be powered off is not powered off, which leads to subsequent electric shock incidents and even affects the efficiency of the entire power grid operation.
[0045] In order to solve the above technical problems, this embodiment creates a power outage job, obtains the power outage type, power outage plan time and equipment to be powered off input by the power outage applicant, and inputs the power outage type, the power outage plan time and the equipment to be powered off into the power outage job to generate a power outage task; performs a first execution judgment on the power outage task, and if the first execution judgment result is that execution is allowed, the power outage task is sent to the task recipient according to the operation area corresponding to the power outage task; receives the second execution judgment result of the power outage task fed back by the task recipient, and if the second execution judgment result is that execution is allowed, the power outage task is sent to the task guardian associated with the task receipt, so that the power outage task is executed by the task guardian; after the power outage task is completed, the power outage information is fed back to the power outage applicant, so that the power outage applicant starts the operation process after the power outage. The above method can monitor the entire power outage operation process in real time to ensure that each power outage task can be successfully completed, thereby ensuring the safety and efficiency of power grid operation. Specifically, it can be implemented as follows.
[0046] In the specific implementation, in this embodiment, before performing power outage control, it is necessary to first create a corresponding power outage job, and then obtain the power outage type, planned power outage time, and equipment to be powered off. Adding this information to the power outage job can generate the corresponding power outage task. In this embodiment, this information is input by the power outage applicant through a mobile terminal, and the mobile terminal has an application for power outage operations installed. Among them, the power outage type includes high-voltage power outage and low-voltage power outage, the planned power outage time includes the start time of the power outage and the duration of the power outage, and the equipment to be powered off includes high-voltage equipment and low-voltage equipment.
[0047] It should be noted that, in this embodiment, the initial task status of all generated power outage tasks will be adjusted to a waiting-for-collection status, and each time a newly generated power outage task appears, the newly generated power outage task will be added to the waiting-for-collection power outage task list.
[0048] Step S20: Perform a first execution judgment on the power outage task. If the first execution judgment result is that execution is allowed, the power outage task is sent to the task recipient according to the operation area corresponding to the power outage task.
[0049] In order to ensure the accuracy of the power outage task, the power outage task needs to be judged in this embodiment. This judgment is the first execution judgment, which is used to determine whether the power outage task is allowed to be executed. The judgment process is to extract the power outage type and the equipment to be powered off from the power outage task; determine whether the power outage type matches the equipment type of the equipment to be powered off. If they match, it is determined that the power outage task is allowed to be executed. If they do not match, it is determined that the power outage task is prohibited from being executed.
[0050] It should be noted that the first execution of the judgment and detection is whether the power outage type matches the equipment to be powered off, which can effectively avoid the initiation of erroneous power outage tasks due to human factors.
[0051] If the first execution judgment result is that execution is allowed, the power outage task can be issued. Specifically, the power outage task can be issued to the task recipient in the corresponding work area. After the task recipient completes the receipt of the power outage task, the task status of the power outage task is changed from the waiting status to the received status, and it is removed from the list of waiting power outage tasks.
[0052] Furthermore, if the first execution judgment result is that execution is prohibited, the power outage task is rejected, and a rejection reason is generated, and the rejection reason and the rejection notification information of the power outage task are sent to the mobile terminal corresponding to the power outage applicant, wherein the rejection reason corresponding to the prohibition of execution is that the power outage type does not match the device type of the device to be powered off. The power outage applicant can view the rejected power outage application and the rejection reason corresponding to the power outage application through the mobile terminal.
[0053] Step S30: receiving the second execution judgment result of the power outage task fed back by the task recipient, and if the second execution judgment result is to allow execution, sending the power outage task to the task guardian associated with the task recipient, so that the power outage task can be executed by the task guardian.
[0054] After the power outage task is issued to the task recipient, the task recipient is required to perform a second execution judgment on the power outage task. In this embodiment, whether to execute the power outage task can be determined based on the result of the second execution judgment.
[0055] If the second execution judgment result is that execution is allowed, the power outage task will be sent to the task guardian associated with the task collection, and the task guardian will be the final executor of the power outage task.
[0056] Furthermore, in the present embodiment, when the power outage task is issued to the task guardian, the task type of the power outage task can be determined so that the task guardian performs the power outage task according to the corresponding task type. Specifically, if the task type is an automatic power outage task, the task guardian's click operation in the mobile terminal is obtained, and when the button corresponding to the click operation is an automatic power outage button, a remote power outage is performed on the power-off equipment to be treated; if the task type is a manual power outage task, the distribution room is remotely opened through the access control system so that the task guardian can manually perform a power outage on the power-off equipment.
[0057] It should be noted that when the task guardian performs the automatic power-off task, he can realize the remote automatic power-off at the automatic power-off button of the mobile terminal motor. When the task guardian performs the manual power-off task, the task guardian needs to manually perform the power-off operation. Among them, when the task guardian performs the manual power-off task, it is necessary to detect whether the task guardian has an operation ticket. If there is an operation ticket, the task guardian can perform the manual power-off operation.
[0058] In some embodiments, if the task type is manual power outage, it is necessary to simultaneously obtain the first power outage completion judgment result fed back by the multimedia terminal of the power distribution room and the second power outage completion judgment result fed back by the task recipient. If both the first power outage completion judgment result and the second power outage completion judgment result are completed power outages, it is determined that the manual power outage at this time is completed. If the task type is automatic power outage, it is sufficient to obtain only the third power outage completion judgment result fed back by the task recipient. If the third power outage completion judgment result is completed power outages, it is determined that the automatic power outage at this time is completed.
[0059] Furthermore, compared with the manual power outage method, the automatic power outage method may have the situation that the power outage is unsuccessful, that is, the automatic power outage is not completed. When this situation occurs, in this embodiment, the task type of the power outage task is converted to a manual power outage, and the status of the power outage task after the task type conversion is adjusted from the received status to the unreceived status, and it is added to the list of power outage tasks to be received, and then the above steps are repeated. At this time, it can be sent to a new task recipient or the same task recipient.
[0060] If the second execution judgment result is that execution is prohibited, similar to the above process, the power outage task is also rejected, and the rejection reason fed back by the task recipient is obtained, and the rejection reason and the rejection notification information of the power outage task are sent to the mobile terminal corresponding to the power outage applicant. It should be noted that the task recipient will judge whether the power outage plan time of the power outage task is reasonable based on the actual situation on site, such as whether the power outage start time meets the on-site requirements and whether the power outage duration meets the on-site requirements. If both are met, the task recipient will feedback to allow execution.
[0061] Step S40: After the power outage task is completed, the power outage information is fed back to the power outage applicant, so that the power outage applicant starts executing the post-power outage operation process.
[0062] By real-time monitoring of the entire process of the power outage task in the above manner, it can be ensured that the power outage task is effectively completed. Then, after it is determined that the power outage task is completed, the power outage information can be fed back to the power outage applicant of the power outage task. Specifically, the power outage information can be sent to the mobile terminal of the power outage applicant and corresponding voice or sound prompts can be made. After receiving the power outage information, the power outage applicant can start the subsequent work process. This method can improve the timeliness of the power outage and ensure the safety of the subsequent operations of the power outage applicant.
[0063] This embodiment creates a power outage job, obtains the power outage type, planned power outage time and equipment to be powered off input by the power outage applicant, inputs the power outage type, planned power outage time and equipment to be powered off into the power outage job to generate a power outage task; performs a first execution judgment on the power outage task, and if the first execution judgment result is that execution is allowed, the power outage task is sent to the task recipient according to the work area corresponding to the power outage task; receives a second execution judgment result of the power outage task fed back by the task recipient, and if the second execution judgment result is that execution is allowed, the power outage task is sent to the task guardian associated with the task recipient, so that the power outage task is executed by the task guardian; after the power outage task is completed, the power outage information is fed back to the power outage applicant, so that the power outage applicant starts the work process after the power outage. In the above manner, the entire power outage operation process can be monitored in real time to ensure that each power outage task can be successfully completed, thereby ensuring the safety and efficiency of power grid operation.
[0064] Reference Figure 2 , Figure 2 It is a structural block diagram of the first embodiment of the power outage control system of the present invention.
[0065] like Figure 2 As shown, the power outage control system proposed in the embodiment of the present invention includes:
[0066] The creation module 10 is used to create a power outage job, obtain the power outage type, power outage plan time and the equipment to be powered off input by the power outage applicant, and input the power outage type, the power outage plan time and the equipment to be powered off into the power outage job to generate a power outage task.
[0067] The sending module 20 is used to perform a first execution judgment on the power outage task. If the first execution judgment result is that execution is allowed, the power outage task is sent to the task recipient according to the operation area corresponding to the power outage task.
[0068] The sending module 20 is used to receive the second execution judgment result of the power outage task fed back by the task recipient. If the second execution judgment result is to allow execution, the power outage task is sent to the task guardian associated with the task recipient so that the power outage task can be executed by the task guardian.
[0069] The feedback module 30 is used to feed back the power outage information to the power outage applicant after the power outage task is completed, so that the power outage applicant can start executing the post-power outage operation process.
[0070] This embodiment creates a power outage job, obtains the power outage type, planned power outage time and equipment to be powered off input by the power outage applicant, inputs the power outage type, planned power outage time and equipment to be powered off into the power outage job to generate a power outage task; performs a first execution judgment on the power outage task, and if the first execution judgment result is that execution is allowed, the power outage task is sent to the task recipient according to the work area corresponding to the power outage task; receives a second execution judgment result of the power outage task fed back by the task recipient, and if the second execution judgment result is that execution is allowed, the power outage task is sent to the task guardian associated with the task recipient, so that the power outage task is executed by the task guardian; after the power outage task is completed, the power outage information is fed back to the power outage applicant, so that the power outage applicant starts the work process after the power outage. In the above manner, the entire power outage operation process can be monitored in real time to ensure that each power outage task can be successfully completed, thereby ensuring the safety and efficiency of power grid operation.
[0071] In some embodiments, the sending module 20 is used to reject the power outage task and generate a rejection reason if the first execution judgment result is prohibited execution, and send the rejection reason and the rejection notification information of the power outage task to the mobile terminal corresponding to the power outage applicant, so that the power outage applicant can view the rejected power outage task through the mobile terminal.
[0072] In some embodiments, the sending module 20 is used to extract the power outage type and the equipment to be powered off from the power outage task, the power outage type including high-voltage power outage and low-voltage power outage; determine whether the power outage type matches the equipment type of the equipment to be powered off, if they match, it is determined that the power outage task is allowed to be executed, if they do not match, it is determined that the power outage task is prohibited from being executed, wherein the equipment type includes high-voltage equipment and low-voltage equipment, and the corresponding rejection reason for prohibiting execution is that the power outage type does not match the equipment type of the equipment to be powered off.
[0073] In some embodiments, the sending module 20 is used to reject the power outage task if the second execution judgment result is prohibited execution, and obtain the rejection reason feedback by the task recipient, and send the rejection reason and the rejection notification information of the power outage task to the mobile terminal corresponding to the power outage applicant, so that the power outage applicant can view the rejected power outage task through the mobile terminal, and the rejection reason is that the power outage plan time of the power outage task does not meet the requirements.
[0074] In some embodiments, the sending module 20 is used to determine the task type of the power outage task;
[0075] If the task type is an automatic power-off task, the task guardian's click operation in the mobile terminal is obtained, and when the button corresponding to the click operation is an automatic power-off button, a remote power-off of the equipment to be powered off is performed; if the task type is a manual power-off task, the distribution room is remotely opened through the access control system so that the task guardian can manually power off the equipment to be powered off.
[0076] In some embodiments, the sending module 20 is used to obtain a first power outage completion judgment result fed back by the multimedia terminal of the distribution room and a second power outage completion judgment result fed back by the task recipient if the task type is a manual power outage, and judge whether the power outage task is completed based on the first power outage completion judgment result and the second power outage completion judgment result; if the task type is an automatic power outage, obtain a third power outage completion judgment result fed back by the task recipient, and judge whether the power outage task is completed based on the third power outage completion judgment result.
[0077] In some embodiments, the sending module 20 is used to convert the task type of the power outage task to a manual power outage if the automatic power outage is not completed, and adjust the status of the power outage task after the task type conversion from a received status to an unreceived status, and add it to the list of power outage tasks to be received.
[0078] An embodiment of the present application also provides a power outage control device, including a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface, and the memory communicate with each other through the communication bus, and the memory is used to store a power outage control program; the processor is used to implement the above-mentioned power outage control method when executing the program stored in the memory.
[0079] The communication bus mentioned in the above power outage control device can be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. The communication bus can be divided into an address bus, a data bus, a control bus, etc.
[0080] The communication interface is used for communication between the above-mentioned power outage control device and other devices.
[0081] The memory may include a random access memory (RAM) or a non-volatile memory (NVM), such as at least one disk memory. Optionally, the memory may also be at least one storage device located away from the aforementioned processor.
[0082] The above-mentioned processor can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, and discrete hardware components.
[0083] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented using software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions may be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium, for example, the computer instructions may be transmitted from a website site, computer, server or data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) mode to another website site, computer, server or data center. The computer-readable storage medium may be any available medium that a computer can access or a data storage device such as a server or data center that includes one or more available media integrated. The available medium may be a magnetic medium, (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid-state drive Solid State Disk (SSD)), etc.
[0084] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0085] Each embodiment in this specification is described in a related manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0086] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
[0087] It should be understood that the above is only an example and does not constitute any limitation on the technical solution of the present invention. In specific applications, technicians in this field can make settings as needed, and the present invention does not limit this.
[0088] It should be noted that the workflow described above is merely illustrative and does not limit the scope of protection of the present invention. In practical applications, technicians in this field can select part or all of them according to actual needs to achieve the purpose of the present embodiment, and no limitation is made here.
[0089] In addition, for technical details not fully described in this embodiment, reference can be made to the power outage control method provided in any embodiment of the present invention, and will not be repeated here.
[0090] In addition, it should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.
[0091] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0092] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as a read-only memory (ROM) / RAM, a magnetic disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present invention.
[0093] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
[0094] It is understandable that the system provided by the embodiment of the present invention corresponds to the method provided by the embodiment of the present invention, and the explanation, examples and beneficial effects of the relevant contents can refer to the corresponding parts in the above method.
Claims
1. A power outage control method, characterized in that: The power outage control method comprises: Creating a power outage job, obtaining the power outage type, power outage plan time, and equipment to be powered off input by the power outage applicant, and inputting the power outage type, the power outage plan time, and the equipment to be powered off into the power outage job to generate a power outage task; Performing a first execution judgment on the power outage task, if the first execution judgment result is that execution is allowed, sending the power outage task to the task recipient according to the operation area corresponding to the power outage task; Receiving the second execution judgment result of the power outage task fed back by the task recipient, if the second execution judgment result is that execution is allowed, sending the power outage task to the task guardian associated with the task recipient, so that the power outage task is executed by the task guardian; After the power outage task is completed, the power outage information is fed back to the power outage applicant so that the power outage applicant can start executing the post-power outage operation process.
2. The power outage control method according to claim 1, characterized in that: The method further comprises: If the first execution judgment result is that execution is prohibited, the power outage task is rejected and a rejection reason is generated. The rejection reason and the rejection notification information of the power outage task are sent to the mobile terminal corresponding to the power outage applicant, so that the power outage applicant can view the rejected power outage task through the mobile terminal.
3. The power outage control method according to claim 2, characterized in that: The first execution judgment of the power outage task includes: Extracting a power outage type and equipment to be powered off from the power outage task, wherein the power outage type includes a high-voltage power outage and a low-voltage power outage; Determine whether the power outage type matches the equipment type of the device to be powered off. If they match, determine that the power outage task is allowed to be executed; if they do not match, determine that the power outage task is prohibited from being executed, wherein the equipment type includes high-voltage equipment and low-voltage equipment, and the corresponding rejection reason for prohibiting execution is that the power outage type does not match the equipment type of the device to be powered off.
4. The power outage control method according to claim 1, characterized in that: The method further comprises: If the second execution judgment result is that execution is prohibited, the power outage task is rejected, and the rejection reason fed back by the task recipient is obtained, and the rejection reason and the rejection notification information of the power outage task are sent to the mobile terminal corresponding to the power outage applicant, so that the power outage applicant can view the rejected power outage task through the mobile terminal, and the rejection reason is that the power outage plan time of the power outage task does not meet the requirements.
5. The power outage control method according to claim 1, characterized in that: The sending of the power outage task to the task guardian associated with the task collection so that the power outage task is executed by the task guardian includes: Determining a task type of the power outage task; If the task type is an automatic power-off task, obtaining the task guardian's click operation in the mobile terminal, and executing remote power-off of the device to be powered off when the button corresponding to the click operation is an automatic power-off button; If the task type is a manual power-off task, the power distribution room is remotely opened through the access control system so that the task guardian can manually power off the power-off equipment.
6. The power outage control method according to claim 5, characterized in that: The method further comprises: If the task type is a manual power outage, a first power outage completion judgment result fed back by the multimedia terminal of the power distribution room and a second power outage completion judgment result fed back by the task recipient are obtained, and whether the power outage task is completed is judged based on the first power outage completion judgment result and the second power outage completion judgment result; If the task type is automatic power outage, the third power outage completion judgment result fed back by the task recipient is obtained, and whether the power outage task is completed is judged based on the third power outage completion judgment result.
7. The power outage control method according to claim 6, characterized in that: The method further comprises: If the automatic power outage is not completed, the task type of the power outage task is converted to manual power outage, and the status of the power outage task after the task type conversion is adjusted from the received status to the unreceived status, and added to the list of power outage tasks to be received.
8. A power outage control system, characterized in that: The power outage control system comprises: A creation module is used to create a power outage job, obtain the power outage type, power outage plan time and the equipment to be powered off input by the power outage applicant, and input the power outage type, the power outage plan time and the equipment to be powered off into the power outage job to generate a power outage task; A sending module is used to make a first execution judgment on the power outage task, and if the first execution judgment result is that the execution is allowed, the power outage task is sent to the task recipient according to the operation area corresponding to the power outage task; The sending module is used to receive the second execution judgment result of the power outage task fed back by the task recipient, and if the second execution judgment result is that the execution is allowed, the power outage task is sent to the task guardian associated with the task receipt, so that the power outage task is executed by the task guardian; The feedback module is used to feed back the power outage information to the power outage applicant after the power outage task is completed, so that the power outage applicant can start executing the post-power outage operation process.
9. The power outage control system according to claim 8, characterized in that: The sending module is used to reject the power outage task and generate a rejection reason if the first execution judgment result is prohibited execution, and send the rejection reason and the rejection notification information of the power outage task to the mobile terminal corresponding to the power outage applicant, so that the power outage applicant can view the rejected power outage task through the mobile terminal.
10. The power outage control system according to claim 9, characterized in that: The sending module is used to extract the power outage type and the equipment to be powered off from the power outage task, and the power outage type includes high-voltage power outage and low-voltage power outage; Determine whether the power outage type matches the equipment type of the device to be powered off. If they match, determine that the power outage task is allowed to be executed; if they do not match, determine that the power outage task is prohibited from being executed, wherein the equipment type includes high-voltage equipment and low-voltage equipment, and the corresponding rejection reason for prohibiting execution is that the power outage type does not match the equipment type of the device to be powered off.